Atch_1_Appendix_B_-_JBSA_B663_Asbestos_Containing_Materials_Inventory_Report.pdf

PDF 116 KB Posted

Attached to
Renovate Bldg. 663, JBSA-Randolph, TX Federal contract opportunity
Solicitation number
FA3016-16-R-0039
Issued by
Department of the Air Force Air Education and Training Command

About this file

Atch 1 Appendix B - JBSA B663 Asbestos Containing Materials Inventory Report

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Bldg. 663, JBSA-Randolph, TX, newest first.
File Type Posted
Post_Site_Visit_Tech_Q A_17May16.pdf PDF
Atch_1_Appendix_J_-_Communication_Requirements.xlsx XLSX spreadsheet
Atch_1_B663_SOW_17May16.pdf PDF
Atch_1_Appendix_A_-_B663_Schematic_Sketch_10May16.pdf PDF
Atch_1_Appendix_E_-_Division_01_General_Requirements_RAND_(Rev_17May_16).pdf PDF
Amendment_SF_30_for_FA3016-16-R-0039.pdf PDF
Atch_1_Appendix_H_-_B663_Boiler_Pump_List.pdf PDF
Atch_4_HAZMAT_Letter_B663_1Mar16.pdf PDF
Atch_11_Detail_Cost_Estimate_Breakdown.docx DOCX document
Atch_1_Appendix_I_-_Local_Requirements.pdf PDF
Atch_8_Base_Pass_Req_Form.pdf PDF
Atch_6_Draft_DD_Form_1354.pdf PDF
Atch_5_Schedule_of_Material_Submittals.xls XLS spreadsheet
RFP_FA3016-16-R-0039.pdf PDF
Atch_1_Appendix_G_-_2nd_Flr_HC_Access.pdf PDF
Atch_7_2016_DBA_Wage_Determination_-_Bexar_County.pdf PDF
Atch_1_Appendix_F_-_Randolph_ACG.pdf PDF
Atch_9__Financial_Information_Questionnaire.pdf PDF
Atch_1_Appendix_C_-_JBSA_B663_Limited_Asbestos_and_Lead_Inspection.pdf PDF
Atch_1_Appendix_D_-_08010_Life_Safety_Fire_Protection_Design_and_Review.pdf PDF
Atch_2_AETC_Form_47_B663_1Mar16.pdf PDF
Atch_1_B663_SOW_4May16.pdf PDF
Atch_13_Brand_Name_Justification.pdf PDF
Atch_1_Appendix_E_-_Division_01_General_Requirements_RAND_(Rev_Apr2015).pdf PDF
Atch_3_Ozone_Depletion_Control_Letter_B663_1Mar16.pdf PDF
Atch_1_Appendix_A_-_B663_Schematic_Sketch_5May16.pdf PDF
Atch_12_Progress_Schedule.xlsx XLSX spreadsheet
Atch_10_Contractor_Responsibility_Questionnaire.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JBSA Asbestos Inventory Print Report

Facility Type

Facility Site: JBSA Randolph

Administrative

Square Footage: 122535Number of Floors: 2

B663.tifDrawing File Name:

Facility Status Manned

663.jpgPhoto File Name

Date Constructed: 1931

Facility Number: Facility Name:663 AFPC

Facility Owner: 902/CES

Facility Address: 555 E Street West Asbestos:

Facility Summary Report:

10/31/2014 - Pipe leaking above ceiling on first floor, West Wing - Pipe insulation contains Amosite asbestos pipe insulation. Do not disturb this material when repairing the pipes above the ceiling. This insulation is located throughout the pipes in different locations.

12/19/2012 - P2976, Call In - Inspect valves above ceilings for asbestos containing materials, valves are bieng replaced. - All Pipe Wrap and Pipe Wrap mastis is NAD, No Asbestos Detected

07/19/2012 - Workorder N7579,0 Install Door - All Sheetrock, Float Mud/Joint Compound and wall texture is NAD (No Asbestos Detected)

06/29/2012 - Bldg 663, Replace Boiler - On the interior of the boiler is a sheet of insulation, Hard Board that contains 15% Chrysotile. The boiler gasket on access door, Interior Door Insulation, Interior Fire Brick, are all None Detect for asbestos Containing MaterialsSome pipes leading into the boiler are Asbestos Containing, other pipes are fiberglass. Identified on walk through with contractor. Also Boiler Flu leading into Chimney has asbestos containing material in between the flu pipe and the bricks.

04/05/2012 - EMCS Controls Upgrade - A visual was conducted for determining if asbestos containing materials will be disturbed during the EMCS Controls Upgrade. AHU 5 . First Floor Lobby. HW control is free of asbestos insulation. CW Controls is fiberglass. AHU7 - HW and CW valve has fiberglass insulation. AHU 6, HW Controls is free of insualtion. Rm 111, AH9 CW pipe is fiberglass. HVAC Duct control is free of insulation. AHU 8, CW is fiberglass, HW is fiberglass. Rm 143, AH 4, HVAC Duct is free of insulation. HW control is fiberglass. CW is fiberglass. AHU 3 , CW is fiberglass, HW is fiberglass, HVAC Duct is free of insulation. Rm. 219 - AHU 11 CW Control has fiberglass, HW has fiberglass. AH 12, CW, Elastomeric Foam, HW Fiberglass. Rm. 240 - AHU 10 - HW Free of insualation, CW Fiberglass, Temp Fiberglass. Basement AHU 2 - HW free of Insulation. CW Fiberglass. Sub Basement - AHU All are fiberglass. Any asbestos materials in the sub basemnet are marked accordingly. There is no asbestos in the areas of the controls. This inspection did not include any pipe insulation outside of the mechanical rooms nor did it include any duct mastic. These area will be required to be inspected for asbestos Containing Materials prior to any disturbance. A copy of this report must be provided to our office in an electronic format for further actions as applicable. A copy of all training certifications must be provided to our office for all Asbestos inspectors. The scope of this work is to large to be done in-house by the Toxic program manager. Room 240 does contain an asbestos vibration cloth but this should not be disturbed for this specific project

04/05/2012 - In room 240 Vibration Joint Cloth is hanging loosely from Vibration Dampener. Must be abated. Awaitng proposal

03/12/2012 - Replace Damaged Ceiling Tiles and Sheetrock from water damage - All ceiling tiles in lobby foyer and sheetrock;

ViewFacility Comments:

Appendix B joint compound in first floor stairwell is NAD, No Asbestos Detected.

01/10/2012 - Workorder 10735 - Pipe insulaton in the hallways of Building 663 is NAD (No Asbestos Detected)

09/6/2011, WO#10449 Upgrade NIPERNET, The floor tile black mastic in room 227 is positive for asbestos containing material.

04/15/2011 - Boiler Project TYMX489756, All boiler Blankets and Pipes are Positive for asbestos containing material. These areas are labeled. Boiler Breach is assumed positive based on previous assessments

29 Jun 10, Workorder L2593_ Install Monitor in Porch Area, All drywall is NAD (No Asbestos Detected)

8 Jun 10, WO K9736 - Replace Windows Building 663 and reseal all windows along porch from room 217 thru 239. The window glazing has received a Positive Srtop 1, which means 1 positive on a sample makes all remaining samples positive. Therefore, all windows at Building 663 are Positive for asbestos Window Glazing. Do not disturb the glazing by any abrasive means such as scraping sanding, blasting, cutting, etc. Any disturbance of this material must be done by a certified asbetos abatement team.

6 Apr 10, Replace Brown Carpet and nstall blue carpet squares. All floor tiles and mastic are Positive for Asbestos Containing Materials There is a potential to pull floor tiles when removing this carpet. The adhesive tightly adheres the carpet to the floor.

Any disturbance must be done by a certified asbestos abatement team.

Facility Comments:

Date User Comment

5/13/2015 HMUser 111701 - Numerous areas will be disturbed during this work order/project. The scope of work is to large to be conducted in-house and therefore needs to be included in the project documents for an asbestos and lead inspection from a Texas Department of State Health Services Asbestos and Lead Based paint consultant for any materials to be disturbed or any materials not specific in this report. Any asbestos or Lead Based Paints reports acquired outside of our office for this project must be provided to the JBSA Environmental Office for further action. Any XRF with a Radio Active Source must be approved by JBSA Randolph Bio Environmental Engineering office prior to bringing the instrument on the installation.

1/7/2015 HMUser Work Order 11717 - replace carpet throughout facility in Basement, 1st and 2nd floor to include all offices. Based on the attached AEHS and other reports, all areas are positive for Asbestos Floor Tiles and Mastic throughout facility. These areas must be abated by a certified Asbestos Abatement team prior to the replacement of carpet. A state notification will be required to be submitted through our office 10 days prior to any abatement activity. All Environmental Specs for Asbestos abatement activities will apply.

1/6/2015 elv Work Order 11705 - Replace all HVAC - An inspection of all HVAC Equipment and components that will be disturbed during the replacement will have to be inspected by a certified asbestos inspector. This will include pipes, plenums and trunk lines The scope of this work is to large to be handled in house by the Toxic Program Manager.

All inspectors must provide training certifications to our office prior to any inspection activity. A copy of the report in electronic format must be provided to our office for futher action and possible abatement activity dependent on results. Provided is a report on the pipe wrap and mastic in the Air Handler Rooms only and does not include any materials on the exterior of the mechanical rooms. A vibration dampener cloth is in room 240 and must be abated prior to replacement of the unit in this room. Amosite pipe insulation has been identified in various areas of pipe runs. This was found during the repair of water pipes above the West Wing ceilings on the first floor.

Asbestos Containing Material (ACM) Results Dimension

AsbestosHSA DescriptionHSA Type Sample # Year ID Location(s) Floor Floor Area

Sample Area Original Sample IDSample ID

0No Sample Results

2014 1

North; Off White;Chalky;Gran;ClosetWall - Joint Tape/Joint Compoud None SF

Hall - West 01 SF663-WLJ-001-B-006

0No Sample Results

2014 1

North; Off White;Chalky;Gran;ClosetWall - Joint Tape/Joint Compoud None SF

Hall - West 01 SF663-WLJ-001-B-007

0No Sample Results

2014 1

North; Off White;Chalky;Gran;ClosetWall - Joint Tape/Joint Compoud None SF

Hall - West 01 SF663-WLJ-001-B-008

0NAD, Cellulose 60%, Fiberglass 10%, Non-fibrous 30%

2014 1

Off White; Silver Foil; Yellow InsulationPipe Wrap 1 LF

Hall - West 01 SF663-PWRP-001-B-001

0NAD, Cellulose 70%, Fiberglass 10%, Non-fibrous 20%

2014 1

Off White; Silver Foil; Yellow InsulationPipe Wrap 2 LF

Hall - West 01 SF663-PWRP-001-B-002

0NAD, Cellulose 60%, Fiberglass 10%, Non-fibrous 30%

2014 1

Off White; Silver Foil; Yellow InsulationPipe Wrap 3 LF

Hall - West 01 SF663-PWRP-001-B-003

0Amosite 15%, Non-fibrous 85%

2014 1

Gray Fibrous materialPipe Insulation 4 LF

Hall - West 01 SF663-PINS-001-B-004

0Amosite 10%, Non-fibrous 90%

2014 1

Gray Fibrous materialPipe Insulation 5 LF

Hall - West 01 SF663-PINS-001-B-005

0NAD, Cellulose 40%, Fiberglass 20%, Non-Fibrous 40%

2012 1

Brown; FibrousPipe Insulation 1 LF

Hall - West 01 SF663-PINS-001-B-001

0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%

2012 2

2' X 2; gray;white; Medium Fiisure;PinholeCeiling - Lay-in Tile 1 SF

Foyer Or Lobby 01 SF663-CLLI-002-B-001

0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%

2012 2

2' X 2; gray;white; Medium Fiisure;PinholeCeiling - Lay-in Tile 2 SF

Foyer Or Lobby 01 SF663-CLLI-002-B-002

0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%

2012 2

2' X 2; gray;white; Medium Fiisure;PinholeCeiling - Lay-in Tile 3 SF

Foyer Or Lobby 01 SF663-CLLI-002-B-003

0NAD, Non-Fibrous 100%

2012 3

1-2 nd Floor, Concrete w float mudWall - Joint Tape/Joint Compoud 1 SF

Stairwell 01 SF663-WLJ-003-B-001

0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%

2012 3

1-2 nd Floor, Concrete w float mudWall - Joint Tape/Joint Compoud 2 SF

Stairwell 01 SF663-WLJ-003-B-002

0NAD, Cellulose 40%, Fiberglass 40%, Perlite 10%, Non-Fibrous 10%

2012 3

1-2 nd Floor, Concrete w float mudWall - Joint Tape/Joint Compoud 3 SF

Stairwell 01 SF663-WLJ-003-B-003

0NAD, wrap/mastic Cellulose 15%, Fiberglass5%, Non-Fiberous 80%

2012 4

AH8; Chill Water Pipe;White Wrap;Yellow Insulation;silver Foil

Pipe Insulation 1 LF

Room - 111 01 SF663-PINS-004-B-001

2012 5 Room - 219 02 SF663-PIPM-005-B-001

12/31/2014 elv Work Order 11717 - Replace carpet in Building 663, Basement, first and 2nd floors. All Floors throughout contain asbestos floor tiles and mastic. Any disturbance must be done by a certified asbestos team. Basement is scheduled for renovation starting 5 Jan 2015

0NAD, wrap/mastic Fiberglass 10%, Woolastenite 5%, Non-Fibrous 85%

AH12; Off White; Adhesive Material;Yellow Insulation;Silver Foil

Pipe - Mastic 1 LF

0NAD, Cellulose 40%, Non-fibrous 60%

2012 5

AH 11; Off white;Cloth;Yellow InsulationPipe - Mastic 2 LF

Room - 219 02 SF663-PIPM-005-B-002

0NAD, Cellulose 60%, Fiberglass 10%, Non-Fibrous 30%

2012 6

AH10; Gray;White;Fibers;Yellow Insulation;Silver Foil

Pipe - Mastic 1 LF

Room - 240 02 SF663-PIPM-006-B-001

0NAD, Cellulose 80%, Fiberglass 10%, Non-Fibrous 10%

2012 6

AH10; Gray;White;Fibers;Yellow Insulation;Silver Foil

Pipe - Mastic 2 LF

Room - 240 02 SF663-PIPM-006-B-002

0Chrysotile 95%, Non-fibrous 5%

2012 6

Off White;gran ThreadsVibration Dampener Cover 3 LF

Room - 240 02 SF663-VDC-006-B-003

0NAD, Non-Fibrous 100%

2012 7

Red;Foundation;BoilerBoiler - Fire Brick 1 SF

Boiler Room 01 SF663-BFB-007-B-001

0Chrysotile 15%, Non-fibrous 85%

2012 7

Interior Sheet;Beige; Gran;IBoiler Insulation 2 SF

Boiler Room 01 SF663-BINS-007-B-002

0NAD, Non-Fibrous 100%

2012 8

East; Off White;Chalky;Gran;OutWall - Joint Tape/Joint Compoud 1 SF

Room - Media BM SF663-WLJ-008-B-001

0NAD, Cellulose 5%, Non-fibrous 95%

2012 8

East; Tan;Chalky;Gran;OutsideWall - Sheetrock 2 SF

Room - Media BM SF663-WLSH-008-B-002

0NAD, Non-Fibrous 100%

2012 8

West; Off White;Chalky;GranWall - Textured Surfacing Material 3 SF

Room - Media BM SF663-WLTX-008-B-003

0NAD, Non-Fibrous 100%

2012 8

West; Off White;Chalky;GranWall - Joint Tape/Joint Compoud 4 SF

Room - Media BM SF663-WLJ-008-B-004

0NAD, Non-Fibrous 100%

2012 8

West; Off White;Chalky;Wall - Sheetrock 5 SF

Room - Media BM SF663-WLSH-008-B-005

0No Sample Results

2012 9

Tan cementitious material., Lt 1st window bottom row

Window Glazing None LF

Room - 235 02 SF663-WGLZ-009-B-001

0No Sample Results

2012 9

Tan cementitious material.Right window, 2nd row, 4th

Window Glazing None LF

Room - 235 02 SF663-WGLZ-009-B-002

0NAD, Cellulose 40%, Non-Fibrous 60%

2012 10

White Wrap; White MasticPipe - Mastic 1 LF

Mechanical BM SF663-PIPM-0010-B-001

No Sample Results

2011 1

No Sample RecordedNo Location Sampled None

Boiler Room BM SF

0NAD, Cellulose 5%, 90% Non-Fibrous 5 Fiber glass%

2011 2

East; Off White;Chalky;GranWall - Sheetrock 1 SF

Room - Records BM SF663-WLSH-002-B-001

0NAD, Cellulose 7%, 90 Non-Fibrous 3 Fiberglass%

2011 2

West; Off White;Chalky;GranWall - Sheetrock 2 SF

Room - Records BM SF663-WLSH-002-B-002

0NAD, Cellulose 5%, 93% Non-Fibrous 2 Fiber glass%

2011 3

East; Outside; Off White;Chalky;GranWall - Sheetrock 1 SF

Room - 227 02 SF663-WLSH-003-B-001

0NAD, Cellulose 5%, 93% Non-Fibrous 2 Fiber glass%

2011 3

West; Off White;Chalky;GranWall - Sheetrock 2 SF

Room - 227 02 SF663-WLSH-003-B-002

0L2, Chrysotile 5%, 95% Non-Fibrous

2011 3

12" x 12 " Red;White Streaks with Black MasticFloor - Vinyl Composite Tile 3 SF

Room - 227 02 SF663-FLVCT-003-B-003

0L1, NAD, FLVCT 100 Non-Fibrous%

2011 3

12" x 12 " Red;White Streaks with Black MasticFloor - Vinyl Composite Tile 3 SF

Room - 227 02 SF663-FLVCT-003-B-003

0NAD, Cellulose 10%, Non-fibrous 90%

2011 4

East; Off White;Chalky;GranWall - Sheetrock 1 SF

Hallway BM SF663-WLSH-004-B-001

0NAD, Cellulose 8%, Non-fibrous 92%

2011 4

West; Off White;Chalky;GranWall - Sheetrock 2 SF

Hallway BM SF663-WLSH-004-B-002

0NAD, Cellulose 90%, Non-fibrous 10%

2011 5

South; Tan;Wood FiberWhite PaintWall - Board 1 SF

Mechanical Room BM SF663-WLBO-005-B-001

0NAD, Non-fibrous 100%

2011 5

South;Light Brown;Gran;AdhesiveWall - Mastic 2 LF

Mechanical Room BM SF663-WLMAS-005-B-002

0NAD, Non-fibrous 100%

2011 5

South; Brown;Green granWall - Mastic 3 SF

Mechanical Room BM SF663-WLMAS-005-B-003

0NAD, Cellulose 10%, Non-fibrous 90%

2011 6

West; Off White;Chalky;GranWall - Sheetrock 1 SF

Breakroom BM SF663-WLSH-006-B-001

0NAD, Cellulose 8%, Non-fibrous 92%

2011 6

East Outside Breakroom; Off White;Chalky;GranWall - Sheetrock 2 SF

Breakroom BM SF663-WLSH-006-B-002

L3, NAD, Non-Fibrous 100%

2010 1

Grey with black masticFloor - Vinyl Composite Tile 1

Room - 224 02 SF663-FLVCT-001-B-001

L1, Chrysotile 6%, Non-fibrous 94%

2010 1

Grey with black masticFloor - Vinyl Composite Tile 1

Room - 224 02 SF663-FLVCT-001-B-001

L2, Chrysotile 8%, Non-fibrous 92%

2010 1

Grey with black masticFloor - Vinyl Composite Tile 1

Room - 224 02 SF663-FLVCT-001-B-001

Positive Stop 1, Chrysotile 2%, Non-fibrous 98%

2010 2

Brow;Tan; CemetitiousWindow Glazing 1

Room - 237 02 SF663-WGLZ-002-B-001

Chrysotile 2%, Non-fibrous 98%

2010 3

Brown;Beige;CementitiousWindow Glazing 1

Room - 235 02 SF663-WGLZ-003-B-001

Positive Stop 1, Chrysotile 2%, Non- Fibrousn-fibrous 98%

2010 4

Brown;Beige;CementitiousWindow Glazing 1

Room - 239 02 SF663-WGLZ-004-B-001

NAD, Cellulose 8%, Non-fibrous 92%

2010 5

White Chalky;Brown FiberWall - Sheetrock 1

Room - Behind Room 02 SF663-WLSH-005-B-001

No Sample Results

2010 6

Gray;Tan:Wht;;BrittleWindow Glazing None

Room - 236 02 SF663-WGLZ-006-B-001

L1, Chrysotile 7%, Non-fibrous 93%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 1

Lobby SF663-FLVCT-001-B-001

L3, NAD, Non-Fibrous 100%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 1

Lobby SF663-FLVCT-001-B-001

L2, Chrysotile 5%, Non-fibrous 95%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 1

Lobby SF663-FLVCT-001-B-001

L2, Chrysotile 5%, Non-fibrous 95%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 2

Lobby SF663-FLVCT-001-B-002

L1, Chrysotile 7%, Non-fibrous 93%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 2

Lobby SF663-FLVCT-001-B-002

L3, NAD, Non-Fibrous 100%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 2

Lobby SF663-FLVCT-001-B-002

L3, NAD, Non-Fibrous 100%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 3

Lobby SF663-FLVCT-001-B-003

L1, Chrysotile 7%, Non-fibrous 93%

2009 1

Gray;Black MasticFloor - Vinyl Composite Tile 3

Lobby SF663-FLVCT-001-B-003

2009 1 Lobby SF663-FLVCT-001-B-003

L2, Chrysotile 5%, Non-fibrous 95% Gray;Black MasticFloor - Vinyl Composite Tile 3

NAD, Cellulose 35%, Non-fibrous 65%

2009 1

White Powder InsulationDoor Core Insulation - Fire Door 4

Lobby SF663-DOOR-001-B-004

NAD, Non- Fibrous 100%, Unknown

2009 2

Brown AdhesiveStair Tread Mastic 1

Stairwell SF663-STMAS-002-B-001

L1, NAD, Non-Fibrous 100%

2009 2

Brown AdhesiveStair Tread Mastic 2

Stairwell SF663-STMAS-002-B-002

L2, NAD, Non-Fibrous 100%

2009 2

Brown AdhesiveStair Tread Mastic 2

Stairwell SF663-STMAS-002-B-002

Chrysotile 5%, Non-fibrous 95%

2009 2

BlackMastic Floor 3

Stairwell SF663-FLMAS-002-B-003

Chrysotile 5%, Non-fibrous 95%

2009 3

Black tar.Mastic Floor 1

Foyer - South SF663-FLMAS-003-B-001

NAD-Mastic L3 0%

2008 1

Rm 2,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 1

Basement SF663-FLVCT-001-B-001

Chrysotile-FT L1 5%, Filler/Binder 58%, Mastic2%, Agregate 35%

2008 1

Rm 2,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 1

Basement SF663-FLVCT-001-B-001

Chrysotile-Tar L2 5%

2008 1

Rm 2,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 1

Basement SF663-FLVCT-001-B-001

NAD,Cellulose 20%, Fibrous Glass 10%, Filler/Binder 70%

2008 1

White block.Wall - Sheetrock 2

Basement SF663-WLSH-001-B-002

NAD, Cellulose 40%, Fibrous Glass 10%, Filler/Binder 15%. Paint 5%

2008 1

R2, Gray MaterialWall - Joint Tape/Joint Compoud 3

Basement SF663-WLJ-001-B-003

Chrysotile-Tar L2 5%

2008 1

R12,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 4

Basement SF663-FLVCT-001-B-004

NAD, Mastic L3 0%

2008 1

R12,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 4

Basement SF663-FLVCT-001-B-004

Chrysotile-FT L1 5%, Filler/Binder 60%, Agregate 35%

2008 1

R12,12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 4

Basement SF663-FLVCT-001-B-004

NAD, Cellulose 50%, Filler/Binder 20%, Paint 30%

2008 1

R12. White, Powdery w tapeWall - Sheetrock 5

Basement SF663-WLSH-001-B-005

NAD, Filler/Binder 100%

2008 1

R12. White materialWall - Joint Tape/Joint Compoud 6

Basement SF663-WLJ-001-B-006

Chrysotile-Tar L2 5%

2008 1

H2, 12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 7

Basement SF663-FLVCT-001-B-007

Chrysotile-FT- L1 5%, Filler/Binder, Agregate 35%

2008 1

H2, 12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 7

Basement SF663-FLVCT-001-B-007

NAD- Mastic L3 0%

2008 1

H2, 12" X 12 " Gray w MasticFloor - Vinyl Composite Tile 7

Basement SF663-FLVCT-001-B-007

NAD, Filler/Binder 70%, Cellulose 20%, Fibrous Glass 10%

2008 1

H2, White Powdery w PaperWall - Sheetrock 8

Basement SF663-WLSH-001-B-008

NAD, Filler/Binder 90%, Paint 10%

2008 1

H2, White SubstanceWall - Joint Tape/Joint Compoud 9

Basement SF663-WLJ-001-B-009

2008 2 Lobby SF663-WLSH-001-H-001

File details come from the government source that posted it. Updated .