AtchL-2PPQuestionnaire.doc

DOC document 96 KB Posted

Attached to
Air Force Space Surveillance System Federal contract opportunity
Solicitation number
FA2517-06-R-8002
Issued by
Department of the Air Force Space Command

About this file

Draft PP Questionnaire

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Space Surveillance System, newest first.
File Type Posted
Amend 0005 Cover Page.pdf PDF
Fence PWS 14 Nov 08_V1_RH —
RFP_Questions_ _Answers 3rd post.doc DOC document
Amendment 0002.pdf PDF
RFP 20 Aug 08_v1 Conformed.docx.docx DOCX document
Attch 16 L-6_StaffingMatrix_FENCE.doc DOC document
Attch 19 WD 05-2058 Rev8 San Diego.txt TXT text file
Attch 15 L-5 PP Transmittal Letter(GovtKt).doc DOC document
Lake Kickapoo CBA 2008-2011.pdf PDF
Jordan Lake 2008-2011 CBA.pdf PDF
Attch 13 L-3 ConsentLetter.doc DOC document
Attch 12 L-2 PP Questionnaire.doc DOC document
Fence PWS 9 Sept 08_RH.docx DOCX document
Silver Lake CBA 2008-2011.pdf PDF
Attch 14 L-4 PP Client Authorization Letter(Commercial).doc DOC document
Tattnall CBA 2008-2011.pdf PDF
Red River CBA 2008-2011.pdf PDF
Elephant Butte CBA 2008-2011.pdf PDF
Arkansas Signed CBA.pdf PDF
Signed Texas CBA.pdf PDF
Alabama Signed CBA.pdf PDF
Hawkinsville CBA 10 01 05 to 09 30 08.pdf PDF
MFR FBO site visit information May 2008.doc DOC document
IndustryDayattendeedparties.doc DOC document
Oneononescheduling.doc DOC document
ListofInterestedParties2.doc DOC document
Answerstotheindustry.doc DOC document
FencePWSDraft10Mar08RH.doc DOC document
NAICSchange.doc DOC document
AtchL-3ConsentLetter.doc DOC document
AtchL-1PPRelevancyMatrix.xls XLS spreadsheet
SectionLM18Mar08_LCMreview.doc DOC document
P00041Redacted.PDF PDF
P00038Redacted.PDF PDF
DraftPWSletter.pdf PDF
Reductedmod15-20.pdf PDF
ContractsectionJ.pdf PDF
Reductedmod21-27.pdf PDF
ContractsectionI.pdf PDF
Reductedmod28-31.pdf PDF
ContractAtoC.pdf PDF
ContractDtoH.pdf PDF
QuestionandResponses 1UnionInformation.doc DOC document
MFRFBOsitevisitinformation.PDF PDF
LakeKickapooandElephantButteMaps.pdf PDF
JordanLakeData.zip ZIP file
RedRivermaintenanceRoutines.zip ZIP file
LakeKickapooData.zip ZIP file
SilverLakeMaintenanceRoutines.zip ZIP file
ElephantButteMaintenenceRoutines.zip ZIP file
Show all 50

Air Force Space Surveillance System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

RFP #FA2517-06-R-8002

Section J - Atch L-2

PAST/PRESENT PERFORMANCE QUESTIONNAIRE

When filled in this document is source selection sensitive information iaw FAR 2.101 & 3.104

SECTION 1: CONTRACT IDENTIFICATION

A. Contractor: _________________________________________________________________________ B. Cage Code of contractor contract was awarded to: _________________________________

C. Contract number: _______________________________________

D. Contract type: ______________________________

E. Was this a competitive contract? Yes _____ No _____

F. Period of performance: _________________________________________________________

G. Initial contract cost: $____________________________

H. Current/final contract cost: $_______________________________

I. Reasons for differences between initial contract cost and final contract costs: ___________

J. Description of service provided:________________________________________________

SECTION 2: CUSTOMER OR AGENCY IDENTIFICATION

A. Customer or agency name: _________________________________________________________________________ B. Customer or agency description (if applicable): _______________________________________________________________

C. Geographic description of services under this contract, i.e. local, nationwide, worldwide, other Commands:

SECTION 3: EVALUATOR IDENTIFICATION

A. Evaluator's name: _________________________________________________________________________ B. Evaluator's title: _________________________________________________________________________ C. Evaluator's phone/fax number: ___________________________________________________________________

D. Number of years evaluator worked on subject contract: _____________________

SECTION 4: EVALUATION

Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:

CODE

PERFORMANCE LEVEL

B BLUE/EXCEPTIONAL - The contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

P PURPLE/VERY GOOD- The contractor’s performance meets contractual requirements and exceeds some (requirements) to the Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

G GREEN/SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Y YELLOW/MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

R RED/UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N

NOT APPLICABLE - Unable to provide a score.

A. Technical Performance

B
P
G
Y
R
N

A1. Contractor’s ability to operate and maintain complex and critical mission system equipment.

A2. Ability to hire and retain employees with appropriate certifications (when applicable).

A3. Ability to operate and maintain complex and critical communications-electronics equipment.

A4. Effectiveness in operating government Maintenance systems (such as the Integrated Maintenance Data System (IMDS)) and performing necessary maintenance actions on mission equipment.

A5. Effectiveness in operating government Supply systems (such as the Standard Base Supply System (SBSS)) and following government supply procedures.

A6. Ability to operate and maintain communications hardware and software, perform upgrades and maintain configuration control.

A7. Effectiveness of real property maintenance, to include preventive maintenance and repair.

A8. Effectiveness in prioritizing and completing real property maintenance actions and documenting the work performed.

B. Program Management

B
P
G
Y
R
N

B1. Ability to attract and retain a qualified workforce in a semi-remote location(s).

B2. Ability to hire, retain and replace, if necessary, qualified personnel with required expertise.

B3. Effectiveness of contractor’s organizational structure and staffing concept providing ability to organize, staff, lead, plan, coordinate and control resources efficiently.

B4. Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

B5. Effectiveness in quality control and/or inspection procedures to meet contract requirements.

B6. Responsiveness to contract changes.

B7. Overall compliance with contract terms and conditions.

B8. Effectiveness of material management (including Government Furnished Property)

B9. Contractor ability to smoothly transition resources and personnel.

B. Program Management (cont.)

B
P
G
Y
R
N

B10. Contractor effectiveness on maintaining continuity of mission support while transitioning/phasing in resources and personnel to support other efforts.

B11. Contractor effectiveness in implementing Quality Control to meet and maintain the requirements of the contract.

B12. Effectiveness in providing management oversight of maintenance and supply controls and procedures in the contract.

C. Cost/Price

B
P
G
Y
R
N

D1. Cost Control

D2. Ability to alert Government of unforeseen costs before they occur; for example, notification of expenditure rate on Cost Reimbursable CLIN(s)

D3. Sufficiency and timeliness of cost reporting

D. Please discuss each and every response for which you indicated B/E (Blue/Exceptional), Y/M (Yellow/Marginal) or R/U (Red/Unsatisfactory) in response to the questions above (use additional sheets, if necessary).

Response #:

F. Government Contracts Only: Has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations?

Yes___ Default___ Convenience___ Pending Terminations___

No ___

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules, etc).

SECTION 5: NARRATIVE SUMMARY

A. What were the contractor’s most positive aspects in the performance of the contract?

B. What were the contractor’s most negative aspect in the performance of the contract? ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

C. Would you have any reservations about soliciting this contractor in the future or having them perform one of your critical and demanding programs?

D. Please provide any additional comments concerning this contractor’s performance, as desired.

Evaluator’s Signature

Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

Mailing Address:

21 CONS/LGCZB (Attn: Mr. Carlo Mosca)

135 Dover Street, Suite 1055 (Mail Stop 1117)

Peterson AFB, CO 80914-2357

Or FAX to:

Attn: Mr. Carlo Mosca

(719) 556-7900

File details come from the government source that posted it. Updated .