Attachment 13 Section L.pdf
PDF 287 KB Posted
- Attached to
- Renovate for MFRC Move B1249 to B5725
- Solicitation number
- FA301620Q0099
About this file
This solicitation requests quotes for a renovation project at Lackland Air Force Base in San Antonio, Texas. The project involves renovating space in Building 1249 to accommodate a move by the Military and Family Readiness Center to Building 5725. The project is set aside entirely for small businesses and has an estimated value between $100,000 and $250,000. Quotes are due by 11:00 a.m. local time on August 19, 2020 and must include pricing for two contract line items, certifications, and representations. A virtual site visit is available via a link to be provided. The solicitation was issued by the Department of the Air Force Air Education and Training Command for this renovation at Joint Base San Antonio Lackland.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTION NOTICE TO OFFERORS
A. General Instructions.
This acquisition is conducted using Simplified Acquisition Procedures in accordance with the guidance provided in FAR Part 13. This section provides general guidance for preparing quotes, as well as specific instructions on the format and content of the quote. Throughout this section, the term “offeror” means the prime contractor submitting the quote. The offeror’s quote must include all data and information requested and must be submitted in accordance with these instructions. Any offeror who submits an incomplete package may be considered ineligible for evaluation. The offer shall be compliant with the requirements as stated in the Request for Quote (RFQ). An offer that is sufficiently documented to support price and technical requirements in a complete, orderly, and specific detailed manner will enable the Government to perform a thorough and fair evaluation. Noncompliance with the instructions and RFQ may result in an unfavorable quote evaluation and may be grounds to dismiss it from consideration for contract award.
B. Type of Acquisition.
This acquisition is a Total Small Business Set-Aside.
C. Discrepancies and Ambiguities.
If an offeror believes the requirements in these instructions contain an error, omission, ambiguities, or are otherwise unsound, the offeror shall immediately notify the CO in writing with supporting rationale no later than 10 calendar days after the RFQ release.
D. Postponement of Closing Date.
If a determination is made to postpone the solicitation closing date, an announcement of the determination shall be posted to the Government-wide Point of Entry (GPE) and, if practicable, before issuance of a formal RFQ amendment otherwise communicated to prospective offerors.
E. Post-Award/Pre-Performance Conference.
A post-award/pre-performance conference will be scheduled by the Contracting Officer (CO) and held prior to the commencement of any work at that installation under the awarded contract. The offeror or their duly authorized representative is required to attend the post-award/pre-performance conference.
F. Contract Document.
Sections K, L and M apply to the solicitation phase only; therefore, they will not be a physical part of the resulting award.
G. Submission of Offers.
In order to be considered eligible for award, the offeror’s quote shall include the following:
1) Price. The offorer shall provide a Unit Price and an extended Amount for each CLIN in the Schedule B. Failure to quote on all CLINs may render the quote unacceptable and ineligible for award consideration.
2) Technical. The offeror shall provide a Project Narrative to include details to milestones and clarification to the work or deliverables included in each of the major elements of work in the proposed schedule; definable features of work (DFOW) per division; critical path work elements and milestones in the schedule; and type(s), size, and quantity of equipment proposed. At minimum, the following areas shall be addressed in the technical Project Narrative.
a) Definable features of work (DFOW) per division to a sufficient level to clearly indicate all aspects of the project including project setup, management, design, site work, construction, equipment installation.
b) Identifies proposed utility outages.
c) Identifies critical path work elements (including any long-lead time materials) in the schedule.
d) Identifies key deliverables/milestones required to fulfill the SOW.
Please submit quotes by emailing a response to MSgt Christopher Henry at christopher.henry.7@us.af.mil no later than 11:00 a.m. local San Antonio, TX time on (Wednesday) 19 Aug 2020 (or sooner if possible) in order to be considered timely. The offeror agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes. Any quote, modification, revision, or withdrawal of a quote received after the exact time specified above shall be determined as late and will not be considered unless received before award is made, the Contracting Officer determines that accepting the late quote would not unduly delay the acquisition, and it was the only quote received.
H. Points of Contact (POC).
The POC for this acquisition is MSgt Christopher Henry, Contracting Administrator (CA). Written requests for clarification may be sent to the CO/CA. Address any questions or concerns to them using the following contact information:
MSGT CHRISTOPHER HENRY ANDREW S. SORENSEN
christopher.henry.7@us.af.mil andrew.sorensen.1@us.af.mil
(409) 263-2223 210-671-8071
502 CONS/JBKAD 502 CONS/JBKAD
1655 Selfridge Ave, Bldg. 5450 1655 Selfridge Ave, Bldg. 5450 JBSA Lackland, TX 78236 JBSA Lackland, TX 78236
File details come from the government source that posted it. Updated .