Attch_3_-_DBEH_13-1523_RPR_Hgr_U,Fac_1744_CCAFS_GPP_Form.pdf
PDF 94 KB Posted
- Attached to
- Repair Hanger U, FAC 1744
- Solicitation number
- FA2521-17-B-0008
About this file
Attachment 3 - DBEH 13-1523 Repair Hangar U, FAC 1744; Green Procurement Form
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Revision Date: 04 May 2007
UNCLASSIFIED
RECOVERED MATERIALS DETERMINATION FORM
(Part 1) Design/Procurement
INSTRUCTIONS
This form is to be completed by the requiring activity when EPA-designated items are applicable to the requirement. For questions on whether the product counts as “EPA-designated” or what the required recycled content is, refer to product descriptions on EPA’s website at www.epa.gov/cpg/products. This form is not required for construction item purchases less than $2,000, or for other purchases less than $3,000. The completed form becomes part of the contracting office contract file.
PROCUREMENT TITLE: DBEH 13-1523 RPR Hgr U,Fac 1744 CCAFS
PROCUREMENT REQUEST NO.
PART 1: RECOVERED MATERIALS DETERMINATION
Part 1 shall be completed by the specifying authority when requesting a procurement action.
EPA-DESIGNATED ITEMS
(Place a check mark next to each product that applies to this procurement)
Construction Products:
Building insulation Polyester carpet Carpet Cushion
Cement & concrete containing:
Coal fly ash Ground granulated blast furnace slag Cenospheres Silica fume Floor tiles (rubber & plastic) Flowable fill Latex paint Laminated paperboard Modular threshold ramps Nonpressure pipe Patio blocks Railroad grade crossings/surfaces Roofing materials Shower & restroom dividers/partitions Structural fiberboard
Landscaping Products:
Compost from yard trimmings or food waste Garden and soaker hoses Hydraulic mulch Lawn and garden edging Plastic lumber landscaping timbers and posts
Park & Recreation Products:
Park and recreational furniture Playground equipment Playground surfaces Running tracks Plastic fencing (snow or erosion control, safetybarriers) Non-paper Office Products:
Binders (paper, solid plastic or plastic covered)
Plastic clipboards Plastic file folders Plastic clip portfolios Plastic presentation folders Office furniture Office recycling containers Office waste receptacles Plastic desktop accessories Plastic envelopes Plastic trash bags Printer ribbons Toner cartridges
Paper & Paper Products:
Commercial/industrial sanitary tissue products Miscellaneous papers Newsprint Paperboard and packaging
Printing and writing papers Tray liners
Vehicular Products:
Engine coolants Rebuilt vehicular parts Re-refined lubricating oils Retread tires
Transportation Products
Channelizers Delineators Flexible delineators Parking stops Traffic barricades Traffic cones
Miscellaneous Products:
Awards and plaques Bike racks Blasting grit Industrial drums Mats Pallets Signage Sorbents
Strapping
UNCLASSIFIED
Revision Date: 04 May 2007
UNCLASSIFIED
RECOVERED MATERIALS DETERMINATION FORM
(PART 1) Design/Procurement (Cont’d)
PROCUREMENT TITLE: DBEH 13-1523 RPR Hgr U,Fac 1744 CCAFS
PROCUREMENT REQUEST NO.
FAR 11.002(c) requires the establishment of statements of work and specification requirements for the procurement of products containing recovered materials and environmentally preferable and energy-efficient products and services.
If no EPA designated items were checked on page 1, than check box A:
A. I hereby certify that no EPA designated guideline items are included in this procurement action
If any EPA designated items are checked on page 1, than mark box B or C:
B. I hereby certify that the EPA recycled content requirements have been specified for all of the designated guideline items in this procurement action
OR
C. I hereby certify that the EPA recycled content requirements have been specified for all but the following designated guideline items for which compliance with EPA standards is not attainable.
If Box C is checked, list each designated item and the corresponding justification number from the list below for each exemption being claimed. Attach the supporting documentation for each waiver.
The exemption being claimed for this purchase is:
1. The product is not available competitively (from two or more sources) within a reasonable time frame;
2. The product is only available at an unreasonable price (based on a life-cycle cost analysis);
3. The product does not meet appropriate performance standards (in accordance with National
Institute of Standards and Technology (NIST) guidelines.)
Designated Item Justification #
1.
2.
3.
4.
R. Constantinide, RAEIS Architect 04.28.2017
Design/Specifying Agent Signature Date
Requiring Organization’s Technical Representative Signature Date
PFISTER.MICHAEL.JOHN.1263200353
Digitally signed by PFISTER.MICHAEL.JOHN.1263200353 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=PFISTER.MICHAEL.JOHN.1263200353 Date: 2017.06.07 13:00:15 -04'00'
File details come from the government source that posted it. Updated .