Post_Site_Visit_Tech_Q A_17May16.pdf

PDF 107 KB Posted

Attached to
Renovate Bldg. 663, JBSA-Randolph, TX Federal contract opportunity
Solicitation number
FA3016-16-R-0039
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bldg. 663, JBSA-Randolph, TX, newest first.
File Type Posted
Atch_1_Appendix_J_-_Communication_Requirements.xlsx XLSX spreadsheet
Atch_1_B663_SOW_17May16.pdf PDF
Atch_1_Appendix_A_-_B663_Schematic_Sketch_10May16.pdf PDF
Atch_1_Appendix_E_-_Division_01_General_Requirements_RAND_(Rev_17May_16).pdf PDF
Amendment_SF_30_for_FA3016-16-R-0039.pdf PDF
Atch_1_Appendix_B_-_JBSA_B663_Asbestos_Containing_Materials_Inventory_Report.pdf PDF
Atch_1_Appendix_H_-_B663_Boiler_Pump_List.pdf PDF
Atch_4_HAZMAT_Letter_B663_1Mar16.pdf PDF
Atch_11_Detail_Cost_Estimate_Breakdown.docx DOCX document
Atch_1_Appendix_I_-_Local_Requirements.pdf PDF
Atch_8_Base_Pass_Req_Form.pdf PDF
Atch_6_Draft_DD_Form_1354.pdf PDF
Atch_5_Schedule_of_Material_Submittals.xls XLS spreadsheet
Atch_13_Brand_Name_Justification.pdf PDF
Atch_1_Appendix_E_-_Division_01_General_Requirements_RAND_(Rev_Apr2015).pdf PDF
Atch_3_Ozone_Depletion_Control_Letter_B663_1Mar16.pdf PDF
Atch_1_Appendix_A_-_B663_Schematic_Sketch_5May16.pdf PDF
Atch_12_Progress_Schedule.xlsx XLSX spreadsheet
Atch_10_Contractor_Responsibility_Questionnaire.pdf PDF
RFP_FA3016-16-R-0039.pdf PDF
Atch_1_Appendix_G_-_2nd_Flr_HC_Access.pdf PDF
Atch_7_2016_DBA_Wage_Determination_-_Bexar_County.pdf PDF
Atch_1_Appendix_F_-_Randolph_ACG.pdf PDF
Atch_9__Financial_Information_Questionnaire.pdf PDF
Atch_1_Appendix_C_-_JBSA_B663_Limited_Asbestos_and_Lead_Inspection.pdf PDF
Atch_1_Appendix_D_-_08010_Life_Safety_Fire_Protection_Design_and_Review.pdf PDF
Atch_2_AETC_Form_47_B663_1Mar16.pdf PDF
Atch_1_B663_SOW_4May16.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Post Site Visit Technical Questions & Answers

FA3016-16-R-0039

Renovate AFPC Bldg. 663, JBSA-Randolph TX

Question 1: The SOW refers to Spec 01 33 16 - Design After Award, please provide the missing sections for Division 1 Specs.

Answer: The following Division 01 Specifications, as referenced in the SOW and supporting documents, have been added to the Atch 1 SOW - Appendix E - Division 01 - General Requirements RAND:

01 01 00.00 44 Work Plan Requirements 01 30 00 Submittal Procedures 01 31 00 44 Project Meetings 01 32 01.00 10 Project Schedule 01 33 16 Design After Award 01 35 13.20 00 Special Project Procedures CAD 01 35 13.30 Special Project Procedures – GIS 01 35 35 Environmental Protection Mar 15 01 45 00.10 20 Contractor Quality Control 01 78 00 Closeout Submittals

Question 2: The SOW item 2.1 states the following, the ceiling height is supposed to be brought to a clearance of 7'6. The ceiling height was measured at 7'3 and 7'4 in places and from floor to deck at 7'5 in places at the pre-proposal site visit. Please advise how this will be addressed.

Answer: It is the responsibility of the Contractor/AE to determine the most cost effective manner in which to comply with the Codes. It is the intent of this project that all habitable spaces in the Basement of B663 shall be at least 7’-6”. It is understood that there may be areas of the ceiling that are not going to be able to be at least 7’-6” due to structural or mechanical reasons.

The Contractor/AE shall reference the most current edition of the Uniform Facilities Code (UFC) and the International Building Code (IBC) to determine the minimum allowable ceiling heights.

Per the IBC 2015:

Question 3: It was mentioned at the site visit that an amendment is forthcoming with a revised period of performance. Please clarify what the revised PoP is?

Answer: Please refer to Section 10 of the revised Statement of Work, Design and Construction Deliverable, Schedule of Services and Deliverable of the Statement of Work, dated 17 May 2016.

File details come from the government source that posted it. Updated .