Atch_2a-SXHT-09-1091-Specs-Addendum.pdf

PDF 7 KB Posted

Attached to
Single-Award Indefinite Delivery Indefinite Quantity Task Order Contract Federal contract opportunity
Solicitation number
FA2521-15-R-0014
Issued by
Department of the Air Force Space Command

About this file

RFP Atch 2a-Initial Requirement Specifications-Addendum

View the file

Other files for this federal contract opportunity

Other files attached to Single-Award Indefinite Delivery Indefinite Quantity Task Order Contract, newest first.
File Type Posted
Photos-SXHT-09-1091-Fac_948.pdf PDF
Drawing_S-601 _Rev_1_(Ref_RFP-Atch_3).pdf PDF
FA2521-15-R-0014-0001_Q A's_RFP.pdf PDF
RFP_Atch_2b-SXHT_09-1091_Specs-Addendum_II.pdf PDF
RFP_Atch_12a-Questions_ _Answers.pdf PDF
Pre-Proposal_Record_of_Site_Visit_15Jul15.pdf PDF
Attend_Record_PreProposalSiteVisit_15Jul2015.pdf PDF
Atch_3-SXHT-09-1091-Drawings.pdf PDF
Atch_10_-_Site_Visit_ROE_8_Jul_15.pdf PDF
Atch_10_-_Site_Visit_ROE_7_Jul_15.pdf PDF
Atch_11_-_Site_Visit_EAL_Request_7_Jul_15.doc DOC document
Atch_5-HazWasteForm.doc DOC document
Atch_11-_Site_Visit_EAL_Request.doc DOC document
Atch_8_-_Non-Priced_Items_Worksheet.xls XLS spreadsheet
Atch_6-GPP.pdf PDF
FA2521-15-R-0014_Construction_IDIQ_RFP.pdf PDF
Atch_9_-_Breakdown_Template.xlsx XLSX spreadsheet
Atch_2-SXHT-09-1091-Specs.pdf PDF
Atch_12_-_Site_Visit_Q A.doc DOC document
Atch_10_-_Site_Visit_ROE.pdf PDF
Atch_9_-_Breakdown_Template-Sample.xlsx XLSX spreadsheet
Atch_3-SXHT-09-1091-Drawings.pdf PDF
Atch_7_-_Solid_Waste_Disposal_Diversion_Tracking.pdf PDF
Atch_4_-_DBWD_FL150001_8MAY15.pdf PDF
Atch_1-IDIQ_Statement_of_Work.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SXHT 09-1091, Repair Central Water Tower

Addendum to Specification Section 26 42 22.00 20, Cathodic Protection System for Steel Water Tanks

June, 2015

The following requirements shall be added to Specification Section 26 42 22.00 20, Paragraph 3.3:

1. Cathodic protection systems shall be inspected and tested, and records shall be kept as required per UFC 3-570-06.

2. Impressed Current System Check. The Impressed Current System Check must be conducted within 60 days of the Close Interval Survey and documented on the AF IMT 491, Cathodic Protection Operating Log for Impressed Current Systems.

3. Close Interval Survey. The survey shall be conducted 30 days after cathodic protection system installation and proper adjustment. Survey data can be computer-generated and shall be maintained in the cathodic protection system record.

4. Water Tank Calibration. Calibration shall be conducted after the cathodic protection system is installed and adjusted, and after one year from the initial calibration. Calibration shall be documented on AF IMT 1689, Water Tank Calibration.

File details come from the government source that posted it. Updated .