Attachment 1 - Division 25 Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award, newest first.
File Type Posted
23Sep09ConformedCopy.doc DOC document
Attachment10.pdf PDF
Attachment7.pdf PDF
Attachment16.pdf PDF
Attachment18.pdf PDF
Attachment4.pdf PDF
Div06.zip ZIP file
Div01.zip ZIP file
Div09.zip ZIP file
Div23.zip ZIP file
44 46 00.pdf PDF
Attachment12.pdf PDF
Div12.zip ZIP file
04 20 00.pdf PDF
Div33.zip ZIP file
14 24 00.pdf PDF
44 10 00.pdf PDF
34 71 13.19.pdf PDF
Div08.zip ZIP file
Amendment1.doc DOC document
Attachment4.pdf PDF
Attachment22CutSheets.zip ZIP file
25 08 10.pdf PDF
Attachment15.pdf PDF
32 93 00.zip ZIP file
Div28.zip ZIP file
Attachment17.pdf PDF
Attachment9.pdf PDF
04 21 13.pdf PDF
FA251708R5002.doc DOC document
Attachment23ConsentLetter.docx DOCX document
Attachment16.pdf PDF
Attachment4.pdf PDF
Div10.zip ZIP file
01 00 03.pdf PDF
01 04 00.pdf PDF
01 33 00.pdf PDF
01 00 05.pdf PDF
COVER SHT TOC ABBREVIATIONS.pdf PDF
01 55 02.pdf PDF
01 00 01.pdf PDF
01 00 04.pdf PDF
RequestforIndustryDay.docx DOCX document
01 57 20.00 10 SAFB Environmental Protection.pdf PDF
01 55 01.pdf PDF
01 00 05.pdf PDF
RequestforIndustryDay.docx DOCX document
01 00 07.pdf PDF
01 35 29.pdf PDF
01 33 00.pdf PDF
Show all 50

Simplified Acquisition of Base Engineering Requirements, Multi-Base, Multi-Award has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SABER Solicitation FA2517-08-R-5002

25 08 10-1 05/08/09

SECTION 25 08 10

UTILITY MONITORING AND CONTROL SYSTEM TESTING

PART 1 GENERAL

1.1 The purpose of this Specification is to define generic Factory, Performance Verification, and

Endurance Test procedures for Utility Monitoring and Control Systems (UMCS) and building level

DDC. These tests are to be used to assure that the physical and performance requirements of

UMCS and building level DDC are tested, and that the test results are adequately documented. The

Government will base certain contractual decisions on the results of these tests.

1.2 REFERENCES

1.2.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. Unless other wise noted, the latest published version and/or revision shall be used.

1.2.1.1 CONSUMER ELECTRONICS ASSOCIATION (CEA)

a. CEA-709.1B Control Network Protocol Specification

b. CEA-709.3 Free-Topology Twisted-Pair Channel Specification

c. CEA-852-A Tunneling Component Network Protocols Over Internet Protocol

Channels

1.3 DEFINITIONS

1.3.1 Algorithm

1.3.1.1 A set of well-defined rules or procedures for solving a problem or providing an output from a specific set of inputs.

1.3.2 Analog

1.3.2.1 A continuously varying signal value (such as temperature current, velocity).

1.3.3 Analog to Digital (A/D) Converter

1.3.3.1 An A/D converter is a circuit or device whose input is information in analog form and whose output is the same information in digital form.

1.3.4 CEA-709.1B

1.3.4.1 "Control Network Protocol Specification", Standard communication protocol for networked control systems that provides peer-to-peer communications.

1.3.5 Application Specific Controller

1.3.5.1 A device that is furnished with a pre-established built in application that is configurable but not

25 08 10-2 05/08/09 re-programmable.

1.3.6 Architecture

1.3.6.1 Architecture is the general organization and structure of hardware and software.

1.3.7 Binary

1.3.7.1 A two-state system where an "ON" condition is represented by a high signal level and an

"OFF" condition is represented by a low signal level.

1.3.8 Building Point of Connection (BPOC)

1.3.8.1 The point of connection between the UMCS network backbone and the building network backbone. The hardware at this location, which performs/provides the connection is referred to as the BPOC Hardware.

1.3.9 Control Wiring

1.3.9.1 This includes conduit, wire, and wiring devices to install complete HVAC control systems, including motor control circuits, interlocks, sensors, PE and EP switches, and like devices.

This also includes all wiring from node to node, and nodes to all sensors and points defined in the I/O summary shown on drawings or specified herein, and required to execute the sequence of operation. Does not include line voltage power wiring.

1.3.10 Demand

1.3.10.1 The maximum rate of use of electrical energy averaged over a specific interval of time, usually expressed in kW.

1.3.11 Diagnostic Program

1.3.11.1 Machine-executable instructions used to detect and isolate system and component malfunctions.

1.3.12 Distributed Control

1.3.12.1 A system whereby all control processing is decentralized and independent of a central computer. In regards to a LonWorks based system, it also means where the control logic for a single piece of building level control resides in more than one controller (node).

1.3.13 Gateway

1.3.13.1 Text

1.3.14 Graphical User Interface (GUI)

1.3.14.1 Human-machine interfacing allows the operator to manage, command, monitor, and program the system.

1.3.15 Integration

25 08 10-3 05/08/09

1.3.15.1 Establishing communication between two or more systems to create a single system.

1.3.16 Interoperable

1.3.16.1 Two devices are interoperable if installed into the same system and they communicate with each other without the use of another device (such as a gateway).

1.3.17 LonTalk(r)

1.3.17.1 Open communication protocol developed by the Echelon(r) Corporation.

1.3.18 LONWORKS(r)

1.3.18.1 The communication technology developed by Echelon(r) Corporation for control systems developed. The technology is based on the CEA-709.1B protocol and employs interoperable devices along with the capability to openly manage these devices using a network configuration tool.

1.3.19 LONMARK(r) International (LONMARK(r) Interoperability Association)

1.3.19.1 Standards committee consisting of numerous independent product developers and systems integrators dedicated to determining and maintaining the interoperability guidelines for the

LONWORKS(r) industry.

1.3.20 LonMarked(r)

1.3.20.1 A device that has been certified for compliance with LonMark(r) standards by the LonMark(r)

International.

1.3.21 LONWORKS(r) Application Specific Controller (ASC)

1.3.21.1 A networked device or node that contains a complete, configurable application that is specific to a particular task.

1.3.22 LONWORKS(r) General Purpose Programmable Controller

1.3.22.1 A programmable control product, that unlike an ASC, is not installed with a fixed factory-installed application program. The application in the controller is custom software produced by the integrator specifically for the project.

1.3.23 LONWORKS(r) Network Services (LNS)

1.3.23.1 The database format for addressing nodes and variable bindings node-to-node.

1.3.24 Network

1.3.24.1 A system of distributed control units that are linked together on a communication bus. A network allows sharing of point information between all control units. Additionally, a network provides central monitoring and control of the entire system from any distributed control unit location.

1.3.25 Network Configuration Tool

25 08 10-4 05/08/09

1.3.25.1 Software used to create and modify the control network database and configure controllers.

1.3.26 Node ID

1.3.26.1 A unique 48-bit node identification (ID) tag given to each node by Echelon Corporation.

1.3.27 Node

1.3.27.1 An intelligent LONWORKS(r) device with a node ID and communicates via CEA-709.1B and is connected to a CEA-709.1B network.

1.3.28 Operating System (OS)

1.3.28.1 Software which controls the execution of computer programs and which provides scheduling, debugging, input/output controls, accounting, compilation, storage assignment, data management, and related services.

1.3.29 Operator Workstation (OWS)

1.3.29.1 The OWS consists of a high-level processing desktop or laptop computer that provides a graphic user interface to network.

1.3.30 Peripheral

1.3.30.1 Input/Output (I/O) equipment used to communicate to and from the computer and make hard copies of system outputs and magnetic files.

1.3.31 Router

1.3.31.1 A device which routes messages destined for a node on another segment subnet or domain of the control network. The device controls message traffic based on node address and priority.

Routers may also serve as communication links between powerline, twisted pair, fiber, coax, and RF media.

1.3.32 Standard Network Variable Type (SNVT)

1.3.32.1 A network variable of a standard format type used to define data information transmitted and receive by the individual nodes.

1.3.33 UMCS Network Media

1.3.33.1 Transmission equipment including cables and interface modules (excluding MODEMs) permitting transmission of digital information.

1.3.34 XIF

1.3.34.1 "External Interface File" contains the contents of the manufacturer's product documentation.

1.4 SUBMITTALS

1.4.1 Government approval may be required on any of the following items. Items requiring submittals

25 08 10-5 05/08/09 will be listed on the Submittal Register. Provide copies of all submittals per the requirements in

Section 01 33 00, Submittal Procedures, or as listed on the Submittal Register.

1.4.1.1 SD-01 Preconstruction Submittals

a. Factory Test

(1) After completing the test, the Contractor shall supply a factory final, complete test report consisting of the following, as a minimum:

(a) Section one of the submittal shall be a short summary of the factory test.

(b) Section two of the submittal shall be a copy of the test plans.

(c) Section three shall be the executed test procedure and shall be divided using tabs. Each tab section shall include all pertinent information pertaining to the executed and approved test, showing date and Government representative who witnessed/approved the test.

1.4.1.2 SD-06 Test Reports

a. UMCS and Building Level DDC Testing Sequence

(1) The Contractor shall perform and document contractor field test on UMCS and building level DDC. The Contractor shall provide field test report prior to start of PVT and endurance testing.

b. Performance Verification Test

(1) After completing the test, the Contractor shall supply a final, complete PVT test report consisting of the following, as a minimum:

(a) Section one of the submittal shall be a short summary of the performance verification test.

(b) Section two of the submittal shall be a copy of the test plans.

(c) Section three shall be the executed test procedure and shall be divided using tabs. Each tab section shall include all pertinent information pertaining to the executed and approved test, showing date and Government representative who witnessed/approved the test.

c. Endurance Testing

(1) The Contractor shall provide UMCS Endurance Test Reports explaining in detail the nature of any failures, corrective action taken, and results of tests performed.

1.5 TEST DESCRIPTIONS

1.5.1 This document covers the factory, performance verification, and endurance test procedures for the

Utility Monitoring and Control System (UMCS) and Direct Digital Control for HVAC. It has been written for a host based system where the LONWORKS(r) LNS database resides on the main computer (server) and communicates over the Ethernet (TCP/IP) connection to the field level controller nodes. The system shall be comprised of the server hardware and software, IP network hardware and software, and building point of connection (BPOC) hardware and software.

25 08 10-6 05/08/09

1.6 RELATED WORK

1.6.1 The contractor which provided building level DDC under the control section shall be responsible for testing the building level DDC. All control testing and controller tuning required under

Section 23 09 23 must be completed and approved before performing Performance Verification and Endurance Tests under this section.

1.7 RELATED SECTIONS

1.7.1 The following Sections: Section 25 10 10 Utility Monitoring and Control System (UMCS) and the control section must be part of the contract documents.

1.8 GENERAL REQUIREMENTS

1.8.1 Factory Test

1.8.1.1 The Contractor shall conduct a factory test at a company site. The Contractor shall perform some of the basic functions of the UMCS and building level DDC, to assure that the performance requirements of the specifications are met.

1.8.2 Performance Verification and Endurance Test

1.8.2.1 Performance Verification and Endurance Test shall:

a. Be conducted on hardware and software installed at the jobsite to assure that the physical and performance requirements of specifications are met. Tests on network media shall include all contractor furnished media and shall include at least one type of each device installed.

b. Be conducted under normal mode operation unless otherwise indicated in the initial conditions description for each test. System normal mode describes a condition in which the system is performing its assigned tasks in accordance with the contract requirements.

c. Utilize the operator workstation (OWS) to issue commands or verify status data.

1.9 TEST EQUIPMENT AND SETUP

1.9.1 All test equipment calibrations shall be traceable to NIST. The accuracy of the test equipment and overall test method shall be at least twice the maximum accuracy required for the test. For example, if a temperature sensor has an accuracy of +1 degree F over the executed range, the test instrument used shall have an accuracy of at least +0.5 degree F or better. All test equipment shall be provided by the Contractor unless otherwise noted in the contract documents.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 UMCS AND BUILDING LEVEL DDC TESTING SEQUENCE

3.1.1 The Contractor shall perform a successful factory test prior to start of installation work, as

25 08 10-7 05/08/09 described in this section. During the installation phase, the Contractor shall perform all required field testing requirements on the UMCS and building level DDC as specified in Sections 25 10 10

Utility Monitoring and Control System (UMCS) and the control section, to verify that systems are functioning and installed per specifications. After completing all required field testing, the

Contractor shall perform a successful PVT and endurance test. All tests must be successfully completed, and test reports received, prior to final acceptance of the UMCS and building level

DDC.

3.2 COORDINATION

3.2.1 The Contractor shall coordinate the testing schedule with the Government. Coordination shall include controls specified in other sections or divisions which include controls and control devices that are to be part of or interfaced to the UMCS specified in this section.

3.3 PROTECTION

3.3.1 The Contractor shall protect all work and material from damage by the work or workers, and shall be liable for all damage thus caused. The Contractor shall be responsible for the work and equipment until finally inspected, tested, and accepted. The Contractor shall protect the work against theft or damage, and shall carefully store material and equipment received onsite that is not immediately installed.

3.4 FACTORY TEST

3.4.1 Factory Test Plan

3.4.1.1 Prior to the scheduling of the factory tests, the Contractor shall provide the Government with a

Factory Test Plan for approval, and receive notification of approval of the Test Plan and

Procedures. The plan shall include the following, as a minimum:

a. System one-line block diagram of equipment used in the factory test model, indicating servers, workstations, peripherals, network equipment, controllers, and instrumentation.

b. System hardware description used in the factory test.

c. System software description used in the factory test.

d. Listing of control and status points in the factory test model; plus a table with the following information:

(1) Input and output variables.

(2) SNVTs for each variable.

(3) Expected engineering units for each variable.

(4) Node ID.

(5) Domain & subnet addressing.

e. Required passwords for each operator access level.

f. List of other test equipment.

3.4.2 Test Procedures

25 08 10-8 05/08/09

3.4.2.1 The factory test procedures shall be developed from the generic test procedures in

ATTACHMENT A. The test procedures shall consist of detailed instructions for test setup, execution, and evaluation of test results. The Contractor shall edit the generic test procedure for the provided UMCS and building level DDC. The Contractor shall perform a factory test on a model of the UMCS and building level DDC for the Government to verify the system will function to the requirements of the contract documents. The test architecture shall mimic a two building arrangement. There shall be a TCP/IP layer with two Internet Protocol (IP) to Lon routers. Below each of the routers shall be both programmable (GPPC) and application-specific controllers (ASC). One server and one workstation with printers shall be connected to the IP layer. There shall be simulated input devices connected to controllers to enable the creation of changing variables. If, during testing, the system fails a portion of a test, the

Government will inform the Contractor if the entire test or only the portion that failed must be re-performed. The Contractor shall give the Government a written report of those items which failed, what the problem was, and what was done to correct it. The Contractor shall provide onsite technical support to perform the PVT. ATTACHMENT A presents the generic Test

Procedures with the following information:

a. Test identification number.

b. Test title.

c. Objective.

d. Initial conditions (if applicable).

e. Test equipment (if required).

f. Sequence of events.

g. Expected results.

3.5 FIELD TEST REQUIREMENTS

3.5.1 The UMCS contractor shall perform and document contractor start-up and field tests as required by Sections 25 10 10 Utility Monitoring and Control System (UMCS) and the control section.

The field test validates that the UMCS and building level DDC are in operation without any problems or system errors prior to starting a PVT. The Contractor is required to validate that all software along with all hardware is installed to meet or exceed the contract document requirements. This includes all LONWORKS(r) networking and monitoring hardware and all peripherals associated with the network and hardware. Start-up and field testing must include:

a. Start-up Testing: All testing listed in Section 25 10 10 Utility Monitoring and Control Systems

(UMCS) and the corresponding control/EMCS Section 23 09 23 shall be completed.

b. Point-to-Point Testing: All point-to-point testing of end field devices through proper input/output to graphic and operator interface shall be completed and approved.

c. All field calibration shall be completed and approved.

d. Detailed functional tests, verified by the Government that the system operation adheres to the

Sequences of Operation.

e. Alarms and Interlocks: All alarm limits and testing shall be completed.

f. System schedules and setpoints: All schedule start/stops and system setpoints shall be entered, operating, and approved.

25 08 10-9 05/08/09

3.6 PERFORMANCE VERIFICATION TEST

3.6.1 Test Plan

3.6.1.1 Prior to the scheduling of the performance verification tests, the Contractor shall provide the

Government with a Performance Verification and Endurance Test Plan and Procedures for approval, and receive notification of approval of the Test Plan and Procedures. The plan shall include the following, as a minimum:

a. Installed system one-line block diagram, indicating servers, workstations, peripherals, network equipment, controllers, and instrumentation.

b. Installed system hardware description.

c. Installed system software description, including any software revisions made since the factory test.

d. Listing of control and status points installed in the system; plus a table with the following information:

(1) Input and output variables.

(2) SNVTs for each variable.

(3) Expected engineering units for each variable.

(4) Node ID.

(5) Domain & subnet addressing.

e. Required passwords for each operator access level.

f. List of other test equipment.

3.6.2 Test Procedures

3.6.2.1 The performance verification test procedures shall be developed from the generic test procedures in ATTACHMENT A. The test procedures shall consist of detailed instructions for test setup, execution, and evaluation of test results. The Contractor shall edit the generic test procedure for the provided UMCS and building level DDC. The Contractor shall perform a performance verification test (PVT) on the completed UMCS and building level DDC for the

Government to verify the system is completely functional. If, during testing, the system fails a portion of a test, the Government shall inform the Contractor if the entire test or only the portion that failed must be re-performed. The Contractor shall give the Government a written report of those items which failed, what the problem was, and what was done to correct it. The contractor shall provide on-site technical support to perform the PVT. ATTACHMENT A presents the generic UMCS Performance Verification Test Procedures with the following information:

a. Test identification number.

b. Test title.

c. Objective.

d. Initial conditions (if applicable).

e. Test equipment (if required).

f. Sequence of events.

25 08 10-10 05/08/09

g. Expected results.

3.7 ENDURANCE TESTING

3.7.1 General

3.7.1.1 Endurance Test shall be designed to demonstrate the specified overall system reliability requirement of the completed system. The Endurance Test shall be conducted in four phases as described below. The Endurance Test shall not be started until the Government notifies the

Contractor, in writing, that the Performance Verification Tests have been satisfactorily completed, training as specified has been completed, correction of all outstanding deficiencies has been satisfactorily completed, and that the Contractor has permission to start the Endurance

Test. The Contractor shall provide an operator to man the system eight hours per day during first shift operations, including weekends and holidays, during Phase I and Phase III Endurance testing, in addition to any Government personnel that may be made available. The Government may terminate testing at any time if the system fails to perform as specified. Upon termination of testing by the Government or by the Contractor, the Contractor shall commence an assessment period as described for Phase II and Phase IV. Upon successful completion of the

Endurance Test, the Contractor shall deliver test reports to the Government prior to acceptance of the system. The Contractor shall keep a record of the time and cause of each outage that takes place during the test period.

3.7.2 Phase I

3.7.2.1 During the Phase I testing, the system shall be operated as specified for 24 hours per day, 7 days per week, for 15 consecutive calendar days, including holidays. The Contractor shall not make repairs during this phase of testing unless authorized by the Government, in writing. If the system experiences no failures during the Phase I test, the Contractor may proceed directly to Phase III testing, after the Contractor receives written permission from the Government.

3.7.3 Phase II

3.7.3.1 In Phase II, which occurs after the conclusion of Phase I, the Contractor shall identify all failures, shall determine the causes of all failures, repair all failures, and submit a test failure report to the Government. After submitting the written report, the Contractor shall convene a test review meeting at the job site to present the results and recommendations to the

Government. The meeting shall be scheduled no earlier than five business days after receipt of the report by the Government. As a part of this test review meeting, the Contractor shall demonstrate that all failures have been corrected by performing appropriate Performance

Verification Tests. Based on the Contractor's report, the test review meeting, and the

Contractor's recommendation, the Government shall independently determine the restart point and may require that the Phase I test be totally or partially rerun. The Contractor shall not commence any required retesting until after receipt of written notification by the Government.

3.7.4 Phase III

3.7.4.1 After the conclusion of any retesting which the Government may require, the Phase II assessment shall be repeated as if Phase I had just been completed. If the retest is completed without any failures, the Contractor may proceed directly to Phase III testing, after the

Contractor receives written permission from the Government. During Phase III testing, the system shall be operated as specified for 24 hours per day, 7 days per week, for 15 consecutive

25 08 10-11 05/08/09 calendar days, including holidays. The Contractor shall not make repairs during this phase of testing unless authorized by the Government, in writing.

3.7.5 Phase IV

3.7.5.1 In Phase IV, which occurs after the conclusion of Phase III, the Contractor shall identify all failures, determine the causes of all failures, repair all failures, and submit a test failure report to the Government. After submitting the written report, the Contractor shall convene a test review meeting at the job site to present the results and recommendations to the Government.

The meeting shall not be scheduled earlier than five business days after receipt of the report by the Government. As a part of this test review meeting, the Contractor shall demonstrate that all failures have been corrected by performing appropriate Performance Verification Tests. Based on the Contractor's report, the test review meeting, and the Contractor's recommendation, the

Government shall independently determine the restart point and may require that the Phase III test be totally or partially rerun. The Contractor shall not commence any required retesting until after receipt of written notification by the Government. After the conclusion of any retesting which the Government may require, the Phase IV assessment shall be repeated as if

Phase III had just been completed. The Contractor shall not be held responsible for failures resulting from the following:

a. An outage of the main power supply in excess of the capability of any backup power source, provided that the automatic initiation of all backup sources was accomplished and that automatic shutdown and restart of the UMCS performed as specified.

b. Failure of a Government-furnished communications link, provided that the LON nodes and

LON routers automatically and correctly operate in the stand-alone mode as specified, and that the failure was not due to contractor furnished equipment, installation, or software.

c. Failure of existing Government-owned equipment, provided that the failure was not due to contractor-furnished equipment, installation, or software.

3.7.6 Failure Reports

3.7.6.1 The Contractor shall provide UMCS Endurance Test Failure Reports. UMCS Test Failure

Reports shall explain in detail the nature of each failure, corrective action taken, results of tests performed. If any failures occur during Phase I or Phase III testing, the Contractor shall recommend the point at which the Phase I or Phase III testing, as applicable, should be resumed.

3.8 ATTACHMENT A

TEST PROCEDURES

TITLE: Test Index

OBJECTIVE: The following is an index of tests.

NOTES: Tests one through twenty contain specific "item(s)" that apply to Sections 25 10 10 Utility

Monitoring and Control Systems (UMCS) and the control section. The following index of tests provides a summary of which "items numbers" apply to which specification.

25 08 10-12 05/08/09

Sect 23 09 23, Test No. Test Title Sect 25 10 10, UMCS DDC for HVAC

One Initial System Items 1 thru 15 Items 16 thru 32

Equipment Verification

Two System Start-up Items 1 thru 4 Items 5 and 6

Three Monitor and Control Items 1 thru 5 Not Applicable

Software

Four Graphic Display of Data Items 1 thru 18 Not Applicable

Five Graphic Navigation Scheme Items 1 and 2 Not Applicable

Six Command Functions Items 1 thru 6 Not Applicable

Seven Command Input Errors Items 1 thru 6 Items 1 thru 6

Eight Special Functions Item 1 Not Applicable

Nine Software Editing Tools Items 1 thru 42 Items 1 thru 42

Ten Scheduling Items 1 thru 7 Items 8 thru 10

Eleven Alarm function Items 1 thru 15 Item 16

Twelve Trending Items 1 thru 8 Not Applicable

Thirteen Demand Limiting Items 1 thru 8 Not Applicable

Fourteen Report Generation Items 1 thru 6 Not Applicable

Fifteen UPS Test Items 1 thru 5 Not Applicable

Sixteen EIA-709.1B to IP Items 1 thru 3 Not Applicable

Router Test

Seventeen EIA-709.1B Router Not Applicable Items 1 thru 4 and Repeater

Eighteen EIA-709.1B Gateway Test Items 1 thru 5 Items 1 thru 5

Nineteen Local Display Panel Not Applicable Items 1 thru 5

Twenty Network Configuration Items 1 thru 8 Items 1 thru 8

Tool

Twenty-One Custom Tests Item 1 and 2 Item 1 and 2

25 08 10-13 05/08/09

PVT Checklist

OBJECTIVE:

1. Inspect/test/verify that building-level DDC system is compliant with UFGS-23 09 23 and capable of integration with UMCS

INITIAL REQUIREMENTS/CONDITIONS

1. The following tests shall be completed and documentation shall be submitted by the contractor to the Government.

1) Date of Checklist: __________

2) Time of Checklist: __________

3) Contractor's Representative: ____________________

4) Government's Representative: ____________________

CHECKLIST PROCEDURES

Expected

Item Action Item Results Approved

UMCS AND DDC FOR HVAC

1 Draft or Final Drawings submitted and

As-Built Drawings approved __________

Point schedule(s) showing all required UMCS SNVTs submitted __________

Point schedules(s) showing device network addresses

Local display panel (LDP) locations indicated on drawings submitted __________

Notes: ___________________________________________________________________

2 Network Bandwidth Test Test completed, accepted, Report and a report documenting results submitted __________

Notes: ____________________________________________________________________

3 Programming software Most recent version of the programming software for

25 08 10-14 05/08/09 each type of GPPC has been

Notes: __________________________________________________________________

4 XIF Files External interface files (XIF) files for each model of

LONWORKS®-based DDC hardware has been submitted __________

5 LNS Database Copies of the LNS database for the completed control network has been submitted __________

6 LNS Plug-in LNS Plug-ins for each application specific controller has been

7 Start-up testing report Start-up has been successfully completed and testing report

Controller tuning has been completed and document on point schedule __________

Calibration accuracy check completed and documented in test report __________

Actuator range check

Functional test to

25 08 10-15 05/08/09 demonstrate control sequence

Notes: _________________________________________________________________

8 Software License Software licenses received for all software on the project __________

End of Test

Specific Abbreviations:

Y = Yes

N = No

NA = Not Applicable

25 08 10-16 05/08/09

TEST NUMBER: One

TITLE: Initial System Equipment Verification

1. To verify that the hardware and software components of the system provided by the contractor are in accordance with the contract plans and specifications and all approved submittals.

1. Submittals

a. Submit a detailed list of all approved hardware with Manufacturer, model number and location. This list is based on the contract plans, specifications, change orders (if any) and approved submittals which must be available for reference purposes during the test.

b. Submit a detailed list of all approved software with revision number and purpose of software. This list is based on the contract plans, specifications, change orders (if any) and approved submittals which must be available for reference purposes during the test.

2. Equipment

a. Verify all equipment is functional.

3. Reference Documentation

a. List user manual documentation and sections pertaining to the testing.

4. Date of Test: __________

5. Time of Test: __________

6. Contractor's Representative: ____________________

7. Government's Representative: ____________________

UMCS

1 The workstation hardware is installed and complies with specification paragraph titled "Workstation Hardware". ________________ __________

Notes: ______________________________________________________________

2 The Server hardware is installed and complies with specification paragraph titled "Server

Hardware". ________________ __________

Notes: _______________________________________________________________

25 08 10-17 05/08/09

3 The fiber optic patch panel is installed and complies with specification paragraph titled

"Fiber Optic Patch Panel". ________________ __________

Notes: _____________________________________________________________

4 The fiber optic media converter is installed and complies with

"Fiber Optic Media Converter". ________________ __________

5 The Ethernet switch is installed paragraph titled "Ethernet

Switch". ________________ __________

6 The IP router is installed and complies with specification paragraph titled "IP Router". ________________ __________

7 The EIA-709.1B to IP router is installed and complies with

"EIA-709.1B to IP Router". ________________ __________

8 The EIA-709.1B gateway is

"EIA-709.1B Gateway". ________________ __________

Notes: ______________________________________________________________

25 08 10-18 05/08/09

9 The alarm printer is installed paragraphs titled "PRINTERS" and

"Alarm Printer". ________________ __________

10 The laser printer is installed paragraphs titled "PRINTERS" and

"Laser Printer". ________________ __________

11 The color printer is installed and complies with specification paragraphs titled "PRINTERS" and "Color

Printer". ________________ __________

12 The operating system is installed paragraph titled "Operating

System (OS)". ________________ __________

13 The office automation software is

"Office Automation Software". ________________ __________

14 The virus protection software is

"Virus Protection Software". ________________ __________

25 08 10-19 05/08/09

15 The configuration server is

"CEA-852-A Configuration Server". ______________ __________

DDC FOR HVAC

16 The CEA-709.1B Router is installed and complies with specification paragraph titled "CEA-709.1B

Router". ________________ __________

17 The CEA-709.3 Repeater is installed paragraph titled "CEA-709.3

Repeater". ________________ __________

18 The TP/FT-10 network is installed in accordance with CEA-709.3, with double-terminated bus topology. ________________ __________

19 Network wiring extends to the location of UMCS BPOC. ________________ __________

20 The Gateway is installed and complies with specification paragraph titled "Gateway". ________________ __________

25 08 10-20 05/08/09

21 All control valves are installed and comply with their associated specification paragraph under the section titled "Control Valves". ________________ __________

22 All dampers are installed and comply with their associated section titled "Dampers". ________________ __________

23 All sensors are installed and comply with their associated section titled "Sensors". ________________ __________

24 All indicating devices are installed and comply with their associated specification paragraph under the section titled "Indicating Devices". ________________ __________

25 All user input devices are associated specification paragraph under the section titled "User

Input Devices". ________________ __________

25 08 10-21 05/08/09

26 All output devices are installed and comply with their associated section titled "Output Devices". ________________ __________

27 All multifunction devices are associated specification paragraph under the section titled

"Multifunction Devices". ________________ __________

28 All compressed air equipment is installed and complies with their associated specification paragraph under the section titled

"Compressed Air". ________________ __________

29 All ASCs are installed and comply with the specification paragraph titled "Application Specific

Controller". ________________ __________

30 All LDPs and laptop computers are provided and comply with the

"Local Display Panel". ________________ __________

31 All GPPCs are installed and comply with the specification paragraph titled "General Purpose

25 08 10-22 05/08/09

Programmable Controller". ________________ __________

32 LNS-based system used to address nodes, bind variables, and LNS database of network exists on system. ________________ __________

25 08 10-23 05/08/09

TEST NUMBER: Two

TITLE: System Start-up

1. To validate that the system properly initializes and that the GUI properly reconnects to all communicating devices.

2. To validate that both application specific and programmable devices retain all vital information upon a power cycle.

a. Contractor shall provide a list of all software that will be used to verify point connection at field level controllers and user interface.

b. Contractor shall provide a list of all software need to verify application specific and programmable controller start-up.

2. Equipment

a. All peripherals and cables shall be connected per manufacturer's requirements.

b. The workstation shall be in the off mode.

c. All controls shall be fully functional and tested.

d. A programmable and application specific controller shall be randomly selected for the test.

3. Date of Test: __________

4. Time of Test: __________

5. Contractor's Representative: ____________________

6. Government's Representative: ____________________

1 Energize the workstation. The workstation will power-up and perform its start-up procedure without generating any errors or problems. __________

a) Operating system Operating system shall be latest version of windows. __________

b) Start Network The Network Configuration

Configuration Tool. Tool drawing will open. __________

c) Start the System The System plug-in will

Plug-in. open. __________

d) Start the Server. The Server will start. __________

e) Start the Workstation. The Workstation will start.

The operator shall now have the ability to view data from any device on the network. __________

25 08 10-24 05/08/09

2 Check the communication Within the workstation from the server to the software, when a device is controllers. selected, dynamic points lists become visible.

Dynamic data represents success. A completion event failure message represents failure. __________

3 Verify on-line status. All devices shall have on-line status indicated by the workstation software

(green indicator). __________

4 View data from the When a graphics page is graphical environment. opened, the points on the page should update.

Question marks in lieu of data reflect failure. __________

DDC FOR HVAC

5 Verify that configuration All configuration data in application parameters should be specific controllers is accessible. __________ written to EEPROM.

a) Open the LONWORKS® Software should open plug-in. without errors. __________

b) Note several Operator is able to view parameters such as a sample of parameters temperature setpoints (data values and setpoints).

and flow settings. __________

c) Remove power from the Device should go off-line controller for a in Network Configuration minimum of 3 minutes. Tool and workstation/server. __________

d) Replace power to the Device should return to

25 08 10-25 05/08/09 controller. on-line status. __________

e) Using the plug-in, Parameters shall not have verify that the changed.

parameters have not __________ changes.

6 Verify that configuration data in programmable controllers is retained after a power cycle. ________________ __________

a) From the Workstation Values of the parameters view several can be viewed from the configuration tree structure.

parameters and note the values. __________

b) Remove power for a Controller will go offline minimum of 3 minutes. in workstation software. __________

c) Replace power to the Controller will return to controller. online status. __________

d) From the Workstation Parameters values shall view the same not have changed.

configuration parameters and note the values. __________

25 08 10-26 05/08/09

TEST NUMBER: Three

TITLE: Monitor and Control (M&C) Software Passwords

1. To validate that the system utilizes four basic password levels

2. To validate that each password level has the specified authority

a. The Contractor shall provide documentation of M&C user password capacity in comparison with specification.

b. The Contractor shall provide a complete list of all users along with their passwords and user level prior to testing.

2. Equipment

a. Server and Workstation

3. Reference Documentation

a. Provide user manual documentation for setting up passwords

4. Date of Test: __________

5. Time of Test: __________

1 Create password for new New users shall exist in users. the server Database. __________

a) Set-up 4 users. ________________ __________

b) Assign different levels to each. ________________ __________

2 Demonstrate level 1 authority. ________________ __________

a) Sign in as the level 1 Sign in shall be user. successful. __________

b) Attempt to view a Action shall be possible.

system graphic. __________

c) Attempt to acknowledge Action shall be denied.

an alarm. __________

d) Attempt to configure a Action shall be denied.

trend. __________

e) Attempt to configure a Action shall be denied.

report. __________

f) Attempt to override a Action shall be denied.

25 08 10-27 05/08/09 point. __________

g) Attempt to configure an Action shall be denied.

alarm. __________

h) Attempt to configure a Action shall be denied.

schedule. __________

i) Attempt to configure a Action shall be denied.

demand limiting parameter. __________

j) Attempt to modify a Action shall be denied.

graphic page. __________

k) Attempt to create a Action shall be denied.

custom program. __________

Notes: ________________________________________________________________

3 Demonstrate level 2 ________________ __________ authority.

a) Sign in as the level 2 Sign in shall be successful.

user. __________

b) Attempt to view a Action shall be possible.

system graphic. __________

c) Attempt to acknowledge Action shall be possible.

an alarm. __________

d) Attempt to configure a Action shall be possible.

trend. __________

e) Attempt to configure a Action shall be possible.

report. __________

f) Attempt to override a Action shall be denied.

point. __________

g) Attempt to configure an Action shall be denied.

alarm. __________

h) Attempt to configure a Action shall be denied.

schedule. __________

i) Attempt to configure a Action shall be denied.

demand limiting parameter. __________

j) Attempt to modify a Action shall be denied.

graphic page. __________

4 Demonstrate level 3

a) Sign in as the level 3 Sign in shall be user. successful. __________

25 08 10-28 05/08/09

b) Attempt to view a Action shall be possible.

system graphic. __________

c) Attempt to acknowledge Action shall be possible.

an alarm. __________

d) Attempt to configure a Action shall be possible.

trend. __________

e) Attempt to configure a Action shall be possible.

report. __________

f) Attempt to override a Action shall be possible.

point. __________

g) Attempt to configure an Action shall be possible.

alarm. __________

h) Attempt to configure a Action shall be possible.

schedule. __________

i) Attempt to configure a Action shall be possible.

demand limiting parameter. __________

j) Attempt to modify a Action shall be denied.

graphic page. __________

5 Demonstrate level 4

a) Sign in as the level 3 Sign in shall be user. successful. __________

b) Attempt to view a Action shall be possible.

system graphic. __________

c) Attempt to acknowledge Action shall be possible.

an alarm. __________

d) Attempt to configure a Action shall be possible.

trend. __________

e) Attempt to configure a Action shall be possible.

report. __________

f) Attempt to override a Action shall be possible.

point. __________

g) Attempt to configure an Action shall be possible.

alarm. __________

h) Attempt to configure a Action shall be possible.

schedule. __________

i) Attempt to configure a Action shall be possible.

demand limiting parameter. __________

j) Attempt to modify a Action shall be possible.

graphic page program. __________

k) Attempt to create a Action shall be possible.

25 08 10-29 05/08/09

25 08 10-30 05/08/09

TEST NUMBER: Four

TITLE: Graphic Display of Data

1. To validate that floor plans and equipment can be graphically displayed through GUI.

2. To validate the proper display of alarms on GUI.

3. To validate the proper display of trend data on GUI.

a. The contractor shall provide hard copies of "snap shots" of sample graphics pages prior to testing.

2. Equipment

a. The contractor shall have all graphics completed.

3. Reference Documentation

a. List user manual documentation and sections pertaining to the testing.

4. Notes

a. Different types of data and states should be clearly distinguishable from each other.

5. Date of Test: __________

6. Time of Test: __________

7. Contractor's Representative: ____________________

8. Government's Representative: ____________________

Item Action Item Results Approved

1 Demonstrate the use of a Equipment shall be three dimensional represented in a three representation of a dimensional manner.

mechanical system. __________

2 Demonstrate the Dynamic real time data presentation of real time shall be presented on a data. graphics page. __________

3 Demonstrate the A user defined parameter presentation of user such as a setpoint shall be entered data. presented on a graphics page.

Different types of data and states should be clearly distinguishable from each

25 08 10-31 05/08/09 other. __________

4 Demonstrate the An indication of override presentation of a point condition shall be viewable in override. on the graphic page.

Different types of data and states should be clearly distinguishable from each other. __________

5 Demonstrate the An indication of the alarm presentation of a device state shall be viewable on in the alarm state. the graphic page. Different types of data and states should be clearly

6 Demonstrate the An indication of out of range presentation of data that condition shall be viewable is out of range. on the graphic page.

Different types of data and states should be clearly

7 Demonstrate the An indication of missing data presentation of missing shall be viewable on the data (controller is graphic page. Different offline). types of data and states should be clearly distinguishable from each

25 08 10-32 05/08/09

8 Demonstrate an error An error message shall be message when the operator displayed.

attempts to execute in improper command. __________

9 Demonstrate point and click Operator shall be able to access to context sensitive easily access context help. sensitive help using the mouse. __________

10 Demonstrate point and click Operator shall be able to access to an engineering access an engineering diagram. diagram using the mouse. __________

11 Demonstrate the creation of Operator shall be able to an engineering diagram. create an engineering diagram. __________

12 Demonstrate the printing of Operator shall be able to a prepared report. print a report using the mouse. __________

13 Demonstrate the display of Operator shall be able to one or more points. request the display of one or more points. __________

25 08 10-33 05/08/09

14 Demonstrate the operator Operator shall be able to override of a point. override a point. __________

15 Demonstrate the Operator shall be able to modification of a modify a time schedule.

time schedule. __________

16 Demonstrate the execution Operator shall be able to of a report. initiate a report. __________

17 Demonstrate the Operator shall be able to presentation of an view an alarm with all of alarm to include: the required data. __________

a) Identification ________________ __________

b) Date and time ________________ __________

c) Alarm Type ________________ __________

d) Set Points ________________ __________

e) Units ________________ __________

f) Current Value ________________ __________

g) Priority ________________ __________

h) Associated message &

Secondary message ________________ __________

18 Demonstrate the Operator shall be able to presentation of view real time trend data real time trend data. as a function of time. __________

25 08 10-34 05/08/09

TEST NUMBER: Five

TITLE: Graphic Navigation Scheme

1. To validate hierarchical graphic displays from main screen to end devices.

a. The contractor shall provide a hierarchical block diagram of the system network prior to testing.

2. Equipment

a. The contractor shall have all programming completed to demonstrate graphic display.

3. Reference Documentation

a. List user manual documentation and sections pertaining to the testing.

4. Date of Test: __________

5. Time of Test: __________

1 Demonstrate the creation Operator shall be able to of a hierarchical tree organize point data graphic structure for the display in a hierarchical presentation of point tree structure based on any data with at least five organization desired.

levels.

A typical organization could be:

- Installation

- Building

- Building sub area

- Main System-Unit

- Terminal Unit __________

2 Demonstrate the creation Operator shall be able or of a hierarchical organize the graphical navigation structure for navigation from page to the graphic pages. page using any hierarchical structure desired.

Examples:

Home page to building 1

25 08 10-35 05/08/09

Building 1 to AHU 1

Building 1 back to Home Page

Building 1 to 1st Floor Plan

AHU 1 back to Building 1

AHU 1 back to Home Page

AHU 1 to Terminal Unit

Summary

1st Floor Plan back to

Building 1

1st Floor Plan back to

Home Page

1st Floor Plan to Any

Terminal Device

Terminal Unit Summary back to AHU 1

Terminal Unit Summary back to Building 1

Terminal Unit Summary back to Home Page

Terminal Unit Summary to

Individual Device __________

25 08 10-36 05/08/09

TEST NUMBER: Six

TITLE: Command Functions

1. To demonstrate the functionality and ability to execute command to the end devices.

a. The Contractor shall provide documentation of all command functions prior to testing.

2. Equipment

a. The contractor shall have all command functions programmed and functional.

3. Reference Documentation

a. List user manual documentation and sections pertaining to the testing.

4. Date of Test: __________

5. Time of Test: __________

1 From the tree structure, The modified value shall be modify a parameter such as downloaded to the controller a set point. without delay and the controller performance shall be viewable by the monitoring of other dynamic points. __________

2 From a graphic page, modify The modified value shall be a parameter such as a set downloaded to the controller point. without delay and the controller performance shall be viewable by the monitoring of dynamic points. __________

3 From the tree structure, The analog output point place an analog output shall accept the assigned point under operator value and ignore changes override and assign a from application logic until

25 08 10-37 05/08/09 fixed value. the point is taken out of override. __________

4 From a graphic page, place The analog output point shall an analog output point accept the assigned value and under operator override ignore changes from and assign a fixed value. application logic until the point is taken out of override. __________

5 From the tree structure, The digital output point shall place a digital output accept the assigned value and

` point under operator ignore changes from application override and assign a logic until the point is taken fixed value. out of override. __________

6 From a graphic page, place The digital output point shall a digital output point accept the assigned value and under operator override ignore changes from application and assign a fixed value. logic until the point is taken out of override. __________

25 08 10-38 05/08/09

TEST NUMBER: Seven

TITLE: Command Input Errors

1. To validate that the system ensures the necessary authority for…