Atch_8_Hazardous_Waste_Form.doc

DOC document 39 KB Posted

Attached to
Consolidated Back-Up Power Building 533 Federal contract opportunity
Solicitation number
FA252119BA009
Issued by
Department of the Air Force Space Command

About this file

Attachment 8 - Hazardous Waste Form

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Back-Up Power Building 533, newest first.
File Type Posted
OF1419_(19BA009).pdf PDF
Answers_w__Attachments_(19BA009__BU_Power_Req).pdf PDF
Solicitation_Amendment_FA252119BA0090001_SF_30.pdf PDF
Section_L_(Amd0001).pdf PDF
Atch_4_CECC_Form_3052.xls XLS spreadsheet
Atch_5_WRR_(FL190001)_1Mar2019.pdf PDF
Solicitation_-_FA252119BA009.pdf PDF
Atch_2_BU_Power_Systems_(B533).pdf PDF
Atch_6_Badge_Request_(45_SFS).pdf PDF
Atch_9_Q_&_A_Template.doc DOC document
Atch_7_GPP_Certification_Form.pdf PDF
Atch_3_BPS_Comm_Ctr_B533_drawings.pdf PDF
Atch_1_SOW_(Feb_2019).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:
SXHT 14-1046
PROJECT TITLE:
Consolidate B/U Power Comm Center- B533

CONTRACTOR:

POINT OF CONTACT:

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equipment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgeable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________