Attachment 2 - SOO EMNS Poles_20 July 2021.pdf
PDF 924 KB Posted
- Attached to
- Fiber Optic Cable Installation to Various Facilities Federal contract opportunity
- Solicitation number
- FA301021R0013
About this file
This document contains a Statement of Objectives (SOO) and details of a related federal contract opportunity. The SOO outlines requirements for the engineering, furnishing, installation, and testing of new single mode fiber optic cables to support connectivity to fifteen existing Giant Voice poles at Keesler Air Force Base in Mississippi. Key requirements include installing fiber optic distribution panels, conduit infrastructure such as duct banks and hand holes, geotextile innerduct, and fiber optic cables ranging from six to twenty-four strands between identified manholes, enclosures, and the Giant Voice poles. The related federal contract opportunity is a $500,000 to $1,000,000 small business set-aside solicitation issued by the Department of the Air Force Air Education and Training Command to acquire the fiber optic cable installation services defined in the SOO.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES (SOO)
Fiber Optic Cables Installation to Support Connectivity to
Giant Voice Poles
Project #: MAHG-2018-00005-00001
Keesler AFB MS
20 July 2021
Prepared By
38 ES/ENII
4064 Hilltop Road
Tinker AFB, OK 73145-2713
SOO - Fiber Optic Cables Installation to Support Connectivity to Giant Voice Poles at Keesler AFB MS
Table of Contents
1.0 SCOPE
2.0 SPECIFIC REQUIREMENTS
2.1. Outside Plant Requirements
2.1.1. Measurements
2.1.2. Pull Boxes/NEMA 4 Enclosures
2.1.3. Fiber Optic Distribution Panel (FODP)
2.2. Outside Plant Installation
2.2.1 Infrastructure Installation
2.2.2 New Hand holes
2.2.3 Duct bank Infrastructure
2.2.4 Geotextile Inner-duct (or Innerduct)
2.2.5 Fiber Optic Cable Installation
2.2.5.1 From ITB 223 to GV Pole #4
2.2.5.2 From ITB 2801 to GV Pole #6
2.2.5.3 From ITB 1101 to GV Pole #7
2.2.5.4 From ITB 1101 to GV Pole #10
2.2.5.5 From ITB 6901 to GV Pole #8
2.2.5.6 From ITB 6901 to GV Pole #12
2.2.5.7 From ITB 6901 to GV Pole #13
2.2.5.8 From ITB 4705 to GV Pole #9
2.2.5.9 From ITB 4705 to GV Pole #14
2.2.5.10 From MH-11K to GV Pole #1
2.2.5.11 From MH-11K to GV Pole #5
2.2.5.12 From MH-11K to MH-149
2.2.5.13 From MH-149 to GV Pole #16
2.2.5.14 From MH-149 to HH-149F
2.2.5.15 From HH-149F to GV Pole #15
2.2.5.16 From HH-149F to GV Pole #17
2.2.5.17 From HH-149F to GV Pole #3
3.0 Appendix A: Reference Drawings
3.1. Install new NEMA Boxes on the fifteen (15) existing Giant Voice Poles
3.2. Manholes/Duct System (MHDS) MH-11K to Giant Voice Poles #1, #3, #5, #15, #16 &
#17
1.0 SCOPE
This SOO lists the objectives for the Contractor to engineer, furnish, install and test (EFI&T) new single mode (SM) fiber optic cables (FOC) to support connectivity to Giant Voice (GV) Poles at
Keesler AFB, MS.
2.0 SPECIFIC REQUIREMENTS
As indicated in this SOO, the Contractor shall EFI&T fifteen (15) each, six (6) strand SM FOC to support connectivity to the fifteen (15) individual GV poles. Contractor shall provide twenty-four
(24) strand SM FOC in some locations as defined within this SOO.
The Contractor shall provide a Statement of Work (SOW) as part of their proposal incorporating all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOO.
The Contractor shall comply with all current, applicable TIA telecommunication installation and testing commercial standards and Keesler AFB Premise Wiring Guide.
All equipment, supplies, and materials provided shall be new and not refurbished.
2.1. Outside Plant Requirements
2.1.1. Measurements
Any distances provided in this SOO are approximations and should NOT be used for ordering materials or determining duct lengths.
2.1.2. Pull Boxes/NEMA 4 Enclosures
The Contractor shall install one each NEMA 4X enclosure and connect 1 each 2” conduit to the existing NEMA Box (power) on the existing GV Poles (total 15). The Contractor shall determine the size of the enclosure needed to satisfy the particular requirement at that location based on the quantity of conduits coming into the enclosure. See NEMA
BOX reference drawing in Appendix A for installation details. Coordinate with 81
CS/SCOIV prior to installation to verify mounting locations.
2.1.3. Fiber Optic Distribution Panel (FODP)
The Contractor shall install the following FODPs. Coordinate with 81 CS/SCOIV for final mounting location within existing racks.
• ITB 223: One 6-port FODP in the existing rack
• ITB 2801: One 6-port FODP in the existing rack
• ITB 1101: One 12-port FODP in the existing rack
• ITB 6901: One 24-port FODP in the existing rack
• ITB 4705: One 12-port FODP in the existing rack
• GV Pole #1: One 6-port FODP in the new NEMA Box
• GV Pole #3: One 6-port FODP in the new NEMA Box
• GV Pole #4: One 6-port FODP in the new NEMA Box
• GV Pole #5: One 6-port FODP in the new NEMA Box
• GV Pole #6: One 6- port FODP in the new NEMA Box
• GV Pole #7: One 6-port FODP in the new NEMA Box
• GV Pole #8: One 6-port FODP in the new NEMA Box
• GV Pole #9: One 6-port FODP in the new NEMA Box
• GV Pole #10: One 6-port FODP in the new NEMA Box
• GV Pole #12: One 6-port FODP in the new NEMA Box
• GV Pole #13: One 6-port FODP in the new NEMA Box
• GV Pole #14: One 6-port FODP in the new NEMA Box
• GV Pole #15: One 6-port FODP in the new NEMA Box
• GV Pole #16: One 6-port FODP in the new NEMA Box
• GV Pole #17: One 6-port FODP in the new NEMA Box
2.2. Outside Plant Installation
Outside Plant Installation shall be accomplished in accordance with paragraph 8.0 of the
Supplemental Information attachment. The Contractor is to propose their own solution and recommendations pertaining to the accomplishment of this requirement in their proposal.
The Contractor shall install underground outside plant infrastructure as described below.
2.2.1 Infrastructure Installation
The contractor shall install the following new infrastructure. All new locations and distances are approximate.
2.2.2 New Hand holes
The Contractor shall install three (3) 4’W x 4’L x 4’H (interior dimensions) hand holes (to be designated as HH-16B-1, HH-138C-3, HH-138C-4), for the purposes of this requirement. Coordinate with 81 CS/SCOIV prior to final hand holes placement and numbering.
2.2.3 Duct bank Infrastructure
Install the following PVC Duct banks
From To Qty
(ea)
Size
(Inch)
Approx.
Distance
(Feet)
Notes
MH-02F MH-02G 2 4 545 Directional Bore
PB-422 GV Pole #4 1 1.25 120 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-2801-1 GV Pole #6 1 1.25 335 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-114A GV Pole #7 1 1.25 100 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-06D GV Pole #10 1 1.25 255 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-16 GV Pole #8 1 1.25 250 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-16B New HH-16B-1 2 4 430 Directional Bore
New HH-16B-1 GV Pole #12 1 1.25 80 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-18 GV Pole #13 1 1.25 300 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-111 GV Pole #9 1 1.25 160 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
Enclosure B4803 GV Pole #14 1 1.25 50 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
HH-138C-2 New HH-138C-3 2 4 200 Directional Bore
New HH-138C-3 New HH-138C-4 2 4 330 Directional Bore
New HH-138C-4 GV Pole #1 1 1.25 120 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-154 GV Pole #5 1 1.25 135 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-149 GV Pole #16 1 1.25 650 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
HH-149F GV Pole #15 1 1.25 145 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
HH-149H GV Pole #17 1 1.25 290 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
HH-149J-2 GV Pole #3 1 1.25 50 1.25” HDPE Rollpipe - Directional
Bore to new NEMA Box
MH-25 MH-26 1 4 725 Directional Bore
2.2.4 Geotextile Inner-duct (or Innerduct)
Each new Quantity 1, 3-cell shall have a separate thread color.
Install the following 3” 3-cell Geotextile Inner-ducts (detectable)
From To Qty
(ea)
Approx.
Distance
(Feet)
Notes
MH-02F MH-02G 3 545 In one of the new 4” conduits
ITB 6901 HH-16 3 205 In an existing, vacant 4” conduit
HH-16 MH-16 3 340 In an existing, vacant 4” conduit
ITB 6901 MH-16B 3 305 In an existing, vacant 4” conduit
MH-16B New HH-16B-1 3 430 In one of the new 4” conduits
MH-135 MH-27 3 330 In an existing, vacant 4” conduit
HH-138C-2 New HH-138C-3 3 200 In one of the new 4” conduits
New HH-138C-3 New HH-138C-4 3 330 In one of the new 4” conduits
MH-25 MH-26 3 725 In the new 4” conduit
2.2.5 Fiber Optic Cable Installation
The Contractor shall install single mode (SM), loose buffer tube, water blocked, outside plant (OSP) fiber optic cable (FOC) suitable for underground applications. The intent is to install the cable in one continuous length, to the extent that it is practical. The cable shall meet RUS 7 CFR 1755.900 criteria; shall comply with industry standards with regard to manufacturers’ cable marking, jacket, rip cords, water blocking, fiber color coding, jacketing materials, etc. In addition, the FOC shall comply with industry standards with
1137906887C Highlight regard to mode field diameter, core cladding concentricity, attenuation, and dispersion characteristics at 1310nm and 1550nm.
All fiber optic cables shall be installed in new or existing geotextile inner-duct / innerduct.
2.2.5.1 From ITB 223 to GV Pole #4
The Contractor shall install approximately 1850’ of 6 strand SM FOC from ITB 223 to GV Pole #4 via MH-2801-6, MH-02F, MH-02G and PB-422. Terminate new 6 strand SM FOC in the new 6-port FODP in ITB 223, and new 6 strand SM FOC in the new 6-port FODP on the GV Pole #4.
2.2.5.2 From ITB 2801 to GV Pole #6
The Contractor shall install approximately 650’ of 6 strand SM FOC from ITB 2801 to GV Pole #6 via MH-01A, and MH-2801-1. Terminate new 6 strand SM FOC in the new 6-port FODP in ITB 2801 and new 6 strand SM FOC in the new 6-port
FODP on the GV Pole #6.
2.2.5.3 From ITB 1101 to GV Pole #7
The Contractor shall install approximately 1500’ of 6 strand SM FOC from ITB
1101 to GV Pole #7 via HH-116A, MM-116, MH-115, MH-114 and MH-114A.
Terminate new 6 strand SM FOC in the new 12-port FODP in ITB 1101, and new 6 strand SM FOC in the new 6-port FODP on the GV Pole #7.
2.2.5.4 From ITB 1101 to GV Pole #10
The Contractor shall install approximately 4350’ of 6 strand SM FOC from ITB
1101 to GV Pole #10 via HH-116A, MM-116, MH-115, MH-114, MH-114A, MH-
05B-1, MH-06, MH-06A, MH-06B, MH-06C and MH-06D. Terminate new 6 strand SM FOC in the new 12-port FODP in ITB 1101, and new 6 strand SM FOC in the new 6-port FODP on the GV Pole #10.
2.2.5.5 From ITB 6901 to GV Pole #8
The Contractor shall install approximately 900’ of 6 strand SM FOC from ITB 6901 to GV Pole #8 via HH-16 and MH-16. Terminate new 6 strand SM FOC in the new
24-port FODP in ITB 6901, and new 6 strand SM FOC in the new 6-port FODP on the GV Pole #8.
2.2.5.6 From ITB 6901 to GV Pole #12
The Contractor shall install approximately 950’ of 6 strand SM FOC from ITB 6901 to GV Pole #12 via MH-16B and New HH-16B-1. Terminate new 6 strand SM
FOC in the new 24-port FODP in ITB 6901, and new 6 strand SM FOC in the new
6-port FODP on the GV Pole #12.
2.2.5.7 From ITB 6901 to GV Pole #13
The Contractor shall install approximately 1900’ of 6 strand SM FOC from ITB
6901 to GV Pole #13 via MH-131, MH-130, MH-17 and MH-18. Terminate new 6 strand SM FOC in the new 24-port FODP in ITB 6901, and new 6 strand SM FOC in the new 6-port FODP on the GV Pole #13.
2.2.5.8 From ITB 4705 to GV Pole #9
The Contractor shall install approximately 2150’ of 6 strand SM FOC from ITB
4705 to GV Pole #9 via MH-135, MH-27, MH-26, MH-25 and MH-111. Terminate new 6 strand SM FOC in the new 12- port FODP in ITB 4705, and new 6 strand SM
FOC in the new 6-port FODP on the GV Pole #9.
2.2.5.9 From ITB 4705 to GV Pole #14
The Contractor shall install approximately 1150’ of 6 strand SM FOC from ITB
4705 to GV Pole #14 via MH-135, MH-27, MH-27A and Enclosure B4803.
Terminate new 6 strand SM FOC in the new 12-port-FODP in ITB 4705, and new 6 strand SM FOC in the new 6-port FODP on the GV Pole #14.
2.2.5.10 From MH-11K to GV Pole #1
The Contractor shall install approximately 4550’ of 6 strand SM FOC from MH-11K to GV Pole #1 via MH-139, MH-138, MH-138A, MH-138B, MH-138C, HH-138C-
1, HH-138C-2, New HH-138C-3 and New HH-138C-4. Terminate new 6 strand SM
FOC in new 6-port FODP on the GV Pole #1. The Contractor shall splice 6 strand
SM FOC into the existing 144 strand SM FOC (126 strands available) in MH-11K.
2.2.5.11 From MH-11K to GV Pole #5
The Contractor shall install approximately 3250’ of 6 strand SM FOC from MH-11K to GV Pole #5 via MH-11L, MH-11M, MH-11N, MH-11O and MH-154. Terminate new 6 strand SM FOC in the new 6-port FODP on the GV Pole #5. The Contractor shall splice 6 strand SM FOC into the existing 144 strand SM FOC (126 strands available) in MH-11K.
2.2.5.12 From MH-11K to MH-149
The Contractor shall install approximately 5300’ of 24 strand SM FOC from MH-
11K to MH-149 via MH-11L, MH-11M, MH-11N, MH-11O, MH-154, MH-153, MH-152, MH-151, and MH-150. The Contractor shall splice 24 strand SM FOC into the existing 144 strand SM FOC (126 strands available) in MH-11K.
2.2.5.13 From MH-149 to GV Pole #16
The Contractor shall install approximately 700’ of 6 strand SM FOC from MH-149 to GV Pole #16. The Contractor shall splice 6 strand SM FOC into new 24 strand
SM FOC in MH-149. Terminate new 6 strand SM FOC in the new 6-port FODP on the GV Pole #16.
2.2.5.14 From MH-149 to HH-149F
The Contractor shall install approximately 4450’ of 24 strand SM FOC (6 strand SM
FOC shall be dark) from MH-149 to HH-149F via HH-149A, HH-149B, HH-44, HH-149C, HH-149D and HH-149E. The Contractor shall splice 24 strand SM FOC
(6 strand SM FOC shall be dark) in to new 24 strand SM FOC in MH-149.
2.2.5.15 From HH-149F to GV Pole #15
The Contractor shall install approximately 200’ of 6 strand FOC SM from HH-149F to GV Pole #15. The Contractor shall splice 6 strand SM FOC in to new 24 strand
SM FOC (6 strand SM FOC shall be dark) in HH-149F. Terminate new 6 strand SM
FOC in the new 6-port FODP on the GV Pole #15.
2.2.5.16 From HH-149F to GV Pole #17
The Contractor shall install approximately 1700’ of 6 strand FOC SM from HH-
149F to GV Pole #17 via HH-149G and HH-149H. Terminate new 6 strand SM
FOC in the new 6-port FODP on the GV Pole #17. The Contractor shall splice 6 strand SM FOC in to new 24 strand SM FOC (6 strand SM FOC shall be dark) in
HH-149F.
2.2.5.17 From HH-149F to GV Pole #3
The Contractor shall install approximately 4350’ of 6 strand FOC SM from HH-
149F to GV Pole #3 via HH-149G, HH-149H, HH-149J, HH-149-J-1 and HH-149-J-
2. The Contractor shall splice 6 strand SM FOC in to new 24 strand SM FOC (6 strand SM FOC shall be dark) in HH-149F. Terminate new 6 strand SM FOC in the new 6-port FODP on the GV Pole #3.
3.0 Appendix A: Reference Drawings
3.1. Install new NEMA Boxes on the fifteen (15) existing Giant Voice Poles
3.2. Manholes/Duct System (MHDS) MH-11K to Giant Voice Poles #1, #3, #5, #15, #16 & #17
FROM
MH-139 MH-138
6 SM 6 SM
6 SM
124 STRAND SM
AVAILABLE
SP
� 6 SM 6 SM
24 SM 24 SM MH-llL
MH-llK
POLE 015
6 SM
SPLICE 24 SM 24 SM
- (6 DARK) (6 DARK)
HH-149E
HH-149F
6 SM POLE 017
6 SM
6 SM
6 SM
6 SM 6 SM
HH-149G HH-149H
MHDS
MH-llK TO
FOR GIANT
GIANT VOICE
VOICE POLES
POLES
MH-138A MH-138B MH-138C
6 SM 6 SM 6 SM
6 SM 6 SM 6 SM
24 SM 24 SM 24 SM MH-llM MH-llN
MH-110
24 SM 24 SM 24 SM
(6 DARK) (6 DARK) (6 DARK) HH-149D
HH-149C HH-44
POLE •3
6 SM
6 SM
6 SM
HH-149J HH-149- HH-149-
J-1 J-2
POLE 01
6 SM
HH-138C-1 HH-138C-2 NEW NEW
HH-138C-3 HH-138C-4 6 SM 6 SM 6 SM
POLE 05
6 SM
24 SM 24 SM 24 SM
MH-154 MH-153 MH-152
MH-151
POLE "16
24 SM
6 SM
24 SM 24 SM SPLICE
(6 DARK) (6 DARK)
- 24 SM HH-149B HH-149A
MH-150
MH-149
FOR REFERENCE ONLY
EXISTING NEMA BOX
<POWER)
INSTALLATION NEW NENA BOX ON THE EXISTING GIANT VOICE POLE
EXISTING
/GVPOLE
SIDE VIEW
NOTE 1
NEW NEMA BOX
(COMM)
NOTES:
L THE CONTRACTOR SHALL INSTALL NEW NEMA BOX
ON THE EXISTING GIANT VOICE POLE
2. THE CONTRACTOR SHALL INSTALL 2" CONDUIT BETWEEN
EXISTING NEMA BOX (POWER) AND NEW NEMA BOX (COMM)
EXISTING NEMA BOX
(POWER)
NOTE 2
TOP VIEW
FOR REFERENCE ONLY
NEW 2" CONDUIT
NEW NEMA BOX
(COMM)
SOO - Fiber Optic Cables Installation to Support Connectivity to Giant Voice Poles at Keesler AFB MS
1137906887C Highlight
1137906887C Highlight
| Attachment 2--SOO EMNS Poles; 15 June 2021 |
| MHDA for Pole Connections |
| NEMA Box DWG |
File details come from the government source that posted it. Updated .