Atch_2a-SXHT-09-1091-Specs-Addendum.pdf
PDF 7 KB Posted
- Attached to
- Single-Award Indefinite Delivery Indefinite Quantity Task Order Contract Federal contract opportunity
- Solicitation number
- FA2521-15-R-0014
About this file
RFP Atch 2a-Initial Requirement Specifications-Addendum
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SXHT 09-1091, Repair Central Water Tower
Addendum to Specification Section 26 42 22.00 20, Cathodic Protection System for Steel Water Tanks
June, 2015
The following requirements shall be added to Specification Section 26 42 22.00 20, Paragraph 3.3:
1. Cathodic protection systems shall be inspected and tested, and records shall be kept as required per UFC 3-570-06.
2. Impressed Current System Check. The Impressed Current System Check must be conducted within 60 days of the Close Interval Survey and documented on the AF IMT 491, Cathodic Protection Operating Log for Impressed Current Systems.
3. Close Interval Survey. The survey shall be conducted 30 days after cathodic protection system installation and proper adjustment. Survey data can be computer-generated and shall be maintained in the cathodic protection system record.
4. Water Tank Calibration. Calibration shall be conducted after the cathodic protection system is installed and adjusted, and after one year from the initial calibration. Calibration shall be documented on AF IMT 1689, Water Tank Calibration.