Project JBSF110004 2 April 2018

01 30 00-Submittal Procedures

SECTION 01 00 00 00

CODE REQUIREMENTS

1.1 Follow the most up-to-date LEED, building code, electrical code, and fire code requirements that exist during the construction of this contract. The most up-to-date codes supersede any others printed within these specifications that may be out-dated at the time of construction.

END OF SECTION 01 00 00 00

SECTION 01 30 00

SUBMITTAL PROCEDURES

SUMMARY – NOT APPLICABLE

REFERENCES – NOT APPLICABLE

SUBMITTALS: The submittals described below are those required and further described in other sections of the specifications. Other requirements pertaining to submittals are included in individual specification sections.

SD-01 Data Submittals, which provide calculations, descriptions, or documentation regarding the work.

SD-04 Drawings Submittals which graphically show relationship of various components of the work, schematic diagrams of systems, details of fabrication, layouts of particular elements, connections, and other relational aspects of the work.

SD-06 Instructions Pre-printed material describing installation of a product, system or material, including special notices and material safety data sheets, if any, concerning impedances, hazards, and safety precautions.

SD-07 Schedules Tabular lists showing location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.

SD-08 Statements A document, required of the Contractor, or through the Contractor, from a supplier, installer, manufacturer, or other lower tier Contractor, the purpose of which is to confirm the quality or orderly progression of a portion of the work by documenting procedures, acceptability of methods or personnel, qualifications, or other verifications of quality.

SD-09 Reports Reports of inspections or tests, including analysis and interpretation of test results. Each report shall be properly identified. Test methods used shall be identified and test results shall be recorded.

SD-13 Certificates Statement signed by an official authorized to certify on behalf of the manufacturer of a product, system or material, attesting that the product, system or material meets specified requirements. The statement must be dated after the award of this contract, must state the Contractor's name and address, must name the project and location, and must list the specific requirements, which are being certified.

SD-14 Samples Samples, including both fabricated and unfabricated physical examples of materials, products, and units of work as complete units or as portions of units of work.

SD-18 Records Documentation to record compliance with technical or administrative requirements.

SD-19 Operation and Maintenance Manuals Data, which forms a part of an operation and maintenance manual.

PART 2 GENERAL

SUMMARY – NOT APPLICABLE

REFERENCES – NOT APPLICABLE

DEFINITIONS:

Submittal: A submittal is a package of project information, samples, drawings, schedules, certificates, etc., submitted to the Contracting Officer for Government review.

Deviation: A specific submittal where an item is identified as not agreeing with the contract requirements and the Contractor is requesting a substitution or change.

Approval/Disapproval: Specific judgments reserved to the Government concerning a submittal's compliance with the plans and specifications.

PURPOSE: Submittals are directed for the convenience of the Government in reviewing the Contractor's planned approach and compliance with the requirements of the contract. It is also a mechanism whereby the Contractor may propose deviations, color choices, shop drawings, etc., at an early point in the contract where changes in approach will have less impact on the materials ordering process.

SUBMITTAL CLASSIFICATION: Submittals are classified as follows:

Government Approved (GA): Governmental approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.

Information Only (FIO): All submittals not requiring Government approval will be for information only. They are not considered to be "shop drawings" within the terms of 1.3.1 SUBMITTAL paragraph referred to above.

APPROVED SUBMITTALS: The approval of submittals by the Contracting Officer shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the CQC requirements of this contract, is responsible for the dimensions and design of adequate connections, details and satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be given consideration unless accompanied by an explanation as to why a substitution is necessary.

DISAPPROVED SUBMITTALS: The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies as specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, notice shall be given promptly in writing to the Contracting Officer.

WITHHOLDING OF PAYMENT: Payment for materials incorporated in the work will not be made if required approvals have not been obtained.

PART 3 PRODUCTS – NOT APPLICABLE PART 4 EXECUTION

SCHEDULING

Contractor shall submit Shop Drawings and Material Submittals within fourteen (14) calendar days after date of receipt of notice to proceed. Each submittal shall be scheduled and coordinated with the Progress Schedule in order to obtain Government approval prior to the acquisition of the material or equipment covered by the submittal. Fourteen (14) calendar days, exclusive of any mailing time, shall be allowed for Government review of submittals or resubmittals.

SUBMITTAL PROCEDURES:

All submittals shall be accomplished on and in accordance with instructions pertaining to AF Form 3000, Material Approval Submittal, except as otherwise directed herein. These forms will be furnished to the Contractor. This form shall be properly completed by filling out all the heading blank spaces and identifying each item submitted. Special care will be exercised to ensure proper listing of the specification paragraph and/or sheet number of the contract drawings pertinent to the data submitted for each item.

Forward all submittals directly to the Contracting Officer, 1655 Selfridge Ave., Bldg. 5450, JBSA-Lackland, Texas, 78236.

Submittals shall be made in four (4) sets except as otherwise noted. One copy of each submittal will be returned to the Contractor.

DEVIATIONS: All requests for deviations shall be clearly identified by the Contractor on AF Form 3000. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the submittal. The Government reserves the right to rescind inadvertent approval of submittals containing unnoticed deviations.

GOVERNMENT APPROVED SUBMITTALS: Upon completion of review of submittals requiring Government approval (GA), the appropriate blocks on the AF Form 3000 will be completed by the Government, including signature(s) and dates, indicating approval or disapproval of the submittal. One (1) copy of the submittal and AF Form 3000 will be returned to the Contractor.

INFORMATION ONLY SUBMITTALS: Normally submittals for information only will not be returned. Government approval is not required on information only submittals. These submittals will be used for information purposes. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the Contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications and will not prevent the Government from requiring removal and replacement if nonconforming material is incorporated in the work. This does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or check testing by the Government in those instances where the technical specifications so prescribe.

STAMPS: Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements shall be similar to the following:

(Firm Name)

Approved

Approved with corrections as noted on submittal data and/or attached sheets(s).

SIGNATURE: TITLE: DATE:

file_0.wmf

Project JBSF110004
2 April 2018

01 30 00-Submittal Procedures

Project JBSF110004
2 April 2018

PROJECT MEETINGS

SECTION 01 31 00.00 44 PROJECT MEETINGS

GENERAL

Preconstruction Conference
Prior to start of construction, a pre-construction conference will be scheduled by the authorized representative of the Contracting Officer. The Contractor's Project Manager, Superintendent, and Quality Control Manager will attend this meeting. The Contractor is encouraged to have an officer of his company and representation from his sub-contractors at this conference. This conference will be held at the location specified by the Contracting Officer's authorized representative. Minutes of the meeting will be prepared by the Government and signed by both the Contractor and the Contracting Officer. The minutes shall become a part of the contract file.
Start of Contract Work
If the Contractor has submitted the Accident Prevention (Safety) Plan, Quality Control Plan, Environmental Protection Plan, and the Storm Water Pollution Prevention Plan for review prior to this meeting, these may be accepted in total or accepted with comments at the conference. Contractor order work will not proceed until after this meeting has been held, these plans noted above have been accepted and the Notice to proceed has been received and acknowledged by the Contractor.
Other Meetings
Construction Quality Control meetings and conferences are specified in Section 01 45

04.40 44 CONTRACTOR QUALITY CONTROL. Other meetings are specified in various Division 1 and technical sections.

PRODUCTS (not applicable)

EXECUTION (not applicable) END OF SECTION

Project JBSF110004
2 April 2018

Project Schedule

SECTION 01 32 01.00 10 – PROJECT SCHEDULE

1.1 GENERAL

References
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

ER 1-1-11 (1995) Progress, Schedules, and Network Analysis Systems

B.

1.

Qualifications The Contractor shall designate an authorized representative who shall be responsible for the preparation of all required project schedule reports.

C.

1.

Submittals Government approval is required for submittals with a "GA" designation; submittals having a "FIO" designation are for information only. When used, a designation following the "GA" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 30 00 SUBMITTAL PROCEDURES:

Project Schedule (CPM); GA.

1.2

PRODUCTS – NOT USED

1.3

EXECUTION

A.

GENERAL REQUIREMENTS: A Project Schedule as described below shall be prepared. The scheduling of construction shall be the responsibility of the Contractor. Contractor management personnel shall actively participate in its development. Subcontractors and suppliers, subcontractors and suppliers working on the project shall also contribute in developing and maintaining an accurate Project Schedule. The approved Project Schedule shall be used to measure the progress of the work, to aid in evaluating time extensions, and to provide the basis of all progress payments.

B BASIS FOR PAYMENT: The schedule shall be the basis for measuring Contractor progress. Lack of an approved schedule or scheduling personnel will result in an inability of the Contracting Officer to evaluate Contractor's progress for the purposes of payment. Failure of the Contractor to provide all information, as specified below, shall result in the disapproval of the entire Project Schedule submission and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes. In the case where Project Schedule revisions have been directed by the Contracting Officer and those revisions have not been included in the Project Schedule, the Contracting Officer may hold retainage up to the maximum allowed by Contract, each payment period, until revisions to the Project Schedule have been made.

Project Schedule: The computer software system utilized by the Contractor to produce the Project Schedule shall be capable of providing all requirements of this specification. Failure of the Contractor to meet the requirements of this specification shall result in the disapproval of the schedule. Manual methods used to produce any required information shall require approval by the Contracting Officer.
Use of the Critical Path Method: The Critical Path Method (CPM) of network calculation shall be used to generate the Project Schedule. The Contractor shall provide the Project Schedule in the Precedence Diagram Method (PDM) or equivalent.
Level of Detail Required: The Project Schedule shall include an appropriate level of detail. Failure to develop or update the Project Schedule or provide data to the Contracting Officer at the appropriate level of detail, as specified by the Contracting Officer, shall result in the disapproval of the schedule. The Contracting Officer will use, but is not limited to the following conditions to determine the appropriate level of detail to be used in the Project Schedule:
Activity Durations: Contractor submissions shall follow the direction of the Contracting Officer regarding reasonable activity durations. Reasonable durations are those that allow the progress of activities to be accurately determined between payment periods (usually less than 2 percent of all non-procurement activities' Original Durations are greater than 20 days).
Procurement Activities: Tasks related to the procurement of long lead materials or equipment shall be included as separate activities in the project schedule. Long lead materials and equipment are those materials that have a procurement cycle of over 90 days. Examples of procurement process activities include, but are not limited to: submittals, approvals, procurement, fabrication, and delivery.
Critical Activities: The following activities shall be listed as separate line activities on the Contractor's project schedule:
Pre-final inspection.

Correction of punch list from pre-final inspection.

Final inspection.

Construction phasing.

Government Activities: Government and other agency activities that could impact progress shall be shown. These activities include, but are not limited to: approvals, approvals, design reviews, environmental permit approvals by State regulators, inspections, and Notice to Proceed (NTP) for phasing requirements.
Responsibility: All activities shall be identified in the project schedule by the party responsible to perform the work. Responsibility includes, but is not limited to, the subcontracting firm, contractor work force, or government agency performing a given task. Activities shall not belong to more than one responsible party. The responsible party for each activity shall be identified by the Responsibility Code.
Work Areas: All activities shall be identified in the project schedule by the work area in which the activity occurs. Activities shall not be allowed to cover more than one work area. The work area of each activity shall be identified by the Work Area Code.

Modification or Claim Number: Any activity that is added or changed by contract modification or used to justify claimed time shall be identified by a mod or claim code that changed the activity. Activities shall not belong to more than one modification or claim item. The modification or claim number of each activity shall

Be identified by the Mod or Claim Number. Whenever possible, changes shall be added to the schedule by adding new activities. Existing activities shall not normally be changed to reflect modifications.

Feature of Work: All activities shall be identified in the project schedule according to the feature of work to which the activity belongs. Feature of work refers, but is not limited to, a work breakdown structure for the project. The feature of work for each activity shall be identified by the Feature of Work Code.
Scheduled Project Completion: The schedule interval shall extend from NTP to the Contract completion date.
Project Start Date: The schedule shall start no earlier than the date on which the NTP was acknowledged. The Contractor shall include as the first activity in the project schedule an activity called "Start Project". The "Start Project" activity shall have an "ES" constraint date equal to the date that the NTP was acknowledged, and a zero day duration.
Constraint of Last Activity: Completion of the last activity in the schedule shall be constrained by the contract completion date. Calculation on project updates shall be such that if the early finish of the last activity falls after the contract completion date, then the float calculation shall reflect a negative float on the critical path. The Contractor shall include as the last activity in the project schedule an activity called "End Project". The "End Project" activity shall have an "LF" constraint date equal to the completion date for the project, and a zero day duration.

Early Project Completion: In the event the project schedule shows completion of the project prior to the contract completion date, the Contractor shall identify those activities that have been accelerated and/or those activities that are scheduled in parallel to support the Contractor's "early" completion. Contractor shall specifically address each of the activities noted in the narrative report at every project schedule update period to assist the Contracting Officer in evaluating the Contractor's ability to actually complete prior to the Contract period.

Interim Completion Dates: Contractually specified interim completion dates shall also be constrained to show negative float if the early finish date of the last activity in that phase falls after the interim completion date.
Start Phase: The Contractor shall include as the first activity for a project phase an activity called "Start Phase X" where "X" refers to the phase of work. The "Start Phase X" activity shall have an "ES" constraint date equal to the date on which the NTP was acknowledged, and a zero day duration.

End Phase: The Contractor shall include as the last activity in a project phase an activity called "End Phase X" where "X" refers to the phase of work. The "End Phase X" activity shall have an "LF" constraint date equal to the completion date for the project, and a zero day duration.

Phase X: The Contractor shall include a hammock type activity for each project phase called "Phase X" where "X" refers to the phase of work. The "Phase X" activity shall be logically tied to the earliest and latest activities in the phase.
Default Progress Data Disallowed: Actual Start and Finish dates shall not be automatically updated by default mechanisms that may be included in CPM scheduling software systems. Actual Start and Finish dates on the CPM schedule shall match those dates provided from Contractor Quality Control Reports. Failure of the Contractor to

document the Actual Start and Finish dates on the Daily Quality Control report for every in-progress or completed activity, and failure to ensure that the data contained on the Daily Quality Control reports is the sole basis for schedule updating shall result in the disapproval of the Contractor's schedule and the inability of the Contracting Officer to evaluate Contractor progress for payment purposes. Updating of the percent complete and the remaining duration of any activity shall be independent functions. Program features which calculate one of these parameters from the other shall be disabled.

Out-of-Sequence Progress: Activities that have posted progress without all preceding logic being satisfied (Out-of-Sequence Progress) will be allowed only on a case-by-case approval of the Contracting Officer. The Contractor shall propose logic corrections to eliminate all out of sequence progress or justify not changing the sequencing for approval prior to submitting an updated project schedule.

Negative Lags: Lag durations contained in the project schedule shall not have a negative value.

Project Schedule Submissions: The Contractor shall provide the submissions as described below. The data reports and network diagrams required for each submission are contained in paragraph SUBMISSION REQUIREMENTS.
Preliminary Project Schedule Submission: The Preliminary Project Schedule, defining the Contractor's planned operations shall be submitted for approval within 10 calendar days after the NTP is acknowledged. The approved preliminary schedule shall be used for payment purposes not to exceed the first 30 calendar days after NTP.
Initial Project Schedule Submission: The Initial Project Schedule shall be submitted for approval within 30 calendar days after NTP. The schedule shall provide a reasonable sequence of activities which represent work through the entire project and shall be at a reasonable level of detail.

Periodic Schedule Updates: Based on the result of progress meetings, specified in "Periodic Progress Meetings," the Contractor shall submit periodic schedule updates. These submissions shall enable the Contracting Officer to assess Contractor's progress. If the Contractor fails or refuses to furnish the information and project schedule data, which in the judgment of the Contracting Officer or authorized representative is necessary for verifying the Contractor's progress, the Contractor shall be deemed not to have provided an estimate upon which progress payment may be made.

Periodic Progress Meetings: Progress meetings to discuss payment shall include a monthly onsite meeting or other regular intervals mutually agreed to at the preconstruction conference. During this meeting the Contractor shall describe, on an activity by activity basis, all proposed revisions and adjustments to the project schedule required to reflect the current status of the project. The Contracting Officer will approve activity progress, proposed revisions, and adjustments as appropriate.
Meeting Attendance: The Contractor's Project Manager and Scheduler shall attend the regular progress meeting.
Update Submission Following Progress Meeting: A complete update of the project schedule containing all approved progress, revisions, and adjustments, based on the regular progress meeting, and shall be submitted not later than four (4) working days after the monthly progress meeting.

Progress Meeting Contents: Update information, including Actual Start Dates, Actual Finish Dates, Remaining Durations, and Cost-to-Date shall be subject to the approval of the Contracting Officer. As a minimum, the Contractor shall address the following items on an activity by activity basis during each progress meeting. The Contracting Officer's determination as to the number of allowable days of contract extension shall be based upon the project schedule updates in effect for the time period in question, and other factual information. Actual delays that are found to be caused by the Contractor's own actions, which result in the extension of the schedule, will not be a cause for a time extension to the contract completion date.

Submission Requirements
The Contractor shall submit a justification for each request for a change in the Contract completion date of less than two (2) weeks based upon the most recent schedule update at the time of the NTP or constructive direction issued for the change. Such a request shall include, as a minimum:
A list of affected activities, with their associated project schedule activity number.

A brief explanation of the causes of the change.

An analysis of the overall impact of the changes proposed.

A sub-network of the affected area.

Activities impacted in each justification for change shall be identified by a unique activity code contained in the required data file.
Additional Submission Requirements: For any requested time extension of over two (2) weeks, the Contracting Officer may request an interim update with revised activities for a specific change request. The Contractor shall provide this disk within four (4) days of the Contracting Officer's request.

OWNERSHIP OF FLOAT: Float available in the schedule, at any time, shall not be considered for the exclusive use of either the Government or the Contractor.

END OF SECTION 01 32 01.00

Project JBSF110004
2 April 2018

SECTION 01 32 33 00 SCHEDULE OF VALUES

Description Of Work
This specification covers the preparation, content and submittal of the schedule of values. The Schedule of Values is an itemized list that establishes the value or cost of each part of the Work. It shall be used as the basis for preparing progress payments.
Preparation
Schedule shall show breakdown of labor, materials equipment and other costs as directed by the Contracting Officer.
Costs shall be in sufficient detail to indicate separate amounts for each major subsection of the Work. The Contractor may include an item for bond, insurance, temporary facilities and job mobilization.
Schedule of Values shall be prepared on 8-1/2-inch by 11-inch white paper.
Use the major subsections of the Detailed Scope of Work as the basis for Schedule format. List sub-items of major products or systems as appropriate or when requested by the Contracting Officer.
When requested by the Contracting Officer, support values with data that will substantiate their correctness.
The sum of the individual values shown on the Schedule of Values must equal the total Job Order Price.
Schedule shall show the purchase and delivery costs for materials and equipment that the Contractor anticipates he shall request payment for prior to their installation.

Submittal: Submit two copies of Schedule, or any other number of copies as directed by the Contracting Officer, to the Contracting Officer for approval at least 20 days prior to submitting first application for a progress payment. After review by the Contracting Officer, revise and resubmit Schedule as required until it is approved.

PRODUCTS (Not Used)

EXECUTION (Not Used) END OF SECTION 01 32 33 00

Schedule of Values

Project JBSF110004
2 April 2018

Occupational Safety And Health

SECTION 01 35 29 - OCCUPATIONAL SAFETY AND HEALTH

References
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI A10.32 Personal Fall Protection - Safety Requirements for Construction and Demolition Operations

ANSI/ASSE A10.34 (2001) Protection of the Public on or Adjacent to Construction Sites

ANSI Z359.1 (1992; R 1999) Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components

ASME INTERNATIONAL (ASME)

ASME B30.22 (2000) Articulating Boom Cranes ASME B30.5 (2000) Mobile and Locomotive Cranes

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 10 (2002) Portable Fire Extinguishers

NFPA 241(2000) Safeguarding Construction, Alteration, and Demolition Operations NFPA 51B(2003) Fire Prevention During Welding, Cutting, and Other Hot Work NFPA 70(2002) National Electrical Code
NFPA 70E(2004) Electrical Safety in the Workplace

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2003) Safety -- Safety and Health Requirements

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA) 29 CFR 1910Occupational Safety and Health Standards
29 CFR 1910.146Permit-required Confined Spaces

29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment

29 CFR 1926Safety and Health Regulations for Construction 29 CFR 1926.500Fall Protection
Submittals
Government approval is required for submittals with a "GA" designation; submittals having a “FIO” designation are for information only. The following shall be submitted in accordance with Section 01330 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals Accident Prevention Plan (APP); GA.

Crane Critical Lift Plan; GA Proof of qualification for Crane Operators; FIO

SD-06 Test Reports Reports: Submit reports as their incidence occurs, in accordance with the requirements of the paragraph entitled, "Reports."; GA.

Accident Reports; GA.

Monthly Exposure Reports; GA. Crane Reports; GA.

Regulatory Citations and Violations; GA.

SD-07 Certificates Hot work permit; GA.

Regulatory Requirements
In addition to the detailed requirements included in the provisions of this contract, work performed shall comply with USACE EM 385-1-1, and the State of Texas laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements shall apply.
Site Qualifications, Duties and Meetings
Personnel Qualifications
Site Safety and Health Officer (SSHO): Site Safety and Health Officer (SSHO) shall be provided at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor.
Project JBSF110004
2 April 2018

Safety, Health and Emergency Response

The Contractor Quality Control (QC) person can be the SSHO on this project. The SSHO shall meet the following requirements:

Level 2: A minimum of 3 years safety work on similar project. 30-hour OSHA construction safety class or equivalent within last 3 years.

Accident Prevention Plan (APP)
The Contractor shall use a qualified person to prepare the written site-specific APP. Prepare the APP in accordance with the format and requirements of USACE EM 385-1-1 and as supplemented herein. Cover all paragraph and subparagraph elements in USACE EM 385-1-1, Appendix A, "Minimum Basic Outline for Accident Prevention Plan". Specific requirements for some of the APP elements are described below. The APP shall be job-specific and shall address any unusual or unique aspects of the project or activity for which it is written. The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site- specific. The Government considers the Prime Contractor to be the "controlling authority" for all work site safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. The APP shall be signed by the person and firm preparing the APP, the Contractor, the on-site superintendent, the designated site safety and health officer. Submit the APP to the Contracting Officer 7 calendar days prior to the date of starting work. Work cannot proceed without an accepted APP. Once accepted by the Contracting

Officer, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer, until the matter has been rectified. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer, project superintendent, SSHO and quality control manager. Should any hazard become evident, stop work in the area, secure the area, and develop a plan to remove the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, all necessary action shall be taken to restore and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public (as defined by ANSI/ASSE A10.34,) and the environment. Copies of the accepted plan will be maintained at the job site. The APP shall be continuously reviewed and amended, as necessary, throughout the life of the contract. Unusual or high-hazard activities not identified in the original APP shall be incorporated in the plan as they are discovered.

EM 385-1-1 Contents: In addition to the requirements outlines in Appendix A of USACE EM 385-1-1, the following is required:
Names and qualifications of competent and of qualified persons. As a minimum, competent persons shall be designated and qualifications submitted for each of the following major areas: scaffolding; fall protection; hazardous energy; confined space; health hazard recognition, evaluation and control of chemical, physical and biological agents; personal protective equipment and clothing to include selection, use and maintenance.
Crane Critical Lift Plan. Prepare and sign weight handling critical lift plans for lifts of personnel; and lifts involving non-routine rigging or operation, sensitive equipment, or unusual safety risks. The plan shall be submitted 15 calendar days prior to on-site work and include the requirements of USACE EM 385-1-1, paragraph 16.C.18. and the following:
For lifts of personnel, the plan shall demonstrate compliance with the requirements of 29 CFR 1926.550(g).
Fall Protection and Prevention (FP&P) Plan: The plan shall be site specific and address all fall hazards in the work place and during different phases of construction.

A qualified person for fall protection shall prepare and sign the plan. The plan shall include fall protection and prevention systems, equipment and methods employed for every phase of work, responsibilities, assisted rescue, self-rescue and evacuation procedures, training requirements, and monitoring methods. Fall Protection and Prevention Plan shall be revised every six months for lengthy projects, reflecting any changes during the course of construction due to changes in personnel, equipment, systems or work habits. The accepted Fall Protection and Prevention Plan shall be kept and maintained at the job site for the duration of the project. The Fall Protection and Prevention Plan shall be included in the Accident Prevention Plan (APP).

Occupant Protection Plan: Provide a safety and health plan with respects to lead-based paint removal, asbestos abatement, demolition and new roof repairs or replacement.

Activity Hazard Analysis (AHA)

The Activity Hazard Analysis (AHA) format shall be in accordance with USACE EM 385-1-1. Submit the AHA for review at least 7 calendar days prior to the start of each phase of work. Format subsequent AHAs as amendments to the APP. The analysis should be used during daily inspections to ensure the implementation and effectiveness of the activity's safety and health controls. The AHA list will be reviewed periodically at least monthly at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change. The activity hazard analyses shall be developed using the project schedule as the basis for the activities performed. Any activities listed on the project schedule will require an AHA. The AHAs will be developed by the contractor, supplier or subcontractor and provided to the prime Contractor for submittal to the Contracting Officer.

REPORTS
Accident Reports: For recordable injuries and illnesses, and property damage accidents resulting in at least $2,000 in damages, the Prime Contractor shall conduct an accident investigation to establish the root cause(s) of the accident, complete the USACE Accident Report Form 3394 and provide the report to the Contracting Officer within five (5) calendar days of the accident. The Contracting Officer will provide copies of any required or special forms.
Accident Notification: Notify the Contracting Officer as soon as practical, but not later than 24 hours after any accident meeting the definition of Recordable Injuries or Illnesses or High Visibility Accidents, property damage equal to or greater than $2,000, or any accident that causes major injury or death. Information shall include contractor name; contract title; type of contract; name of activity, installation or location where accident occurred; date and time of accident; names of personnel injured; extent of property damage, if any; extent of injury, if known, and brief description of accident (to include type of construction equipment used, PPE used, etc.). Preserve the conditions and evidence on the accident site until the Government investigation team arrives on-site and Government investigation is conducted.
HOT WORK
Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame- producing/spark producing devices, a written permit shall be requested from the Fort Sam Houston Fire Department. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The Contractor will provide at least two (2)-twenty (20) pound 4A:20 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of thirty (30) minutes after completion of the task or as specified on the hot work permit. When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the emergency Fire Department phone number. ANY FIRE, NO MATTER HOW SMALL, SHALL BE REPORTED TO THE RESPONSIBLE FIRE DEPARTMENT IMMEDIATELY.

PRODUCTS – NOT APPLICABLE

EXECUTION

Construction and/or Other Work
The Contractor shall comply with USACE EM 385-1-1, NFPA 241, the APP, the AHA, Federal and/or State OSHA regulations, and other related submittals and activity fire and safety regulations. The most stringent standard shall prevail.
Fall Hazard Protection and Prevention Program
The Contractor shall establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. The program shall include company policy, identify responsibilities, education and training requirements, fall hazard identification, prevention and control measures, inspection, storage, care and maintenance of fall protection equipment and rescue and evacuation procedures.
Training: The Contractor shall institute a fall protection training program. As part of the Fall Hazard Protection and Prevention Program, the Contractor shall provide training for each employee who might be exposed to fall hazards. A competent person for fall protection shall provide the training. Training requirements shall be in accordance with USACE EM 385-1-1, section 21.A.16.
Fall Protection Equipment and Systems: The Contractor shall enforce use of the fall protection equipment and systems designated for each specific work activity in the Fall Protection and Prevention Plan and/or AHA at all times when an employee is exposed to a fall hazard. Employees shall be protected from fall hazards as specified in EM 385-1-1. Personal fall arrest systems are required when working from an articulating or extendible boom, swing stages, or suspended platform. In addition, personal fall arrest systems are required when operating other equipment such as scissor lifts if the work platform is capable of being positioned outside the wheelbase. The need for tying-off in such equipment is to prevent ejection of the employee from the equipment during raising, lowering, or travel. Fall protection must comply with 29 CFR 1926.500, Subpart M, USACE EM 385-1-1 and ANSI A10.32.

SECTION 01 35 30

SAFETY, HEALTH AND EMERGENCY RESPONSE

GENERAL

References
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

CODE OF FEDERAL REGULATIONS (CFR)

29 CF 1904Recording and Reporting Occupational Injuries and Illnesses 29 CF 1910Occupational Safety and Health Standards for General Industry
29 CF 1926Safety and Health Regulations for Construction for General Industry 49 CFR 171General Information, Regulations, and Definitions
49 CFR 172Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

ENGINEERING MANUALS

E 385-1-1 (1996) U.S. Army Corps of Engineers Safety and Health Requirements Manual

FSH REG 385-10 Fort Sam Houston Safety Program

Description of Work
This section provides additional requirements for implementing the accident prevention provisions of EM 385-1-1, and specifies a Site Safety and Health Plan (SSHP) which shall satisfy the requirements for submission of a separate Accident Prevention Plan (APP) as required by EM 385-1-1.
Submittals
Government approval is required for submittals with a "GA" designation; submittals having an "FIO" designation are for information only. The following shall be submitted in accordance with Section 01 30 00 SUBMITTAL PROCEDURES:

SD-08 Statement Site Safety and Health Plan, GA.

SD-09 Reports Safety and Health Phase-Out Report; GA. 1.4 REGULATORY REQUIREMENTS

Work performed under this Contract shall comply with EM 385-1-1, applicable Federal, state, and local safety and occupational health laws and regulations. This includes, but is not limited to, Occupational Safety and Health Administration (OSHA) standards, 29 CFR 1910 and 29 CFR 1926.

Preconstruction Safety Conference
Prior to construction, meet with the Contracting Officer to discuss and to review safety procedures.
Safety and Health Program
Integrate the site-specific program requirements of the OSHA Standards into one site- specific document, the Site Safety and Health Plan (SSHP) . The SSHP shall interface with the employer's overall Safety and Health Program. Any portions of the overall Safety and Health Program that are referenced in the SSHP shall be included as appendices to the SSHP.
Site Safety and Health Plan
Preparation and Implementation: Prepare a Site Safety and Health Plan (SSHP) covering onsite work to be performed by the Contractor and all subcontractors. The SSHP shall establish, in detail, the protocols necessary for the anticipation, recognition, evaluation, and control of hazards associated with each task performed. The SSHP shall address site- specific safety and health requirements and procedures based upon site-specific conditions. The level of detail provided in the SSHP shall be tailored to the type of work, complexity of operations to be performed, and hazards anticipated. Details about some activities may not be available when the initial SSHP is prepared and submitted. Therefore, the SSHP shall address, in as much detail as possible, anticipated tasks, their related hazards and anticipated control measures. Additional details shall be included in the activity hazard analyses as described in paragraph ACTIVITY HAZARD ANALYSES.
Acceptance and Modifications: Prior to submittal, the SSHP shall be signed and dated by Site Superintendent. The SSHP shall be submitted for review fourteen (14) days prior to the start of construction. Deficiencies in the SSHP shall be identified by the Contracting Officer and returned. The SSHP shall be revised to correct the deficiencies and resubmitted for acceptance. Onsite work shall not begin until the plan has been accepted. A copy of the written SSHP shall be maintained onsite. As work proceeds, the SSHP shall be adapted to new situations and new conditions. Changes and modifications to the accepted SSHP shall be made with the knowledge and concurrence of the Site Superintendent, and the Contracting Officer. Should any unforeseen hazard become evident during the performance of the work, the Site Superintendent shall bring such hazard to the attention of the Contracting Officer, both verbally and in writing, for resolution as soon as possible. In the interim, necessary action shall be taken to re- establish and maintain safe working conditions in order to safeguard onsite personnel, visitors, the public, and the environment. Disregard for the provisions of this specification or the accepted SSHP shall be cause for stopping of work until the matter has been rectified.
Availability: The SSHP shall be made available in accordance with 29 CFR 1910, Section .120 (b) (1) (v) and 29 CFR 1926, Section .65 (b) (1) (v).
Elements: Topics required by 29 CFR 1910, Section .120 (b) (4) 29 CFR 1926, Section

.65 (b) (4) and the Accident Prevention Plan as described in Appendix A of EM 385- 1-1 and those described in this section shall be addressed in the SSHP. Where the use of a specific topic is not applicable to the project, the SSHP shall include a statement to justify its omission or reduced level of detail and establish that adequate consideration was given the topic.

Site Description and Contamination Characterization

1 Project/Site Conditions: A record of site contaminants and a description of site shall be part of each Contract Scope of Work. Additional sources of information are available as listed below.

List of Documents: Subject to availability, the 502 Civil Engineer Squadron, Fort Sam Houston, Building 4196, (210) 221-5611, can provide facilities and utilities as- built documents and Master Plans showing the layout of Fort Sam Houston and Camp Bullis including power, pavements, street lighting, communications, water, sanitary sewer, natural gas, and storm sewer.
Other Sources of Information:
Natural Resources Management Section, 502 Civil Engineer Squadron, Fort Sam Houston, Building 4196, (210) 221-4842
Safety Office, 502 Civil Engineer Squadron, Fort Sam Houston, Building 4196, (210) 221- 3836 / 4543
Camp Bullis Natural Resources Management Section, Camp Bullis, Building 5902, (210) 295-7761
Camp Bullis Safety Office, Camp Bullis, Building 5050, (210) 295- 7915
Unexploded Ordnance (UXO): Unexploded ordnance (aerial practice bombs, mortar bombs, artillery shells, grenades, rifle cartridges, etc.) may be encountered at some sites on Fort Sam Houston and almost any work site at Camp Bullis. The contractor will be notified whether or not unexploded ordnance has been discovered in the past in the work sites, borrow areas, haul routes, etc. The Natural Resources Offices at Fort Sam Houston and Camp Bullis maintain current information on unexploded ordnance.
Plan Requirements
The SSHP shall include a site description and contamination characterization section that addresses the following elements:
Description of site location, topography, size and past uses of the site.
A list of contaminants that may present occupational health and safety hazards. This list shall be created by evaluating the analytical results in this section and by researching sources of information from past site investigation activities. Chemical names, concentration ranges, media in which found, locations onsite, and estimated quantities/volumes to be impacted by site work shall be included if known. The contamination characterization shall be reviewed and revised if new chemicals are identified as work progresses.
Unexploded Ordinance (UXO)
The contractor shall be notified of the likelihood of encountering unexploded ordnance in the work site, borrow areas, haul routes, etc.

If unexploded ordnance is discovered during operations, the Contractor shall:

Immediately stop operations in the affected area.
Notify onsite personnel of the UXO hazard and evacuate the immediate area of the UXO.
Restrict access to the area.

Notify the Contracting Officer.

At Camp Bullis, notify Range Control Operations, Building 6110, at (210) 295- 7510/7758.
The Government will make appropriate arrangements for evaluation and proper disposal of UXO. The SSHP shall specifically address procedures to be followed, if known or potential ordnance items are encountered during any phase of field work. Include evacuation distance, safe distance to use cell phones and radios, and points of contact for reporting unexploded ordnance with telephone numbers.
Hazard/Risk Analysis
The SSHP shall include a safety and health hazard/risk analysis for each site task and operation to be performed. The hazard/risk analysis shall provide information necessary for determining safety and health procedures, equipment, and training to protect onsite personnel, the environment, and the public. Available site information shall be reviewed when preparing the "Hazard/Risk Analysis" section of the SSHP. The following elements, at a minimum, shall be addressed.
Site Tasks and Operations (Work Plan): The SSHP shall include a comprehensive section that addresses the tasks and resources required to reach those tasks. The following is a list of anticipated major site tasks and operations to be performed: Demolition of site tasks and operations; therefore, it shall be expanded and/or revised, during preparation of the SSHP as necessary.
Hazards: The following potential hazards may be encountered during site work. These are not complete lists; therefore, they shall be expanded and/or revised as necessary during preparation of the SSHP.

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
Attachment_15_Roads_for_Detour_Map.pptx PPTX presentation
Attachment_19_Revised_Culvert_Map.pptx PPTX presentation
Attachment_17_Historic_Culvert_Restoration.docx DOCX document
Attachment_22_Site_Visit_Questions&Answers.docx DOCX document
Attachment_16_Water_Map_Wilderness_Trail-1.pptx PPTX presentation
Attachment_23_Site_Photos.pdf PDF
Attachment_21_Revised_SOW_Wilderness_Trail_12_Jun_18.docx DOCX document
FA301618R0051_0001_Amended_solicitation.docx DOCX document
Attachment_18_Range_Gate_Distance_to_Demo.pptx PPTX presentation
Attachment_20_Wastewater_Map_Wilderness_Trail.pptx PPTX presentation
Range_Gate_Distance_to_Demo.pptx PPTX presentation
11_June_2018Site_Visit_Questions&Answers.docx DOCX document
SITE_VISIT_ATTENDANCE_RECORD.docx DOCX document
Revised_Culvert_Map.pptx PPTX presentation
Wastewater_Map_Wilderness_Trail.pptx PPTX presentation
Historic_Culvert_Restoration.docx DOCX document
Water_Map_Wilderness_Trail-1.pptx PPTX presentation
Attachment_14-SOW_Wilderness_Trail.docx DOCX document
03K_Attachment_10_-_Appendix_C_JBSA_-_Lackland_Enviromental_Protection_Specification.pdf PDF
03C_Attachment_2_Culvert_Map.pptx PPTX presentation
Attachment_13_Wage_Determination.docx DOCX document
Appendix_G_Radioactive_Material_Request.pdf PDF
Appendix_M_Digging_Clearance.pdf PDF
Attachment_12-COSA_HMAC_Spec_with_TxDOT_Language_Highlighted.pdf PDF
03E_Attachment_4_Range_Entrance_Gate_Demo.pptx PPTX presentation
03J_Attachment_9_AutoCAD__901_35_1320_00_Special_Project_Procedures_CAD.pdf PDF
Attachment_11-COSA_SPecification_402_High_Density_Corrugated_Pipe.pdf PDF
Appendix_B_Required_Construction_Specs_(COSA).pdf PDF
03H_Attachment_7-Removing_Graffiti_From_Historic_Masonry.pdf PDF
Appendix_J_CAD_and_As-Built_Information.pdf PDF
03G_Attachment_6-Dangers_of_Abrasive_Cleaning_to_Historic_Buildings.pdf PDF
03B_Attachment_1_New_Pavement_Location_Map.pdf PDF
Attachment_15_Submittal_Register.xls XLS spreadsheet
03D_Attachment_3_New_Pavement_at_Water_Supply_Point_Circle.pptx PPTX presentation
03F_Attachment_5-Assessing_Cleaning_and_Water_Repellent_Treatments_for_Hostoric_Masonry_Buildings.pdf PDF
03I_Attachment_8-Repointing_Mortar_Joints_In_Historic_Masonry_Buildings.pdf PDF
FA301618R0051_Repair_Wilderness_Trail.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it.