Add_1_SECTION_16_50_00_LIGHTING.pdf

PDF 17 KB Posted

Attached to
Renovate Student Dorms Winters Manor Federal contract opportunity
Solicitation number
FA3010-14-R-0006
Issued by
Department of the Air Force Air Education and Training Command

About this file

Addendum 1 Section 16 50 00

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Student Dorms Winters Manor, newest first.
File Type Posted
SECTION_10_10_00_DISPLAY_CASES.pdf PDF
Section_12_48_23_Entrance_Floor_Grids.pdf PDF
RFI's_Winters_Manor.pdf PDF
MAHG10-1032_PAE_addendum_3.pdf PDF
FA3010-14-R-0006-0007.pdf PDF
Amendment_0006.pdf PDF
MAHG101032_Addendum_2.pdf PDF
Amendment_0005.pdf PDF
Add_2_SECTION_12_36_00_COUNTERTOPS.pdf PDF
Amendment_0004.pdf PDF
Winters_Manor_Additional_QA.pdf PDF
MAHG101032_Addendum_1_RFIs.pdf PDF
Add_1_SECTION_16_11_00_RACEWAYS.pdf PDF
Add_1_SECTION_15_40_00_PLUMBING.pdf PDF
Add_1_SECTION_08_11_13_STEEL_DOORS_AND_FRAMES.pdf PDF
Add_1_SECTION_16_72_60_PUBLIC_ADDRESS_AND_MASS_NOTIFICATION_SYSTEMS.pdf PDF
Add_1_SECTION_15_20_00_DOMESTIC_WATER_PIPING.pdf PDF
Add_1_Section_07_56_00_Fluid_Applied_Roofing.pdf PDF
Add_1_SECTION_16_00_00_GENERAL_PROVISIONS-ELECTRICAL.pdf PDF
Add_1_MAHG10-1032_Drawing_Sheets_Revision_01_5_21_14.pdf PDF
Amendment_0003.pdf PDF
Add_1_SECTION_09_68_13_TILE_CARPETING.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
Site_Visit_Sign_In.pdf PDF
Attachment_5_Past_Performance_Reference_List.pdf PDF
Attachment_6_SF_1444.pdf PDF
Attachment_6_Instructions.pdf PDF
WD_MS140119.pdf PDF
MAHG101032_Repair_student_Dorm_7404_SPECIFICATIONS.pdf PDF
Solicitation.pdf PDF
MAHG101032_DRAWINGS_2013-2-20.pdf PDF
Attachment_4_Performance_Questionnaire.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAHG10-1032

SECTION 16 50 00 - LIGHTING

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Furnish and install lighting fixtures, complete with lamps, in accordance with this section.

For purposes of identification, certain manufacturers and catalog numbers have been specified. Fixtures of other manufactures of equal quality, general dimensions, photometric characteristics, and appearance will be acceptable upon approval by Contracting Officer. Comply with Paragraph 16000-1.06 before bidding. Section 16000 - Electrical General Requirements, apply to the work specified in this Section, with additions and modifications specified herein.

1.2 SECTION INCLUDES

A. Luminaries B. Shielding Media C. Lamps D. Ballasts E. Installation of Fixtures

PART 2 PRODUCTS

2.1 PRODUCTS

A. Luminaire shall be manufactured by Hubbell Outdoor Lighting model no. PGM3-070P-18- BZ-L or approved equal.

1. Product requirements for each luminaire are as follows:

a. HOUSING: Cast aluminum door frame with prismatic glass refractor. Door seals to housing gasket with twin Hubbell Gard® captive fasteners Die cast aluminum housing allows firm mounting over recessed junction boxes or on flat surfaces for 1/2” surface conduit. Casting dissipates ballast heat for long life. Top hub supplied for field installation of button photo control, ordered separately

b. LIGHT CONTROL:

Specular aluminum reflector with kicker panels. Vertical socket position to provide six to one spacing to mounting height ratio for maximum spacing.

c. ELECTRICAL: PGM features 70-250w HPS and pulse start metal halide.

QuadTap®, 347V and 50Hz 220/240V

d. FINISH: Each standard luminaire to receive a fade and abrasion resistant, electrostatically applied, thermally cured, textured TGlC polyester powder-coat finish. Dark bronze 800 Series powder paint finish standard on frame and housing.

e. LABELS: All luminaires bear UL or CUL (where applicable) Wet Location labels.

f. WARRANTY: 5 year limited warranty. Polycarbonate lenses to carry a 1 year warranty only.

B. Accessories: Provide required accessories for mounting and operations of each luminaire as indicated.

1. Thermal Protection: Provide thermal protection devices to meet NFPA 70 requirements.

2. Surface Luminaries: Provide spacers and brackets required for mounting.

2.2 LAMPS

A. Provide lamps for all fixtures.

Section 16 50 00_1-2

MAHG10-1032

B. Description:

1. Pulse start metal halide.

2.3 BALLASTS-not applicable

2.8 INSTALLATION OF FIXTURES

A. Provide adequate support for all fixtures.

B. Contractor to verify facility and site voltage prior to ordering fixtures.

PART 3 EXECUTION

3.1 EXAMINATION AND PREPARATION

A. Examine adjacent surfaces to determine that surfaces are ready to receive work.

3.2 INSTALLATION

A. Install luminaries and accessories in accordance with manufacturer's instructions.

1. Install luminaries so that there is no light leakage around fixture trim. Support fixtures in accordance with Article 410-16 C of the National Electrical Code.

2. Install lamps in luminaries and lamp-holders.

3.3 ADJUSTING AND CLEANING

A. Align luminaries and clean lenses and diffusers at completion of work.

B. Aim adjustable luminaries and lamp-holders as indicated or as directed.

C. Clean paint splatters, dirt and debris from installed luminaries.

D. Re-lamp luminaries, which have failed lamps at completion of work.

E. Touch up luminaire at completion of work.

F. Adjust relays, timers, photo controls, etc. to achieve specified or directed operation.

END OF SECTION

Section 16 50 00_2-2

File details come from the government source that posted it. Updated .