Winters Manor – Additional Questions and Answers
1. In amendment 3 drawing 2 of 12 revision 01 21 May 2012 read “include duplex outlets in locations shown”. There was no revised drawing 9 of 12 with amendment 3 and the original drawing 9 of 12 doesn’t show in additional outlets. How are we to proceed?
This should have reference drawing 10 of 12.
2. Specification supplied in Amendment 3, Section 15 40 00 Plumbing, references stops, supply lines and traps (drawings only specify replacing the fixture). Is contractor to include new supply lines, stops and traps at all new plumbing fixtures?
Contractor to supply new trap, stop, and supply line (from new fixture to existing valve) for each new dorm room lavatory. Fixtures shall be replaced as specified in SOW.
ADDITIONALLY, note 39 on page 9 shall be revised to read: (essentially replacing solid surface with cultured marble with integral sink)
Remove countertops. Replace with 5/8" (min) cultured marble counter tops over base cabinets only. Extend overhands 1/2" on open sides and provide backsplashes on wall sides. Lavatory counter to include integral sink and kitchen counter to be modified as shown in detail 11 page
10. Caulk along edges and repair and paint walls as necessary.
The SOW and associated details for the dormitory lavatories shall now replace solid surface lavatory tops with cultured marble.