Post Site Visit Technical Questions & Answers
FA3016-16-R-0039
Renovate AFPC Bldg. 663, JBSA-Randolph TX
Question 1: The SOW refers to Spec 01 33 16 - Design After Award, please provide the missing sections for Division 1 Specs.
Answer: The following Division 01 Specifications, as referenced in the SOW and supporting documents, have been added to the Atch 1 SOW - Appendix E - Division 01 - General Requirements RAND:
01 01 00.00 44 Work Plan Requirements 01 30 00 Submittal Procedures 01 31 00 44 Project Meetings 01 32 01.00 10 Project Schedule 01 33 16 Design After Award 01 35 13.20 00 Special Project Procedures CAD 01 35 13.30 Special Project Procedures – GIS 01 35 35 Environmental Protection Mar 15 01 45 00.10 20 Contractor Quality Control 01 78 00 Closeout Submittals
Question 2: The SOW item 2.1 states the following, the ceiling height is supposed to be brought to a clearance of 7'6. The ceiling height was measured at 7'3 and 7'4 in places and from floor to deck at 7'5 in places at the pre-proposal site visit. Please advise how this will be addressed.
Answer: It is the responsibility of the Contractor/AE to determine the most cost effective manner in which to comply with the Codes. It is the intent of this project that all habitable spaces in the Basement of B663 shall be at least 7’-6”. It is understood that there may be areas of the ceiling that are not going to be able to be at least 7’-6” due to structural or mechanical reasons.
The Contractor/AE shall reference the most current edition of the Uniform Facilities Code (UFC) and the International Building Code (IBC) to determine the minimum allowable ceiling heights.
Per the IBC 2015:
Question 3: It was mentioned at the site visit that an amendment is forthcoming with a revised period of performance. Please clarify what the revised PoP is?
Answer: Please refer to Section 10 of the revised Statement of Work, Design and Construction Deliverable, Schedule of Services and Deliverable of the Statement of Work, dated 17 May 2016.