SOW Attachment 1 DO Order Instructions .pdf

PDF 62 KB Posted

Attached to
Eglin Simplified Acquisition Base Engineering Requirements (SABER)
Solicitation number
FA2823-09-R-0007
Issued by

About this file

Statement of Work Attachment 1 Delivery Order Procedures.

View the file

Other files

File Type Posted
Amendment 2.pdf PDF
Questions and Answers Post II.docx DOCX document
RFP Amendment 1.pdf PDF
2009 SABER Contract SOW 1 June 2009 Attachment 2.pdf PDF
Attachment L-1.pdf PDF
Attachment 2 SABER SOW.pdf PDF
FA2823-09-R-0007.pdf PDF
Attachment 3 Eglin SABER SPECS.pdf PDF
ATTACHMENT L-4 Past Performance Questionaire.pdf PDF
Attachment L-3 Consent Form.pdf PDF
Attachment 1 Wage Determinations.pdf PDF
ATTACHMENT L-2 Past Performance Info.pdf PDF
Eglin Vicinity Map.pdf PDF
Eglin —
Executive Summary Letter.pdf PDF
2009 SABER Contract SOW 1 Apr 09 Attachment 2.docx DOCX document
Draft RFP.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2823-09-R-0007

SOW Attachment #1

Signature/Date

Results of the evaluation are on the reverse of this form

EVALUATION WORKSHEET FOR DELIVERY ORDER PROPOSALS

1. Criterion – Contractor’s understanding of the DO requirements.

Weight

Standard – The DO proposal addresses all requirements established in the RFP and at the site visit, including specific materials and methods, and any special conditions such as phasing of work or required completion date.

2. Criterion – Completeness, accuracy and reasonableness of the DO proposal.

Standard – The drawings indicate proposed construction methods and materials, including the description and specific locations of each item contained in the cost Proposal. The drawings are to scale and include dimensions, details, and door, frame, hardware, window, equipment and finish schedules.

Standard – The cost proposal contains only line items needed to satisfy the DO requirements with applied coefficient. Material quantities are calculated as “in place” using the dimensioned drawings. Three independent written price quotes are included for each NPI exceeding $3,000.00

(or as required by the Contracting Officer).

Standard – The timeline addresses all critical DO work elements, phasing and material delivery times, and indicates work will be coordinated and scheduled to avoid unnecessary delays. Productivity for installation of prepriced items is calculated using the R.S. Means daily output based on quantities in the cost proposal.

3. Criterion – Contractor’s past performance on DO’s under this contract.

Standard – The Contractor provided quality work in a timely manner. Previous DO proposals were submitted on time and the work was completed by the negotiated task order completion date.

Task order proposals will be evaluated against the standards listed above, and graded on a scale of 1 thru 5. The proposal with the highest composite score will be deemed the most advantageous to the

Government.

20% x

20% x

20% x

20% x

20% x

TOTAL SCORE: _______________