Attachment 4 - Construction Breakdown Form
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF1419_(19BA009).pdf | ||
| Answers_w__Attachments_(19BA009__BU_Power_Req).pdf | ||
| Solicitation_Amendment_FA252119BA0090001_SF_30.pdf | ||
| Section_L_(Amd0001).pdf | ||
| Atch_2_BU_Power_Systems_(B533).pdf | ||
| Atch_6_Badge_Request_(45_SFS).pdf | ||
| Atch_9_Q_&_A_Template.doc | DOC document | |
| Atch_7_GPP_Certification_Form.pdf | ||
| Atch_3_BPS_Comm_Ctr_B533_drawings.pdf | ||
| Atch_1_SOW_(Feb_2019).pdf | ||
| Atch_5_WRR_(FL190001)_1Mar2019.pdf | ||
| Solicitation_-_FA252119BA009.pdf | ||
| Atch_8_Hazardous_Waste_Form.doc | DOC document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF3052 CLIN 001
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| PURCHASE REQUEST FORM | PROJECT NUMBER | WORK LOCATION | ||||||||
| MATERIAL COST | LABOR COST | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE | ||
| NO. | MEASURE | UNIT | TOTAL | MANDAYS | RATE | COSTS | TOTAL | |||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 0.00 | 0.00 | 0.00 | 0.00 | |||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | ||||||||||
| 0.00 | ||||||||||
| 0 | 0.00 | |||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | ||||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| 0.00 | 0.00 | 0.00 | ||||||||
| CECC FORM 3052 | PAGE 1 | |||||||||
| INSTRUCTIONS FOR COMPLETING AF FORM 3052 | ||||||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient | ||||||||||
| detail to permit itemizing of all direct costs. | ||||||||||
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples--square yards--SY, cubic yards-- | ||||||||||
| CY, square feet--SF, linear feet--LF, board feet--BF, each--EA, pound--LB). | ||||||||||
| Col 3 Quantity. Constractor's estimate of quantity required in terms of unit of measure (couldmn 2). Itms and units of measure will | ||||||||||
| be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price | ||||||||||
| contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates. | ||||||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total costs (Col 5) for items listed in column 1. | ||||||||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in | ||||||||||
| column 1. Enter in col 7 the average rate per manhour (manday) and in col 8 the total labor cost. | ||||||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the | ||||||||||
| contract and of significant dollar value. | ||||||||||
| Col 10 Line Total. Self-explanatory. | ||||||||||
| NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on | ||||||||||
| the last page as follows. | ||||||||||
| TOTAL MATERIAL COSTS | $ | |||||||||
| TOTAL LABOR COSTS | $ | |||||||||
| TOTAL OTHER DIRECT COSTS | $ | |||||||||
| TOAL DIRECT COSTS | $ | |||||||||
| OVERHEAD | $ | |||||||||
| SUBTOTAL | $ | |||||||||
| PROFIT | $ | |||||||||
| TOTAL PRICE | $ | |||||||||
| DATE | FIRM NAME | |||||||||
| TITLE | BY | |||||||||
| (Signature) | ||||||||||
| INSTRUCTIONS TO OFFERORS | ||||||||||
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of | ||||||||||
| incurred and estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award | ||||||||||
| of a contract resulting from this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a | ||||||||||
| certificate of current cost or pricing data (see ASPR 3-807.3(e) and 3.807.4). | ||||||||||
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit | ||||||||||
| with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an | ||||||||||
| appropriate review and analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that | ||||||||||
| there be a clear understanding of | ||||||||||
| a. The existing, verifiable data | ||||||||||
| b. The judgmental factors applied in projecting from known data to the estimate, and | ||||||||||
| c. The contingencies used by the offeror in his proposed price. | ||||||||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||||||
| 3. When attachment of supporting cost or pricing data to this form is impracticalbe, the data will be described (with schdules as | ||||||||||
| appropriate), and made available to the contracting officer or his authorized representative on request. | ||||||||||
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, | ||||||||||
| for the purpose of verifying the cost or pricing data submitted, those books, records, documents, and other supporting data which | ||||||||||
| will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right | ||||||||||
| may be exercised in connection with any negotiations prior to contract award. | ||||||||||
| (Reverse of AF Form 3052, Jan 88) | ||||||||||
| *U.S. GOVERNMENT PRINTING OFFICE: 1988-24D-979:51319 |