Drawing_S-601 _Rev_1_(Ref_RFP-Atch_3).pdf
PDF 198 KB Posted
- Attached to
- Single-Award Indefinite Delivery Indefinite Quantity Task Order Contract Federal contract opportunity
- Solicitation number
- FA2521-15-R-0014
About this file
Drawing S-601 Rev 1 replaces Drawing S-601 (Ref RFP-Atch 3-Drawings)
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONNECTION PL'S, BOLTS REPAIR/REPLACE QUANTITY SCHEDULE
QTY
MEMBER
EXGUSSET
/ LOCATION
THK WTH
No.
MAIN CONNECTION WORK
TYPE
REPAIR
REPLACE
GUSSET PLATE WELD
Area
EX EX 8.0
REPAIR
REPLACE
EX EX EX 1.0
PART GUSSET AR
AR
GUSSET
PART GUSSET
COMMENTS, NOTES
& FOOTNOTES
Ø COL & Ø RISER
MAIN TOWER SUPPORT FRAMING MEMBERS REPAIR / REPLACE SCHEDULE
MEMBER
MAIN
COMMENTS, NOTES
100 1.0 ALL INTERIOR SURFACES
REPAIRFULL LGTH
WELDQTY
Area
TYPE
No.
/ LOCATION & FOOTNOTES
WORKCONNECTION
TURNBUCKLE, CLEVIS & RELATED HARDWARE REPAIR / REPLACE SCHEDULE
MAIN
MEMBER
COMMENTS, NOTESCONNECTION WORK
& FOOTNOTES/ LOCATION
No.
TYPE
Area
QTY CONN PL'S WELD
REPLACE 4
FULL LGTH REPLACE
FULL HT COL & RISER
1.25"Ø HORIZ
W6 BEAM REPAIRFULL LGTH
1.50"Ø VERT FULL LGTH REPLACE
1.75"Ø VERT
Ø HORIZ & Ø VERT FULL LGTH
FULL LGTH
REPAIR
REPLACE
NA NA NA
SIDE/BASE/CAP PL
REPAIR / REPLACEMENT SCHEDULE NOTES:
RR-1: ALL QUANTITIES SHOWN IN THE ABOVE TABLE ARE ESTIMATES. ACTUAL QUANTITIES
WILL VARY DEPENDING ON LEVEL OF CORROSION ENCOUNTERED DURING DETAILED
INSPECTION BY THE CONTRACTOR. ACTUAL REPAIR & REPLACE QUANTITIES USED WILL VARY.
WHEREVER POSSIBLE, ALL REPAIRS SHALL BE CARRIED OUT AT GROUND LEVEL TO MAKE
INSPECTION MORE PRACTICAL AND PROVIDE BETTER AND MORE CONTROLLABLE WELDING
CONDITIONS.
RR-2: ALL PARTIAL AND FULL GUSSET PLATE 'REPLACE' WELDS SHALL BE DOUBLE SIDED
BEVELED FULL PENETRATION WELDS 'AS REQUIRED' (AR) AND THESE QUANTITIES ARE NOT
INCLUDED IN THE SCHEDULE ABOVE. ALL WELDS SHALL MEET ALL APPLICABLE AISC & AWS
D1.1 REQUIREMENTS FOR PRE-QUALIFIED WELDS INCLUDING DIMENSIONAL TOLERANCES FOR
GAPS ETC. PROVIDE BACKUP BARS IF AND AS REQUIRED AND REMOVAL FOR ALL EXPOSED
BARS.
RR-3: REPAIR PROCEDURE OUTLINE;
A) CHECK MAXIMUM CORROSION PITTING AND COMPARE TO 'WELD REPAIR THRESHOLD
SCHEDULE' [SECTION (4/S503)] TO SEE IF AND WHERE WELDING MATERIAL BUILD UP REPAIRS
ARE REQUIRED.
B) PREPARE ALL SURFACES AS REQUIRED (BRUSHING, GRINDING, SANDBLASTING ETC) FOR
WELDING AS REQUIRED PER AISC AND AWS D1.1 REQUIREMENTS TO ENSURE THAT
CORROSION DOES NOT REOCCUR IN THE FUTURE UNDER WELD REPAIRED AREAS.
C) FILL AREAS TO BE REPAIRED WITH WELD USING E60xx ELECTRODES AS REQUIRED. CLEAN
AND PREP BETWEEN ADDITIONAL PASSES AS REQUIRED.
D) GRIND ALL REPAIRED WELDED SURFACES, FAYING AND BEARING SURFACES, ADJACENT
AREAS AND TRANSITIONS AT PLATE REPLACEMENT. REMOVE ALL BURRS, WELD SPLATTER ETC
AS REQUIRED TO PROVIDE A SMOOTH FINISHED SURFACE PRIOR TO BLASTING & PAINTING
PREP SPECIFICATIONS.
E) SANDBLAST FINISH SURFACES TO BE PAINTED (INCLUDING FAYING SURFACES) TO SSPC10
('NEAR WHITE') AS A MINIMUM AND AS REQUIRED BY THE PAINT SPECIFICATIONS. PENCIL
BLAST ALL BOLT HOLES, INCLUDING HOLES TO BE ABANDONED, AND SIMILAR SMALL OPENING
AREAS TO SSPC SP10.
RR-4: ALL 'REPAIRS' TO CONNECTION PLATES, MEMBERS ETC SHALL BE BUILT UP TO THE
ORIGINAL MATERIAL FLUSH THICKNESS USING MULTIPLE FILLET WELDS PASSES AND GROUND
SMOOTH AS REQUIRED ON ALL FAYING AND BEARING SURFACES. CLEAN INTERMEDIATE WELD
SURFACES AS REQUIRED BY AISC AND AWS. THE MAJORITY OF CORRODED AREAS TO BE
REPAIRED CAN BE FILLED WITH A SINGLE PASS DEPTH (~3/16 " THICK/DEEP) FILLET WELD.
MULTIPLE PASS WELDS WILL BE REQUIRED TO BUILD UP AREAS WITH LOCALLY DEEP
CORROSION AND ARE ALREADY INCLUDED AS AN AVERAGE. GRIND AND PREP ALL WELD
SURFACES FOR PRIOR TO PAINTING TO SSPC SP 10.
RR-5: ALL REPAIRED AND NEW REPLACEMENT SURFACES TO BE PRE-BLASTED BEFORE
INSPECTION AND BLASTED & AND PAINTED TO MATCH ADJACENT SURFACES WITH INORGANIC
ZINC. SEE PAINT SPECIFICATIONS.
RR-6: E60xx ELECTRODES SHALL BE USED FOR ALL 'REPAIR' & 'REPLACEMENT' WELDS FOR
CONNECTIONS AND MEMBERS ETC.
RR-7: ALL GUSSET PLATE DIMENSIONS AND THICKNESS GIVEN ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY EXACT SIZES. MATCH EXISTING GUSSET PLATE THICKNESS
AND FINISH DIMENSIONS.
RR-8: PROVIDE ALL OTHER MATERIAL PREPARATION STEPS AS REQUIRED TO PROVIDE A
COMPLETE STRUCTURAL SYSTEM THAT MEETS ALL APPLICABLE CODES AND STANDARDS
(AISC, AWS, SSPC ETC.) AND SPECIFICATIONS.
RR-9: IN GENERAL, THE EXISTING CIRCULAR BRACING/BRIDGING RODS ARE IN RELATIVELY
GOOD CONDITION ALTHOUGH THERE MAY BE HIDDEN OR UN-NOTED SEVERE CORROSION
LOCALLY THAT WILL NEED TO BE REPAIRED LOCALLY BY GRINDING AND WELDING BEFORE
REUSE. IF THE CORROSION IS SEVERE ENOUGH ALONG THE FULL LENGTH OF THE ROD,
OVERALL REMOVAL AND REPLACEMENT MAY BE WARRANTED IF THE REPAIR COSTS ARE 50%
OR MORE OF THE FULL ROD REPLACEMENT COST, INCLUDING ALL REQUIRED CONNECTIONS
AND FASTENERS. NOTE THAT THE END CONNECTION HARDWARE (CLEVISES AND ESPECIALLY
TURNBUCKLES) MAY NOT BE SIGNIFICANTLY CORRODED AND MAY BE SALVAGED AND REUSED
ALONG WITH ENOUGH OF THE THREADED PORTION OF THE RODS TO ALLOW FULL
PENETRATION WELDING. SIGNIFICANT ROD CORROSION RIGHT AT THE INTERFACE OF THE
CAST IRON TURNBUCKLES MAY REQUIRE THAT WELDING REPAIRS AT THESE LOCATIONS NOT
BE ALLOWED, AND PARTIAL ROD REPLACEMENT INCLUDING THE ADJACENT TURNBUCKLE MAY
BE REQUIRED.
RR-10: CAST METAL FITTINGS SUCH AS TURNBUCKLES ETC SHALL NOT BE REPAIRED BY
WELDING WITHOUT SPECIFIC APPROVAL FROM THE E.O.R. AND CONTRACTING OFFICER.
ALTHOUGH LOCALIZED CORROSION AND PITTING MAY EXIST, IT MAY BUT MAY BE EITHER
RELATIVELY INSIGNIFICANT, OR MAY BE LOCATED WHERE IT IS NOT CRITICAL TO THE
COMPONENTS STRENGTH. CONTACT THE CONTRACTING OFFICER FOR FURTHER GUIDANCE IF
SIGNIFICANT CORROSION IS FOUND.
RR-11: TIE ROD AND TURNBUCKLE THREADING MUST MATCH EXACTLY. WHEN TURNBUCKLE
REPLACEMENT IS REQUIRED, A PORTION OF THE CONNECTING RODS AT EITHER END SHALL
ALSO BE REPLACED, INCLUDING THE CLEVIS. THE REPLACED ROD END SHALL BE FULL
PENETRATION WELDED TO THE REMAINING INTACT ORIGINAL PORTION OF THE ROD.
RR-12: ROD COUPLERS FOR CIRCULAR HORIZONTAL RADIAL RODS SHALL BE 'CADWELD' OR
PRE-APPROVED EQUAL. INSTALL IN FULL COMPLIANCE WITH MANUFACTURER'S WRITTEN
RECOMMENDATIONS. ALL ROD ENDS AT EACH END OF SPLICES SHALL BE CORROSION FREE.
ALTERNATELY, 'COUPLING RODS MAY BE USED IN LIEU OF FULL PENETRATION WELDING FOR
SPLICING HORIZONTAL RADIAL RODS ONLY, AT NO ADD'L COST TO THE GOVERNMENT.
RR-13: REPAIR METHODS SHALL NOT BE CONSIDERED OR USED THAT WOULD RESULT IN ANY
FORMS OR TYPES OF UN-MAINTAINABLE SURFACES, OTHER THAN AT FAYING CONTACT
SURFACES.
RR-14: ALL REINFORCEMENT PLATES, SPLICES OR SIMILAR REPAIRS SHALL HAVE FULL LENGTH
CONTINUOUS SEAL WELDS IN ADDITION IN ADDITION TO ALL REQUIRED STRUCTURAL WELDS
TO NOT ALLOW MOISTURE INTRUSION.
STRUCTURAL STEEL
S-1: THESE NOTES APPLY TO ALL REPAIR OR REPLACEMENT WORK PERFORMED ON
STRUCTURAL STEEL MEMBERS, MISCELLANEOUS METALS, AND TANK ELEMENTS THAT MAY BE
REQUIRED DURING THE PERFORMANCE OF THIS CONTRACT.
S-2: STEEL WORK SHALL CONFORM TO THE AISC "SPECIFICATIONS FOR THE DESIGN,
FABRICATION AND ERECTION OF STRUCTURAL STEEL BUILDINGS", 13TH EDITION.
S-3: STRUCTURAL STEEL SHALL CONFORM TO ASTM A-36 (Fy = 36 ksi) UNLESS OTHERWISE
NOTED. ASTM A-36 (FY = 36 ksi) MAY BE USED FOR PLATES, ANGLES AND CHANNEL SHAPES.
S-3: STEEL TUBING SHALL CONFORM TO ASTM A-500, GRADE B. (Fy = 46 ksi)
S-4: STEEL PIPE SHALL CONFORM TO ASTM A-53 TYPE E OR S, GRADE B. (Fy = 35 ksi)
S-5: 2 BOLTS SHALL BE USED IN ALL CONNECTIONS UNLESS SHOWN OTHERWISE.
S-6: IN GENERAL ALL FIELD CONNECTIONS SHALL BE BOLTED USING BEARING TYPE
CONNECTIONS.
(sq in/ea)
WELD
Area
& FOOTNOTES
COMMENTS, NOTES
LADDER, GUARDRAIL & MISCELLANEOUS METALS & RELATED FABRICATIONS
VERTICAL (18' O.A.)
ARME ME ME
EXRAILS, RUNGS, PL'S REPAIR
(ft)(inch)(each) (inch)
MATERIALQTY
TYPE
No. WTHTHK
/ LOCATION
WORKCONNECTION
LADDER #2
MEMBER
MAIN
LADDER #2
LADDER #2
RUNGS
REPLACESIDE RAILS
REPLACE MEMEME AR ~48 O.A.10
SIDE RAILSLADDER #2 REPLACE SLOPED/CURVEDME AR10
EXEX
MEME
(each) (inch) (inch) (ft) (sq in/ea)
WTHTHK
1.00"Ø HORIZ REPLACEFULL LGTH
(each) (sq in/ea)(ft)(inch)(inch)
ALL VERT 'X'
ALL RADIAL Ø
ALL RADIAL Ø
REPLACEREPLACE
1.0
AR
AR
1.0
AR
AR
ALL AREAS REPAIR
NANANA
NA NA NA
NANANA
NA NA NA
NANANA
NA NA NA
NANANA
- 2.0
INCL CLEVIS ASS'Y EA END
42 TOTAL
28 TOTAL
ALL VERT 'X'
10 ME ME ME
ME ME ME
INCL Ø ROD W/ THD ENDS
INCL Ø ROD W/ THD ENDS
INCL Ø ROD W/ THD ENDS
INCL Ø ROD W/ THD ENDS
TURNBUCKLE
TURNBUCKLE
TURNBUCKLE
TURNBUCKLE
REPLACE
REPLACE
REPLACE
(each) (inch) (inch) (ft) (sq in/ea)
C o n n
P l a t e s
B o l t s
M a i n
M e m b e r s
P l a t f o r m s
L a d d e r s
M i s c
H a r d w a r e
NANA NA400 TOP, BOTTOM, EDGES & SIDES1.0REPAIRTYPICALDECK PL & SUPP STRUCT
ALL EXTERIOR SURFACESEXTERIOR TANK REPAIRALL AREAS NANANA 1.0200
INTERIOR TANK
INCL PART Ø ROD
HORIZ CLEVIS (ALL)
VERT CLEVIS (ALL)
REPLACE REPLACE
12 ME ME ME AR
INCL PART Ø RODARMEMEME6
STRUCTURAL STEEL (CONTINUED)
S-7: SHOP CONNECTIONS SHALL GENERALLY BE WELDED. WELDS SHALL CONFORM TO AWS
REQUIREMENTS. NOTE THAT WELDING ELECTRODES FOR REPAIRS TO ALL EXISTING
MEMBERS SHALL BE E60XX. ELECTRODES FOR NEW MEMBERS ONLY MAY BE EITHER E60xx OR
E70xx ELECTRODES. CERTIFIED WELDERS SHALL DO ALL SHOP AND FIELD WELDING. A
MINIMUM OF 3/16" FILLET WELDS SHALL BE USED ON ALL STRUCTURAL CONNECTIONS. ALL
WELDS SHALL BE CONTINUOUS, FUNCTION AS SEAL WELDS, AND NOT ALLOW MOISTURE
INTRUSION INTO THE JOINT. LARGER WELD SIZES MAY BE REQUIRED PER AISC
SPECIFICATIONS.
S-8: BOLTS FOR MISCELLANEOUS METAL FRAMING AND OTHER MISC TYPE CONNECTIONS
SHALL BE HOT DIPPED GALVANIZED ASTM A 307. MATCH SIZE OF EXISTING BOLTS U.O.N.OR
REQ'D FOR LOADS.
S-9: REFER TO THE PAINTING SPECIFICATIONS FOR DETAILS ON MATERIAL PREPARATION
REQUIRED.
S-10: DO NOT REPAIR BOLTS, NUTS OR ANY FORGED STEEL HARDWARE MEMBERS BY
WELDING.
S-11: FORGED STEEL CONNECTING HARDWARE, SUCH AS TURNBUCKLES, SHALL NOT BE
REPAIRED BY WELDING. IF MORE THAN 10% OF GROSS SECTION AREA LOSS IS PRESENT, THE
ITEM SHALL BE REPLACED WITH A NEW UNLESS APPROVED IN WRITING BY THE CONTRACTING
OFFICER.
LADDERS AND RELATED CONSTRUCTION
L-1: VERTICAL LADDERS SHALL CONFORM TO SECTION 7 OF 29 CFR 1910.27 APPLICABLE OSHA
REQUIREMENTS.
L-2: SIDE STRINGER RAILS SHALL BE A MINIMUM OF 2 1/2 BY 3/8 INCH STEEL FLAT BARS AND 3/4
INCH DIAMETER STEEL RODS FOR RUNGS. RUNGS SHALL NOT LESS THAN 16 INCHES WIDE,
SPACED ONE FOOT APART, PLUG WELDED OR SHOULDERED AND HEADED INTO STRINGERS.
L-3: INSTALL LADDERS SO THAT THE DISTANCE FROM THE RUNGS TO ANY FINISHED SURFACE
BEHIND WILL NOT BE LESS THAN 7 INCHES.
L-4: PROVIDE HEAVY CLIP ANGLES RIVETED OR BOLTED TO THE STRINGER AND CONNECTED
WITH NOT LESS THAN TWO 1/2 INCH DIAMETER BOLTS, OR AS INDICATED. PROVIDE
INTERMEDIATE CLIP ANGLES NOT OVER 48 INCHES ON CENTERS. REFER TOT THE STRUCTURAL
DRAWINGS FOR ADDITIONAL INFORMATION AND REQUIREMENTS ON LADDER SUPPORTS.
L-5: LADDERS SHALL BE CONSTRUCTED PER THE DRAWINGS AND SPECIFICATIONS AND HOT
DIPPED GALVANIZED AFTER FABRICATION. ALL CONNECTORS SHALL BE EITHER HDG A307
BOLTS OR 304 SS.
L-6: PROVIDE SELF CLOSING SAFETY GATE AT TOP TOP PLATFORM LEVEL. SAFETY GATE
SYSTEM SHALL BE FABRICATED ENTIRELY OUT OF 316 SS. FASTENERS MAY BE EITHER 304 SS
OR 316 SS.
L-7: PROVIDE CLIMB FALL PROTECTION SYSTEM FOR FULL HEIGHT OF LADDER INCLUDING
LADDER TO TOP OF TANK ABOVE. FALL PROTECTION SYSTEM (INCLUDING ALL ATTACHMENTS)
SHALL BE FABRICATED ENTIRELY OUT OF 304 SS OR 316 SS.
L-8: LADDER LOCKED DOOR SECURITY/INTRUDER PROTECTION SYSTEM AT BASE OF LADDER
TO MATCH EXISTING & FABRICATED OF 304 SS, 316 SS OR ANODIZED ALUMINUM. PROVIDE
FACILITY # ON DOOR.
ANTENNA & RELATED COMMUNICATION EQUIPMENT SUPPORTS
AS-1: ANTENNA, OR RELATED COMMUNICATION SYSTEM ELEMENTS INCLUDING CABLES OR
SUPPORTS SHALL NOT INTERFERE WITH ANY LADDER OR RELATED SAFETY CLIMBING
SYSTEMS. MAINTAIN ALL REQUIRED OSHA CLEARANCES AROUND SIDES OF LADDER SIDE
RAILS AND BEHIND LADDER RUNGS ETC AS REQ'D. IF IN ANY DOUBT AS TO SPECIFIC MINIMUM
REQUIRED OSHA CLEARANCES, PROVIDE A MINIMUM OF 9" CLEAR IN ALL DIRECTIONS FROM
ANY PARTS OF LADDER OR RELATED SAFETY SYSTEM.
AS-2: CONTRACTOR TO COORDINATE WITH EACH USER FOR LOCATION AND REQUIREMENTS
FOR ADDED SUPPLEMENTAL CABLE SUPPORTS TO BE ADDED TO TANK SUPPORT COLUMNS,
LADDER SUPPORT FRAME STRUCTURE, TANK SHELL ETC. SEE ELECTRICAL SPECIFICATIONS
FOR ADD'L INFO & REQT'S.
AS-3: CONTRACTOR TO COORDINATE WITH USERS FOR LOCATION OF REQ'D CABLE SUPPORTS
ON THE TOP OF THE TANK ROOF. REMOVE & REPLACE EXISTING MOUNTS W/ NEW ANTENNA
MOUNTS AS DETAILED IN THE SAME LOCATION AS EXISTING.
AS-4: ALL MOUNTING HARDWARE SHALL BE 304 SS OR APPROVED EQUAL.
MISCELLANEOUS WATER TOWER RELATED ITEMS
T-1: LABEL ALL TANK AND MANHOLE MANWAY ACCESS HATCHES AS 'CONFINED SPACE ENTRY'
PER OSHA.
T-2: TEMPORARILY REMOVE AND REPLACE ALL EXISTING TANK APPURTENANCES AND
ATTACHMENTS (E.G. ROOF VENTS, WATER LEVEL INDICATORS ETC) AS REQ'D TO PERFORM
TANK REPAIRS, PREPARATION AND REPAINTING UNLESS OTHERWISE NOTED. EXERCISE CARE
TO NOT DAMAGE ITEMS DURING REMOVAL, STORAGE AND REPLACEMENT. PROVIDE NEW 304
SS CONNECTORS TYPICAL (E.G.. HATCH HINGE BOLTS).
T-3: COORDINATE WITH THE CATHODIC PROTECTION SYSTEM FOR ACCESS PORTS ETC.
T-4: REFER TO 'FIGURE 4.49'; 'TEMPLATE FOR AIR FORCE SYMBOL ON WATER TOWER TANKS' IN
THE 'UNIFIED FACILITIES CRITERIA' (UFC) 'AIR FORCE SIGN STANDARD', 'UFC 3-120-01, FEBRUARY 6 2003' FOR DECAL SIGNAGE DETAILS.
PAINT SYSTEMS:
PS-1: REFER TO PAINTING, COATING AND RELATED SPECIFICATIONS FOR FULL DETAILS OF
TYPE, SURFACE PREPARATION AND LOCATION OF PAINT SYSTEMS REQUIRED.
PS-2: ALL SURFACES SHALL BE REPAIRED AND PREPARED AS REQUIRED PER SPECIFICATIONS
PRIOR TO PAINTING. EXTERIOR SURFACES SHALL BE COATED WITH INORGANIC ZINC (I.O.Z.)
PRIOR TO APPLICATION OF FINISH COATS. ANY AND ALL ADJACENT OR SURROUNDING
SURFACES (INCLUDING INTERIOR TANK SURFACES) THAT HAVE BEEN REPAINTED SHALL BE
PROTECTED AS REQUIRED FROM DAMAGE AND IF DAMAGED (INCLUDING BY WELDING) SHALL
BE RE-PREPARED AND REPAINTED AS REQUIRED TO MATCH INTACT PAINT SYSTEM.
PROVIDE ADD'L Ø ROD AS REQ'D
PROVIDE ADD'L Ø ROD AS REQ'D
PROVIDE ADD'L Ø ROD AS REQ'D
PROVIDE ADD'L Ø ROD AS REQ'D
ARR/RR/R 2 EACH TOTAL (FUTURE USE)EQUIP MOUNT REPLACEROOF TANK R/R2
~ 160' TOE PL TOTAL8.0EXEX
10 1.3'TANK PLATFORM REPLACETOE PLATE TOTAL 'R/R' TOE PL LENGTHR/R R/R AR
24TANK PLATFORM REPAIRTOE PLATE EX
S-M-
S-M-
S-M-
S-M-
S-M-
S-M-
S-M-
S-M-
S-M-
S-C-
S-C-
S-C-
S-C-
S-C-
S-C-
S-C-
S-P-
S-P-
S-P-
S-P-
S-H-
S-H-
S-H-
S-H-
UNIT PRICE
IDENTIFIER
UNIT PRICE
IDENTIFIER
UNIT PRICE
IDENTIFIER
UNIT PRICE
IDENTIFIER
AR = AS REQ'D
NA = NOT APPLICABLE
EX = EXISTING
AR
AR
AR
AR
LGTH
LGTH
HORIZ & VERT CLEVIS 84 TOTAL1.0EX EX EX300REPAIRPART GUSSET
S-P-
S-P-
S-P-
S-P- 8
5 1.0
VERTICAL (18' O.A.)
FOOTNOTES TO TABLES:
A) 'REPAIR WELD' (sq in) QUANTITY INDICATES ANTICIPATED AVERAGE AREA OF EACH 'WELD REPAIR' USING 'PREP', 'FILL' & 'GRIND' PROCEDURE.
AVERAGE 'REPAIR WELD' AREA REPRESENTS BUILDING UP CORRODED AREAS USING MULTIPLE ONE PASS (APPROX 3/16" THICK) FILLET WELDS
AS REQUIRED TO BUILD BACK UP LOST MATERIAL TO ORIGINAL THICKNESS, U.O.N.
B) QUANTITY UNIT MEASUREMENTS ARE AS FOLLOWS;
C) GUSSET 'REPLACEMENT' SHALL BE 'PER PIECE', APPROX SIZED AS INDICATED, AND INCLUDE ALL CUTTING, PREP GRINDING, FULL
PENETRATION WELDING, FINAL GRINDING ETC., (SHOP) OVERSIZED PRE-PUNCHED BOLT HOLES ETC AS REQ'D TO PROVIDE A COMPLETE FINAL
SYSTEM.
D) CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS FOR TOTAL CUT, PREP GRIND, MATERIAL, WELD, AND FINISH GRIND QUANTITIES FOR GUSSET
'REPLACEMENT' TYPE REPAIRS. NOTE THAT WELDS QUANTITIES FOR REPLACEMENT ARE NOT INCLUDED AND ARE 'AS REQUIRED' (AR). E.G.. FULL
PENETRATION WELDS AT ROD/ROD CONNECTIONS.
UNIT PRICING:
UP-1: ALL ITEMS NOT LISTED IN THE 'UNIT PRICE' SCHEDULE SHALL BE INCLUDED IN THE CONTRACT AS REQUIRED TO PROVIDE A COMPLETE
WATER STORAGE TANK SYSTEM INCLUDING FINAL FINISHES AS INDICATED ON THE DRAWINGS AND SPECIFICATIONS.
UP-2: 'UNIT PRICES' FOR ALL CATEGORIES LISTED SHALL BE SUBMITTED WITH THE BID USING THE EXCEL SPREADSHEET PROVIDED. AFTER THE
CORROSION SURVEY RESULTS HAVE BEEN SUBMITTED BY THE CONTRACTOR AND REVIEWED THE CONTRACTING OFFICER (C.O.) , THE
QUANTITIES WILL BE UPDATED AND ADJUSTED ACCORDINGLY AT HIS SOLE DISCRETION OF THE C.O.
UP-3: 'UNIT PRICES' SHALL INCLUDE ALL MATERIALS, PREPARATION, FINISHES, LABOR, OVERHEAD, PROFIT AND ALL APPLICABLE BURDENS AND
MARKUPS FOR SUBCONTRACTORS AND THE GENERAL CONTRACTOR. THE 'BASE' PRICE PORTION OF THE CONTRACT SHALL INCLUDE ALL OTHER
ITEMS, COSTS AND EXPENSES NOT ASSOCIATED WITH THE VARIABLE REPAIR / REPLACEMENT QUANTITIES.
UP-4: IF A MEMBER OR ELEMENT'S REPAIR COST EXCEEDS IT'S REPLACEMENT COST, A NEW MEMBER SHALL BE PROVIDED IN LIEU OF REPAIRING
IT UNLESS THIS IS SPECIFICALLY APPROVED AND DIRECTED IN ADVANCE BY THE CONTRACTING OFFICER.
CORROSION SURVEY:
CS-1: THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING A DETAILED CORROSION SURVEY PRIOR TO PERFORMING ANY REPAIRS OR
REPLACEMENTS, OR ORDERING ANY REPAIR OR REPLACEMENT MATERIALS. THE FINAL CORROSION SURVEY SHALL BE SUBMITTED TO THE C.O.
FOR REVIEW AND USE AS OUTLINED BELOW.
CS-2: NOTE THAT THERE ARE MAY BE UNUSUAL ITEMS, WITH NO AVAILABLE SUBSTITUTES, THAT WILL REQUIRE SPECIAL MATERIAL ORDERS WITH
LONG LEAD TIMES.
CS-3: THE CORROSION SURVEY REPORT SHALL CLEARLY SHOW THE MAGNITUDE AND EXTENT (%) OF CORROSION AND LOCATIONS FOR ALL
INDIVIDUAL MEMBERS, CONNECTIONS AND RELATED HARDWARE THAT REQUIRE EITHER 'REPAIRS' OR 'REMOVAL AND REPLACEMENT'. THE
SURVEY SHALL INCLUDE DESTRUCTIVE INVESTIGATIONS IF/AS REQUIRED TO DETERMINE AND COMPARE THE ITEM TO THE APPLICABLE
THRESHOLDS REQUIRING EITHER 'REPAIR' OR 'REMOVAL AND REPLACEMENT'. THE SURVEY PHASE SHALL INCLUDE THE REMOVAL OF ALL LOOSE
CORROSION AS REQUIRED TO DETERMINE IF AN ELEMENT IS REPAIRABLE OR NEEDS TO BE REMOVED AND REPLACED, BUT DOES NOT ANY
PREPARATION FOR REPAIRS.
CS-4: THE CORROSION SURVEY RESULTS WILL BE USED BY THE C.O. AT THEIR SOLE DISCRETION, TO DETERMINE THE FINAL SCOPE OF WORK
AND DIRECT THE CONTRACTOR SPECIFICALLY WHICH MEMBERS ARE TO BE REPAIRED &/OR REMOVED AND REPLACED.
CS-5: REFER TO THE CORROSION 'WELD REPAIR THRESHOLD SCHEDULE' FOR TOLERABLE CORROSION LEVELS ON VARIOUS ELEMENTS.
CS-6: CORROSION SURVEY SHALL INDICATE LOCATION, ELEMENT, TYPE, EXTENT OF CORROSION AND ANY UNUSUAL FINDINGS FOR ALL
ELEMENTS REQUIRING EITHER REPAIR OR REPLACEMENT. THE SURVEY FORMAT SHALL TIE DIRECTLY INTO THE UNIT PRICE SCHEDULE AND ITEM
IDENTIFIERS INDICATED HEREIN.
1 3/4" Ø 'X' RODS
1 1/2" Ø 'X' RODS
1 1/4" Ø 'X' RODS
1" Ø 'X' RADIAL RODS
SCHEDULE ABBREVIATIONS;
AR = AS REQ'D
NA = NOT APPLICABLE
EX = EXISTING
R/R = REMOVE & REPLACE
O.A. = OVERALL
ME = MATCH EXISTING
ABBREVIATION / KEY;
E = EXISTING
N = NEW
R/R = REMOVE & REPLACE
REP = REPAIR
F.V. = FIELD VERIFY
NOTE: ALL DIMENSIONS SHOWN ARE
APPROXIMATE. CONTRACTOR TO
FIELD VERIFY ALL MEMBER
DIMENSIONS AND SIZES BEFORE
ORDERING ANY MATERIALS
NOTE: FOR ALL REPAIRS &
REPLACEMENTS, SEE 'MEMBER &
ELEMENT REPLACEMENT/REPAIR
SCHEDULES' ON (S601), 'WELD REPAIR
THRESHOLD SCHEDULE' ON (5/S503) AND
ALL APPLICABLE NOTES, SECTIONS,
SPECIFICATIONS ETC TYP
LGTH
THK WTH LGTH
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
AR
R/R = REMOVE & REPLACE
O.A. = OVERALL
ME = MATCH EXISTING
'REPAIR' & 'REMOVE/REPLACE' SCHEDULE ABBREVIATIONS;
U S
A F
T
H
C
I V
I L
E
N G
I N
E E
R
S
Q U
A D
R O
N
S
B
U I
T
D
T
E
D E
L I V
E R
Y
N
O
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
R E
V I E
W E
D
B
Y
D A
T E
SHEET
IDENTIFICATION
C O
N T
R A
C
N
O
F
A D
R
E I S
R A
N G
E
A
R C
H I T
E C
T E
N G
I N
E E
R
I N
S P
E C
T I O
N
S
E R
V I C
E S
F A
D n g i n e e r i n g I n c
L L
E N
E A
O n e i d a
T o t a l
I n t e g r a t e d
E n t e r p r i s e s
A
B
2 3
C
1 2 3
4 5
4 5
C
D
A
B
D
R
B
A R
C A
N T
R
B
A R
C A
N T
L
C
O L
E M
A N
S X
H
G
B
E A
R D
R E
P A
I
E N
T R
A L
W
A T
O W
E R
S X
H
P A
F B
F
L
S-601
W A
T E
R
T
O W
P
A I
S
H
E D
U
P
A I R
N O
T E
S
AutoCAD SHX Text Richard Barcant, FL PE #35462 RKB & Assoc Inc., FBPE CA #8377 304 Oak St., Melbourne Beach, FL 32951 321-725-3989
1204846070C Rectangle
1204846070C Line
1204846070C Line
1204846070C Typewritten Text
1204846070C Polygon
1204846070C Typewritten Text Rev 27 Jul 2015
1204846070C Polygon
1204846070C Typewritten Text
| SXHT 09-1091 Repair Central Water Tower (Final Drawings) |
| Sheets and Views |
| S-601 WATER TOWER REPAIR SCHEDULE & REPAIR NOTES |