Atch_3_DBEH_12-2713_100__Submittal_Register.xls
XLS spreadsheet 87 KB Posted
- Attached to
- Repair Lift Stations, Various, CCAFS Federal contract opportunity
- Solicitation number
- FA2521-17-B-0006
About this file
IFB # FA2521-17-B-0006 Attachment 3 Submittal Register for DBEH 12-2713 Repair Lift Stations Various 5 pages, not dated
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Bid_Questions_and_Answers_22.pdf | ||
| Amendment_02.pdf | ||
| Atch_13_Pre-Bid_Questions_and_Answers_10-21.pdf | ||
| Attach_6_WD_8_Sep_17.pdf | ||
| Atch_10_Pre-Bid_Site_Visit_Attendance.pdf | ||
| 16B0006_Amendmend_01.pdf | ||
| Atch_12_Plumbers-Pipefitters_Agreement_re_Pipelaying_(CCAFS,_KSC_Jurisdiction).pdf | ||
| Atch_11_Pre-Bid_Questions_and_Answers_1-9.pdf | ||
| Attach_6_WD_4_Aug_17.pdf | ||
| Atch_9_Badge_Request_45_SFS_Form_V10.pdf | ||
| Atch_4_Green_Procurement_Form-signed.pdf | ||
| FA252117B0006_Rpr_Lift_Stations_Various.pdf | ||
| Atch_7_CECC_3052_Template.xls | XLS spreadsheet | |
| Atch_2_DBEH_12-2713_Repair_Lift_Stations_ITL_100__Drawings.pdf | ||
| Atch_1_DBEH_12-2713_Repair_Lift_Stations_ITL_100__Design_Specs.pdf | ||
| Atch_8_Question_and_Answer_Template.docx | DOCX document | |
| Atch_5_Haz_Waste_Form.doc | DOC document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | Repair Lift Stations - ITL | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | ||||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Lifting Operation Plan | 3.7.1 | G | ||||||||||||||
| 2 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Utility Outage Requests | 1.10.1 | G | ||||||||||||||
| 3 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Connection Requests | 1.10.1 | G | ||||||||||||||
| 4 | 01 11 00.00 30 | 01 | Preconstruction Submittals | AF 3952 | 1.8.4 | G | ||||||||||||||
| 5 | 01 11 00.00 30 | 01 | Preconstruction Submittals | SOLID WASTE DISPOSAL DIVERSION TRACKING | 1.11.6 | G | ||||||||||||||
| 6 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Premises/Access Plan | 1.7 | G | ||||||||||||||
| 7 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Storage Area Request | 1.8.1 | G | ||||||||||||||
| 8 | 01 11 00.00 30 | 01 | Preconstruction Submittals | Superintendent Contact and Qualifications | 3.8 | G | ||||||||||||||
| 9 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.7 | G | ||||||||||||||
| 10 | 01 35 26 | 01 | Preconstruction Submittals | Accident Prevention Plan (APP) | 1.7 | G | ||||||||||||||
| 11 | 01 35 26 | 06 | Test Reports | Monthly Exposure Reports | 1.4 | |||||||||||||||
| 12 | 01 35 26 | 06 | Test Reports | Notifications and Reports | 1.12 | |||||||||||||||
| 13 | 01 35 26 | 06 | Test Reports | Accident Reports | 1.12.2 | G | ||||||||||||||
| 14 | 01 35 26 | 06 | Test Reports | LHE Inspection Reports | 1.12.3 | |||||||||||||||
| 15 | 01 35 26 | 07 | Certificates | Crane Operators/Riggers | 1.6.1.4 | |||||||||||||||
| 16 | 01 35 26 | 07 | Certificates | Standard Lift Plan | 1.7.2.2 | G | ||||||||||||||
| 17 | 01 35 26 | 07 | Certificates | Critical Lift Plan | 1.7.2.3 | G | ||||||||||||||
| 18 | 01 35 26 | 07 | Certificates | Naval Architecture Analysis | 1.7.2.4 | G | ||||||||||||||
| 19 | 01 35 26 | 07 | Certificates | Activity Hazard Analysis (AHA) | 1.8 | |||||||||||||||
| 20 | 01 35 26 | 07 | Certificates | Confined Space Entry Permit | 1.9.1 | |||||||||||||||
| 21 | 01 35 26 | 07 | Certificates | Hot Work Permit | 1.9.1 | |||||||||||||||
| 22 | 01 35 26 | 07 | Certificates | Certificate of Compliance | 1.12.4 | |||||||||||||||
| 23 | 01 35 26 | 07 | Certificates | License Certificates | 1.14 | |||||||||||||||
| 24 | 01 35 26 | 07 | Certificates | Radiography Operation Planning Work Sheet | 1.14.1 | G | ||||||||||||||
| 25 | 01 35 26 | 07 | Certificates | Portable Gauge Operations Planning Worksheet | 1.14.1 | G | ||||||||||||||
| 26 | 01 57 19 | 01 | Preconstruction Submittals | Preconstruction Survey | 1.5.1 | |||||||||||||||
| 27 | 01 57 19 | 01 | Preconstruction Submittals | Solid Waste Management Permit | 1.9 | G | ||||||||||||||
| 28 | 01 57 19 | 01 | Preconstruction Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 29 | 01 57 19 | 01 | Preconstruction Submittals | Environmental Protection Plan | 1.6 | G | ||||||||||||||
| 30 | 01 57 19 | 01 | Preconstruction Submittals | Stormwater Notice of Intent | 3.2.2 | G | ||||||||||||||
| 31 | 01 57 19 | 01 | Preconstruction Submittals | Dirt and Dust Control Plan | 1.6.9.1 | G | ||||||||||||||
| 32 | 01 57 19 | 01 | Preconstruction Submittals | Employee Training Records | 1.5.5 | G | ||||||||||||||
| 33 | 01 57 19 | 01 | Preconstruction Submittals | Environmental Manager Qualifications | 1.5.4 | G | ||||||||||||||
| 34 | 01 57 19 | 06 | Test Reports | Inspection Reports | 3.2.3 | |||||||||||||||
| 35 | 01 57 19 | 06 | Test Reports | Solid Waste Management Report | 3.6.2.1 | G | ||||||||||||||
| 36 | 01 57 19 | 07 | Certificates | Employee Training Records | 1.5.5 | G | ||||||||||||||
| 37 | 01 57 19 | 11 | Closeout Submittals | Stormwater Pollution Prevention Plan Compliance Notebook | 3.2.4 | G | ||||||||||||||
| 38 | 01 57 19 | 11 | Closeout Submittals | Stormwater Notice of Termination | 3.2.5 | G | ||||||||||||||
| 39 | 01 57 19 | 11 | Closeout Submittals | Waste Determination Documentation | 3.6.1 | G | ||||||||||||||
| 40 | 01 57 19 | 11 | Closeout Submittals | Disposal Documentation for Hazardous and Regulated Waste | 3.6.3.6 | G | ||||||||||||||
| 41 | 01 57 19 | 11 | Closeout Submittals | Assembled Employee Training Records | 1.5.5 | G | ||||||||||||||
| 42 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Permit | 1.9 | G | ||||||||||||||
| 43 | 01 57 19 | 11 | Closeout Submittals | Solid Waste Management Report | 3.6.2.1 | G | ||||||||||||||
| 44 | 01 57 19 | 11 | Closeout Submittals | Hazardous Waste/Debris Management | 3.6.3.1 | G | ||||||||||||||
| 45 | 01 57 19 | 11 | Closeout Submittals | Regulatory Notifications | 1.5.2 | G | ||||||||||||||
| 46 | 01 57 19 | 11 | Closeout Submittals | Sales Documentation | 3.6.2.1 | G | ||||||||||||||
| 47 | 01 57 19 | 11 | Closeout Submittals | Contractor Certification | 3.6.2.1 | |||||||||||||||
| 48 | 01 57 19 | 11 | Closeout Submittals | As-Built Topographic Survey | 3.2.5 | |||||||||||||||
| 49 | 01 74 19 | 01 | Preconstruction Submittals | Waste Management Plan | 1.6 | G | ||||||||||||||
| 50 | 01 74 19 | 11 | Closeout Submittals | Records | 1.7 | |||||||||||||||
| 51 | 01 78 00 | 03 | Product Data | Warranty Management Plan | 1.6.1 | |||||||||||||||
| 52 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.6.4 | |||||||||||||||
| 53 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.5 | |||||||||||||||
| 54 | 01 78 00 | 08 | Manufacturer’s Instructions | Instructions | 1.6.1 | |||||||||||||||
| 55 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.2 | G | ||||||||||||||
| 56 | 01 78 00 | 11 | Closeout Submittals | As-Built Drawings | 3.1 | G | ||||||||||||||
| 57 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 1.2.2 | G | ||||||||||||||
| 58 | 01 78 00 | 11 | Closeout Submittals | Certification of EPA Designated Items | 2.1 | G | ||||||||||||||
| 59 | 02 41 00 | 01 | Preconstruction Submittals | Demolition Plan | 1.2.1 | G | ||||||||||||||
| 60 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.11 | |||||||||||||||
| 61 | 02 41 00 | 07 | Certificates | Notification of Demolition | 1.7 | |||||||||||||||
| 62 | 03 30 53 | 02 | Shop Drawings | Installation Drawings | 1.5 | G | ||||||||||||||
| 63 | 03 30 53 | 03 | Product Data | Air-Entraining Admixture | 2.2.3.1 | |||||||||||||||
| 64 | 03 30 53 | 03 | Product Data | Accelerating Admixture | 2.2.3.2 | |||||||||||||||
| 65 | 03 30 53 | 03 | Product Data | Water-Reducing or Retarding Admixture | 2.2.3.3 | |||||||||||||||
| 66 | 03 30 53 | 03 | Product Data | Curing Materials | 2.2.10 | |||||||||||||||
| 67 | 03 30 53 | 03 | Product Data | Expansion Joint Filler Strips, Premolded | 2.2.6 | |||||||||||||||
| 68 | 03 30 53 | 03 | Product Data | Joint Sealants - Field Molded Sealants | 2.2.7 | |||||||||||||||
| 69 | 03 30 53 | 03 | Product Data | Waterstops | 2.4.1 | |||||||||||||||
| 70 | 03 30 53 | 03 | Product Data | Chemical Floor Hardener | 2.4.2 | |||||||||||||||
| 71 | 03 30 53 | 03 | Product Data | Batching and Mixing Equipment | 3.1.3.3 | |||||||||||||||
| 72 | 03 30 53 | 03 | Product Data | Conveying and Placing Concrete | 3.2 | |||||||||||||||
| 73 | 03 30 53 | 03 | Product Data | Formwork | 2.2.8 | |||||||||||||||
| 74 | 03 30 53 | 03 | Product Data | Mix Design Data | 2.3 | G | ||||||||||||||
| 75 | 03 30 53 | 03 | Product Data | Ready-Mix Concrete | 2.3 | |||||||||||||||
| 76 | 03 30 53 | 03 | Product Data | Curing Compound | 2.4.3 | |||||||||||||||
| 77 | 03 30 53 | 03 | Product Data | Mechanical Reinforcing Bar Connectors | 2.2.5 | |||||||||||||||
| 78 | 03 30 53 | 06 | Test Reports | Aggregates | 2.2.2 | |||||||||||||||
| 79 | 03 30 53 | 06 | Test Reports | Concrete Mixture Proportions | 2.1.3 | G | ||||||||||||||
| 80 | 03 30 53 | 06 | Test Reports | Compressive Strength Testing | 3.9.3 | G | ||||||||||||||
| 81 | 03 30 53 | 06 | Test Reports | Slump | 3.9.3 | G | ||||||||||||||
| 82 | 03 30 53 | 06 | Test Reports | Air Content | 3.9.3 | |||||||||||||||
| 83 | 03 30 53 | 06 | Test Reports | Water | 2.2.4 | |||||||||||||||
| 84 | 03 30 53 | 07 | Certificates | Cementitious Materials | 2.2.1 | |||||||||||||||
| 85 | 03 30 53 | 07 | Certificates | Pozzolan | 2.2.1.2 | |||||||||||||||
| 86 | 03 30 53 | 07 | Certificates | CPG for recycled materials or appropriate Waiver Form | 1.5.1 | |||||||||||||||
| 87 | 03 30 53 | 07 | Certificates | Aggregates | 2.2.2 | |||||||||||||||
| 88 | 03 30 53 | 07 | Certificates | Delivery Tickets | 2.3 | |||||||||||||||
| 89 | 03 30 53 | 08 | Manufacturer’s Instructions | Chemical Floor Hardener | 2.4.2 | |||||||||||||||
| 90 | 03 30 53 | 08 | Manufacturer’s Instructions | Curing Compound | 2.4.3 | |||||||||||||||
| 91 | 03 42 13.00 10 | 01 | Preconstruction Submittals | Quality Control Procedures | 1.3.2.2 | |||||||||||||||
| 92 | 03 42 13.00 10 | 02 | Shop Drawings | Standard Precast Units | 2.1.1 | G | ||||||||||||||
| 93 | 03 42 13.00 10 | 02 | Shop Drawings | Custom-Made Precast Units | 2.1.2 | G | ||||||||||||||
| 94 | 03 42 13.00 10 | 02 | Shop Drawings | Special Finishes | 3.2.4.3 | |||||||||||||||
| 95 | 03 42 13.00 10 | 03 | Product Data | Standard Precast Units | 2.1.1 | |||||||||||||||
| 96 | 03 42 13.00 10 | 03 | Product Data | Proprietary Precast Units | 2.1.3 | |||||||||||||||
| 97 | 03 42 13.00 10 | 03 | Product Data | Embedded Items | 3.1.3 | |||||||||||||||
| 98 | 03 42 13.00 10 | 03 | Product Data | Accessories | 2.2.5 | |||||||||||||||
| 99 | 03 42 13.00 10 | 05 | Design Data | Design Calculations | 2.1.2 | G | ||||||||||||||
| 100 | 03 42 13.00 10 | 05 | Design Data | Concrete Mix Proportions | 2.1.5.1 | |||||||||||||||
| 101 | 03 42 13.00 10 | 06 | Test Reports | Test Reports | 1.3.2.4 | |||||||||||||||
| 102 | 03 42 13.00 10 | 07 | Certificates | Quality Control Procedures | 1.3.2.2 | |||||||||||||||
| 103 | 26 20 00 | 03 | Product Data | Switches | 2.7 | |||||||||||||||
| 104 | 26 20 00 | 03 | Product Data | Motor controllers | 2.11 | G | ||||||||||||||
| 105 | 26 20 00 | 03 | Product Data | Surge protective devices | 2.19 | G | ||||||||||||||
| 106 | 26 20 00 | 06 | Test Reports | 600-volt wiring test | 3.5.2 | G | ||||||||||||||
| 107 | 26 20 00 | 06 | Test Reports | Grounding system test | 3.5.5 | G | ||||||||||||||
| 108 | 26 20 00 | 06 | Test Reports | Transformer tests | 3.5.3 | G | ||||||||||||||
| 109 | 26 20 00 | 06 | Test Reports | Ground-fault receptacle test | 3.5.4 | G | ||||||||||||||
| 110 | 26 20 00 | 07 | Certificates | Fuses | 2.8 | G | ||||||||||||||
| 111 | 26 20 00 | 10 | Operation and Maintenance Data | Electrical Systems | 1.5.1 | G | ||||||||||||||
| 112 | 31 00 00 | 01 | Preconstruction Submittals | Shoring | 3.5 | |||||||||||||||
| 113 | 31 00 00 | 01 | Preconstruction Submittals | Dewatering Work Plan | 1.3 | |||||||||||||||
| 114 | 31 00 00 | 06 | Test Reports | Testing | 3.15 | |||||||||||||||
| 115 | 31 00 00 | 07 | Certificates | Testing | 3.15 | |||||||||||||||
| 116 | 32 10 00 | 06 | Test Reports | Trial batch | 1.3.4 | |||||||||||||||
| 117 | 32 10 00 | 06 | Test Reports | Mix design | 1.3.5 | |||||||||||||||
| 118 | 32 10 00 | 06 | Test Reports | Asphalt concrete | 2.1 | |||||||||||||||
| 119 | 32 10 00 | 06 | Test Reports | Density | 3.3.1.1 | |||||||||||||||
| 120 | 32 10 00 | 06 | Test Reports | Thickness | 3.2.4 | |||||||||||||||
| 121 | 32 92 19 | 07 | Certificates | seed | 2.1 | |||||||||||||||
| 122 | 32 92 23 | 07 | Certificates | sods | 2.1 | |||||||||||||||
| 123 | 33 11 00 | 03 | Product Data | Pipe, Fittings, Joints and Couplings | 2.2 | G | ||||||||||||||
| 124 | 33 11 00 | 03 | Product Data | Valves | 2.3 | G | ||||||||||||||
| 125 | 33 11 00 | 03 | Product Data | Valve Boxes | 2.3.3 | G | ||||||||||||||
| 126 | 33 11 00 | 03 | Product Data | Pipe Anchorage | 2.2.4 | G | ||||||||||||||
| 127 | 33 11 00 | 03 | Product Data | Tapping Sleeves | 2.4.1 | G | ||||||||||||||
| 128 | 33 11 00 | 03 | Product Data | Corporation Stops | 2.4.6.1 | G | ||||||||||||||
| 129 | 33 11 00 | 03 | Product Data | Backflow Preventers | 1.3.2.1 | G | ||||||||||||||
| 130 | 33 11 00 | 06 | Test Reports | Backflow Preventer Tests | 3.3.1 | |||||||||||||||
| 131 | 33 11 00 | 06 | Test Reports | Bacteriological Samples | 3.2.6 | G | ||||||||||||||
| 132 | 33 11 00 | 07 | Certificates | Pipe, Fittings, Joints and Couplings | 2.2 | |||||||||||||||
| 133 | 33 11 00 | 07 | Certificates | Lining | 2.2.1.1 | |||||||||||||||
| 134 | 33 11 00 | 07 | Certificates | Lining for Fittings | 2.2.2.1.1 | |||||||||||||||
| 135 | 33 11 00 | 07 | Certificates | Valves | 2.3 | |||||||||||||||
| 136 | 33 11 00 | 07 | Certificates | Backflow Prevention Training Certificate | 1.3.2.1.2 | |||||||||||||||
| 137 | 33 11 00 | 07 | Certificates | Backflow Tester | 1.3.2.1.1 | |||||||||||||||
| 138 | 33 11 00 | 07 | Certificates | Disinfection Procedures | 3.2.6 | |||||||||||||||
| 139 | 33 11 00 | 08 | Manufacturer’s Instructions | Manufacturer's Instructions | 3.2.1 | |||||||||||||||
| 140 | 33 32 13.13 | 01 | Preconstruction Submittals | Material, Equipment, and Fixtures List | 2.2 | G | ||||||||||||||
| 141 | 33 32 13.13 | 02 | Shop Drawings | Fabrication Drawings | 2.1 | G | ||||||||||||||
| 142 | 33 32 13.13 | 02 | Shop Drawings | Erection/Installation Drawings | 2.1 | G | ||||||||||||||
| 143 | 33 32 13.13 | 03 | Product Data | Spare Parts Data | 3.3.1 | G | ||||||||||||||
| 144 | 33 32 13.13 | 03 | Product Data | Manhole Chambers | 2.2.3 | G | ||||||||||||||
| 145 | 33 32 13.13 | 03 | Product Data | EPA-CPG Compliance | 1.3 | G | ||||||||||||||
| 146 | 33 32 13.13 | 03 | Product Data | Entrance Covers | 2.2.2 | G | ||||||||||||||
| 147 | 33 32 13.13 | 03 | Product Data | Pumps | 2.2.4 | G | ||||||||||||||
| 148 | 33 32 13.13 | 03 | Product Data | Pump Controls | 2.2.8 | G | ||||||||||||||
| 149 | 33 32 13.13 | 03 | Product Data | Impellers | 2.1.1.1 | G | ||||||||||||||
| 150 | 33 32 13.13 | 03 | Product Data | Couplings | 2.1.1.1 | G | ||||||||||||||
| 151 | 33 32 13.13 | 03 | Product Data | Bearings | 2.1.1.1 | G | ||||||||||||||
| 152 | 33 32 13.13 | 03 | Product Data | Stuffing Boxes | 2.1.1.1 | G | ||||||||||||||
| 153 | 33 32 13.13 | 03 | Product Data | Gate Valves | 2.2.5.1 | G | ||||||||||||||
| 154 | 33 32 13.13 | 03 | Product Data | Check Valves | 2.2.5.3 | G | ||||||||||||||
| 155 | 33 32 13.13 | 03 | Product Data | Electric Motors | 2.1.1.1 | G | ||||||||||||||
| 156 | 33 32 13.13 | 05 | Design Data | Motor/Pumps | 2.1 | G | ||||||||||||||
| 157 | 33 32 13.13 | 05 | Design Data | Pump Test | 3.2.1 | G | ||||||||||||||
| 158 | 33 32 13.13 | 05 | Design Data | Hydrostatic Pressure Test | 3.2.1 | G | ||||||||||||||
| 159 | 33 32 13.13 | 05 | Design Data | Pressure Sensor Test | 3.2.1 | G | ||||||||||||||
| 160 | 33 32 13.13 | 05 | Design Data | Float Test | 3.2.1 | G | ||||||||||||||
| 161 | 33 32 13.13 | 07 | Certificates | Listing of Product Installations | 1.3 | G | ||||||||||||||
| 162 | 33 32 13.13 | 07 | Certificates | Recycled Material Content | 1.3 | G | ||||||||||||||
| 163 | 33 32 13.13 | 07 | Certificates | Manhole Chambers | 2.2.3 | G | ||||||||||||||
| 164 | 33 32 13.13 | 07 | Certificates | Entrance Covers | 2.2.2 | G | ||||||||||||||
| 165 | 33 32 13.13 | 07 | Certificates | Pumps | 2.2.4 | G | ||||||||||||||
| 166 | 33 32 13.13 | 07 | Certificates | Gate Valves | 2.2.5.1 | G | ||||||||||||||
| 167 | 33 32 13.13 | 07 | Certificates | Check Valves | 2.2.5.3 | G | ||||||||||||||
| 168 | 33 32 13.13 | 07 | Certificates | Electric Motors | 2.1.1.1 | G | ||||||||||||||
| 169 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Manhole Chambers | 2.2.3 | G | ||||||||||||||
| 170 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Entrance Covers | 2.2.2 | G | ||||||||||||||
| 171 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Pumps | 2.2.4 | G | ||||||||||||||
| 172 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Pump Controls | 2.2.8 | G | ||||||||||||||
| 173 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Gate Valves | 2.2.5.1 | G | ||||||||||||||
| 174 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Check Valves | 2.2.5.3 | G | ||||||||||||||
| 175 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Electric Motors | 2.1.1.1 | G | ||||||||||||||
| 176 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Special Tools | 3.3.1 | G | ||||||||||||||
| 177 | 33 32 13.13 | 08 | Manufacturer’s Instructions | Posted Instructions | 3.3.1 | G | ||||||||||||||
| 178 | 33 32 13.13 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.3.1 | G | ||||||||||||||
| 179 | 33 32 13.13 | 10 | Operation and Maintenance Data | Preventative Maintenance and Inspection Procedure | 3.3.1 | G | ||||||||||||||
| 180 | 33 32 13.13 | 11 | Closeout Submittals | Warranty | 1.5 | G | ||||||||||||||
| 181 | 33 34 00 | 06 | Test Reports | Hydrostatic Tests | 3.2 |