Atch 1 Appendix B - JBSA B663 Asbestos Containing Materials Inventory Report
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBSA Asbestos Inventory Print Report
Facility Type
Facility Site: JBSA Randolph
Administrative
Square Footage: 122535Number of Floors: 2
B663.tifDrawing File Name:
Facility Status Manned
663.jpgPhoto File Name
Date Constructed: 1931
Facility Number: Facility Name:663 AFPC
Facility Owner: 902/CES
Facility Address: 555 E Street West Asbestos:
Facility Summary Report:
10/31/2014 - Pipe leaking above ceiling on first floor, West Wing - Pipe insulation contains Amosite asbestos pipe insulation. Do not disturb this material when repairing the pipes above the ceiling. This insulation is located throughout the pipes in different locations.
12/19/2012 - P2976, Call In - Inspect valves above ceilings for asbestos containing materials, valves are bieng replaced. - All Pipe Wrap and Pipe Wrap mastis is NAD, No Asbestos Detected
07/19/2012 - Workorder N7579,0 Install Door - All Sheetrock, Float Mud/Joint Compound and wall texture is NAD (No Asbestos Detected)
06/29/2012 - Bldg 663, Replace Boiler - On the interior of the boiler is a sheet of insulation, Hard Board that contains 15% Chrysotile. The boiler gasket on access door, Interior Door Insulation, Interior Fire Brick, are all None Detect for asbestos Containing MaterialsSome pipes leading into the boiler are Asbestos Containing, other pipes are fiberglass. Identified on walk through with contractor. Also Boiler Flu leading into Chimney has asbestos containing material in between the flu pipe and the bricks.
04/05/2012 - EMCS Controls Upgrade - A visual was conducted for determining if asbestos containing materials will be disturbed during the EMCS Controls Upgrade. AHU 5 . First Floor Lobby. HW control is free of asbestos insulation. CW Controls is fiberglass. AHU7 - HW and CW valve has fiberglass insulation. AHU 6, HW Controls is free of insualtion. Rm 111, AH9 CW pipe is fiberglass. HVAC Duct control is free of insulation. AHU 8, CW is fiberglass, HW is fiberglass. Rm 143, AH 4, HVAC Duct is free of insulation. HW control is fiberglass. CW is fiberglass. AHU 3 , CW is fiberglass, HW is fiberglass, HVAC Duct is free of insulation. Rm. 219 - AHU 11 CW Control has fiberglass, HW has fiberglass. AH 12, CW, Elastomeric Foam, HW Fiberglass. Rm. 240 - AHU 10 - HW Free of insualation, CW Fiberglass, Temp Fiberglass. Basement AHU 2 - HW free of Insulation. CW Fiberglass. Sub Basement - AHU All are fiberglass. Any asbestos materials in the sub basemnet are marked accordingly. There is no asbestos in the areas of the controls. This inspection did not include any pipe insulation outside of the mechanical rooms nor did it include any duct mastic. These area will be required to be inspected for asbestos Containing Materials prior to any disturbance. A copy of this report must be provided to our office in an electronic format for further actions as applicable. A copy of all training certifications must be provided to our office for all Asbestos inspectors. The scope of this work is to large to be done in-house by the Toxic program manager. Room 240 does contain an asbestos vibration cloth but this should not be disturbed for this specific project
04/05/2012 - In room 240 Vibration Joint Cloth is hanging loosely from Vibration Dampener. Must be abated. Awaitng proposal
03/12/2012 - Replace Damaged Ceiling Tiles and Sheetrock from water damage - All ceiling tiles in lobby foyer and sheetrock;
ViewFacility Comments:
Appendix B joint compound in first floor stairwell is NAD, No Asbestos Detected.
01/10/2012 - Workorder 10735 - Pipe insulaton in the hallways of Building 663 is NAD (No Asbestos Detected)
09/6/2011, WO#10449 Upgrade NIPERNET, The floor tile black mastic in room 227 is positive for asbestos containing material.
04/15/2011 - Boiler Project TYMX489756, All boiler Blankets and Pipes are Positive for asbestos containing material. These areas are labeled. Boiler Breach is assumed positive based on previous assessments
29 Jun 10, Workorder L2593_ Install Monitor in Porch Area, All drywall is NAD (No Asbestos Detected)
8 Jun 10, WO K9736 - Replace Windows Building 663 and reseal all windows along porch from room 217 thru 239. The window glazing has received a Positive Srtop 1, which means 1 positive on a sample makes all remaining samples positive. Therefore, all windows at Building 663 are Positive for asbestos Window Glazing. Do not disturb the glazing by any abrasive means such as scraping sanding, blasting, cutting, etc. Any disturbance of this material must be done by a certified asbetos abatement team.
6 Apr 10, Replace Brown Carpet and nstall blue carpet squares. All floor tiles and mastic are Positive for Asbestos Containing Materials There is a potential to pull floor tiles when removing this carpet. The adhesive tightly adheres the carpet to the floor.
Any disturbance must be done by a certified asbestos abatement team.
Facility Comments:
Date User Comment
5/13/2015 HMUser 111701 - Numerous areas will be disturbed during this work order/project. The scope of work is to large to be conducted in-house and therefore needs to be included in the project documents for an asbestos and lead inspection from a Texas Department of State Health Services Asbestos and Lead Based paint consultant for any materials to be disturbed or any materials not specific in this report. Any asbestos or Lead Based Paints reports acquired outside of our office for this project must be provided to the JBSA Environmental Office for further action. Any XRF with a Radio Active Source must be approved by JBSA Randolph Bio Environmental Engineering office prior to bringing the instrument on the installation.
1/7/2015 HMUser Work Order 11717 - replace carpet throughout facility in Basement, 1st and 2nd floor to include all offices. Based on the attached AEHS and other reports, all areas are positive for Asbestos Floor Tiles and Mastic throughout facility. These areas must be abated by a certified Asbestos Abatement team prior to the replacement of carpet. A state notification will be required to be submitted through our office 10 days prior to any abatement activity. All Environmental Specs for Asbestos abatement activities will apply.
1/6/2015 elv Work Order 11705 - Replace all HVAC - An inspection of all HVAC Equipment and components that will be disturbed during the replacement will have to be inspected by a certified asbestos inspector. This will include pipes, plenums and trunk lines The scope of this work is to large to be handled in house by the Toxic Program Manager.
All inspectors must provide training certifications to our office prior to any inspection activity. A copy of the report in electronic format must be provided to our office for futher action and possible abatement activity dependent on results. Provided is a report on the pipe wrap and mastic in the Air Handler Rooms only and does not include any materials on the exterior of the mechanical rooms. A vibration dampener cloth is in room 240 and must be abated prior to replacement of the unit in this room. Amosite pipe insulation has been identified in various areas of pipe runs. This was found during the repair of water pipes above the West Wing ceilings on the first floor.
Asbestos Containing Material (ACM) Results Dimension
AsbestosHSA DescriptionHSA Type Sample # Year ID Location(s) Floor Floor Area
Sample Area Original Sample IDSample ID
0No Sample Results
2014 1
North; Off White;Chalky;Gran;ClosetWall - Joint Tape/Joint Compoud None SF
Hall - West 01 SF663-WLJ-001-B-006
0No Sample Results
2014 1
North; Off White;Chalky;Gran;ClosetWall - Joint Tape/Joint Compoud None SF
Hall - West 01 SF663-WLJ-001-B-007
0No Sample Results
2014 1
North; Off White;Chalky;Gran;ClosetWall - Joint Tape/Joint Compoud None SF
Hall - West 01 SF663-WLJ-001-B-008
0NAD, Cellulose 60%, Fiberglass 10%, Non-fibrous 30%
2014 1
Off White; Silver Foil; Yellow InsulationPipe Wrap 1 LF
Hall - West 01 SF663-PWRP-001-B-001
0NAD, Cellulose 70%, Fiberglass 10%, Non-fibrous 20%
2014 1
Off White; Silver Foil; Yellow InsulationPipe Wrap 2 LF
Hall - West 01 SF663-PWRP-001-B-002
0NAD, Cellulose 60%, Fiberglass 10%, Non-fibrous 30%
2014 1
Off White; Silver Foil; Yellow InsulationPipe Wrap 3 LF
Hall - West 01 SF663-PWRP-001-B-003
0Amosite 15%, Non-fibrous 85%
2014 1
Gray Fibrous materialPipe Insulation 4 LF
Hall - West 01 SF663-PINS-001-B-004
0Amosite 10%, Non-fibrous 90%
2014 1
Gray Fibrous materialPipe Insulation 5 LF
Hall - West 01 SF663-PINS-001-B-005
0NAD, Cellulose 40%, Fiberglass 20%, Non-Fibrous 40%
2012 1
Brown; FibrousPipe Insulation 1 LF
Hall - West 01 SF663-PINS-001-B-001
0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%
2012 2
2' X 2; gray;white; Medium Fiisure;PinholeCeiling - Lay-in Tile 1 SF
Foyer Or Lobby 01 SF663-CLLI-002-B-001
0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%
2012 2
2' X 2; gray;white; Medium Fiisure;PinholeCeiling - Lay-in Tile 2 SF
Foyer Or Lobby 01 SF663-CLLI-002-B-002
0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%
2012 2
2' X 2; gray;white; Medium Fiisure;PinholeCeiling - Lay-in Tile 3 SF
Foyer Or Lobby 01 SF663-CLLI-002-B-003
0NAD, Non-Fibrous 100%
2012 3
1-2 nd Floor, Concrete w float mudWall - Joint Tape/Joint Compoud 1 SF
Stairwell 01 SF663-WLJ-003-B-001
0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%
2012 3
1-2 nd Floor, Concrete w float mudWall - Joint Tape/Joint Compoud 2 SF
Stairwell 01 SF663-WLJ-003-B-002
0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%
2012 3
1-2 nd Floor, Concrete w float mudWall - Joint Tape/Joint Compoud 3 SF
Stairwell 01 SF663-WLJ-003-B-003
0NAD, wrap/mastic Cellulose 15%, Fiberglass5%, Non-Fiberous 80%
2012 4
AH8; Chill Water Pipe;White Wrap;Yellow Insulation;silver Foil
Pipe Insulation 1 LF
Room - 111 01 SF663-PINS-004-B-001
2012 5 Room - 219 02 SF663-PIPM-005-B-001
12/31/2014 elv Work Order 11717 - Replace carpet in Building 663, Basement, first and 2nd floors. All Floors throughout contain asbestos floor tiles and mastic. Any disturbance must be done by a certified asbestos team. Basement is scheduled for renovation starting 5 Jan 2015
0NAD, wrap/mastic Fiberglass 10%, Woolastenite 5%, Non-Fibrous 85%
AH12; Off White; Adhesive Material;Yellow Insulation;Silver Foil
Pipe - Mastic 1 LF
0NAD, Cellulose 40%, Non-fibrous 60%
2012 5
AH 11; Off white;Cloth;Yellow InsulationPipe - Mastic 2 LF
Room - 219 02 SF663-PIPM-005-B-002
0NAD, Cellulose 60%, Fiberglass 10%, Non-Fibrous 30%
2012 6
AH10; Gray;White;Fibers;Yellow Insulation;Silver Foil
Pipe - Mastic 1 LF
Room - 240 02 SF663-PIPM-006-B-001
0NAD, Cellulose 80%, Fiberglass 10%, Non-Fibrous 10%
2012 6
AH10; Gray;White;Fibers;Yellow Insulation;Silver Foil
Pipe - Mastic 2 LF
Room - 240 02 SF663-PIPM-006-B-002
0Chrysotile 95%, Non-fibrous 5%
2012 6
Off White;gran ThreadsVibration Dampener Cover 3 LF
Room - 240 02 SF663-VDC-006-B-003
0NAD, Non-Fibrous 100%
2012 7
Red;Foundation;BoilerBoiler - Fire Brick 1 SF
Boiler Room 01 SF663-BFB-007-B-001
0Chrysotile 15%, Non-fibrous 85%
2012 7
Interior Sheet;Beige; Gran;IBoiler Insulation 2 SF
Boiler Room 01 SF663-BINS-007-B-002
0NAD, Non-Fibrous 100%
2012 8
East; Off White;Chalky;Gran;OutWall - Joint Tape/Joint Compoud 1 SF
Room - Media BM SF663-WLJ-008-B-001
0NAD, Cellulose 5%, Non-fibrous 95%
2012 8
East; Tan;Chalky;Gran;OutsideWall - Sheetrock 2 SF
Room - Media BM SF663-WLSH-008-B-002
0NAD, Non-Fibrous 100%
2012 8
West; Off White;Chalky;GranWall - Textured Surfacing Material 3 SF
Room - Media BM SF663-WLTX-008-B-003
0NAD, Non-Fibrous 100%
2012 8
West; Off White;Chalky;GranWall - Joint Tape/Joint Compoud 4 SF
Room - Media BM SF663-WLJ-008-B-004
0NAD, Non-Fibrous 100%
2012 8
West; Off White;Chalky;Wall - Sheetrock 5 SF
Room - Media BM SF663-WLSH-008-B-005
0No Sample Results
2012 9
Tan cementitious material., Lt 1st window bottom row
Window Glazing None LF
Room - 235 02 SF663-WGLZ-009-B-001
0No Sample Results
2012 9
Tan cementitious material.Right window, 2nd row, 4th
Window Glazing None LF
Room - 235 02 SF663-WGLZ-009-B-002
0NAD, Cellulose 40%, Non-Fibrous 60%
2012 10
White Wrap; White MasticPipe - Mastic 1 LF
Mechanical BM SF663-PIPM-0010-B-001
No Sample Results
2011 1
No Sample RecordedNo Location Sampled None
Boiler Room BM SF
0NAD, Cellulose 5%, 90% Non-Fibrous 5 Fiber glass%
2011 2
East; Off White;Chalky;GranWall - Sheetrock 1 SF
Room - Records BM SF663-WLSH-002-B-001
0NAD, Cellulose 7%, 90 Non-Fibrous 3 Fiberglass%
2011 2
West; Off White;Chalky;GranWall - Sheetrock 2 SF
Room - Records BM SF663-WLSH-002-B-002
0NAD, Cellulose 5%, 93% Non-Fibrous 2 Fiber glass%
2011 3
East; Outside; Off White;Chalky;GranWall - Sheetrock 1 SF
Room - 227 02 SF663-WLSH-003-B-001
0NAD, Cellulose 5%, 93% Non-Fibrous 2 Fiber glass%
2011 3
West; Off White;Chalky;GranWall - Sheetrock 2 SF
Room - 227 02 SF663-WLSH-003-B-002
0L2, Chrysotile 5%, 95% Non-Fibrous
2011 3
12" x 12 " Red;White Streaks with Black MasticFloor - Vinyl Composite Tile 3 SF
Room - 227 02 SF663-FLVCT-003-B-003
0L1, NAD, FLVCT 100 Non-Fibrous%
2011 3
12" x 12 " Red;White Streaks with Black MasticFloor - Vinyl Composite Tile 3 SF
Room - 227 02 SF663-FLVCT-003-B-003
0NAD, Cellulose 10%, Non-fibrous 90%
2011 4
East; Off White;Chalky;GranWall - Sheetrock 1 SF
Hallway BM SF663-WLSH-004-B-001
0NAD, Cellulose 8%, Non-fibrous 92%
2011 4
West; Off White;Chalky;GranWall - Sheetrock 2 SF
Hallway BM SF663-WLSH-004-B-002
0NAD, Cellulose 90%, Non-fibrous 10%
2011 5
South; Tan;Wood FiberWhite PaintWall - Board 1 SF
Mechanical Room BM SF663-WLBO-005-B-001
0NAD, Non-fibrous 100%
2011 5
South;Light Brown;Gran;AdhesiveWall - Mastic 2 LF
Mechanical Room BM SF663-WLMAS-005-B-002
0NAD, Non-fibrous 100%
2011 5
South; Brown;Green granWall - Mastic 3 SF
Mechanical Room BM SF663-WLMAS-005-B-003
0NAD, Cellulose 10%, Non-fibrous 90%
2011 6
West; Off White;Chalky;GranWall - Sheetrock 1 SF
Breakroom BM SF663-WLSH-006-B-001
0NAD, Cellulose 8%, Non-fibrous 92%
2011 6
East Outside Breakroom; Off White;Chalky;GranWall - Sheetrock 2 SF
Breakroom BM SF663-WLSH-006-B-002
L3, NAD, Non-Fibrous 100%
2010 1
Grey with black masticFloor - Vinyl Composite Tile 1
Room - 224 02 SF663-FLVCT-001-B-001
L1, Chrysotile 6%, Non-fibrous 94%
2010 1
Grey with black masticFloor - Vinyl Composite Tile 1
Room - 224 02 SF663-FLVCT-001-B-001
L2, Chrysotile 8%, Non-fibrous 92%
2010 1
Grey with black masticFloor - Vinyl Composite Tile 1
Room - 224 02 SF663-FLVCT-001-B-001
Positive Stop 1, Chrysotile 2%, Non-fibrous 98%
2010 2
Brow;Tan; CemetitiousWindow Glazing 1
Room - 237 02 SF663-WGLZ-002-B-001
Chrysotile 2%, Non-fibrous 98%
2010 3
Brown;Beige;CementitiousWindow Glazing 1
Room - 235 02 SF663-WGLZ-003-B-001
Positive Stop 1, Chrysotile 2%, Non- Fibrousn-fibrous 98%
2010 4
Brown;Beige;CementitiousWindow Glazing 1
Room - 239 02 SF663-WGLZ-004-B-001
NAD, Cellulose 8%, Non-fibrous 92%
2010 5
White Chalky;Brown FiberWall - Sheetrock 1
Room - Behind Room 02 SF663-WLSH-005-B-001
No Sample Results
2010 6
Gray;Tan:Wht;;BrittleWindow Glazing None
Room - 236 02 SF663-WGLZ-006-B-001
L1, Chrysotile 7%, Non-fibrous 93%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 1
Lobby SF663-FLVCT-001-B-001
L3, NAD, Non-Fibrous 100%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 1
Lobby SF663-FLVCT-001-B-001
L2, Chrysotile 5%, Non-fibrous 95%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 1
Lobby SF663-FLVCT-001-B-001
L2, Chrysotile 5%, Non-fibrous 95%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 2
Lobby SF663-FLVCT-001-B-002
L1, Chrysotile 7%, Non-fibrous 93%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 2
Lobby SF663-FLVCT-001-B-002
L3, NAD, Non-Fibrous 100%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 2
Lobby SF663-FLVCT-001-B-002
L3, NAD, Non-Fibrous 100%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 3
Lobby SF663-FLVCT-001-B-003
L1, Chrysotile 7%, Non-fibrous 93%
2009 1
Gray;Black MasticFloor - Vinyl Composite Tile 3
Lobby SF663-FLVCT-001-B-003
2009 1 Lobby SF663-FLVCT-001-B-003
L2, Chrysotile 5%, Non-fibrous 95% Gray;Black MasticFloor - Vinyl Composite Tile 3
NAD, Cellulose 35%, Non-fibrous 65%
2009 1
White Powder InsulationDoor Core Insulation - Fire Door 4
Lobby SF663-DOOR-001-B-004
NAD, Non- Fibrous 100%, Unknown
2009 2
Brown AdhesiveStair Tread Mastic 1
Stairwell SF663-STMAS-002-B-001
L1, NAD, Non-Fibrous 100%
2009 2
Brown AdhesiveStair Tread Mastic 2
Stairwell SF663-STMAS-002-B-002
L2, NAD, Non-Fibrous 100%
2009 2
Brown AdhesiveStair Tread Mastic 2
Stairwell SF663-STMAS-002-B-002
Chrysotile 5%, Non-fibrous 95%
2009 2
BlackMastic Floor 3
Stairwell SF663-FLMAS-002-B-003
Chrysotile 5%, Non-fibrous 95%
2009 3
Black tar.Mastic Floor 1
Foyer - South SF663-FLMAS-003-B-001
NAD-Mastic L3 0%
2008 1
Rm 2,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 1
Basement SF663-FLVCT-001-B-001
Chrysotile-FT L1 5%, Filler/Binder 58%, Mastic2%, Agregate 35%
2008 1
Rm 2,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 1
Basement SF663-FLVCT-001-B-001
Chrysotile-Tar L2 5%
2008 1
Rm 2,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 1
Basement SF663-FLVCT-001-B-001
NAD,Cellulose 20%, Fibrous Glass 10%, Filler/Binder 70%
2008 1
White block.Wall - Sheetrock 2
Basement SF663-WLSH-001-B-002
NAD, Cellulose 40%, Fibrous Glass 10%, Filler/Binder 15%. Paint 5%
2008 1
R2, Gray MaterialWall - Joint Tape/Joint Compoud 3
Basement SF663-WLJ-001-B-003
Chrysotile-Tar L2 5%
2008 1
R12,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 4
Basement SF663-FLVCT-001-B-004
NAD, Mastic L3 0%
2008 1
R12,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 4
Basement SF663-FLVCT-001-B-004
Chrysotile-FT L1 5%, Filler/Binder 60%, Agregate 35%
2008 1
R12,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 4
Basement SF663-FLVCT-001-B-004
NAD, Cellulose 50%, Filler/Binder 20%, Paint 30%
2008 1
R12. White, Powdery w tapeWall - Sheetrock 5
Basement SF663-WLSH-001-B-005
NAD, Filler/Binder 100%
2008 1
R12. White materialWall - Joint Tape/Joint Compoud 6
Basement SF663-WLJ-001-B-006
Chrysotile-Tar L2 5%
2008 1
H2, 12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 7
Basement SF663-FLVCT-001-B-007
Chrysotile-FT- L1 5%, Filler/Binder, Agregate 35%
2008 1
H2, 12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 7
Basement SF663-FLVCT-001-B-007
NAD- Mastic L3 0%
2008 1
H2, 12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 7
Basement SF663-FLVCT-001-B-007
NAD, Filler/Binder 70%, Cellulose 20%, Fibrous Glass 10%
2008 1
H2, White Powdery w PaperWall - Sheetrock 8
Basement SF663-WLSH-001-B-008
NAD, Filler/Binder 90%, Paint 10%
2008 1
H2, White SubstanceWall - Joint Tape/Joint Compoud 9
Basement SF663-WLJ-001-B-009
2008 2 Lobby SF663-WLSH-001-H-001