Historic_Culvert_Restoration.docx

DOCX document 16 KB Posted

Attached to
Repair Wilderness Trail, JBSA Camp Bullis
Solicitation number
FA301618R0051
Issued by

About this file

Culvert Restoration Information

View the file

Other files

File Type Posted
Attachment_15_Roads_for_Detour_Map.pptx PPTX presentation
Attachment_19_Revised_Culvert_Map.pptx PPTX presentation
Attachment_17_Historic_Culvert_Restoration.docx DOCX document
Attachment_22_Site_Visit_Questions&Answers.docx DOCX document
Attachment_16_Water_Map_Wilderness_Trail-1.pptx PPTX presentation
Attachment_23_Site_Photos.pdf PDF
Attachment_21_Revised_SOW_Wilderness_Trail_12_Jun_18.docx DOCX document
FA301618R0051_0001_Amended_solicitation.docx DOCX document
Attachment_18_Range_Gate_Distance_to_Demo.pptx PPTX presentation
Attachment_20_Wastewater_Map_Wilderness_Trail.pptx PPTX presentation
Range_Gate_Distance_to_Demo.pptx PPTX presentation
11_June_2018Site_Visit_Questions&Answers.docx DOCX document
SITE_VISIT_ATTENDANCE_RECORD.docx DOCX document
Revised_Culvert_Map.pptx PPTX presentation
Wastewater_Map_Wilderness_Trail.pptx PPTX presentation
Water_Map_Wilderness_Trail-1.pptx PPTX presentation
Attachment_14-SOW_Wilderness_Trail.docx DOCX document
03K_Attachment_10_-_Appendix_C_JBSA_-_Lackland_Enviromental_Protection_Specification.pdf PDF
03C_Attachment_2_Culvert_Map.pptx PPTX presentation
Attachment_13_Wage_Determination.docx DOCX document
Appendix_G_Radioactive_Material_Request.pdf PDF
Appendix_M_Digging_Clearance.pdf PDF
Attachment_12-COSA_HMAC_Spec_with_TxDOT_Language_Highlighted.pdf PDF
AppendixA_Division_1_General_Requirement_Project_Specs.rtf RTF text file
03E_Attachment_4_Range_Entrance_Gate_Demo.pptx PPTX presentation
03J_Attachment_9_AutoCAD__901_35_1320_00_Special_Project_Procedures_CAD.pdf PDF
Attachment_11-COSA_SPecification_402_High_Density_Corrugated_Pipe.pdf PDF
Appendix_B_Required_Construction_Specs_(COSA).pdf PDF
03H_Attachment_7-Removing_Graffiti_From_Historic_Masonry.pdf PDF
Appendix_J_CAD_and_As-Built_Information.pdf PDF
03G_Attachment_6-Dangers_of_Abrasive_Cleaning_to_Historic_Buildings.pdf PDF
03B_Attachment_1_New_Pavement_Location_Map.pdf PDF
Attachment_15_Submittal_Register.xls XLS spreadsheet
03D_Attachment_3_New_Pavement_at_Water_Supply_Point_Circle.pptx PPTX presentation
03F_Attachment_5-Assessing_Cleaning_and_Water_Repellent_Treatments_for_Hostoric_Masonry_Buildings.pdf PDF
03I_Attachment_8-Repointing_Mortar_Joints_In_Historic_Masonry_Buildings.pdf PDF
FA301618R0051_Repair_Wilderness_Trail.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Historic Culvert Restoration

Historic Culvert I-7 (Range Side)

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) Contractor shall install 2 new yellow reflectors attached to one new galvanized steel pole with concrete foundation on each side of each headwall. Reflector poles shall be located about a foot past the edge of the shoulder.

3) The culvert pipe is 18-inches in diameter and shall be replaced completely with new HDPE pipe.

4) The distance from back of headwall to back of headwall is 27’-2 1/2”. This is close enough to 28-ft to NOT REQUIRE moving the headwall to achieve a back of headwall to back of headwall distance of 28 feet.

Historic Culvert I-7 (Salado Creek Side)

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) Contractor shall install 2 new yellow reflectors attached to one new galvanized steel pole with concrete foundation on each side of each headwall. Reflector poles shall be located about a foot past the edge of the shoulder.

3) Grading around the culvert pipe to facilitate positive drainage in and out of the culvert pipe.

4) Additional brush clearing is required for 20 feet from the culvert headwall towards Salado Creek and the width of the headwall plus 5-feet on each side. This shall include clearing all brush and small trees and insuring the area around the pipe outfall is unobstructed and provides positive drainage.

Historic Culvert I-9 (Range Side)

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones and installation of new stones to raise the headwall about 12-inches above the pavement surface. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) Contractor shall install 2 new yellow reflectors attached to one new galvanized steel pole with concrete foundation on each side of each headwall. Reflector poles shall be located about a foot past the edge of the shoulder.

3) The culvert pipe is 24-inches in diameter and shall be replaced completely with new HDPE pipe.

4) The distance from back of headwall to back of headwall is 20’-10”. The Range Side headwall shall be moved to achieve a back of headwall to back of headwall distance of 28 feet.

Historic Culvert I-9 (Salado Creek Side)

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) The Contractor shall provide grading around the culvert pipe to facilitate positive drainage into and out of the culvert pipe.

3) Additional brush clearing is required for 20 feet from the culvert headwall to the creek. This shall include clearing all brush and small trees and insuring the area around the pipe outfall is unobstructed and provides positive drainage.

Historic Culvert I-10 (Range Side)-

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones and installation of new stones to raise the headwall about 12-inches above the pavement surface. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) Contractor shall install 2 new yellow reflectors attached to one new galvanized steel pole with concrete foundation on each side of each headwall. Reflector poles shall be located about a foot past the edge of the shoulder.

3) The culvert pipe is 18-inches in diameter and shall be replaced completely with new HDPE pipe.

4) The distance from back of headwall to back of headwall is 26’-6”. The Range Side headwall shall be moved to achieve a back of headwall to back of headwall distance of 28 feet.

Historic Culvert I-10 (Salado Creek Side)

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) The Contractor shall provide grading around the culvert pipe to facilitate positive drainage into and out of the culvert pipe.

Historic Culvert I-11 (Range Side)-

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) Contractor shall install 2 new yellow reflectors attached to one new galvanized steel pole with concrete foundation on each side of each headwall. Reflector poles shall be located about a foot past the edge of the shoulder.

3) The culvert pipe is 30-inches in diameter and shall be replaced completely with new HDPE pipe.

4) The distance from back of headwall to back of headwall is 27’-11 1/2”. This is close enough to 28-ft to NOT REQUIRE moving the headwall to achieve a back of headwall to back of headwall distance of 28 feet.

Historic Culvert I-11 (Salado Creek Side)

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, replacement of missing stones, and grading around the culvert pipe to facilitate positive drainage into the culvert pipe.

2) Additionally, the newer TxDOT Type Headwall in back of Historic Culvert I-11 South is to be demolished and removed completely and replaced with pipe.

Historic Culvert I-12 (Range Side)

1) Restoration involves complete rebuilding of the headwall and non-abrasive complete removal of all paint and cleaning of the culvert headwall, and replacement of missing stones. In lieu of water blasting, rebuild the historic headwalls or flip the existing stones over, so yellow paint side is inward and not visible. Contractor shall relay stones in an un-coursed random rubble type pattern. If Contractor decides to remove paint by water blasting method and some paint remains in pores of rock, as long as it is not noticeable from 20 feet away, that will be okay.

2) Contractor shall install 2 new yellow reflectors attached to one new galvanized steel pole with concrete foundation on each side of each headwall. Reflector poles shall be located about a foot past the edge of the shoulder.

3) The culvert pipe is 18-inches in diameter and shall be replaced completely with new HDPE pipe.

4) The distance from back of headwall to back of headwall is 23’-9 1/2”. The Range Side headwall shall be moved to achieve a back of headwall to back of headwall distance of 28 feet.

Historic Culvert I-12 (Salado Creek Side)-

1) Restoration involves non-abrasive complete removal of all paint and cleaning of the culvert headwall, replacement of missing stones, and grading around the culvert pipe to facilitate positive drainage into the culvert pipe.