Renovate Student Dorms Winters Manor Federal contract opportunity
Solicitation number
FA3010-14-R-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 3 Wage Determination MS140119

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Student Dorms Winters Manor, newest first.
File Type Posted
MAHG10-1032_PAE_addendum_3.pdf PDF
FA3010-14-R-0006-0007.pdf PDF
SECTION_10_10_00_DISPLAY_CASES.pdf PDF
Section_12_48_23_Entrance_Floor_Grids.pdf PDF
RFI's_Winters_Manor.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Add_2_SECTION_12_36_00_COUNTERTOPS.pdf PDF
MAHG101032_Addendum_2.pdf PDF
Amendment_0004.pdf PDF
Winters_Manor_Additional_QA.pdf PDF
MAHG101032_Addendum_1_RFIs.pdf PDF
Add_1_SECTION_16_50_00_LIGHTING.pdf PDF
Amendment_0003.pdf PDF
Add_1_SECTION_09_68_13_TILE_CARPETING.pdf PDF
Add_1_SECTION_16_00_00_GENERAL_PROVISIONS-ELECTRICAL.pdf PDF
Add_1_MAHG10-1032_Drawing_Sheets_Revision_01_5_21_14.pdf PDF
Add_1_SECTION_16_11_00_RACEWAYS.pdf PDF
Add_1_SECTION_15_40_00_PLUMBING.pdf PDF
Add_1_SECTION_08_11_13_STEEL_DOORS_AND_FRAMES.pdf PDF
Add_1_SECTION_16_72_60_PUBLIC_ADDRESS_AND_MASS_NOTIFICATION_SYSTEMS.pdf PDF
Add_1_SECTION_15_20_00_DOMESTIC_WATER_PIPING.pdf PDF
Add_1_Section_07_56_00_Fluid_Applied_Roofing.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Site_Visit_Sign_In.pdf PDF
Solicitation.pdf PDF
MAHG101032_DRAWINGS_2013-2-20.pdf PDF
Attachment_4_Performance_Questionnaire.pdf PDF
Attachment_6_SF_1444.pdf PDF
Attachment_6_Instructions.pdf PDF
MAHG101032_Repair_student_Dorm_7404_SPECIFICATIONS.pdf PDF
Attachment_5_Past_Performance_Reference_List.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

General Decision Number: MS140119 02/07/2014 MS119

Superseded General Decision Number: MS20130119

State: Mississippi

Construction Type: Building

County: Harrison County in Mississippi.

BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 01/03/2014 1 02/07/2014

ELEC0903-002 06/01/2013

Rates Fringes

Electrician (including the low voltage wiring for and installation of temperature controls for HVAC systems).......$ 23.80 7.37

IRON0058-009 06/01/2013

Rates Fringes

IRONWORKER, STRUCTURAL AND

ORNAMENTAL, Excludes Metal Building Erection................$ 19.60 7.97

* PLUM0568-001 12/01/2013

Rates Fringes

PLUMBER (including HVAC pipe)....$ 24.41 8.57

SHEE0214-008 07/01/2013

Rates Fringes

SHEET METAL WORKER (including HVAC Duct).......................$ 25.65 9.49

SUMS2008-046 07/07/2008

Rates Fringes

BRICKLAYER.......................$ 22.00 0.02

CARPENTER, Includes Acoustical Ceiling

Installation, Cabinet Installation, Drywall Hanging, and Form Work...........$ 13.41 0.00

CEMENT MASON/CONCRETE FINISHER...$ 10.91 0.00

GLAZIER..........................$ 10.00 0.00

IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 11.90 0.00

LABORER: Common or General......$ 8.64 0.00

LABORER: Mason Tender - Brick...$ 10.00 0.00

OPERATOR: Backhoe...............$ 15.58 1.62

OPERATOR: Bulldozer.............$ 13.50 0.00

OPERATOR: Crane.................$ 16.73 0.92

OPERATOR: Excavator.............$ 11.33 0.00

OPERATOR: Forklift..............$ 11.75 1.61

OPERATOR: Grader/Blade, Includes Finishing...............$ 12.50 1.57

OPERATOR: Trackhoe..............$ 14.50 0.00

PAINTER: Brush, Roller and Spray............................$ 12.75 0.00

PIPEFITTER, Excludes HVAC Pipe Installation................$ 21.83 0.00

ROOFER...........................$ 14.50 0.00

TRUCK DRIVER.....................$ 11.00 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION