IndustryDaySETAIVSlidesFinal.pdf
PDF 7 MB Posted
- Attached to
- Systems Engineering and Technical Assistance (SETA) IV Federal contract opportunity
- Solicitation number
- FA0021-09-R-0004
About this file
Industry Day slides as briefed.
View the file
Other files for this federal contract opportunity
Show all 50
Systems Engineering and Technical Assistance (SETA) IV has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR FORCE SPECIAL OPERATIONS COMMAND
Air Commandos Quiet ProfessionalsAir Commandos – Quiet Professionals
Systems Engineering andSystems Engineering and Technical Assistance
(SETA IV) S i(SETA IV) Services Industry DayIndustry Day
Captain Edens, Program Manager Mr. Buchanan, Contracting Specialist
6 May 09
SETA IV Industry Day Morning SessionMorning Session
0825 Administrative Announcements
0840 Opening Remarks
0845 HQ AFSOC Mission Overview
0905 SETA History/Overview
0940 Cost/Price Proposal Overview
1010 Technical Requirements Overview
1020 Sample Task Orders
1040 Solicitation Overview1040 Solicitation Overview
1100 Questions & Answers
1130 Lunch
Return 1300 (1PM)Return 1300 (1PM) 1130 Lunch
Afternoon SessionAfternoon Session
1300 Contractor Presentations
1350 Break
1400 Contractor Presentations
1450 Break
1500 Contractor Presentations1500 Contractor Presentations
1540 Break
1600 Contractor Presentations
1640 AFSOC Closing Remarks
Administrative
This conference is UNCLASSIFIED
Silence pagers and wireless phones
Public Restrooms
Emergency Exits
No Food/drink permitted in auditorium/lobby
Smoking area outside the building
Public telephones
Industry Day Ground Rules
Questions Comments, Observations & Feedback welcome
If in doubt, Ask for Clarification
Sensitive Information will be protected
Written questions about draft solicitation on 3x5 cards
Deposit in box at sign-in tablep g
Review during lunch break--answer today if able
All Q&A will be posted to FedBizOpps.gov
E-mail questions to: SETA4@hurlburt.af.mil NLT 15 May 09
IAW FAR 15.201, presentation available at FedBizOpps.gov
Disclaimer
Industry Day presentations and discussions are for informational and planning p rposes onland planning purposes only
A warranted Contracting Officer is the only authorized individual that can commit the Government
Remarks and explanations at this conference shall not qualify the terms and conditions of the draft Request For Proposal (RFP)
Formal solicitation takes precedence over all preliminary or draftFormal solicitation takes precedence over all preliminary or draft documents, discussions or postings
All dates, technical information and other aspects of the program may change without specific notificationp g y g p Please carefully read the final RFP in total, as the information may have changed from what was published in the draft RFP
If in doubt contact the AFSOC Contracting Officer Mr Lowman
If in doubt, contact the AFSOC Contracting Officer, Mr. Lowman at 850-884-2022.
Ethics & Communication
Integrity of the acquisition process paramount
Ethical conduct and Integrity at the forefront
Not only “do things right" but “do the right thing”
Intrinsic part of everyday decision-making and practice
Communication throughout source selection
Ensure even-handed treatment of interested parties
Offerors treated so no unfair competitive advantage
AFSOC Contracting Officer sole focal point after RFP release
AFSOC Contracting Officer, Mr. Lowman, 850-884-2022 g , , Opening RemarksOpening Remarks
Maj Gen Kurt A. Cichowski Vice Commander
Command BriefCommand Brief
Lt Col Michael A. Wormley Commander’s Action Group
Air Commandos – Quiet Professionals
AFSOC Command
Brief
This Briefing Is: UNCLASSIFIED
Overview
Air Commando Heritage
Missions & Organization
Weapon Systems
Air Commando Heritage
Korean
War
World War II http://images.google.com/imgres?imgurl=http://www.cantho-rvn.org/soc-trang/verebely-patch-SocTrang102-550.jpg&imgrefurl=http://www.cantho-rvn.org/insig.html&usg=__BwV_I-tntD87XrhsATzddqfgcdA=&h=679&w=550&sz=87&hl=en&start=2&tbnid=ZALhlZRQok2yiM:&tbnh=139&tbnw=113&prev=/images?q=1st+air+commando+group+patch&gbv=2&hl=en
Air Commando Heritage
Desert
One
Southeast Asia
Vietnam, Laos, Cambodia
AFSOC Core Missions
Aviation Foreign Internal Defense
Specialized Air Mobility
Battlefield Air Operations
Intelligence, Surveillance, and Recon
Precision Aerospace Fires
Agile Combat Support
Command and Control
Specialized Refueling
Information Operations
Psychological Operations
AFSOC Weapon Systems
Current as of: 27 Apr 09
1 SOW
Organization
27 SOW 720 STG 352 SOG 919 SOW353 SOG 193 SOWAFSOTC
Wings/Groups
Location:
Duke Field, FL
Weapon System:
MC-130E
Unit: 919 SOW
Location:
Hurlburt Field, FL
Weapon Systems:
AC-130H/U, MC-130H/P, CV-22,
U-28A
Units: 23 AF, 1 SOW, 720 STG, AFSOTC
Location: Harrisburg, PA
Weapon System: EC-130J
Unit: 193 SOW
Location:
RAF Mildenhall, UK
Weapon Systems:
MC-130H/P, Special Tactics
Unit: 352 SOG
Location:
Kadena AB, JA
Weapon Systems:
MC-130H/P, Special
Tactics
Unit: 353 SOG
Location:
Cannon AFB/
Melrose Range, NM
Weapon Systems:
MC-130W, U-28A,
MQ-1
Unit: 27 SOW
Air Force Major Commands
US Air Forces
Europe
Air Force
Special Operations
Command
Air Combat
Command
Pacific Air
Forces
Air Mobility
Command
Air Force Materiel
Command
Air Force Reserve
Command
Air Force Space
Command
Air Education
& Training
Command
USSOCOM Components
Joint Special
Operations
Command Air Force Special
Operations
Command
Naval Special Warfare
Command
US Army Special
Operations
Command
Marine Corps Forces
Special Operations
Command
Aviation Foreign Internal Defense
6 SOS
Assess
Train
Advise
Assist
Integrate
Specialized Air Mobility Weapon Systems
MC-130E Talon I/MC-130H Talon II/MC-130W Combat Spear
Primary mission: Infil/exfil/resupply
Secondary: SOF aerial refueling
Specialized Air Mobility Weapon Systems
Twice as far and fast in one period of darkness
CV-22 Osprey
318th & 319th SOS Tactical mobility support to
Special Operations Forces
SOF Theater Mobility Weapon Systems
U-28A Exterior ViewPC-12/ U-28 (Light lift)
M-28
U-28A
Specialized Refueling Weapon Systems
MC-130P Combat Shadow
Primary mission: SOF aerial refueling
Secondary: infil/exfil/resupply
Intelligence, Surveillance & Reconnaissance
Weapon Systems
11th IS
MQ-9
MQ-1
Precision Aerospace Fires Weapon Systems
AC-130H/U
“The Gunship”
Entire kill chain: find, fix, finish, exploit, analyze
High ops tempo in OEF & OIF
Psychological Operations Weapon Systems
EC-130
Commando Solo
PSYOP…To Win the Hearts and Minds
Flown by 193 SOW
(ANG), Harrisburg PA
Broadcasts produced by
Army’s 4th Psychological Ops Group
Agile Combat Support
Space Ops
Weather Support
IntelligenceLegal
Operations Support
Agile Combat Support
Communications
Security Forces Civil Engineering
Logistics
Medical https://eis.afsoc.af.mil/sites/A4/AgileCombatSupport/DSC_7324.jpg https://eis.afsoc.af.mil/sites/A4/AgileCombatSupport/CV22 Engine Maintenance.jpg https://eis.afsoc.af.mil/sites/A4/AgileCombatSupport/Airdrop.jpg https://eis.afsoc.af.mil/sites/A4/AgileCombatSupport/070719-F-5957S-070.JPG
Command and Control
• Joint Special
Operations Air
Component
(JSOAC)
• Joint Forces
Special Operations
Component
Commander
(JFSOCC)
• Commander Air
Force Special
Operations Forces
(COMAFSOF)
Special Tactics: Battlefield Air Ops Weapon Systems
- Provide air/ground interface
- Highly skilled, innovative, adaptable, mature operators
- Small, flexible, joint teams
Combat Controller Battlefield Airmen
Terminal Control Operations
Airfield Survey & Assessment
Special Reconnaissance
Special Operations Weather Battlefield Airmen
5 SFG/
160 SOAR
3/160 SOAR
OL-A, Det 2
Savannah
Det 2
Ft Campbell
Det 1
Ft Lewis
10 CWS
Hurlburt
Hurlburt
1 SFG
10 SFG
Rangers
3 &7 SFG
Det 5
Ft Bragg
Det 4
Ft Benning
Det 3
Ft Carson
Environmental Reconnaissance
Objective Area Weather Forecasting
Pararescue Jumper Battlefield Airmen
Personnel and
Equipment Recovery
Combat Search and
Rescue
Battlefield Trauma
Care and Staging
17th ASOS
4 Locations in direct support of Special Forces Groups and the Ranger Regiment
Advanced Terminal Attack, Guidance and Control Ops
Battlefield Targeting
Special Reconnaissance
Tactical Air Control Party Battlefield Airmen
VISION: Transforming Airmen into Air Commandos who can fight and win anytime, anywhere…
MISSION: AFSOC’s focal point for recruiting, assessing, selecting, training and educating Air
Commandos
Recruit, assess and select best qualified candidates
Deliver responsive and relevant training and education that supports the Air Force Special
Operations mission
Foster & build the Air Commando warrior ethos
Air Force Special Operations
Training Center
Questions?
SOF Truths
Humans are more important than hardware
Special Operations Forces cannot be mass produced
Quality is better than Quantity
Competent Special Operations
Forces cannot be created after emergencies occur
SETA IV Acquisition q Strategy Overview
Kurt Buchanan Contracting Specialist
6 May 096 May 09
SETA History/Overview Mission need
SETA III b k dSETA III background
SETA IV support objectives/parameters
SETA IV timeline/milestones
SETA III to IV transition
Risk assessment
Small business considerations
Cost/Price proposal overview
Technical requirements overview
Solicitation overview
Mission Need
AFSOC has a continuing requirement for Contractor support on a ld id b i d ithi b d f A&AS iworld-wide basis and within a broad range of A&AS services
Selected SETA contractors will provide short-term non-personal professional services to HQ AFSOC organizations
SETA contractors support AFSOC, DRU’s, and other SOF entitiespp
To ensure continuity of services, SETA IV will be awarded for a 5-year period prior to the expiration of SETA IIIyear period prior to the expiration of SETA III
SETA III Background
SETA III Indefinite Delivery/Indefinite Quantity (IDIQ) C i 16 D 2009 (TO d 120 d )Contract expires 16 Dec 2009 (TOs extend up to 120 days) Small Business Set Aside <10 proposals received, 3 contracts awarded $75M ceiling, expect $63M total
HQ AFSOC is principal customer; others include 720th STG, AFSOTC, USAFSOS…etc.
SETA III Customers
A2 (Intel)
14% 22%
A3 (Ops)
A4 (Logistics)
23%
A4 (Logistics)
A5 (Requirements)
23%
18% A8,9 (Planning / Analysis)
CCX (Cmd Section) 2%
16%3%
2% AFSOTC (Training)
OTHERS (SOF Units)% Contractor Man% Contractor Man--yearyear
OTHERS (SOF Units)% Contractor Man% Contractor Man year year Equivalents (CMEs) AwardedEquivalents (CMEs) Awarded
SETA IV Support Overview
Provide technical & analytical tools to support / improve:
P li d l tPolicy development Management & administration Government systems
Planning Programming Acquisition Implementation Sustainment Training
SETA IV Objectives
Centralized contract management & execution Continuity with contractors with a local presence
Acquire intellectual capital to support:q p pp Ops & Training Management & Professional Support Services Acq & Log Management & Professional Support Services Intelligence Management & Professional Support ServicesIntelligence Management & Professional Support Services Studies, Analyses & Evaluations Engineering & Technical Services
SETA IV Contract Parameters
Contract type Indefinite Delivery/Indefinite Quantity (IDIQ)
Contract structure Anticipate up to 4 awards Performance period – 5 years with no options Estimated ceiling -- $85M aggregate over the 5-year periodEstimated ceiling -- $85M aggregate over the 5-year period Government expects $3,000.00 minimum award met with award of Initial Task Order
SETA IV Contract Parameters
Pricing arrangements Labor
Firm Fixed Price Labor hours
Cost reimbursable Travel MaterialsMaterials New Mexico Gross Receipts Tax
Overseas allowances Overtime
Milestones
EVENT DATE
INDUSTRY DAY 06 May
RFP RELEASE 05 Jun
PROPOSALS RECEIVED 09 Jul
EVAL/COMPETITIVE RANGE BRIEFING 18 Aug
FINAL DECISION BRIEFING 01 Oct
DECISION DOCUMENTS DUE 08 Oct
CONGRESSIONAL NOTIFICATION 27 Oct
CONTRACT AWARD 30 Oct
CONTRACT AWARD 30 Oct
SETA III to IV Transition
Plan as of April 2009 SETA III Incumbents
Blackhawk Mgt Corp WinTec Arrowmaker Inc
Tasks (32)
CME
(121)WinTec Arrowmaker Inc.
Current TOs may continue to:
Dec 5 11
Jan 7 43 16 Apr 2010 Enable smooth transition Feb 8 29
Mar 8 30Mar 8 30
Apr 4 8
Risk Assessment
Risk Statement - If the contractor: L-0006 M-0001 lacks sufficient breadth and depth of management & 3 2 1 5 1 1 1lacks sufficient breadth and depth of management & technical experience to accomplish the technical specification of the PWS, then the likelihood of unsuccessful contract performance is increased.
3.2.1 5.1.1.1 lacks a sound methodology for selecting and retaining key personnel, then disruption of schedule and degradation of performance will result.
3.2.2 5.1.1.2 lacks sound rationale for selecting lead and other selected subcontractors, then performance will be degraded for the 5 PWS functional specialties.
3.2.3 5.1.1.3 lacks effective processes for team communication, monitoring of team performance, quality control, and conflict resolution, then there will be a need for increased Government oversight.
3.2.4 5.1.1.4
Government oversight.
Risk Statement - If the contractor: L-0006 M-0001 lacks a sound methodology for responding to time 3 2 5 5 1 1 5lacks a sound methodology for responding to time-constrained requirements or unexpected surges in activity, then mission degradation & disruption of schedule will result.
3.2.5 5.1.1.5 lacks an acceptable plan for continuous compliance with FAR 52.219-14, Limitations on Subcontracting, then there will be a need for increased Government oversight.
3.2.6 5.1.1.6 lacks a sufficient screening mechanism to recognize potential OCI issues, & viable measures to avoid or mitigate potential conflicts of interest, then there will be a need for increased Government oversight
3.2.7 5.1.1.7 need for increased Government oversight.
Risk Statement - If the contractor: L-0006 M-0003 lacks a sound approach to providing technical expertise to 3 3 5 1 1 8lacks a sound approach to providing technical expertise to address anticipated technical challenges when accomplishing TOs, then disruption of schedule, increased cost, & an increased likelihood of unsuccessful contract
3.3 5.1.1.8 performance will result.
lacks a sufficient number of qualified personnel physically located within a reasonable commuting distance (or a l ) th th lik lih d f ffi i t il bilit f
3.4.1 5.1.1.9 plan), then the likelihood of sufficient availability of personnel at TO competition and TO start date is decreased.
Risk Statement - If the contractor: L-0006 M-0003 lacks a recruitment approach to ensure both technical and 3 4 2 5 1 1 10lacks a recruitment approach to ensure both technical and SOF expertise is available at the time of TO competition and TO start date, then competition may decrease which may result in increased cost.
3.4.2 5.1.1.10 lacks retention practices that enhance flexibility and redundancy of personnel available at the time of TO competition and start date, then competition may d hi h lt i i d t
3.4.3 5.1.1.9 5.1.1.10 decrease which may result in increased cost.
lacks personnel available that can satisfy the contract security specification as required by TO, then disruption of schedule and degradation of performance will result
3.5.1 – 3.5.4
5.1.1.9 5.1.1.11 of schedule and degradation of performance will result along with the need for increased Government oversight.
Small Business ConsiderationsConsiderations
100% Set-Aside for Small Business Engineering and Management Services NAICS Code 541330 Small Business Size – $27M or less gross avg annual revenueg g Market research shows small business teams capable of performing all tasks in PWS
Offeror required to perform at least 50% of the cost of contract performance incurred for personnel
Plan for continuous compliance; close monitoring by GovPlan for continuous compliance; close monitoring by Gov
Competition
“Median” source selection procedures required for:
Acquisitions estimated value of > $10M < $100M
Best value--performance may outweigh cost difference p y g
Multiple awards--up to 4 IDIQ contracts Establish pool of qualified contractorsEstablish pool of qualified contractors Obtain technical expertise needed
Points of Contact
Points of Contact for SETA IV Email: SETA4@hurlburt.af.mil Contract Specialist: Kurt Buchanan, phone (850) 884-3196 Contracting Officer: Jeff Lowman, phone (850) 884-2022g p ( )
Draft RFP / Final RFP / Amendments will be issued on FBO:
https://www fbo gov/index?s=opportunity&mode=form&id=bahttps://www.fbo.gov/index?s=opportunity&mode=form&id=ba ef94f576809566c54fc5ca144fe7c3&tab=core&_cview=1
BreakBreak
Cost/Price Proposal p Overview
Capt Jeff Edens Program Manager
6 May 20096 May 2009
Importance of Cost/price
Cost/Price is the Least Significant of the Evaluation Factors:
Mission Capability Proposal Risk Past Performance Cost
Cost/Price Evaluation Criteria
Reasonableness Must reflect sound business judgment and represent a price to the Government that a prudent person would pay in the conduct of competitive business
Realism Proposed costs are sufficient for the work to be performed, p p reflective of a clear understanding of the requirements, and consistent with the unique methods of performance and materials described in the offeror’s proposal
Value/Use of Attached SpreadsheetSpreadsheet
Value added for Government Evaluation Evaluation is greatly facilitated when all the offerors propose to the same format and assures that some important piece of information didn’t “fall through the cracks.”
This approach historically also reduced contractor error
Value Added for Contractor Proposal Generationp The e-spreadsheet provides clear and precise guidance There is very little ambiguity involved Provides for more accuracy & lessens possibility of “typos”Provides for more accuracy & lessens possibility of typos
Structure of Spreadsheets
1.0 Instructions - Prime
2 0* I t ti S b t t2.0* Instructions - Subcontractor 3.0* General Information 4.0* Offeror Calculations 5 0 Composite Calculations5.0 Composite Calculations
6.0 Fully Burdened Labor Rates (FBLR)
7.0A Task Pricing 7.0B Task Pricing7.0B Task Pricing
8.0 Most Probable Distribution
9.0 Miscellaneous
* Required of Major Subcontractors (>20% of effort)q j ( )
Yellow Cells: Offeror enters cost data Blue Cells: Totals usually referenced from other worksheets
Cells that pull their values directly from another worksheet Red Cells:
DO NOT ADD VALUES TO ANY CELL WITH A RED BACKGROUND
Green Cells: Cells containing specific information
Red Cells:
Offeror Calculations
I l l i h
Worksheet 4.0: Offeror Calculations Calculates the Average/Maximum FBLR for the Prime (or Subcontractor)
Insert columns only in the green area Note: Offerors have the option of either using formulae or direct inputting values for the indirect columns.
YEAR 1
Yearly Base Prime Ktr Disciplines/Skill Levels Salary Rate Fringe Overhead G&A C.O.M. Profit FBLR FY 10 Proposed Indirect Rates
Management Senior Advisor V -$ -$Senior Advisor V $ $ Program Manager IV -$ -$ Project Manager IV -$ -$ Project Manager III -$ -$ Project Manager II $ $Project Manager II -$ -$
Composite FBLR
Composite Fully Burdened Labor Rates (FBLR) YEAR 1
Worksheet 5.0 Composite Calculation.
Calculates the "composite" Average FBLR used in Worksheet 6.0
AVERAGE Prime Subkr 1 Subkr 2 Subkr 3 N/A N/A YEAR 1
Disciplines/Skill Levels Contractor Composite
FBLR FBLR FBLR FBLR FBLR FBLR FBLR
Management Senior Advisor V -$Senior Advisor V $
100% 0% 0% 0% 0% 0% 100%
Program Manager IV -$ 100% 0% 0% 0% 0% 0% 100%
Project Manager IV -$ 100% 0% 0% 0% 0% 0% 100%
Project Manager III -$ 100% 0% 0% 0% 0% 0% 100%
Project Manager II -$ oject a age $ 100% 0% 0% 0% 0% 0% 100%
Fully Burdened Labor Rates
Labor Category
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6
Worksheet 6: Fully Burdened Labor Rates (FBLR)
AVERAGE FBLR RATE
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6
Management
Senior Advisor V -$ -$ -$ -$ -$ -$ Program Manager IV -$ -$ -$ -$ -$ -$ Project Manager IV -$ -$ -$ -$ -$ -$ P j t M III $ $ $ $ $ $Project Manager III -$ -$ -$ -$ -$ -$ Project Manager II -$ -$ -$ -$ -$ -$
Analyst Analyst IV -$ -$ -$ -$ -$ -$ Analyst III -$ -$ -$ -$ -$ -$ y Analyst II -$ -$ -$ -$ -$ -$ Analyst I -$ -$ -$ -$ -$ -$
Engineer Engineer III -$ -$ -$ -$ -$ -$ Engineer II $ $ $ $ $ $Engineer II -$ -$ -$ -$ -$ -$ Engineer I -$ -$ -$ -$ -$ -$ Systems Engineer IV -$ -$ -$ -$ -$ -$ Systems Engineer III -$ -$ -$ -$ -$ -$
Task Pricing Worksheet 7.0A
Sample Task 1
Disciplines/Skill Levels Ave FBLR HOURS Rate Cost
Management Senior Advisor V -$ -
$Program Manager IV -$ - Project Manager IV -$ - Project Manager III -$ - Project Manager II -$ -
AnalystAnalyst Analyst IV -$ - Analyst III -$ - Analyst II -$ - Analyst I -$ -Analyst I $
Engineer Engineer III -$ - Engineer II -$ - Engineer I -$ -g Systems Engineer IV -$ - Systems Engineer III -$ -
DCAA (www.dcaa.mil) Information for ContractorsInformation for Contractors
Technical Requirements q Overview
Capt Jeff Edens
Performance Work Statement
PWS 1.0 Description of Services Scope Background Requirementsq Security Administration Management and Administration Task OrdersTask Orders Travel Requirements Material Requirements Transition Release of Information Limitation of Subcontracting g
Performance Work Statement
PWS 2.0 Service Delivery Summary Objectives directly related to mission critical items Minimum acceptable levels of service required
PWS 3 0 G t F i h d P tPWS 3.0 Government Furnished Property
PWS 4.0 General Information Work HoursWork Hours Place of Performance Contractor Training Motor Vehicle Operation Services During Crisis Declared by the President, Secretary of Defense, or Overseas Combatant Commander
Deployments
SMALL UNMANNED AIRCRAFTSMALL UNMANNED AIRCRAFT
SYSTEMS (SUAS) JOINT
TRAINING CENTER SUPPORTTRAINING CENTER SUPPORT
Sample Task Order #1
Capt Jeff Edens
Description of Service
What
Provide analysis, research, training development, instruction, and management support
Supports Major Command (AFSOC) role to organize, train, and equip joint forces to successfully employ SUASq p j y p y
Description of Service – Cont.
How
SUAS Program Management Support
SUAS Instruction/Evaluation Support
SUAS Training Courseware SupportSUAS Training Courseware Support
SUAS Range Complex Scheduling Support
SOF MOBILITY AIRCRAFT
SUPPORTSUPPORT
Sample Task Order #2
Capt Jeff Edens
Description of Service
What
Assist in the development of policies, procedures, and planning for operational requirements, and operational test & evaluation (OT&E)
Assist in conversion of AFSOC concepts, roles, & missions p into operational requirements for SOF Mobility Aircraft & support systems
Support the development of concepts, policies, and doctrine for joint and unilateral employment of SOF Mobility Aircraft
Description of Service – Cont.
How Support design reviews, source selections, Analysis of Alternatives (AOAs), and technical reviews Support AFSOC’s role as focal point with industry, civil, and military research agencies Assist AFSOC in managing the OT&E of the SOF Mobility Aircraft and support systems Provide support necessary toward achieving initial operational capability (IOC) for the SOF Mobility Aircraft Define a team of personnel to provide expertise in the following functional areas:
Requirements definition, aircrew and aircraft training, aircraft systems maintenance and logistics/sustainment and operational systems employment.
BreakBreak
Solicitation OverviewSolicitation Overview
Capt Jeff Edens
Section L-0003 General InformationGeneral Information
Restrictions on Contacts Point of Contact
DD Form 254 Bidder’s Library / ElectronicPoint of Contact
Caution Personnel Changes Notice – Availability of Funds Discrepancies
Bidder s Library / Electronic Reference Documents Retention of Proposals Unnecessary Elaboration &Discrepancies
Contract Limitation Evaluation
Unnecessary Elaboration & Formatting Classified Materials Operation of Hurlburt FieldProposal Delivery
Proposal Suspense Dates
Operation of Hurlburt Field Local Area Network (LAN) and Base Information Transfer System (BITS)Transfer System (BITS)
Section L-0004 Proposal Prep InstructionsProposal Prep Instructions
BINDER VOLUME VOLUME TITLE NUMBER OF COPIES * PAGE
LIMITATION**
# 1 I E ti S P O i i l + 5 10# 1 I Executive Summary Paper: Original + 5 10
# 1 II Mission Capability Paper: Original + 5 60
# 1 III P l Ri k P O i i l 5 10# 1 III Proposal Risk Paper: Original + 5 10
# 2 IV Present and Past Performance Paper: Original + 4 50
# 3 V C t / P i P l P O i i l 2 N Li it# 3 V Cost / Price Proposal Paper: Original + 2 No Limit
# 3 VI Solicitation, Offer, and Award Paper: Original + 2 No Limit
* Submit virus-free CD-ROM(s) containing the entire proposal in a sleeve(s) placed in the front of the “Original” binder #1. Additionally, submit a separate CD-ROM containing only Volume IV proposal information either with the Volume IV proposal submission or separately to arrive at the same location identified in Section L-0003, Paragraph 8.0.
**Excluded from Page Limitation: Blank Pages Dividers Cover Pages Title Pages Tabs Indexes Table
Excluded from Page Limitation: Blank Pages, Dividers, Cover Pages, Title Pages, Tabs, Indexes, Table of Contents, Glossaries, Cross-Reference Matrix, Consent Letters, Present and Past Performance Recipient List, Resumes (2-page limit per resume), and Organization Charts.
Section L-0004 Proposal Prep InstructionsProposal Prep Instructions
Description Section L Section M Proposal Volume, Table 3.1 – Cross-Reference Matrix p Para No. Para No.
p , Section No., Page &
Para No.
F t 1 Mi iFactor 1 Mission Capability
S bf t 1 L-0006 3 2 1
M-0001 5 1 1 1Subfactor 1:
Management / Technical / Staffing
/ Security
3.2.1 3.2.2 3.2.3 3 2 4
5.1.1.1 5.1.1.2 5.1.1.3 5 1 1 4/ Security
(Ref PWS Paras. 1.3, 1 4 and 1 5)
3.2.4 3.2.5 3.2.6 3.2.7
5.1.1.4 5.1.1.5 5.1.1.6 5.1.1.7
1.4, and 1.5) 3.2.7 5.1.1.7
Section L-0005 Volume I – Executive SummaryVolume I – Executive Summary
Not evaluated; serves to orient evaluators to the approach and f t f th ff ’ lfeatures of the offeror’s proposal
Volume Organization/Content Electronic copies of entire proposal (in “original” copy only) Master Table of Contents Master Glossary of AbbreviationsMaster Glossary of Abbreviations Section I--Executive Summary Section II--Other information, if any
Section L-0006 Volume II – Mission CapabilityVolume II – Mission Capability
Offeror shall provide as specifically as possible the actual th d l d t li h/ ti f i tmethodology used to accomplish/satisfy requirements
Offeror proposal shall describe the capability to perform this contract including pertinent aspects of the proposed approach such as teaming or subcontracting arrangements
Primary basis for evaluating your proposed approach to meeting or exceeding the minimum performance/capability requirements
Section L-0006 Volume II – Mission CapabilityVolume II – Mission Capability
Table 3.1 - Team Structure Matrix
# PWS Functional PWS Para. Lead Other Supporting Vol. II Section ## PWS Functional
Specialty PWS Para.
Reference
Lead Contractor
Other Supporting Contractor(s)
Section # Page # Para #
Operations and Training Management & 1.3.1.1 through
1 Professional Support Services (O&T
M&PSS)
through 1.3.1.1.9
Acquisition and Logistics Management & 1.3.1.2
2 Management & Professional Support Services (A&L
M&PSS)
through 1.3.1.2.3
Intelligence Management & 1.3.1.3 thro gh
3 g Professional Support Services (I M&PSS) through 1.3.1.3.1
Studies, Analyses and Evaluations
(SA&E)
1.3.2
1.3.2.9
Engineering and Technical Services
(E&TS)
1.3.3
1.3.3.4
Section L-0007 Volume III – Proposal RiskVolume III – Proposal Risk
Offeror shall address Proposal Risk by identifying those aspects of the proposal considered to have the potential for:of the proposal considered to have the potential for:
Disruption of Schedule Increased Cost D d ti f P fDegradation of Performance The need for increased Government oversight Unsuccessful contract performance
Classify each risk IAW AFFARS Mandatory Procedure MP5315.3
Provide the rationale for each risk and its rating
Describe the impact of each identified risk
Propose a realistic "work-around" for identified risks
Identify & classify any new risks introduced by risk mitigation
Section L-0008 Volume IV Present & Past Performance
Offeror shall submit past performance IAW Attachment 10 on:
Present & Past Performance
Offeror and subcontractors, teaming partners, joint venture partners proposed to perform 20 percent or more of the effort
Present & past performance info shall be recent & relevantp p Recent: work completed or ongoing during the three (3) years prior to the Government due date for proposal Volume IV Relevant: how closely the magnitude of effort and complexitiesRelevant: how closely the magnitude of effort and complexities resemble the solicitation requirements
Organizational Structure Change History Include a “roadmap” describing all such changes in org for the offeror, joint venture partners & proposed major subcontractors
If no recent or relevant info, document in Volume IV
Submit NLT 25 Jun 09
Offeror shall provide Relevancy Matrix (RFP Atch 9)
Present & Past Performance
1) Contractor
Factor
Subfactor
Subfactor 2Subfactor 1
FACTOR 1 - MISSION CAPABILITY
REFERENCES
1) Contractor
Factor
Subfactor
Subfactor 2Subfactor 1
FACTOR 1 - MISSION CAPABILITY
REFERENCES
*Offeror shall submit no more than fourteen (14) “Present and Past
Cost/ Price
Sample
TO #2
Sample TO #1SecurityStaffingTechMgtE &TSSA&EI M &PSS
A & L
M &PSS
O & T
M &PSS
1) Contractor
2) Prime Contract No. (and DO / TO # or Subcontract #, as applicable)
Citation #* Cost/ Price
Sample
TO #2
Sample TO #1SecurityStaffingTechMgtE &TSSA&EI M &PSS
A & L
M &PSS
O & T
M &PSS
1) Contractor
2) Prime Contract No. (and DO / TO # or Subcontract #, as applicable)
Citation #*
Offeror shall submit no more than fourteen (14) Present and Past Performance Citations” for all “Prime Contributors” identified in the “Team Structure Matrix” in Volume II
At l t (1) “P t d P t P f Cit ti ” i i dAt least one (1) “Present and Past Performance Citation” is required for each “Lead Contractor”
At least fifty percent (50%) of Present and Past Performance
Citations shall be relevant work performed by the Offeror
Present and Past Performance Questionnaires with transmittal l tt (RFP At h 8)
Present & Past Performance letter (RFP Atch 8)
Offeror send to POCs familiar with each example
Responses due on proposal due date of Volumes I, II, III, V, & VI If no response 1 week after due, 1 phone & fax attempt to POC If no response 2 weeks after due, CO will notify OfferorIf no response 2 weeks after due, CO will notify Offeror If no response 3 weeks after due, survey scored neither favorably nor unfavorably
Consent letters for subcontractors and teaming partners shall be t d (RFP At h 11)
Present & Past Performance executed (RFP Atch 11) Complete all information required on the Present and Past Performance Recipient List (RFP Atch 12)
Questionnaire Recipient Information Name Of Effort Citation #:
Date Sent
Mode ofMode of Transmittal
Point of Contact Name
Phone / Fax / E-Mail Phone Fax E-mail
C NCompany Name
Address
Date of Last Contact
Date Sent
Date Sent
Comments
Section L-0009 Volume V – Cost/PriceVolume V – Cost/Price
The offeror shall submit “Cost Proposal Workbook” (RFP Atch 7) Do not compress files; do not password protect
Competitive acquisition w/ adequate price competition anticipatedp q q p p p Cost documentation is considered to be other than cost or pricing data and shall not be certified in accordance with FAR Part 15.406-2
Section L-0009 Volume VI – Solicitation Offer & Award
Offeror to provide information necessary to the Government for i th t t d t d ti fil
Volume VI Solicitation, Offer & Award preparing the contract document and supporting file Signature Page (Section A – Solicitation / Contract Form) Proposal Expiration Statement Solicitation (Sections B – J) Representations, Certifications, and Other Statements of Offerors (Section K)( )
Online Representations and Certifications Application (ORCA) http://orca.bpn.gov
DD Form 254DD Form 254
Section M-0001 Evaluation ProceduresEvaluation Procedures
Based on AFFARS Mandatory Procedure MP5315.3 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/MP5315.3.doc
Best Value; integrated assessment of Mission CapabilityBest Value; integrated assessment of Mission Capability, Proposal Risk, Present & Past Performance, Cost/Price
Gov intends to evaluate proposals & award w/o discussionsp p
Awardable contract must Meet all PWS technical requirements Conform to all required terms and conditions Include all required certifications
Evaluation Factors and Subfactors
Factor 1: Mission Capability
Evaluation Factors and Subfactors
Subfactor 1 - Management / Technical / Staffing / Security Subfactor 2 - TO Evaluation – Small UAS Joint Training Subfactor 3 – TO Evaluation – SOF Mobility Aircrafty
Factor 2: Proposal Risk Factor 3: Past Performance Factor 4: Cost/PriceFactor 4: Cost/Price
Order of Importance Mission Capability & Past Performance are equal Proposal Risk is of less importance than Mission Capability & Past Performance, but of greater importance than Cost/Price
Mission Capability RatingsMission Capability Ratings
• Exceptional: Exceeds specified minimum performance or capabilityExceptional: Exceeds specified minimum performance or capability requirements in a way beneficial to the Government: proposal must have one or more strengths and no deficiencies to receive a blue.
• Acceptable: Meets specified minimum performance or capability
Blue
• Acceptable: Meets specified minimum performance or capability requirements delineated in the Request for Proposal; proposal rated green must have no deficiencies but may have one or more strengths.
• Marginal: There is doubt regarding whether an aspect of the proposal
Green
• Marginal: There is doubt regarding whether an aspect of the proposal meets a specified minimum performance or capability requirements, but any such uncertainty is correctable.
• Unacceptable: Fails to meet specified minimum performance or
Yellow
• Unacceptable: Fails to meet specified minimum performance or capability requirements. The proposal has one or more deficiencies and is not awardable.
Red
Proposal RiskProposal Risk
Focuses on the risks and weaknesses associated with an ff ’ d hofferor’s proposed approach
Includes assessment for Disruption of scheduleDisruption of schedule Increased cost Degradation of performance N d f i d i hNeed for increased government oversight Likelihood of unsuccessful contract performance
Considers submitted risk analysis as well as risks that are knownConsiders submitted risk analysis as well as risks that are known to the evaluators based on experience with similar contracts
Evaluation will address offeror’s plan for mitigating risks and p g g why that approach is or is not manageable
Proposal Risk RatingsProposal Risk Ratings
Low* Has little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring willof performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate* Can potentially cause disruption of schedule, increased cost or degradation of performance. Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High* Likely to cause significant disruption of schedule, increased cost or degradation of performance. Extraordinary contractor emphasis and rigorous Government it i b bl t diffi ltimonitoring may be able to overcome difficulties.
Unacceptable The existence of a significant weakness or combination of weaknesses that is very likely to cause unmitigated disruption of schedule, drastically increased cost or severely degraded performance Proposals with an unacceptable rating are notseverely degraded performance. Proposals with an unacceptable rating are not awardable.
* A plus “+“ rating may be used as an option when risk is evaluated to be in the upper boundaries of a Proposal Risk Rating, but is not high enough to merit the next inferior rating. For example, p g, g g g p , where in the judgment of the evaluator, an offeror has risk that approaches or is nearly rated as a Moderate Risk, a Proposal Risk Rating of “Low+” may be assigned.
Present & Past PerformancePresent & Past Performance
Performance Confidence Assessment Group (PCAG)
Targets performance relevant to Factor 1 (subfactors) & Factor 4
Confidence rating based on Recency (para 7.4) Relevancy (para 7 5)Relevancy (para 7.5) Quality (para 7.6)
Confidence RatingsConfidence Ratings
Substantial Based on the offeror’s performance record the Government has a highSubstantial Confidence
Based on the offeror’s performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s performance record, the Government has an expectation that the offeror will successfully perform the required effortConfidence expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown Confidence No performance record is identifiable or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.
Recency & Relevancy DefinitionsRecency & Relevancy Definitions
Recency: effort must be ongoing or must have been performed d i th t th (3) i t th G t d d tduring the past three (3) years prior to the Government due date
Rating is Pass / Fail Information that fails this condition shall not be evaluated
Relevancy: “Not Relevant” citations shall not be rated for quality Highly Relevant (HR) Past/present performance effort involved essentially the same magnitude f ff t d l iti thi li it ti iof effort and complexities this solicitation requires.
Relevant (R) Past/present performance effort involved much of the magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
(SR)
Past/present performance effort involved some of the magnitude of effort and complexities this solicitation requires.
Not Relevant (NR) Past/present performance effort did not involve any of the magnitude of
Not Relevant (NR) Past/present performance effort did not involve any of the magnitude of effort and complexities this solicitation requires.
Present and Past Performance Quality DefinitionsQuality Definitions
EXCEPTIONAL Performance meets contractual requirements and exceeds many, to the Government’s (or customer’s) benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VERY GOOD Performance meets contractual requirements and exceeds some, to the Government’s (or customer’s) benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor
Blue g p problems for which corrective actions taken by the contractor were effective.
SATISFACTORY Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Purple corrective actions taken by the contractor appear or were satisfactory.
MARGINAL Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented
Green
Yellow marginally effective or were not fully implemented.
UNSATISFACTORY Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective. Red
NOT APPLICABLE The question does not apply. No performance record identifiable within the area of evaluation.
White
Evaluation Process
Evaluation Process Past Performance Volume Received and Evaluated Other Volumes Received and Evaluated Competitive Range Established p g Pre-Award Debriefing Period Discussions with Offerors in Competitive Range Final Proposal RevisionsFinal Proposal Revisions Best Value Contractors Selected Post-Award Debriefing Period
QuestionsQuestions
Afternoon SessionAfternoon Session
CONTRACTOR PRESENTATIONS
1300 – Symvionics, Inc.
1310 – Chenega Federal Systems 1330 – P3I Incorporated1330 P3I, Incorporated 1340 – PE Systems, Inc.
1350 – BOSH Global Services 1400 Ch G t C lti1400 – Chenega Government Consulting 1410 – Zel Technologies, Inc.
File details come from the government source that posted it. Updated .