Attch_2_-_DBEH_13-1523_Rpr_Hangar_U_FAC_1744_Dwgs.pdf
PDF 16 MB Posted
- Attached to
- Repair Hanger U, FAC 1744 Federal contract opportunity
- Solicitation number
- FA2521-17-B-0008
About this file
Attachment 2 - DBEH 13-1523 Repair Hangar U, FAC 1744 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA2521-17-B-0008_Attendees.pdf | ||
| FA2521-17-B-0008_Abstract.pdf | ||
| FA2521-17-B-0008_Amendment_05.pdf | ||
| Amend_04.pdf | ||
| FA2521-17-B-0008_Amendment_03.pdf | ||
| FA2521-17-B-0008_Q&As.pdf | ||
| FA2521-17-B-0008_-_Q&As.pdf | ||
| FA2521-17-C-0008_Amendment_2.pdf | ||
| Attch_4_-_DBWD_FL170001_4_Aug_17.pdf | ||
| Site_Visit_Attendees.pdf | ||
| Attch_1_-_DBEH_13-1523,_Repair_Hangar_U,_Fac_1744_(100__Design_Specs).pdf | ||
| FA2521-17-B-0008_Rpr_Hangar_U_-_Conformed_Copy.pdf | ||
| Attch_4_-_DBWD_FL170001_14Jul2017.pdf | ||
| Attch_8-__Q&A_Template.docx | DOCX document | |
| Attch_5_-_CECC_Form_3052.xls | XLS spreadsheet | |
| FA2521-17-B-0008.pdf | ||
| Attch_6_-_Haz_Waste_Form.doc | DOC document | |
| Amendment_01_.pdf | ||
| Attch_7_-_45_SFS_Badge-Visitor_Request_Form.pdf | ||
| Attch_3_-_DBEH_13-1523_RPR_Hgr_U,Fac_1744_CCAFS_GPP_Form.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
K
I
D
T
R
I
P
B
A
N
R
V
E
L
C
O
TO
KENNEDY SPACE CENTER
INDUSTRIAL AREA
VISITOR CONTROL
CENTER
SOUTH GATE
N
A
W
Y
CCAFS
INDUSTRIAL
AREA
PORT CANAVERAL
SR A1A TO COCOA BEACH
DBEH 13-1523
REPAIR HANGAR U, FAC 1744
PERMIT(S)/ENVIRONMENTAL ACTIONS
REQUIRED PRIOR TO CONSTRUCTION
ERP/STORMWATER
ERP/WETLANDS/DREDGE & FILL
FDEP/DRINKING WATER
FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL
SURVEY/WILDLIFE
OTHER
NONE
FDEP/IND. WASTE WATER
IRP
FDEP/FUEL TANK
NOI/SWPPP
ASBESTOS
NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT
IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN
ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL
UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.
HEAVY METALS
YES NO
LEAD
PCB
NOT
VERIFIED
HAZARDOUS MATERIALS
G-001
M
A
L L E
N
R
C
O N
S T
A N
T I N
I D
E
L O
C A
T I O
N
M
A P
P
R O
J E
E
A
A
N D
D R
A W
I N
G
I N
D E
X
C
H
A R
T N
E T
T
D B
H
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
U I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
CAPE CANAVERAL AIR FORCE STATION
CAPE CANAVERAL, FLORIDA
SCALE:
LOCATION MAP
NONE
TRUE
NORTH
N
S
C
R
J
I
N
D
U
S
T
A
D
H
A
N
G
PROJECT
AREA
HANGAR U
FACILITY 01744,
CCAFS
DRAWING INDEX
Sheet Number Sheet Title
GENERAL
G-001
LOCATION MAP, PROJECT AREA AND DRAWING INDEX
G-002 AREAS OF WORK PLAN AND NOTES
HAZARDOUS MATERIALS
H-001 GENERAL HAZARDOUS MATERIAL NOTES AND ABBREVIATIONS
H-101 HAZARDOUS MATERIAL IDENTIFICATION AND ABATEMENT
CIVIL
C-100 HIGH BAY TRENCH PROJECT SCOPE
C-101 HIGH BAY TRENCH SEQUENCE
C-102 HIGH BAY TRENCH DEMOLITION PLAN
C-103 HIGH BAY INFILL PLAN
C-104 HIGH BAY TRENCH UTILITY PLAN
C-500 HIGH BAY TRENCH DETAILS
ARCHITECTURAL
A-001 INSTALLATION AND CORROSION TREATMENT NOTES
AD-100 FLAG NOTES - DEMOLITION
AD-101 HIGH BAY FLOOR PLAN AND PHOTOS - DEMOLITION
AD-102
HIGH BAY DOOR PLANS, ELEVATION & PHOTOS - DEMOLITION
A-100 FLAG NOTES - NEW CONSTRUCTION
A-101 HIGH BAY FLOOR PLAN AND SCHEDULES - NEW CONSTRUCTION
A-102
HIGH BAY DOOR PLANS, ELEVATIONS & SCHEDULE - NEW CONSTRUCTION
MECHANICAL
M-001
GENERAL NOTES, SUMMARY OF WORK, AND LEGEND
M-301 MECHANICAL HIGH BAR DOOR PLANS AND ELEVATION
M-302 MECHANICAL DETAIL AND PHOTOS
M-901 MECHANICAL PHOTOS
ELECTRICAL
E-001
ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS
ED-101 ELECTRICAL PLAN - DEMOLITION
E-101 ELECTRICAL PLAN - NEW
E-601 SINGLE-LINE DIAGRAM - DEMO AND NEW
E-602
PANEL SCHEDULES - EXISTING, NEW AND MODIFIED
BASE OPERATIONS:
COMMUNICATIONS:
PROJECT MANAGER:
CHIEF, ENGINEERING FLIGHT:
USER:
SAFETY:
SECURITY FORCES:
ATO:
OTHER:
ENVIRONMENTAL:
FIRE:
A
P
P
R
O
V
E
D
A
M b a r v i r
AREAS OF WORK - HIGH BAY
AREAS OF WORK - HIGH BAY HANGAR DOORS
LEGEND:
CLIN 1, 2, 3 AND 4 - AREAS OF WORK NOTES:
PROJECT DBEH 13-1523 'REPAIR HANGAR U, FAC 1744' CONSISTS OF 4 SEPARATE CLINS COMBINED INTO ONE DRAWING PACKAGE. THE PROJECTS'
OVERALL SCOPE OF WORK PROVIDES THE MULTIDISCIPLINARY CONSTRUCTION DOCUMENTS AND COORDINATION BETWEEN IDENTIFIED
ARCHITECTURAL, MECHANICAL, ELECTRICAL AND HAZARDOUS MATERIALS. EACH CLIN IS CLEARLY IDENTIFIED IN EACH RESPECTIVE DRAWING. THE
INDICATED SCOPES ARE DESCRIBED INDIVIDUALLY AND IDENTIFIED IN DOCUMENT DRAWINGS, THE CONTRACTOR IS NOT LIMITED BY THE INDICATED
DRAWINGS BUT IS REQUIRED TO VERIFY THE ENTIRE DOCUMENT PACKAGE IN ADDITION TO THOSE ITEMS STATED BELOW.
THE CONTRACTOR SHALL BID THE CONSTRUCTION WORK, INDICATED BY THE CURRENT DESIGN DOCUMENTS, INTO 4 SEPARATE COST ESTIMATES.
THIS DRAWING DESCRIBES ALL CLINS:
CLIN 1 - TRENCH SYSTEM WORK CONSISTS OF THE FOLLOWING:
ELIMINATE (BY FILLING IN) EXISTING FLOOR UTILITY TRENCHES AND LUBE LIFT SYSTEM WITH METAL GRATING WHERE INDICATED IN DRAWINGS.
INSTALL NEW CONDUIT CHASE SYSTEM AND BACKFILL FLUSH WITH EXISTING CONCRETE DECK AND WITH VEHICULAR STRUCTURAL STABLE
INFILL AND SURFACE - REFER TO DRAWINGS C-100 - C-500. REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL, CLEANING AND INSTALLATION.
DISCONNECT AND REMOVE EXISTING COMPRESSED AIR DISTRIBUTION SYSTEM AND AIR STATIONS LOCATED IN THE FLOOR TRENCH SYSTEM AND
REPLACE WITH NEW - REFER TO DRAWINGS C-100 - C-500.
COLLECT AND DISPOSE OF EXISTING HAZARDOUS MATERIALS - REFER TO DRAWINGS H-001 - H-101.
CLIN 2 - FLOOR REPAIR AND COATING SYSTEM WORK CONSISTS OF THE FOLLOWING:
REPAIR HIGH BAY CONCRETE FLOOR INCLUDING EXPANSION JOINTS AND PROVIDE NEW CONCRETE FLOOR FINISH LEVELING COAT - REFER TO
DRAWINGS A-001 - AD-101 AND A-100 - A-101.
COLLECT AND DISPOSE OF EXISTING HAZARDOUS MATERIALS - REFER TO DRAWINGS H-001 - H-101.
CLIN 3 - HIGH BAY DOOR MECHANICAL DOOR OPERATION REPAIRS WORK CONSISTS OF THE FOLLOWING:
PROVIDE REPAIR FOR HIGH BAY DOORS TO RESTORE MANUAL OPERATION TO OPEN AND CLOSE DOORS BY REPLACEMENT OF DOOR ROLLERS, BEARINGS, BRAKES ASSEMBLY, SEALS AND GUIDES - REFER TO DRAWINGS M-101 - M-9010.
COLLECT AND DISPOSE OF EXISTING HAZARDOUS MATERIALS - REFER TO DRAWINGS H-001 - H-101.
THE CONTRACTOR SHALL POWER CLEAN BOTTOM TRACK TO REMOVE ANY CORROSION DEBRIS AFTER WIRE BRUSHING THE DOOR STRUCTURE
AND WICKET DOOR FRAME. EQUIPMENT SHALL HAVE HEPA SHROUD. REFER TO CORROSION CLEANING, REPAIR AND COATING NOTES ON
DRAWING A-001.
CLIN 4 - HIGH BAY DOOR CORROSION CONTROL WORK CONSISTS OF THE FOLLOWING:
PROVIDE CORROSION TREATMENT TO ALL HIGH BAY HANGAR DOORS, INCLUDING BUT NOT LIMITED TO EXTERIOR PANELS, STRUCTURAL
SUPPORTS AND MECHANICAL EQUIPMENT HOUSING TO REMAIN AND REPLACE HIGH BAY DOOR GASKETS - REFER TO DRAWINGS A-001 - AD-100, AD-102 - A-100 AND A-102.
COLLECT AND DISPOSE OF EXISTING HAZARDOUS MATERIALS - REFER TO DRAWINGS H-001 - H-101.
SCALE:
CLIN 1, 2, 3 AND 4 - AREAS OF WORK PLAN
NONE
76 8 9
76 8 9
G-002
F
L A
B O
Y
F
L A
B O
Y
A R
E A
S
O
F
W
O R
K
P
L A
N
A
T
E S
R
C
O N
S T
A N
T I N
I D
E
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
R
U
E
N
O
R
T
H
N O
R T
H
P L A
N
A
M b a r v
ABBREVIATIONS:
45 SW - 45TH SPACE WING
ACM - ASBESTOS CONTAINING MATERIAL
ACT - ACOUSTIC CEILING TILE
AFF - ABOVE FINISHED FLOOR
ALUM - ALUMINUM
ANOD - ANODIZED
BLDG - BUILDING
CFR - CODE OF FEDERAL REGULATIONS
CONC - CONCRETE
CONT - CONTINUOUS
CMDR - COMMANDER'S
CMU - CONCRETE MASONRY UNIT
CPT - CARPET
CT - CERAMIC TILE
DEMO - DEMOLITION
DN - DOWN
DWGS - DRAWINGS
EPA - ENVIRONMENTAL PROTECTION AGENCY
EXIST - EXISTING
EXT - EXTERIOR
F.A.C. - FLORIDA ADMINISTRATIVE CODE
F.G. - FIBERGLASS
FDEP - FLORIDA DEPARTMENT OF
ENVIRONMENTAL PROTECTION
FIN FL - FINISH FLOOR
F.V. - FIELD VERIFY
GA - GAUGE
GALV - GALVANIZED
GC - GENERAL CONTRACTOR
GRT - GROUT
GYP - GYPSUM
GYP BD/GWB - GYPSUM WALL BOARD
H.M. - HOLLOW METAL
HAZMAT - HAZARDOUS MATERIALS
HW/HDW - HARDWARE
INSUL - INSULATION
INT - INTERIOR
MAX - MAXIMUM
MFR - MANUFACTURER
MIN - MINIMUM
M.O. - MASONRY OPENING
MTL - METAL
MRGWB - MOISTURE RESIST GYPSUM WALL BOARD
MTD - MOUNTED
NOM - NOMINAL
O.C. - ON CENTER
O.D. - OUTSIDE DIAMETER
OSHA - OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PEL - PERMISSIBLE EXPOSURE LIMITS
P/PT - PAINT
P.T. - PRESSURE TREATED
PCB - POLYCHLORINATED BIPHENYLS
PEL - PERMISSIBLE EXPOSURE LEVEL
PLYWD - PLYWOOD
PL - PLASTIC LAMINATE
PLST - PLASTER
P.O.L. - PETROLEUM, OIL, & LUBRICANT
PPE - PERSONAL PROTECTIVE EQUIPMENT
PSI - POUNDS PER SQUARE INCH
PTS - POINTS
PVC - POLYVINYL CHLORIDE
REINF - REINFORCED
RO - ROUGH OPENING
R.S. - RUBBER STRINGER
RTNR - RUBBER TREAD/NOSE/RISER
S.C. - SOLID CORE
SCHED/SCH - SCHEDULE
SDS - SAFETY DATA SHEETS
SMS - SHEET METAL SCREW
SOW - SCOPE OF WORK
S.S. - SOLID SURFACE
ST. STL. - STAINLESS STEEL
TBB - TILE BACKER BOARD
TYP - TYPICAL
U.O.N. - UNLESS OTHERWISE NOTED
VWB - VINYL WALL BASE
VAT - VINYL ASBESTOS TILE
HAZARDOUS MATERIAL LEGEND:
PROJECT SPECIFIC NOTES
1. CONTRACTOR SHALL COORDINATE DUST AND EQUIPMENT COVER INSTALLATION
WITH CONTRACTING OFFICER AND WITH FACILITY USER.
GENERAL HAZARDOUS MATERIAL NOTES:
REFER TO HAZMAT SPECIFICATIONS FOR ADDITIONAL INSTRUCTIONS.
1. ABATEMENT CONTRACTOR IS RESPONSIBLE FOR VISITING THE SITE PRIOR TO PROVIDING BIDS FOR
CONDUCTING ABATEMENT WORK.
2. THERE SHALL BE NO HAZARDOUS AIR EMISSIONS FROM DEBRIS PER 29 CFR 1910. ANY SANDBLASTING OR
NEEDLE-JET OPERATIONS MUST BE APPROVED BY THE CONTRACTING OFFICER AND SHOULD HAVE FULL
CONTAINMENT.
3. THE CONTRACTOR SHALL COMPLY WITH, BUT NOT LIMITED TO: AFI 32-7086, HAZARDOUS MATERIALS
MANAGEMENT, FEBRUARY 2015. NO HAZMAT IS ALLOWED TO BE BROUGHT ON TO ANY 45 SW INSTALLATION
WITHOUT PRIOR APPROVAL. THE CONTRACTOR SHALL CONTACT THE 45 CES/CEIE HAZARDOUS MATERIALS
PROGRAM MANAGER AT 321-494-9268 TO REVIEW HAZMAT AUTHORIZATION PROCEDURES PRIOR TO HAZMAT
BEING BROUGHT ON TO 45 SW FACILITIES.
4. THE GC SHALL UTILIZE ASBESTOS AND HEAVY METALS SURVEY REPORTS INCLUDED AS AN ATTACHMENT TO
THE SPECIFICATIONS IN ORDER TO COMPLETE THE SCOPE OF WORK PER THE DRAWINGS AND
SPECIFICATIONS. THE GC SHALL CONTACT THE CONTRACTING OFFICER IF THE PRESENCE OF MATERIALS
CONTAINING HEAVY METALS, INCLUDING LEAD, CADMIUM, OR CHROMIUM, OR ASBESTOS-CONTAINING
MATERIALS (ACM) IS SUSPECTED OR DISTURBED, AND HAS NOT BEEN IDENTIFIED BY THIS CONTRACT, BUT IS
REQUIRED TO BE DISTURBED IN ORDER TO:
• PERFORM THE CONTRACT WORK;
• SAFELY ACCESS THE AREA OF WORK WITHOUT EXPOSURE TO HAZMAT ABOVE THE PEL; OR
• HAVE WORKERS PERFORM THE CONTRACT WORK WITHOUT EXPOSURE TO HAZMAT ABOVE PEL.
UNDER NO CIRCUMSTANCES SHALL ANY MATERIALS CONTAINING HEAVY METALS OR ASBESTOS BE REMOVED
WITHOUT THE CONTRACTING OFFICER APPROVAL. FOR REFERENCE, SEE HAZMAT LEGEND OR REFER TO
HAZMAT DRAWINGS.
5. ACM MAY BE ENCOUNTERED IN EXISTING CONCRETE FLOOR , FLOOR JOINT SEALANT AND WALL CMU DURING
REPAIR ACTIVITIES. CAUTION MUST BE UTILIZED DURING REPAIR ACTIVITIES TO ENSURE THAT
DAMAGE/DISTURBANCE TO ACM DOES NOT OCCUR. REPAIR ACTIVITIES SHALL BE PERFORMED IN
ACCORDANCE WITH THE TRAINING AND HANDLING REQUIREMENTS OF 29 CFR 1926.1101 FOR CLASS II
ASBESTOS WORK AND 29 CFR 1926.85, 40 CFR 763, 45SW OPLAN 19-14, F.A.C. CHAPTER 62-257 AND FDEP FORM
62-257.900(1). FDEP FORM 62-257.900(1)(NOTICE OF DEMOLITION OR ASBESTOS RENOVATION) MUST BE
FORWARDED TO FDEP AT LEAST 10 DAYS PRIOR TO ACM REMOVAL.
6. THE REQUIREMENTS ESTABLISHED IN THE OSHA STANDARD FOR LEAD, CADMIUM AND CHROMIUM IN
CONSTRUCTION, 29 CFR 1926.62, 29 CFR 1926.1127 AND 29 CFR 1926.1126, RESPECTIVELY, MUST BE COMPLIED
WITH FOR ANY CONSTRUCTION, REFURBISHMENT, OR DEMOLITION OPERATIONS WHICH INVOLVE THE
DISTURBANCE OF LEAD CONTAINING-MATERIALS OR COATINGS WHICH CONTAIN HEAVY METALS. THE LEAD, CADMIUM AND CHROMIUM STANDARDS ESTABLISH SPECIFIC PERSONAL PROTECTIVE EQUIPMENT TO INCLUDE
RESPIRATORY PROTECTION BASED ON THE TYPE OF WORK TO BE PERFORMED (SEE SPECIFICATIONS FOR
ADDITIONAL DATA). FOR REFERENCE SEE LEGEND ON COVER DRAWING G-001.
7. IF HEAVY METALS, INCLUDING LEAD, AND/OR PCB EXIST IN PAINTED SURFACES, THERE WILL BE CONCERNS
ABOUT PARTICULATE MATTER IN RINSATE AND ABOUT LEACHABILITY AND IMPACTS TO SURROUNDING
ENVIRONMENTS. NON-LIQUID PCB MATERIAL SHOULD BE HANDLED AND TESTED IN ACCORDANCE WITH 40 CFR
761. GC SHALL PROVIDE A SUBMITTAL FOR AN ENVIRONMENTAL WORK PLAN TO ADDRESS THE IDENTIFIED
BEST MEANS OF PRACTICE BY THE QUALIFIED CONTRACTOR IN COMPLIANCE WITH FDEP, EPA AND OSHA.
ONLY THOSE PERSONNEL TRAINED IN ABATEMENT HANDLING AND DISPOSAL MAY PERFORM WORK AND SHALL
DO SO IN A MANNER THAT MINIMIZES GENERATION OF AIR-BORNE DEBRIS. WATER AND DEBRIS SHALL BE
COLLECTED, TESTED, MANAGED AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND AIR FORCE
REGULATIONS.
8. ABSORBENT MATERIAL AND SEDIMENT THAT MAY BE CONTAMINATED WITH WASTE/USED OIL, FUEL
PETROLEUM COMPOUNDS AND CLEANING SOLVENTS WILL BE ENCOUNTERED DURING CLEANING AND
PREPARATION OF THE FLOOR TRENCHES PRIOR TO FILLING WITH FLOWABLE FILL. WORKERS SHALL UTILIZE
PERSONAL PROTECTION EQUIPMENT TO PROTECT AGAINST EXPOSURE TO CONTAMINATED ABSORBENT AS
PER 29 CFR 1910.133, 1910.134, 1910.136, AND 1910.138. REMOVAL OF THE ABSORBENT MATERIAL AND
SEDIMENT WILL BE DONE IN ACCORDANCE WITH F.A.C. 62-730 AND 45 SW OPLAN 19-14.
9. IF PRODUCTS ARE TO BE USED DURING THE PROJECT WHICH MAY CONTAIN HAZARDOUS CHEMICALS, THE SDS
FOR THOSE PRODUCTS SHALL BE SUBMITTED TO THE 45 CES/CEIE HAZARDOUS MATERIALS PROGRAM
MANAGER AT 321-494-9268 FOR REVIEW TO DETERMINE PERSONAL PROTECTIVE EQUIPMENT REQUIREMENT
FOR PERSONNEL USING PRODUCTS ALONG WITH GC'S SAFETY PLAN, PRIOR TO START OF WORK.
10. PERSONNEL WHO UTILIZE RESPIRATORY EQUIPMENT SHALL COMPLY WITH OSHA STANDARD 29 CFR 1910.134.
THE REQUIREMENTS FOR PROTECTION OF PERSONNEL DURING DISTURBANCE OF COATINGS CONTAINING
HEAVY METALS APPLY WHEN THE CONTENT HAS BEEN IDENTIFIED AS "LOW". OSHA STANDARD 29 CFR 1926.62
DOES NOT INDICATE A LEVEL OF CONTENT LIMIT. IF LEAD IS PRESENT AT ANY LEVEL, THE STANDARD SHALL BE
ADHERED. FOLLOW 45 SW GUIDANCE FOR THE REMOVAL OF MATERIALS AND COATINGS CONTAINING HEAVY
METALS.
11. THE HAZMAT DRAWINGS ARE REPRESENTATIONS OF LOCATIONS CONTAINING HAZMAT AT LEVELS MEETING
OR EXCEEDING REGULATORY LEVELS. THE GC IS REQUIRED TO SUBMIT A WORK PLAN FOR THE ABATEMENT
OF ACM, HEAVY METALS AND PCB, WHERE APPLICABLE, FOR THIS PROJECT. THE GC SHALL COORDINATE THE
EXTENT OF BUILDING DEMOLITION WITH THE EXTENT OF ABATEMENT DEMOLITION TO AVOID WORK
DUPLICATION.
12. ALL HAZMAT SAMPLING REPORTS ARE COMPILED FROM THE ASBESTOS SURVEY REPORT AND HEAVY METALS
REPORT, ALL OF WHICH ARE MADE AVAILABLE AS ADDENDA TO THE PROJECT SPECIFICATIONS. ALL SAMPLING
REPORTS ARE PROVIDED FOR INFORMATION ONLY AND DO NOT REFLECT THE CONTRACT WORK.
13. THE GC SHALL PROVIDE CERTIFICATION OF MONITORED AIR AND TESTING RESULTS PRIOR TO START OF
DEMOLITION WORK.
14. WHERE APPLICABLE, CONTRACTOR SHALL REFER TO SPECIFICATIONS FOR DISPOSAL OF ACM, HEAVY METALS
AND PCB.
15. QUALIFIED CONTRACTOR SHALL COORDINATE REMOVAL OF HAZMAT WITH ENVIRONMENTAL WORK PLAN AND
CONTRACTING OFFICER PRIOR TO COMMENCEMENT OF WORK AND REPORT THE PRESENCE OF ANY OTHER
SUSPICIOUS HAZMAT IN AREAS OF WORK PRIOR TO START OF REMOVAL/DEMOLITION.
16. WHEN DISTURBING CONCRETE AND CMU, ADHERE TO OSHA STANDARDS FOR RESPIRATORY PROTECTION
AGAINST SILICA.
17. IN THE EVENT THAT HAZARDOUS/CONTROLLED WASTE IS GENERATED AT SITE, IMMEDIATELY CONTACT
ENVIRONMENTAL SUPPORT CONTRACTOR AT 853-6985.
APPLICABLE CODES
WORK SHALL BE IN COMPLIANCE WITH THE LATEST REVISION OF THE FOLLOWING CODES AND WITH
PROJECT SPECIFICATIONS:
OSHA STANDARD FOR ASBESTOS, 29 CFR 1926.1101
OSHA STANDARD FOR LEAD, 29 CFR 1926.62
OSHA STANDARD FOR CADMIUM, 29 CFR 1926.1127
OSHA STANDARD FOR CHROMIUM (VI), HEXAVALENT CHROMIUM, 29 CFR 1926.1126
OSHA STANDARD FOR HAZARDOUS WASTE COMMUNICATION, 29 CFR 1910.1200
2015 INTERNATIONAL BUILDING CODE
2015 INTERNATIONAL MECHANICAL CODE
OSHA STANDARD FOR RESPIRATORY PROTECTION, 29 CFR 1910.134
OSHA STANDARD FOR GASES, VAPORS, FUMES, DUSTS AND MISTS, 29 CFR 1926.55
ASBESTOS ABATEMENT, FLORIDA STATUTES CHAPTER 469
2016 GENERAL BUILDING REQUIREMENTS UFC 1-200-01
WASTE PETROLEUM PRODUCTS AND HAZARDOUS WASTE MANAGEMENT PLAN, 45 SW
OPLAN 19-14
ASBESTOS PROGRAM, F.A.C. CHAPTER 62-257
NATIONAL EMISSION STANDARD FOR ASBESTOS, 40 CFR 61 SUBPART M
EPA STANDARD FOR PCB, 40 CFR 761
SYNTHETIC ORGANIC CONTAMINANTS MONITORING REQUIREMENTS, F.A.C. 62-550.516
HEAVY METALS PRESENT
HATCHING PROVIDED FOR
INFORMATION ONLY. ALL
ABATEMENT ACTIVITIES ARE
IDENTIFIED USING FLAG NOTES.
H-001
A
R
O M
A N
J
M
C G
A N
N
G E
N E
R A
L
H
A Z
A R
D O
M
T
E R
I A
L
N
O T
E S
A N
D
A
B B
R E
V I A
T I O
N S
J
M
C G
A N
N
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L E
N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
METAL TRENCH COVER
PROJECT LEGEND:
A
M b a r v
A A
A A
A
A A A A
A A A A A A
SCALE:
FLOOR TRENCH INFILL
1" = 10'
HANGAR U HIGH BAY
30'20'10'0'10'
GRAPHIC SCALE 1" = 10'
GENERAL NOTES:
1. FOR DEMOLITION OF END ITEMS, REFER TO SUBSEQUENT DISCIPLINE DRAWINGS AND
ATTACHED HAZARDOUS MATERIAL SAMPLING REPORTS ATTACHED TO THE
SPECIFICATIONS.
2. WORKERS SHALL UTILIZE RESPIRATORY PROTECTION PER 29 CFR 1910.134 AGAINST SILICA
AND PARTICULATES WHEN DISTURBING CONCRETE DURING DEMOLITION AND REPAIR
ACTIVITIES, AND WHILE REMOVING OR INSTALLING EQUIPMENT AND FIXTURES.
3. LEAD, CADMIUM AND CHROMIUM HAVE BEEN IDENTIFIED IN WALL, HANGAR DOOR AND
FLOOR PAINTS IN HANGAR U. WHEN DISTURBING PAINTS AND COATINGS THAT MAY CONTAIN
LEAD, CADMIUM AND CHROMIUM DURING DEMOLITION AND REPAIR ACTIVITIES, WORKERS
SHALL UTILIZE PERSONAL PROTECTIVE EQUIPMENT FOR LEAD AS PER 29 CFR 1926.62,
CADMIUM AS PER 29 CFR 1926.1127 AND CHROMIUM AS PER 29 CFR 1926.1126.
4. ABSORBENT MATERIAL AND SEDIMENT THAT MAY BE CONTAMINATED WITH WASTE/USED
OIL, FUEL PETROLEUM COMPOUNDS AND CLEANING SOLVENTS WILL BE ENCOUNTERED
DURING CLEANING AND PREPARATION OF THE FLOOR TRENCHES PRIOR TO FILLING WITH
FLOWABLE FILL. WORKERS SHALL UTILIZE PERSONAL PROTECTION EQUIPMENT TO
PROTECT AGAINST EXPOSURE TO CONTAMINATED ABSORBENT AS PER 29 CFR 1910.133,
1910.134, 1910.136, AND 1910.138.
5. COORDINATE WITH ARCHITECTURAL DRAWINGS ON THE EXTENT OF EQUIPMENT AND
FIXTURE INSTALLATION AND REMOVAL.
FLAG NOTES:
1. TRENCHES CONTAIN WASTE ABSORBENT MATERIAL AND SEDIMENT GENERATED DURING SPILL
CLEAN-UP OPERATIONS. CONTRACTOR SHALL SAMPLE AND ANALYZE WASTE ABSORBENT
MATERIAL AND SEDIMENT PRIOR TO CLEANING THE TRENCHES. THREE SAMPLES SHALL BE
COLLECTED FROM EACH TRENCH AND ANALYZED FOR CORROSIVITY, IGNITABILITY, REACTIVITY, TCLP METALS, TCLP VOLATILE ORGANIC COMPOUNDS AND TCLP SEMI-VOLATILE ORGANIC
COMPOUNDS.
2. CONTRACTOR SHALL EXCAVATE, REMOVE AND STOCKPILE WASTE ABSORBENT MATERIAL FROM
THE TRENCHES. CONTRACTOR SHALL COLLECT REPRESENTATIVE GRAB SAMPLES FROM THE
STOCKPILE FOR WASTE CLASSIFICATION ANALYSIS. SAMPLES SHALL BE ANALYZED FOR
CORROSIVITY, IGNITABILITY, REACTIVITY, TCLP METALS, TCLP VOLATILE ORGANIC COMPOUNDS
AND TCLP SEMI-VOLATILE ORGANIC COMPOUNDS. BASED ON THE WASTE CLASSIFICATION
RESULTS, THE MATERIAL SHALL DISPOSED OF IN ACCORDANCE WITH 40 CFR PARTS 239
THROUGH 279, F.A.C.62-730 AND 45 SW OPLAN 19-14.
3. AFTER REMOVAL OF ABSORBENT MATERIAL, TRENCHES SHALL BE CLEANED TO REMOVE
RESIDUAL WASTE. WASTE WATER GENERATED DURING CLEANING SHALL BE COLLECTED FOR
WASTE CLASSIFICATION TESTING PRIOR TO OFF-SITE TRANSPORT AND DISPOSAL. WASTE
WATER SHALL BE TESTED FOR CORROSIVITY, IGNITABILITY, REACTIVITY, TCLP METALS, AND
TCLP SEMI-VOLATILE ORGANIC COMPOUNDS. BASED ON THE ANALYTICAL RESULTS, WASTE
SHALL BE CLASSIFIED AND DISPOSED OF IN ACCORDANCE WITH 40 CFR PARTS 239 THROUGH
279, F.A.C.62-730 AND 45 SW OPLAN 19-14.
4. THE ABOVE GRADE OIL LUBRICATION STATION AND TWO BELOW GRADE HYDRAULIC LIFTS WILL
BE REMOVED AS PART OF THE HANGAR REPAIR EFFORT. LUBRICATION OIL AND HYDRAULIC
FLUID WILL BE DRAINED AND REMOVED FROM THE LUBRICATION STATION, HYDRAULIC LIFTS,
AND ASSOCIATED PIPING AND HOSES. THE OIL AND HYDRAULIC FLUID WILL BE ADDED TO THE
EXISTING WASTE POL STORAGE UNITS AT HANGAR U.
5. LEAD, CADMIUM AND CHROMIUM ARE PRESENT IN RED AND YELLOW PAINT ON THE FLOOR.
WASTES GENERATED DURING REMOVAL OF FLOOR PAINT SHALL BE COLLECTED AND STAGED
FOR WASTE CLASSIFICATION TESTING PRIOR TO OFF-SITE TRANSPORT AND DISPOSAL. PAINT
WASTE SHALL BE TESTED FOR TCLP METALS. BASED ON THE ANALYTICAL RESULTS, PAINT
WASTE SHALL BE CLASSIFIED AND DISPOSED OF IN ACCORDANCE WITH 40 CFR PARTS 239
THROUGH 279, F.A.C.62-730 AND 45 SW OPLAN 19-14.
6. LEAD, CADMIUM AND CHROMIUM ARE PRESENT IN TAN PAINT ON THE HANGAR DOORS. WASTES
GENERATED DURING REMOVAL OF THE HANGAR DOOR PAINT SHALL BE COLLECTED AND
STAGED FOR WASTE CLASSIFICATION TESTING PRIOR TO OFF-SITE TRANSPORT AND DISPOSAL.
PAINT WASTE SHALL BE TESTED FOR TCLP METALS. BASED ON THE ANALYTICAL RESULTS,
PAINT WASTE SHALL BE CLASSIFIED AND DISPOSED OF IN ACCORDANCE WITH 40 CFR PARTS
239 THROUGH 279, F.A.C.62-730 AND 45 SW OPLAN 19-14.
H-101
A
R
O M
A N
J
M
C G
A N
N
H A
Z A
R D
O U
S
M
A T
E R
I A
L
I D
E N
T I F
I C
A T
I O
N
A
A
T E
M E
N T
J
M
C G
A N
N
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
R
U
E
N
O
R
T
H
NORTH
PLAN
5 6
1 2
1 2 3
2 3
6 5
5 5
A
M b a r v i r
AutoCAD SHX Text
WASTE POL STORAGE
AutoCAD SHX Text
WASTE POL STORAGE
AutoCAD SHX Text
COMPRESSOR & DRYER
AutoCAD SHX Text
COMPRESSOR & DRYER
CAR LIFT
CAR LIFT
EYE FIRE
A A
A A
A A
A
A A A A
A
B D EC
F
A A A A A A
WASTE
POL
STORAGE
WASTE
POL
STORAGE
C O
M P
R E
S S
O R
D
R Y
E R
C O
M P
R E
S S
O R
D
R Y
E R
PANEL A
PANEL D
PANEL L2
FLOOR EXPANSION
JOINT (TYP)
3-DOOR RAILS
& FOUNDATION
DOOR TRENCH
DRAIN
EYE
ROOM #1115
ROOM #1128
ROOM
#1114
PANEL P3
PROJECT SCOPE:
A. ALL FLOOR TRENCHES & HYDRAULIC LIFT FLOOR TRENCH ARE FILLED WITH OIL ABSORBENT
MATERIAL. PROVIDE SAMPLES, TESTING, REMOVAL, & PROPER DISPOSAL W/ DOCUMENTATION
OF WASTE OIL ABSORBENT MATERIAL AS A HAZARDOUS WASTE, WASH & CLEAN FLOOR
TRENCHES, SEE SHEET H-101 FOR COORDINATION.
B. REMOVE ABOVE GRADE OIL LUBRICATION STATION.
C. REMOVE 2 BELOW GRADE LUBE STATION HYDRAULIC LIFTS, FILL ABANDON HYDRAULIC LIFT 7'
DEEP TRENCH WITH FLOWABLE FILL AND CONCRETE CAP.
D. PROTECT IN PLACE EXISTING FLOOR TRENCH & SALVAGE FOR REUSE METAL TRENCH
COVERS IN NOTED HIGH BAY TRENCHES, UTILITY TURN & INTERSECTION TRENCHES, FUTURE
UTILITY STATION, AND UTILITY SERVICE TRENCH. REFER TO ARCHITECTURAL DRAWINGS FOR
REMOVAL, CLEANING AND INSTALLATION OF TRENCH COVERS.
E. FLOOR TRENCHES ALL 10, B, & D, PORTION B, 5, & 9, AND ROOMS 1115 & 1128 - FROM SERVICE
SOURCE CONNECTION TO USE POINT PROVIDE NEW ELECTRIC, COMPRESSED AIR, EMPTY
UTILITY DISTRIBUTION CONDUIT, AND UTILITY PIPING SERVICE CONNECTION TO SERVICE
STANDS AND 3 CAR LIFTS.
F. FLOOR TRENCH ALL 1 THRU 4 & 6 THRU 9, PORTION 5 & B THRU E - ENCLOSE FLOOR
TRENCHES BY PROVIDING FLOWABLE FILL, REINFORCEMENT,& CONCRETE CAP, AND
EXPANSION JOINTS. ACCOMMODATE NEW UTILITIES INTO THE TRENCH FILL OPERATION.
LEGEND:
A
D
A
A
B
AAAA
AAA
F
METAL TRENCH CONCRETE
COVER FILLED TRENCH
ELECTRIC DISTRIBUTION
SHOP COMPRESSED 150 PSI AIR
EMPTY CONDUIT
SCALE:
FLOOR RESTORATION
1" = 10'
HANGAR U HIGH BAY
30'20'10'0'10'
GRAPHIC SCALE 1" = 10'
A
D
A
F
E
E
A
E
E
E
E
F
A
C-100
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
H I G
H
B
E
N C
H
P
R O
J E
O
P E
S
H
O U
G H
T A
L I N
G
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
R
U
E
N
O
R
T
H
NORTH
PLAN
D
D
D
A
F
A
F
A
D
A
A
F
E
A
F
E
A
F
E
A
F
E
A
F
A
F
A
F
A
F
CCCC
D
A
D
D
A
D
E
E
E
E
E
A
M b a r v
B D EC
F
SCALE:
PROJECT SEQUENCE & HAZARDOUS MATERIALS
1" = 10'
HANGAR U HIGH BAY
30'20'10'0'10'
GRAPHIC SCALE 1" = 10'
SEQUENCE 2
C-101
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
H I G
H
B
E
N C
H
S
E Q
U E
N C
E
S
H
O U
G H
T A
L I N
G
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
SEQUENCE 1
T
R
U
E
N
O
R
T
H
NORTH
PLAN
SPECIAL INSTRUCTIONS:
· THE PLANS DEPICT A CONSTRUCTION SEQUENCE IN 4 STEPS TO MAINTAIN AND LIMIT OUTAGES TO
ELECTRICAL AND AIR UTILITIES WITH THE HANGAR HIGH BAY. THE DEPICTED CONSTRUCTION
SEQUENCE IS INTENDED TO PLACE UTILITY DECOMMISSION, SAFING, REMOVAL, NEW
DISTRIBUTION, AND PLACEMENT INTO SERVICE HIGH BAY UTILITIES IN CONSTRUCTION SEQUENCE
3 & 4. THE CONTRACTOR MAY REQUEST IN WRITING TO THE CONTRACTING OFFICE MODIFYING
THE CONSTRUCTION SEQUENCE AND ENCROACHMENT INTO OTHER SEQUENCE AREA FOR
CONSIDERATION. THE CONTRACTOR SHALL NOT MODIFY THE CONSTRUCTION SEQUENCE UNTIL
CHANGES TO THE CONSTRUCTION SEQUENCE IS APPROVED BY THE CONTRACTING OFFICER.
· ABOVE GRADE REMOVAL AND EQUIPMENT SALVAGE WORK MAY BE CONDUCTED IN ANY
SEQUENCE.
· THE GOVERNMENT RESERVES THE RIGHT TO REQUEST AND HAVE THE THE CONTRACTOR
PERFORM SPECIFIC WORK TO EXPEDITE MAINTAINING AND RESTORING EXISTING AND NEW
UTILITIES SERVICE WITHIN THE HANGAR HIGH BAY.
· IN ADDITION TO CONTRACT REQUIREMENTS SCHEDULES THE CONTRACTOR SHALL DEVELOP AND
MAINTAIN A 6 WEEK TIME FORWARD GENERAL WORK SCHEDULE AND A DETAILED WEEKLY
SCHEDULE NOTING WORK TASK & WORK AREAS.
· THE FACILITIES IN THE NORTHERN WING, SOUTHERN WING, & WASTE POL (PAINT, OIL, LUBRICANT)
STORAGE IN HANGAR U ARE TO MAINTAIN PEDESTRIAN ACCESS TO MAINTAIN FACILITY
OPERATIONS. THE AISLE ALONG THE NORTHERN & SOUTHERN WALLS SHALL REMAIN OPEN,
UNOBSTRUCTED, & AS REQUIRED WARNING FENCED FOR PEDESTRIAN ACCESS WITH LIMITED
OUTAGE PERIODS.
· OPEN TRENCHES WITH NO TRENCH COVERS ARE TO BE MINIMIZED.
· AS WORK PROGRESSES INACTIVE WORK AREAS FOR GREATER AND 7 DAY THE TRENCH COVERS
ARE TO BE REINSTALLED.
· OPEN TRENCH AREA ARE TO BE BARRICADED AGAINST VEHICLE ENTRY.
· OPEN TRENCH AREA ARE TO BE ENCIRCLED BY VERTICAL SUPPORTED 4' TALL ORANGE WARNING
FENCE TO PREVENT PEDESTRIAN ACCESS.
· WORK SHALL BE COMPLETED IN SEQUENCE 1 AREA PRIOR TO MOVING INTO SEQUENCE 2 AREA
NOTED ON SHEET C-101, CONTRACTING OFFICER MAY GRANT CONTRACTOR WRITTEN REQUESTED
FOR SEQUENCE OUTSIDE AREA OPERATION VARIANCE FOR SPECIFIED OPERATIONS.
· CAR AND PICK UP TRUCKS VEHICULAR TRAFFIC SHALL NOT BE ALLOWED ON COMPLETED FILL
TRENCHES FOR 14 DAYS UPON PLACEMENT. ALL OTHER LARGE VEHICLES SHALL AWAIT 27 DAYS
PRIOR TO DRIVING UPON COMPLETED FILLED TRENCHES. CONTRACTING OFFICER MAY GRANT
CONTRACTOR WRITTEN REQUESTED FOR REDUCED ACCESS PERIODS BY USING STEEL TRAFFIC
PLATES TO BRIDGE FILLED TRENCHES.
· MAINTAIN ACCESS TO SAFETY SHOWER & EYE WASH.
· EXPANSION JOINTS WITHIN THE 10" CONCRETE CAP WILL REQUIRE THIS INSTALLATION WORK TO
BE PLACE IN A CHECKERBOARD PATTERN. EACH SEQUENCE DEPICTS 3 TRENCH FOR CONCRETE
CAP PLACEMENT TO ACCOMMODATE THIS INSTALLATION METHOD.
· IN SEQUENCE 2 THE CONTRACTOR SHALL PRIORITIZE THE REMOVAL, INSTALLATION, AND
PLACEMENT INTO SERVICES THE UTILITIES WITHIN TRENCH 5 AND THE TRENCH INFILL WORK
BETWEEN TRENCHES 6 & 7 TO RESTORE THEM TO USE PRIOR TO COMPLETING THE SEQUENCE.
SEQUENCE 3
EYEWASH SAFETY SHOWER
EYEWASH
SEQUENCE:
INDIVIDUAL CONCRETE CAP PLACEMENT AREAS:
SEQUENCE 4
AND
AND
A
M b a r v
5' TALL METAL AIR &
LUBE SUPPORT RACK
12'± TALL OVERHEAD
AIR SUPPORT RACK
CAR LIFT
CAR LIFT
CAR LIFT
EYE FIRE
A
B D EC
F
F
O
E
E L
S
T O
P
E
N C
H
L I F
T
IN TRENCH LIFT
IN TRENCH LIFT
METAL CABINET
GRINDER
VICE
ANVIL
HYDRAULIC OIL
TANK & PUMP
WASTE
POL
STORAGE
WASTE
POL
STORAGE
C O
M P
R E
S S
O R
D
R Y
E R
C O
M P
R E
S S
O R
D
R Y
E R
PANEL A
PANEL D
PANEL L2
PNL P3
PNL P3
PNL P3
FLOOR EXPANSION
JOINT (TYP)
3-DOOR RAILS
& FOUNDATION
DOOR TRENCH
DRAIN
EYE
ROOM #1115
ROOM #1128
ROOM
#1114
PANEL P3
SCALE:
DEMOLITION
1" = 10'
HANGAR U HIGH BAY
DEMOLITION FLAG NOTES:
10. SALVAGE & PLACE INTO TEMPORARY STORAGE SHOP FIXED EQUIPMENT, AND COORDINATE
LOCATION FOR REINSTALLATION - GRINDER, VICE, & ANVIL.
11. REMOVE ABOVE GRADE LUBRICATION STATION - ALL ABOVE GRADE SUPPORT RACKS,
CABINET, HYDRAULIC OILS STORAGE TANK, PIPING & TUBING, ELECTRICAL & AIR SERVICE,
AND EQUIPMENT.
12. REMOVE 2 LUBRICATION STATION IN GROUND HYDRAULIC LIFTS & WHEEL STOPS
MECHANICAL EQUIPMENT , AND METAL LIDS. REMOVE & CUT ALL PROTRUDING ABOVE
GRADE PORTIONS OF THE LUBRICATION STATION, LIFT, WHEEL STOPS, & COVER
ATTACHMENTS FLUSH WITH GRADE W/ NO SHARP POINTS.
13. REMOVE IN TRENCH 8", 10", & 12" EXHAUST DUCT, IN TRENCH CONNECTION POINT
ASSEMBLIES, EXPOSED & WALL MOUNTED IN HIGHBAY VEHICLE EXHAUST DUCT,
EQUIPMENT, AND SUPPORT SYSTEM.
14. SEQUENCE THE REMOVAL OF ALL & SALVAGE FOR REUSE SELECTED HIGH BAY TRENCH
COVERS. REFER TO ARCHITECTURAL DRAWINGS FOR REMOVAL, CLEANING AND
INSTALLATION OF TRENCH COVERS.
15. SEQUENCE THE REMOVAL OF IN TRENCH UNIDENTIFIED DEACTIVATED NON-HAZARDOUS
ABANDON IN PLACE UTILITIES, COMPRESSED AIR PIPE, AND ELECTRICAL DISTRIBUTION
SYSTEM.
16. SEQUENCE THE REMOVAL OF ABOVE FLOOR UTILITY SERVICES STANDS.
17. 3 LOCATIONS - SAFE CAR LIFT ELECTRICAL SERVICE CONDUCTOR & CONDUIT ENCASED IN
CONCERT FOR REUSE.
18. LOCATE, VERIFY ROUTE, SIZE, & MATERIAL, DISCONNECT, PROVIDE NECESSARY PARTS TO
PRESSURE PLUG WATER SYSTEM TO REMAIN IN SERVICE, AND REMOVE WATER
DISTRIBUTION & SERVICE PIPING WITHIN HIGH BAY.
19. COMM ORANGE INNER DUCT AND FIBER OPTIC TO BE REMOVED FROM FLOOR TRENCH AND
REROUTED.
FLAG NOTE 20 NOT USED
PROJECT LEGEND:
30'20'10'0'10'
GRAPHIC SCALE 1" = 10'
16161616 16
1616 1616 1616
METAL TRENCH
COVER
C-102
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
H I G
H
B
E
N C
H
D
E M
O L
I T
I O
N
P
L A
N
S
H
O U
G H
T A
L I N
G
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
R
U
E
N
O
R
T
H
NORTH
PLAN
14141414
141414
A
M b a r v i r
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.76
AutoCAD SHX Text 10.81
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.77
AutoCAD SHX Text 10.81
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.77
AutoCAD SHX Text 10.82
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.81
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.81
AutoCAD SHX Text 10.81
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.77
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.77
AutoCAD SHX Text 10.76
AutoCAD SHX Text 10.77
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.76
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.75
AutoCAD SHX Text 10.79
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.80
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.81
AutoCAD SHX Text 10.78
AutoCAD SHX Text 10.78
10.79
CAR LIFT
EYE FIRE
A A
A A
A A
A
A A A A
A
B D EC
F
A A A A A A
WASTE
POL
STORAGE
WASTE
POL
STORAGE
C O
M P
R E
S S
O R
D
R Y
E R
C O
M P
R E
S S
O R
D
R Y
E R
PANEL A
PANEL D
PANEL L2
FLOOR EXPANSION
JOINT (TYP)
3-DOOR RAILS
& FOUNDATION
DOOR TRENCH
DRAIN
EYE
ROOM #1115
ROOM #1128
ROOM
#1114
PANEL P3
SCALE:
FLOOR TRENCH INFILL
1" = 10'
HANGAR U HIGH BAY
30'20'10'0'10'
GRAPHIC SCALE 1" = 10'
TRENCH INFILL FLAG NOTES:
FLAG NOTES MAY BE CONSTRUCTED OUT OF ORDER TO MEET SHEET C-101 PROJECT SEQUENCE.
GENERAL NOTE ALL HIGH BAY TRENCHES - SEE SHEET H-101 FOR SOIL & DEBRIS REMOVAL, PRESSURE
WASHING, WASH WATER COLLECTION & DISPOSAL. SEE SHEET C-102 FOR KNOWN & UNKNOWN UTILITIES
WITHIN THE TRENCH AND IN TRENCH HOIST SYSTEM, SAFEING SYSTEMS, AND SEQUENCED REMOVAL.
21. TRENCH 1 & 2 AND B, C, D, & E CROSSING - PROVIDE FLOWABLE FILL & CONCRETE CAP W/
REINFORCEMENT, 18 EXPANSION JOINTS, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 20
TRANSVERSE SAW CUTS, 4 PROTRUDING CORNER 3 FOOT DIAGONAL #3 BAR, 4 END WALL, 4 OPEN TO
FILLED WALLS, IN TRENCH UTILITY CONDUITS TRENCH B & D, CAP OPEN TRENCH EMPTY CONDUITS, AND
ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
22. TRENCH 3 & 4 AND B, C, D, & E CROSSING - PROVIDE FLOWABLE FILL & CONCRETE CAP W/
REINFORCEMENT, 20 EXPANSION JOINTS, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 18
TRANSVERSE SAW CUTS, 2 PROTRUDING CORNER 3 FOOT DIAGONAL #3 BAR, 4 END WALL, IN TRENCH
UTILITY CONDUITS TRENCH B & D, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
23. TRENCH 6 & PORTION OF 5 AND B, C, D, & E CROSSING - PROVIDE FLOWABLE FILL & CONCRETE CAP W/
REINFORCEMENT, 12 EXPANSION JOINTS, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 12
TRANSVERSE SAW CUTS, 2 PROTRUDING CORNER 3 FOOT DIAGONAL #3 BAR, 2 END WALL, 4 OPEN TO
FILLED WALLS, IN TRENCH UTILITY CONDUITS TRENCH 5, B, & D, CAP OPEN TRENCH EMPTY CONDUITS, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
24. TRENCH 7 & 8 AND B, C, D, & E CROSSING - PROVIDE FLOWABLE FILL & CONCRETE CAP W/
REINFORCEMENT, 22 EXPANSION JOINTS, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 16
TRANSVERSE SAW CUTS, 5 PROTRUDING CORNER 3 FOOT DIAGONAL #3 BAR, 4 END WALL, AND IN
TRENCH UTILITY CONDUITS TRENCH B & D, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE
SEALANT.
25. TRENCH 9 AND B, C, D, & E CROSSING - PROVIDE FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, 11 EXPANSION JOINTS, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 9 TRANSVERSE SAW CUTS, 2
PROTRUDING CORNER 3 FOOT DIAGONAL #3 BAR, 2 END WALL, 4 OPEN TO FILLED WALLS, IN TRENCH
UTILITY CONDUITS TRENCH B, D, & 9 TO 3-CAR LIFT SERVICES, CAP OPEN TRENCH EMPTY CONDUITS, AND
ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
26. TRENCH 5 & D INTERSECTION - INSTALL SALVAGED METAL TRENCH GRATES AND PROVIDE UTILITY
SERVICE STANDS. ALL FLAG NOTES - SALVAGED METAL TRENCH GRATES TO BE TIGHT, LEVEL, NO
WOBBLE, NO TRIP EDGE INSTALLED FIT.
27. TRENCH 10 - INSTALL SALVAGED METAL TRENCH GRATES AND PROVIDE UTILITY SERVICE STANDS.
28. TRENCH B, C, D, & E - INSTALL SALVAGED METAL TRENCH GRATES
29. TRENCH 5 EASTERN END - INSTALL SALVAGED METAL TRENCH GRATE
30. TRENCH 3 & 5 ISOLATE EASTERN END - PROVIDE FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, 2
EXPANSION JOINTS, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 4 END WALLS, AND ALLOW
CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
31. TRENCH 2-L HOIST TRENCH - PROVIDE FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, AND CORNER DIAGONAL SAW CUT, AND ALLOW
CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
32. TRENCH 2- HOIST TRENCH - PROVIDE FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, PERIMETER
GRATING LIP LONGITUDINAL SAW CUT, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE
SEALANT.
33. TRENCH C & E - INFILL BETWEEN NEW EXPANSION JOINTS BY OTHER FLAG NOTES, 7 LOCATIONS PROVIDE
FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, PERIMETER GRATING LIP LONGITUDINAL SAW
CUT, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE SEALANT.
34. TRENCH C - START AT NEW EXPANSION JOINT BY OTHER FLAG NOTES, PROVIDE FLOWABLE FILL &
CONCRETE CAP W/ REINFORCEMENT, PERIMETER GRATING LIP LONGITUDINAL SAW CUT, 1 OPEN TO
FILLED WALLS, CAP OPEN TRENCH EMPTY CONDUITS, AND ALLOW CONCRETE CURE & APPLY CONCRETE
SURFACE SEALANT.
35. TRENCH B & D - INFILL BETWEEN NEW EXPANSION JOINTS BY OTHER FLAG NOTES, 6 LOCATIONS PROVIDE
IN TRENCH UTILITY CONDUITS, FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, PERIMETER
GRATING LIP LONGITUDINAL SAW CUT, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE
SEALANT.
36. TRENCH B & D - INFILL BETWEEN NEW EXPANSION JOINTS BY OTHER FLAG NOTES, 2 LOCATIONS PROVIDE
IN TRENCH UTILITY CONDUITS, FLOWABLE FILL & CONCRETE CAP W/ REINFORCEMENT, PERIMETER
GRATING LIP LONGITUDINAL SAW CUT, OPEN TO FILLED WALLS, IN TRENCH UTILITY CONDUITS TRENCH B
& D, CAP OPEN TRENCH EMPTY CONDUITS, AND ALLOW CONCRETE CURE & APPLY CONCRETE SURFACE
SEALANT.
TRENCH INFILL DETAILS:
C-103
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
H I G
H
B
F I L
L
P
L A
N
S
H
O U
G H
T A
L I N
G
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
R
U
E
N
O
R
T
H
NORTH
PLAN
METAL TRENCH CONCRETE
COVER FILLED TRENCH
1-D
C500
TYP TRENCH
EXPANSION JOINT
TYP DIAGONAL
SAW CUT JOINT
TYP END WALL
TYP OPEN TO FILL WALL
33353335
TYP PROTRUDING CORNER W/ REINFORCEMENT
35 33
1-B
C500
26 34 21 1-C
C500
36 22
25 23 1-E
C500
34 24
21 25 1-A
C500
30 34THRU
21 24
33 36
THRU
THRU
C500
C500
C500
21 25
THRU
4-H
C500
21 25
THRU23 21
4-G
C500
34 2536
THRU
ALL HIGH BAY TRENCHES
TYP EXISTING FLOOR
EXPANSION JOINT
H
C-500
4H
C-500
TYP TRANSVERSE
SAW CUT JOINT
1A
C-500
4G
C-500
E
RR
PROJECT LEGEND:
A
M b a r v
CAR LIFT
SS EYE C C FIRE
C AB-ESS
C
E
SS
SS E
A A
A A
A A
A
A A A A
E
PNL-P4
E
L4
E
PNL-P3
E
PNL-L3
A
PNL-P2
EPNL-P1 E
OH
CRANE
E
PNL-L1
E
A
B D EC
F
A A A A A A
E
PNL-A
E
PNL-D
WASTE
POL
STORAGE
WASTE
POL
STORAGE
C O
M P
R E
S S
O R
D
R Y
E R
C O
M P
R E
S S
O R
D
R Y
E R
PANEL A
PANEL D
PANEL L2
FLOOR EXPANSION
JOINT (TYP)
3-DOOR RAILS
& FOUNDATION
DOOR TRENCH
DRAIN
EYE
ROOM #1115
ROOM #1128
ROOM
#1114
PANEL P3
SCALE:
FLOOR TRENCH UTILITIES
1" = 10'
HANGAR U HIGH BAY
UTILITY FLAG NOTES:
FLAG NOTES 37, 38, & 39 NOT USED
40. PROVIDE IN TRENCH D & E FROM PANELS D IN ROOM 1115 TO SERVICE TRENCH 5 - TRENCH C
FROM PANELS A IN ROOM 1128 TO SERVICE TRENCH 10 - 8-2" ELECTRIC DUCTS AND IN TRENCH
5 & 10, SEE ELECTRICAL SHEETS FOR SERVICE STAND ELECTRICAL SERVICES.
41. PROVIDE IN TRENCH 9 & C, 3-1" ELECTRIC DUCT SERVICE EACH CAR LIFT, SEE ELECTRICAL
SHEETS FOR ELECTRICAL SERVICE FOR CAR LIFTS.
42. AIR DISTRIBUTION & SERVICE - PROVIDE IN TRENCH D, SEQUENCED 1-2" HDPE AIR
DISTRIBUTION PIPE, 10-2" METAL BODY SHUT OFF BALL VALVES, 3-2" HDPE TEE, 3-2" HDPE 90
BENDS, 4 TERMINAL END BLOW OFF W/ VALVE, DISTRIBUTION BRANCH AT TRENCH 5 & 10,
INDIVIDUAL SERVICE BRANCHES - W/ SERVICE TEE, SHUT OFF VALVE, & GALV IRON PIPE &
FITTINGS, CONVERT TO 2" SCH 40 GALV IRON PIPE & FITTINGS EACH END OPEN TRENCH AREA, SEQUENCE MAKE CONNECTION TO EXISTING GALV IRON PIPE AIR SUPPLY SYSTEM IN ROOM
1115 ABOVE GRADE & ROOM 1114 IN TRENCH.
43. EMPTY DUCTS - PROVIDE IN TRENCH B & 5 (EAST OF D) SEQUENCED 2-4" EMPTY DUCTS , PLACE CAPS ON END DO NOT SECURE TO DUCT, ACCOMMODATE NEW UTILITY CROSSING AT
TRENCH 5 & 10.
44. TRENCH 5 & 10, 12 LOCATIONS PROVIDE UTILITY SERVICE STANDS W/ ELECTRIC & AIR UTILITY
SERVICE.
45. COMMUNICATION - TRENCH 5 ORANGE INTER-DUCT & FIBER OPTIC TO RE REMOVED AND
REROUTED SEE ELECTRICAL SHEETS.
UTILITY DETAILS:
PROJECT LEGEND:
30'20'10'0'10'
GRAPHIC SCALE 1" = 10'
C500
C500
METAL TRENCH CONCRETE
COVER FILLED TRENCH
C-104
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
H I G
H
B
E
N C
H
U
T I L
I T
Y
P
L A
N
S
H
O U
G H
T A
L I N
G
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L U
S A
F
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
T
R
U
E
N
O
R
T
H
NORTH
PLAN
4044 42
45 43
45 43
A
M b a r v
SCALE:
TRENCH SECTIONS
NONE
C-500
SCALE:
TRENCH CAP REINFORCEMENT
NONE
C-500
SCALE:
TRENCH UTILITY CONNECTIONS
NONE
C-500
WORK STATION
9-2"
UTILITY CONDUITS
ANCHOR HEAD STUD 2.5"X0.25"
@ 45°, 3' SPACING, #3 BAR CONT.
T
O
FLOWABLE FILL
24"2.75"
TRENCH EXPANSION JOINT - ALIGN WITH
EXISTING FLOOR JOINTS AND BACK EDGE OF
TRENCH LIP INTERSECTION W/ 1/2" JOINT FILLER,
TOP JOINT SEALANT, TRANSVERSE BENT #3, 2-1"
DIA, 18" SMOOTH DOWEL, LUBRICATE ONE END
AIR SERVICE - SECURE SERVICE BRANCH TO FLOOR
TEE W/ 3/4" FEMALE THREADED CONNECTION, CLOSE
NIPPLE, 3/4" GALV IRON PIPE & FITTINGS
2" AIR
1" ELEC
4,000 PSI CONCRETE SMOOTH TROWEL FINISH W/ SEALCOAT
FILLED TRENCH
NO UTILITIES
SCALE:
TRENCH ENDS
NONE
C-500
WORK STATION UTILITIES
A
C
T Y
P
SCALE:
UTILITY SERVICE STAND
NONE
C-500
WORK STATION
36"
6 LOCATIONS 208/120 V, 3 PH POWER
EACH LEG - 4-EPOXY IMBED,
3/8" SS ALL THREAD, NUT, LOCK
WASHER, & FLAT WASHER
HEAVY DUTY FIBERGLASS CHANNEL
W/ END CAP & FOOT PLATE
ALL LOCATIONS 4 - 120 V, SINGLE-PHASE POWER
GALV IP AIR
0-200 PSI AIR REGULATOR W/
PRESSURE GAGE & WATER
SEPARATOR. NORGREN OR EQUAL
M I N
TYP UTILITY CONDUIT W/ PIPE CLAMPS
HANGAR FLOOR
TRENCH METAL
GRATE SUPPORT
TRENCH VERTICAL WALL
PROVIDE - TRENCH GRATE SUPPORT
SPAN TRENCH 2.5"X2.5" X0.25" L,
KONTCH ENDS,
BACKED W/ 2-2"-2"X2"X0.25" L,
SPOT WELD ASSEMBLY IN PLACE
CONCRETE FLOWABLE FILL
CAP
TRENCH TO BE FILLED W/ CONCRETE
TRENCH TO REMAIN OPEN
W/ METAL TRENCH COVER
2-4"
UTILITY CONDUITS
D
SALVAGED TRENCH GRATE
SALVAGED TRENCH GRATE
TRENCH GRATE SUPPORT
TRENCH LIP REINFORCEMENT
TRENCH BOTTOM
U S
T
H
C
I V
G
I N
E E
R
S
Q U
A D
R O
N
I L
T
D
A T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
F
A
D
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
CONCRETE
12" MIN
TRENCH TRANSITION FROM
FILLED TO OPEN
3/4" BALL VALVE, BRASS FNPT
C-500
S
H
O U
G H
T A
L I N
G
S
H
O U
G H
T A
L I N
G
H I G
H
B
E
N C
H
D
E T
A I L
S
S
H
O U
G H
T A
L I N
G
D B
G
B
E A
R D
R E
P A
N
G A
R
U
F
D B
C C
A F
S
F
L
EXPLOSIONPROOF SEAL FITTING
18" ABOVE FINISHED FLOOR
CONCRETE FILLED TRENCH
JOINT
SEALANT
AIR HOSE REEL
SECURE TO FLOOR
EXISTING L ANGLE IRON
3 #4 CONTINUOUS W/ 20" #4 @ 12" SPACING
TYP LONGITUDINAL SAW CUT - 3/8"
W/ BACKER ROD & SEALANT (1/3 TO
1/4 DEPTH)
CHAMFER EDGE
TYP TRANSVERSE SAW CUT JOINT
OPEN TRENCH
W/ UTILITIES
B
TYP ELECTRIC IN OPEN
TRENCH - HEAVY DUTY
FIBERGLASS CHANNEL W/
ELECTRICAL CONDUIT
SALVAGED TRENCH GRATE
3/4" AIR
HEAVY DUTY FIBERGLASS
CHANNEL W/ ELECTRICAL
CONDUIT
TYP AIR SERVICE
TYP ELECTRIC
SERVICE
EXISTING TRENCH WALL & BOTTOM
EXISTING TRENCH BOTTOM
TRENCH CAP REINFORCEMENT
2-4" & 1-2"
UTILITY CONDUITS
D
3-2"
UTILITY CONDUITS
D
CONCRETE
12" MIN
END WALL
OPEN TO
FILLED WALL
TYP AIR IN OPEN TRENCH -
2-12" HEAVY DUTY
FIBERGLASS CHANNEL
& EACH SERVICE
H G
MIN 3/8"
M
E M
B E
D
5/8" BACKER ROD
JOINT SEALANT
JOINT FILLER
1/2"
M I N
3"
JOINT SEAL
WALL & FLOOR
ANCHOR
SAW CUT
M
MIN
3/8"
INDUCED
CRACK
SAW CUT
JOINT
BACKER ROD
A
M b a r v i r
AutoCAD SHX Text
TOP OF CONCRETE
PRE DRILL W/ EPOXY GROUT ANCHOR
F
L A
B O
Y
D B
C C
A F
S
F
L
CORROSION CLEANING, REPAIR AND COATING NOTES:
1. THE EXISTING STEEL DOOR AND FRAMES MAY NOT MEET EXISTING WIND CODES BUT ALL NEW
COMPONENTS SHALL MEET CURRENT CODE REQUIREMENTS. THE CONTRACTOR SHALL FIELD
VERIFY ALL EXISTING SIZES, SPACING, DIMENSIONS AND CONDITIONS AT THE INTERFACES AS
REQUIRED. SUBMIT SIGNED AND SEALED CALCULATIONS AND DRAWINGS FOR ALL
COMPONENTS TO BE REPLACED INCLUDING CONNECTIONS TO THE EXISTING FRAME. USE
COMPONENT AND CLADDING WIND PRESSURES ALONG WITH APPLICABLE TRIBUTARY AREAS.
MANUFACTURERS WIND PRESSURES SHALL NOT BE USED.
- WIND VELOCITY: PER IBC 2015 AND ASCE 7-10 (SEE WIND PRESSURES BELOW)
170 MPH WIND REGION
USE FACTOR 1.0
EXPOSURE 'C'
CATEGORY II
COMPONENTS AND CLADDING WIND PRESSURE +45.29 psf / -57.13 psf
2. A PARTIAL LIST OF RELATED ITEMS TO BE ADDRESSED ARE AS FOLLOWS, REFER TO DRAWINGS, NOTES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND REQUIREMENTS:
· EXISTING HIGH BAY DOOR SUPPORT STRUCTURE TO REMAIN IN PLACE BUT TO BE
REFURBISHED IN ACCORDANCE WITH ARCHITECTURAL NOTES AND DETAILS.
· THE EXTERIOR DOOR PANELS/PLATES SHALL BE REMOVED, REFURBISHED AND
REINSTALLED WHERE INDICATED IN DRAWINGS.
· UPPER TRACK LATERAL SUPPORT / GUIDE ASSEMBLY BRACKETS AND STOP ANGLE
BRACKETS SHALL REMAIN, NOT IN SCOPE.
· THE WICKET/PILOT DOORS SHALL BE REMOVED AND REPLACED INCLUDING ALL FLASHING
AND SAFETY FEATURES.
· REMOVE AND REPLACE ALL EDGE AND BASE SEALS, END BUMPERS. INCLUDING TRIM AND
FASTENERS HOLDING SEALS IN PLACE.
· THE MAIN WHEELS, DRIVING GEARS, CHAINS ETC FOR BOTH ACTIVE AND PASSIVE DOORS
SHALL BE INSPECTED FOR DAMAGE AND REPAIRED IN ACCORDANCE WITH MECHANICAL
AND ELECTRICAL DRAWINGS.
3. CONTRACTOR SHALL STORE STEEL MEMBERS IN DESIGNATED STORAGE AREA. ALL STEEL
SHALL BE COVERED AND PROTECTED FROM ELEMENTS.
4. PRIOR TO WORK ON HIGH BAY HANGAR DOORS, QUALIFIED CONTRACTOR SHALL ABATE HEAVY
METALS FROM LOCALIZED AREAS OF PROPOSED MODIFICATION AND REPLACEMENT.
ABATEMENT SHALL REMOVE EXISTING PAINT TO BARE METAL, PER SSPC-SP 1 'SOLVENT
CLEANING' AND SSPC-SP 11 'POWER TOOL CLEANING TO BARE METAL' WITH HEPA SHROUD.
REFER TO HAZARDOUS MATERIAL DRAWINGS AND SPECIFICATIONS.
5. ALL WELDING OPERATIONS MUST BE PERFORMED AFTER COMPLETION OF SURFACE
PREPARATION OF STEEL.
6. HANGAR DOOR SUPPORT STRUCTURE - POWER TOOL CLEAN STEEL TO SSPC SP-3; WHERE THE
STEEL MEMBER HAS LOST 10% OF THE STRUCTURAL CROSS-SECTIONAL AREA (CROSS
SECTIONAL SLICE AT AREA OF CORROSION DAMAGE, SHALL BE FIELD MEASURED WITH CALIPERS
TO DETERMINE EXTENT OF DAMAGE). CUT AND PROVIDE NEW SECTION TO MATCH EXISTING,
WELD WITH 3/16" CONTINUOUS WELD. PREPARE AND PAINT NEW AND EXISTING STEEL PER
SPECIFICATIONS STEEL COATING SYSTEM. COLOR AND SHEEN SHALL BE SELECTED TO MATCH
EXISTING COLORS. (FOR BIDDING PURPOSES ASSUME 20% OF INDIVIDUAL STEEL MEMBERS
FROM BOTTOM OF WINDOW OPENINGS TO BOTTOM OF DOOR)
7. EXTERIOR FACE OF HIGH BAY DOORS - POWER TOOL CLEAN STEEL TO SSPC SP-3; PREPARE
AND PAINT PER SPECIFICATIONS STEEL COATING SYSTEM. WHERE EXPOSED TO UV
DEGRADATION PROVIDE ADDITIONAL COATING AS INDICATED IN SPECIFICATIONS. COLOR AND
SHEEN SHALL BE SELECTED TO MATCH EXISTING DOOR COLOR. (FOR PURPOSES OF BIDDING
ASSUME 10% OF INDIVIDUAL STEEL PANELS FROM BOTTOM OF WINDOW OPENINGS TO BOTTOM
OF DOOR)
8. THE CONTRACTOR SHALL PROVIDE A NACE LEVEL III INSPECTOR FOR ALL SURFACE
PREPARATION AND COATING WORK. EXCESSIVE FLAKING AND NON-ADHERED PAINT OR STEEL
FILINGS EMBEDDED IN PAINT ARE CONSIDERED DEFICIENCIES IN WORK AND WILL NOT BE
ACCEPTED.
9. HIGH BAY DOORS - REPLACE EXISTING GASKETS AND GASKET HOUSING WITH 3/16" EPDM
RUBBER AND ALUMINUM HOUSING TO MATCH EXISTING IN PROFILE AND FASTENER SPACING
(TYPICAL ALL DOORS). SEPARATE DISSIMILAR METALS WITH ASPHALTIC TAPE OR PAINT.
10. HIGH BAY DOOR FASTENERS - CONTRACTOR SHALL USE EXISTING FASTENER SIZE AND SPACING
TO GREATEST EXTENT POSSIBLE (FIELD VERIFY); DRILL AND TAP HOLES FOR NEW FASTENERS
BASED UPON EXISTING FASTENING PATTERN. REMOVE ALL STEEL SHAVINGS PRIOR TO
PREPARATION FOR PRIME AND PAINT. REINSTALLED DOOR COMPONENTS SHALL USE 304SS
FASTENERS.
11. STRUCTURAL REFURBISHMENT OF DOOR RAIL BOTTOM TRACK IS NOT IN CURRENT
CONSTRUCTION CONTRACT. THE CONTRACTOR SHALL POWER CLEAN BOTTOM TRACK TO
REMOVE ANY CORROSION DEBRIS AFTER WIRE BRUSHING THE DOOR STRUCTURE AND WICKET
DOOR FRAME. EQUIPMENT SHALL HAVE HEPA SHROUD. REFER TO CLIN 3 ON DRAWING G-002.
GENERAL REMOVAL AND INSTALLATION NOTES:
1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH PROJECT DRAWINGS AND
SPECIFICATIONS; FOR PURPOSES OF CLARIFICATION THE WORD 'PROVIDE' MEANS PROVIDE
AND INSTALL U.O.N.
2. INFORMATION ON EXISTING CONDITIONS IS BASED ON THE AVAILABLE OBSERVABLE IN PLACE
ELEMENTS. CONTRACTOR TO FIELD MEASURE AND VERIFY REQUIREMENTS FOR EXACT
DIMENSIONS. PRIOR TO START OF ALL WORK OPERATIONS, CONTRACTOR SHALL FIELD VERIFY
CURRENT PROJECT CONDITIONS. ALL CONSTRUCTION REQUIREMENTS SHALL BE COORDINATED
WITH THE CONTRACTING OFFICER.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS FOR PROPOSED WORK, PRIOR TO
START OF WORK. PROJECT SPECIFICATIONS CONTAIN ADDITIONAL DEMOLITION AND REPAIR
PROCEDURES AND REQUIREMENTS.
4. NOTATIONS FOR REMOVAL AND INSTALLATION REQUIREMENTS SHALL APPLY TO ALL SHEETS IN
THIS DRAWING PACKAGE.
5. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND
SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE PROJECT,
EXCEPT WHERE A DIFFERENT DETAIL IS SHOWN.
6. ALL REFERENCES TO MANUFACTURER NAMES ARE FOR IDENTIFICATION ONLY; THE
REFERENCES ARE NOT INTENDED TO LIMIT SELECTION OF SIMILAR ITEMS FROM OTHER
MANUFACTURERS WITH APPROVAL OF CONTRACTING OFFICER.
7. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE DEPENDS UPON THE
INTERACTION OF VARIOUS CONNECTED COMPONENTS. PROVIDE ADEQUATE BRACING,
SHORING, AND OTHER TEMPORARY SUPPORTS AS REQUIRED TO SAFELY COMPLETE THE WORK.
8. WHERE REQUIRED, ALL NEW STEEL STRUCTURAL MEMBERS SHALL BE ASTM A36 UNLESS
OTHERWISE NOTED IN STRUCTURAL DRAWINGS.
9. WHERE REQUIRED AND NOT OTHERWISE SPECIFIED, ALL WELDING SHALL BE DONE BY AWS
CERTIFIED WELDERS.
10. STRUCTURAL STEEL COATINGS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS, REFER TO SPECIFICATIONS AND ARCHITECTURAL DRAWINGS.
11. DISPOSAL OF ALL CONSTRUCTION DEBRIS SHALL BE AS DESCRIBED IN THE SPECIFICATIONS AND
SHALL BE COORDINATED WITH HAZMAT DOCUMENTS. ANY UNFORESEEN CONDITIONS SHALL BE
BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.
12. CONTRACTOR SHALL TAKE EXTREME CARE TO AVOID DAMAGE TO EXISTING ITEMS INTENDED TO
BE REMOVED, RE-USED, OR RECYCLED.
13. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE GOVERNMENT, ANY DAMAGE DONE BY
HIMSELF OR HIS EMPLOYEES. CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED TO PROPERLY INSTALL ITS WORK.
14. USER CRITICAL EQUIPMENT SHALL BE REMOVED AND STORED BY THE USER, PRIOR TO START
OF WORK. EQUIPMENT TO REMAIN IN-PLACE, SHALL BE PROTECTED; CONTRACTOR SHALL
PROVIDE - FOR APPROVAL OF CONTRACTING OFFICER, A PLAN AND METHOD OF PROTECTING
IN-PLACE EQUIPMENT, PRIOR TO START OF WORK.
15. FOR ALL CONSTRUCTION REQUIREMENTS REGARDING ENVIRONMENTAL ASBESTOS AND HEAVY
METAL DEMOLITION, REFER TO HAZARDOUS MATERIAL DRAWINGS.
16. AFTER COMPLETION OF CONSTRUCTION WORK, ALL WORK AREAS SHALL BE LEFT CLEAN AND
FREE OF ANY EXTRANEOUS SEALANT AND PAINT SMEARS OR SPLATTERS AND STAINS.
17. NO EXISTING (LOAD BEARING) STRUCTURAL MEMBER SHALL BE CUT, REMOVED, AND/OR
MODIFIED (UNLESS SPECIFIED IN THE CONSTRUCTION DOCUMENTS) WITHOUT THE WRITTEN
APPROVAL OF THE CONTRACTING OFFICER; ANY EXISTING DISTURBED AND/OR DAMAGED
SURFACES (I.E. CONCRETE, MISCELLANEOUS STRUCTURAL MEMBERS, PAINT, ETC.) WITHIN THE
AREA OF CONSTRUCTION SHALL BE REPAIRED AS NECESSARY, TO MATCH EXISTING
CONSTRUCTION.
18. PROVIDE LEVELING COMPOUND AT FLOOR AREAS DAMAGED OR CHIPPED DURING DEMOLITION
WHERE REQUIRED TO PROVIDE LEVEL, CONTINUOUS FLOOR SPACE.
PROJECT SPECIFIC NOTES:
1. THE CONTRACTOR SHALL ENCLOSE THE HANGAR FROM INCLEMENT WEATHER DURING THE
CONSTRUCTION PROCESS INCLUDING PERIODS WHEN THE DOORS ARE EXPOSED DUE TO
REFURBISHMENT AND REPAIRS. THE INTERIOR OF THE HANGAR SHALL BE PROTECTED
FROM RAIN, HIGH WINDS AND CONDENSATION DUE TO EXCESSIVE HIGH HUMIDITY.
2. CONTRACTOR SHALL COORDINATE DUST AND EQUIPMENT COVER INSTALLATION WITH
CONTRACTING OFFICER AND WITH FACILITY USER; EXISTING FACILITY FUNCTION SHALL
NOT BE COMPROMISED.
3. CONTRACTOR SHALL SALVAGE DEMOLISHED HIGH BAY HANGAR DOOR COMPONENTS FOR
MATERIAL INSTALLATION TEMPLATES. NEW DOOR COMPONENTS SHALL BE PREDRILLED TO
MATCH EXISTING FRAMING MEMBER FASTENER SPACING.
4. EXISTING TOP AND BOTTOM STEEL TRACKS TO REMAIN IN PLACE (NO CHANGE).
DISSIMILAR METALS:
CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF DISSIMILAR METALS BY APPROPRIATE MEANS, SUCH AS ASPHALTIC TAPE, NEOPRENE TAPE, PEEL AND STICK TAPE, OR ASPHALTIC PAINT AS REQUIRED.
ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE SELECTED IN ORDER TO PREVENT OR MINIMIZE ANY
GALVANIC REACTION BETWEEN DISSIMILAR METALS. AND UNLESS OTHERWISE NOTED PROVIDE 304
STAINLESS STEEL.
SEQUENCING OF WORK:
CONTRACTOR SHALL SEQUENCE DEMO WORK TO FULLY COMPLETE ALL REQUIRED CONSTRUCTION WORK.
PHASED CONSTRUCTION IS ACCEPTABLE WHERE APPROVED BY THE CONTRACTING OFFICER.
CONTRACTOR SHALL PROVIDE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .