About this file

RFP Atch 8-Non-priced Items Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Single-Award Indefinite Delivery Indefinite Quantity Task Order Contract, newest first.
File Type Posted
Photos-SXHT-09-1091-Fac_948.pdf PDF
RFP_Atch_12a-Questions_ _Answers.pdf PDF
FA2521-15-R-0014-0001_Q A's_RFP.pdf PDF
RFP_Atch_2b-SXHT_09-1091_Specs-Addendum_II.pdf PDF
Drawing_S-601 _Rev_1_(Ref_RFP-Atch_3).pdf PDF
Attend_Record_PreProposalSiteVisit_15Jul2015.pdf PDF
Pre-Proposal_Record_of_Site_Visit_15Jul15.pdf PDF
Atch_3-SXHT-09-1091-Drawings.pdf PDF
Atch_10_-_Site_Visit_ROE_8_Jul_15.pdf PDF
Atch_10_-_Site_Visit_ROE_7_Jul_15.pdf PDF
Atch_11_-_Site_Visit_EAL_Request_7_Jul_15.doc DOC document
Atch_7_-_Solid_Waste_Disposal_Diversion_Tracking.pdf PDF
Atch_4_-_DBWD_FL150001_8MAY15.pdf PDF
Atch_1-IDIQ_Statement_of_Work.pdf PDF
Atch_2a-SXHT-09-1091-Specs-Addendum.pdf PDF
Atch_3-SXHT-09-1091-Drawings.pdf PDF
Atch_2-SXHT-09-1091-Specs.pdf PDF
Atch_12_-_Site_Visit_Q A.doc DOC document
Atch_10_-_Site_Visit_ROE.pdf PDF
Atch_9_-_Breakdown_Template-Sample.xlsx XLSX spreadsheet
Atch_5-HazWasteForm.doc DOC document
Atch_11-_Site_Visit_EAL_Request.doc DOC document
Atch_6-GPP.pdf PDF
FA2521-15-R-0014_Construction_IDIQ_RFP.pdf PDF
Atch_9_-_Breakdown_Template.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NON PRICED ITEMS - COST ESTIMATE BREAKDOWN*
OFFERORADDRESS
CONTRACT FOR (Work to be performed)PROPOSED PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBER SXHT 09-1091WORK LOCATION
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURAVERAGETOTALDIRECTLINE
NOMEASUREMANDAYSRATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1
2
3
4
5
6
7
8
9
10
11
12
13
To be used per Paragrpah 1.4 Non-Priced Items

&CPage 1 Attachment 8

FA2521-15-R-0014

INSTRUCTIONS FOR COMPLETING NON-PRICED ITEMS - COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$
TOTAL LABOR COSTS$
TOTAL OTHER DIRECT COSTS$
TOTAL DIRECT COSTS$
OVERHEAD%$
SUBTOTAL$
PROFIT%$
TOTAL PRICE$
DATEFIRM NAME
TITLEBY
(Signature)
INSTRUCTIONS TO OFFERORS
1.The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from
this proposal the offeror may be required to submit a certificate of current cost or pricing data
2.In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and
analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a.The existing, verifiable data.
b.The judgmental factors applied in projecting from known data to the estimate, and
c.The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3.When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer his authorized representative upon request.
4.By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection
with any negotiations prior to contract award.

&CPage 2 of 2 Attachment 8

FA2521-15-R-0014

File details come from the government source that posted it. Updated .