MAHG10-1032
Section 10 10 00_1-2
SECTION 10100 - VISUAL DISPLAY BOARDS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Bulletin boards – Enclosed
1.2 SUBMITTALS
A. Product Data: Provide manufacturer's descriptive literature including item number, size, description and representative picture.
B. Shop Drawings: Provide shop drawings where manufacturer data from 1.2.A above is insufficient for verification of suitability to application and installation.
C. Samples: Provide samples of board surface and framing where manufacturer data from 1.2.A above is insufficient for verification of suitability to application and installation.
1.3 DELIVERY, STORAGE & HANDLING
A. Packing, Shipping, Handling and Unloading: Panels are to be packed in wooden crates for shipment to site. Cardboard only packing is not acceptable.
B. Acceptance at Site: Crated panels are to be opened and inspected for shipment damage and losses including scratches and dents on the panel and framing surfaces, frame misalignment due to rough handling and missing components and accessories. Any such shipping damage shall be noted on the bill of lading with the concurrence of a representative of the delivering carrier. Signing the bill of lading without interior crate inspection is not acceptable.
C. Storage and Protection: Panels and included accessories shall be returned to the shipping crate or other suitable container for storage in a protected, office environment type area prior to installation. Excessive heat, cold or humidity are not acceptable.
1.4 PROJECT/SITE CONDITIONS
A. Project/Site Environmental Requirements: Panels shall not be installed until site conditions are such that panels will not be damaged or contaminated by remaining construction activities. If necessary, provide physical protection to protect an installed panel's surfaces from physical damage. Accessories are to be separately retained for delivery to the owner.
1.5 WARRANTY
A. Warranty shall be the manufacturer's stated warranty plus any extended warranty provided by the manufacturer of any raw construction materials. Warranty shall apply to replacement/repair of returned materials only and shall not include costs of removal/reinstallation and shipping unless specifically allowed.
MAHG10-1032
Section 10 10 00_2-2
PART 2 PRODUCTS
2.1 MATERIALS
A. Bulletin boards - plain and enclosed:
1. Panel to be constructed of 7/32" minimum thickness natural cork laminated to ¼" nominal hardboard backing.
2. Enclosure to be constructed of mitered aluminum framing with a 2-3" depth with hinged door.
a. Hinged door enclosures shall include keyed locking doors, continuous hinges, and acrylic plastic windows.
3. Include concealed mounting brackets.
PART 3 EXECUTION
3.1 INSTALLATION
A. Install per manufacturers supplied installation instructions.
3.2 CLEANING
A. Clean panel surface per manufacturer's supplied instructions. Use of cleaning solutions other than specified acrylic and aluminum cleaner or abrasive cleaners of any kind is prohibited.
END OF SECTION