The proposed slides for the conference are attached. The schedule for the day may change pending the actual number of contractor presentations.
View the file
Other files for this federal contract opportunity
Show all 50
Systems Engineering and Technical Assistance (SETA) IV has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR FORCE SPECIAL OPERATIONS COMMAND
Air Commandos – Quiet Professionals
Systems Engineering and Technical Assistance (SETA IV) Services Industry Day Captain Edens, Program Manager Mr. Buchanan, Contracting Specialist 6 May 09
Return 1300 (1PM) SETA IV Industry Day Morning Session 0830 Administrative Announcements
0840 Opening Remarks
0845 HQ AFSOC Mission Overview
0905 SETA History/Overview
0940 Cost/Price Proposal Overview
1010 Technical Requirements Overview
1020 Sample Task Orders
1040 Solicitation Overview
1100 Questions & Answers
1130 Lunch
SETA IV Industry Day Afternoon Session 1300 Contractor Presentations
1350 Break
1400 Contractor Presentations
1450 Break
1500 Contractor Presentations
1540 Break
1600 Contractor Presentations
1640 AFSOC Closing Remarks
Administrative This conference is UNCLASSIFIED
Silence pagers and wireless phones
Public Restrooms
Emergency Exits
No Food/drink permitted in auditorium/lobby
Smoking area outside the building
Public telephones
Industry Day Ground Rules
| Questions Comments, Observations & Feedback welcome |
| If in doubt, Ask for Clarification |
| Sensitive Information will be protected |
| Written questions about draft solicitation on 3x5 cards |
| Deposit in box at sign-in table |
| Review during lunch break--answer today if able |
| All Q&A will be posted to FedBizOpps.gov |
E-mail questions to: SETA4@hurlburt.af.mil NLT 15 May 09
IAW FAR 15.201, presentation available at FedBizOpps.gov
| Industry Day presentations and discussions are for informational and planning purposes only |
| A warranted Contracting Officer is the only authorized individual that can commit the Government |
Remarks and explanations at this conference shall not qualify the terms and conditions of the draft Request For Proposal (RFP)
| Formal solicitation takes precedence over all preliminary or draft documents, discussions or postings |
| All dates, technical information and other aspects of the program may change without specific notification |
| Please carefully read the final RFP in total, as the information may have changed from what was published in the draft RFP |
If in doubt, contact the AFSOC Contracting Officer, Mr. Lowman at 850-884-2022.
Disclaimer
Integrity of the acquisition process paramount
Ethical conduct and Integrity at the forefront
Not only “do things right" but “do the right thing”
Intrinsic part of everyday decision-making and practice
Communication throughout source selection
Ensure even-handed treatment of interested parties
Offerors treated so no unfair competitive advantage
AFSOC Contracting Officer sole focal point after RFP release
AFSOC Contracting Officer, Mr. Lowman, 850-884-2022
Ethics & Communication
Opening Remarks Maj Gen Kurt A. Cichowski Vice Commander, HQ AFSOC
Command Brief Lt Col Michael A. Wormley Commander’s Action Group
Who We Are
How We Operate
How We Are Organized
AFSOC Command Brief
AFSOC Command Brief Slides not included to save file space
SETA IV Acquisition Strategy Overview Kurt Buchanan Contracting Specialist
SETA History/Overview Mission need
SETA III background
SETA IV support objectives/parameters
SETA IV timeline/milestones
SETA III to IV transition
Risk assessment
Small business considerations
Cost/Price proposal overview
Technical requirements overview
Solicitation overview
Mission Need AFSOC has a continuing requirement for Contractor support on a world-wide basis and within a broad range of A&AS services
Selected SETA contractors will provide short-term non-personal professional services to HQ AFSOC organizations
SETA contractors support AFSOC, DRU’s, and other SOF entities
To ensure continuity of services, SETA IV will be awarded for a 5-year period prior to the expiration of SETA III
| SETA III Indefinite Delivery/Indefinite Quantity (IDIQ) |
| Contract expires 16 Dec 2009 (TOs extend up to 120 days) |
| Small Business Set Aside |
| <10 proposals received, 3 contracts awarded |
| $75M ceiling, expect $63M total |
HQ AFSOC is principal customer; others include
720th STG, AFSOTC, USAFSOS…etc.
SETA III Background
SETA III Customers % Contractor Man-year Equivalents (CMEs) Awarded
Chart1
A2 (Intel)
A3 (Ops)
A4 (Logistics)
A5 (Requirements)
A8,9 (Planning / Analysis)
CCX (Cmd Section)
AFSOTC (Training)
OTHERS (SOF Units)
SETA III CUSTOMERS
0.1363636364
0.2373737374
0.0151515152
0.1616161616
0.0303030303
0.0202020202
0.1767676768
0.2222222222
Sheet1
CME DIVISON 5YR
A2 (Intel) 27 14%
A3 (Ops) 47 24%
A4 (Logistics) 3 2%
A5 (Requirements) 32 16%
A8,9 (Planning / Analysis) 6 3%
CCX (Cmd Section) 4 2%
AFSOTC (Training) 35 18%
OTHERS (SOF Units) 44 22%
198 100%
Sheet1
SETA III CUSTOMERS
Sheet2
Sheet3
SETA IV Support Overview
| Provide technical & analytical tools to support / improve: |
| Policy development |
| Management & administration |
| Government systems |
| Planning |
| Programming |
| Acquisition |
| Implementation |
| Sustainment |
| Training |
SETA IV Objectives
| Centralized contract management & execution |
| Continuity with contractors with a local presence |
| Acquire intellectual capital to support: |
| Ops & Training Management & Professional Support Services |
| Acq & Log Management & Professional Support Services |
| Intelligence Management & Professional Support Services |
| Studies, Analyses & Evaluations |
| Engineering & Technical Services |
SETA IV Contract Parameters
| Contract type |
| Indefinite Delivery/Indefinite Quantity (IDIQ) |
| Contract structure |
| Anticipate up to 4 awards |
| Performance period – 5 years with no options |
| Estimated ceiling -- $85M aggregate over the 5-year period |
| Government expects $3,000.00 minimum award met with award of Initial Task Order |
SETA IV Contract Parameters
| Pricing arrangements |
| Labor |
| Firm Fixed Price |
| Labor hours |
| Cost reimbursable |
| Travel |
| Materials |
| New Mexico Gross Receipts Tax |
| Overseas allowances |
| Overtime |
EVENT DATE
INDUSTRY DAY 06 May
RFP RELEASE 05 Jun
PROPOSALS RECEIVED 09 Jul
EVAL/COMPETITIVE RANGE BRIEFING 18 Aug
FINAL DECISION BRIEFING 01 Oct
DECISION DOCUMENTS DUE 08 Oct
CONGRESSIONAL NOTIFICATION 27 Oct
CONTRACT AWARD 30 Oct Milestones
SETA III to IV Transition
| SETA III Incumbents |
| Blackhawk Mgt Corp |
| WinTec Arrowmaker Inc. |
| Current TOs may continue to: |
| 16 Apr 2010 |
| Enable smooth transition |
Plan as of April 2009
| Tasks | |
| (32) | CME |
(121)
| Dec | 5 | 11 |
| Jan | 7 | 43 |
| Feb | 8 | 29 |
| Mar | 8 | 30 |
| Apr | 4 | 8 |
Risk Assessment
| Risk Statement - If the contractor: | L-0006 | M-0001 |
| lacks sufficient breadth and depth of management & technical experience to accomplish the technical specification of the PWS, then the likelihood of unsuccessful contract performance is increased. | 3.2.1 | 5.1.1.1 |
| lacks a sound methodology for selecting and retaining key personnel, then disruption of schedule and degradation of performance will result. | 3.2.2 | 5.1.1.2 |
| lacks sound rationale for selecting lead and other selected subcontractors, then performance will be degraded for the 5 PWS functional specialties. | 3.2.3 | 5.1.1.3 |
| lacks effective processes for team communication, monitoring of team performance, quality control, and conflict resolution, then there will be a need for increased Government oversight. | 3.2.4 | 5.1.1.4 |
| Risk Statement - If the contractor: | L-0006 | M-0001 |
| lacks a sound methodology for responding to time-constrained requirements or unexpected surges in activity, then mission degradation & disruption of schedule will result. | 3.2.5 | 5.1.1.5 |
| lacks an acceptable plan for continuous compliance with FAR 52.219-14, Limitations on Subcontracting, then there will be a need for increased Government oversight. | 3.2.6 | 5.1.1.6 |
| lacks a sufficient screening mechanism to recognize potential OCI issues, & viable measures to avoid or mitigate potential conflicts of interest, then there will be a need for increased Government oversight. | 3.2.7 | 5.1.1.7 |
| Risk Statement - If the contractor: | L-0006 | M-0003 |
| lacks a sound approach to providing technical expertise to address anticipated technical challenges when accomplishing TOs, then disruption of schedule, increased cost, & an increased likelihood of unsuccessful contract performance will result. | 3.3 | 5.1.1.8 |
| lacks a sufficient number of qualified personnel physically located within a reasonable commuting distance (or a plan), then the likelihood of sufficient availability of personnel at TO competition and TO start date is decreased. | 3.4.1 | 5.1.1.9 |
| Risk Statement - If the contractor: | L-0006 | M-0003 |
| lacks a recruitment approach to ensure both technical and SOF expertise is available at the time of TO competition and TO start date, then competition may decrease which may result in increased cost. | 3.4.2 | 5.1.1.10 |
| lacks retention practices that enhance flexibility and redundancy of personnel available at the time of TO competition and start date, then competition may decrease which may result in increased cost. | 3.4.3 | 5.1.1.9 5.1.1.10 |
| lacks personnel available that can satisfy the contract security specification as required by TO, then disruption of schedule and degradation of performance will result along with the need for increased Government oversight. | 3.5.1 – 3.5.4 | 5.1.1.9 5.1.1.11 |
Small Business Considerations
| 100% Set-Aside for Small Business |
| Engineering and Management Services |
| NAICS Code 541330 |
| Small Business Size – $27M or less gross avg annual revenue |
| Market research shows small business teams capable of performing all tasks in PWS |
| Offeror required to perform at least 50% of the cost of contract performance incurred for personnel |
| Plan for continuous compliance; close monitoring by Gov |
| “Median” source selection procedures required for: |
| Acquisitions estimated value of > $10M < $100M |
Best value--performance may outweigh cost difference
| Multiple awards--up to 4 IDIQ contracts |
| Establish pool of qualified contractors |
| Obtain technical expertise needed |
Competition
Points of Contact
| Points of Contact for SETA IV |
| Email: SETA4@hurlburt.af.mil |
| Contract Specialist: Kurt Buchanan, phone (850) 884-3196 |
| Contracting Officer: Jeff Lowman, phone (850) 884-2022 |
| Draft RFP / Final RFP / Amendments will be issued on FBO: |
| https://www.fbo.gov/index?s=opportunity&mode=form&id=baef94f576809566c54fc5ca144fe7c3&tab=core&_cview=1 |
Break
Cost/Price Proposal Overview Capt Jeff Edens Program Manager 6 May 2009
Importance of Cost/price
| Cost/Price is the Least Significant of the Evaluation Factors: |
| Mission Capability |
| Proposal Risk |
| Past Performance |
| Cost |
Cost/Price Evaluation Criteria
| Reasonableness |
| Must reflect sound business judgment and represent a price to the Government that a prudent person would pay in the conduct of competitive business |
| Realism |
| Proposed costs are sufficient for the work to be performed, reflective of a clear understanding of the requirements, and consistent with the unique methods of performance and materials described in the offeror’s proposal |
Value/Use of Attached Spreadsheet
| Value added for Government Evaluation |
| Evaluation is greatly facilitated when all the offerors propose to the same format and assures that some important piece of information didn’t “fall through the cracks.” |
| This approach historically also reduced contractor error |
| Value Added for Contractor Proposal Generation |
| The e-spreadsheet provides clear and precise guidance |
| There is very little ambiguity involved |
| Provides for more accuracy & lessens possibility of “typos” |
| 1.0 | Instructions - Prime |
| 2.0* | Instructions - Subcontractor |
| 3.0* | General Information |
| 4.0* | Offeror Calculations |
| 5.0 | Composite Calculations |
| 6.0 | Fully Burdened Labor Rates (FBLR) |
| 7.0A | Task Pricing |
| 7.0B | Task Pricing |
| 8.0 | Most Probable Distribution |
| 9.0 | Miscellaneous |
* Required of Major Subcontractors (>20% of effort) Structure of Spreadsheets
1.0 INSTRUCTION-PRIME
Worksheet 1.0
INSTRUCTIONS TO OFFERORS
(PRIME CONTRACTOR)
1. Worksheets contained in this workbook shall be used to form the core of your cost proposal. As stated in Section L of the RFP, all COST AREA information shall be submitted in electronic format, plus the number of paper copies indicated.
2. This workbook is designed to make the proposal process less confusing for offerors and to make the evaluation of the cost area easier for the Government. Please provide the information required on the worksheets in the format provided. "PLEASE DO N
*Note: If you need additional cost categories that are not included in the FBLRs worksheet, you may insert additional columns only in the GREEN COLUMNS - to accommodate the added indirect categories. DO NOT delete any columns. If you don't propose Frin
The following worksheets are for the Prime Contractor.
1.0 INSTRUCTIONS TO OFFERORS (PRIME CONTRACTOR) - Provides general instructions/directions to the
Prime Contractor
2.0 INSTRUCTIONS TO OFFERORS (MAJOR SUBCONTRACTORS) - Provides general instructions/directions to
Major Subcontractors (Defined in Para 10 below).
3.0 GENERAL INFORMATION - Identifies administrative information that is required for reasonableness analysis.
4.0 Offeror Calculations - Provides worksheet to input offeror's charges.
5.0 Composite Calculations - Calculates the "composite" Average FBLR used in Worksheet 6.0.
7.0A and 7.0B Sample Task # 1 and Sample Task # 2 Pricing - Worksheets to propose cost for the Sample TOs.
8.0 Most Probable Labor Distribution - Cost of Labor for TOTAL Most Probable Labor Distribution
9.0 Miscellaneous - Supporting Cost Information - Use to provide additional quantitative information
3. Supporting cost information IS REQUIRED and shall be provided either as a "Microsoft Word" document, by adding additional worksheets after Worksheet 9.0, or typing information in at "Supporting Cost Information" at Worksheet 9.0. Supporting Cost Inf
4. In the worksheets themselves, the following color codes are used:
Yellow Cells: Offeror enters cost data
Blue Cells: Totals usually referenced from other worksheets
Red Cells: Cells that pull their values directly from another worksheet
DO NOT ADD VALUES TO ANY CELL WITH A RED BACKGROUND
Green Cells: Cells containing specific information
5. Please use the following filename when submitting the Cost Volume: "COMPANYNAMECOST."
6. The Prime Contractor shall complete and submit all Worksheets.
7. If the Prime Contractor is adding handling to their subcontractor's FBLR, then the Prime Contractor shall provide information to support the cost in the "Miscellaneous or Supporting Cost Information" area on Worksheet 9.0 to identify and quantify what
8. The offerors are advised that their proposed labor rates should reflect the range salaries for any given category as well as a rational expectation of the distribution of skill and experience within each labor category. Provide a description of how
9. Additional comments / directions may be provided in the "Comments" section of individual cells.
10. For the purposes of cost evaluation only, MAJOR SUBCONTRACTOR is defined as any subcontractor providing
20% or more of any given labor category.
&LCOST PROPOSAL WORKBOOK-HURLBURT&RDRAFT Solicitation FA0021-09-R-0004 ## June 2009
&CAtch 7A &P of &N
2.0 INSTRUCTION-SUBS
Worksheet 2.0
INSTRUCTIONS TO OFFERORS
(MAJOR SUBCONTRACTORS)
1. Major Subcontractor is defined as any subcontractor who is expected to provide 20% or more of any given labor category. (See Para 10, Worksheet 1.0.)
2. For those firms proposing as Major Subcontractors to a Prime, Worksheet 4.0 Offeror Calculations shall be completed as appropriate for those labor categories provided by the sub. A copy of the sub's completed Worksheet 4.0 shall be provided to the G
3. The following worksheets shall form the core of your cost proposal. As requested in Section L of the RFP, all COST AREA information should be presented in electronic format plus the number of paper copies indicated.
4. This workbook is designed to make the proposal process less confusing for offerors and to make the evaluation of the cost area easier for the Government. Please provide the information required on the worksheets in the format provided. *PLEASE DO NO
*If you need additional cost categories that are not included in the FBLRs worksheet, you may insert additional columns only in the GREEN COLUMNS - to accommodate the added indirect categories. DO NOT delete any columns. If you don't propose Fringe or C
5. Subcontractors are requested to complete and submit the following completed Worksheets:
2.0 INSTRUCTIONS TO OFFERORS - (MAJOR SUBCONTRACTORS) - Provides general instructions/directions to Subcontractors.
3.0 GENERAL INFORMATION - Identifies administrative information that is required for reasonableness analysis.
4.0 Offeror Calculations - Provides worksheet to input offeror's charges.
9.0 Miscellaneous - Supporting Cost Information - Use to provide additional quantitative information.
6. As discussed previously and under Sections L & M of the RFP, Subcontractors may submit their detailed proposals under separate cover by the proposal due date as identified in the RFP.
7. Supporting cost information IS REQUIRED and shall be provided either as a "Microsoft Word" document, by adding additional Worksheets after Worksheet 9.0, or typing information in at "Supporting Cost Information" at Worksheet 9.0. Supporting Cost Info
8. In the worksheets themselves, the following color codes are used:
Yellow Cells: Offeror enters cost data.
Blue Cells: Totals usually referenced from other worksheets.
Red Cells: Cells that pull their values directly from another worksheet.
DO NOT ADD VALUES TO ANY CELL WITH A RED BACKGROUND.
Green Cells: Cells containing specific information.
9. Please use the following filename when submitting the Cost Volume: "COMPANYNAMECOST."
10. The Prime Contractor shall use Worksheet 9.0 for "Misc - Supporting Cost Info" to identify and quantify what they are adding to their subcontractor's FBLR to aid in the trackability of Subcontractor rates to Prime rates.
11. Major subcontractors are required to complete Worksheets 3.0, 4.0, and 9.0. If they desire, they may provide their calculations directly to the Government under separate cover by the proposal date as identified in the RFP.
12. The offerors are advised that their proposed labor rates should reflect the range salaries for any given category as well as a rational expectation of the distribution of skill and experience within each labor category. Provide a description of how
13. Additional comments / directions may be provided in the "Comments" section of individual cells.
3.0 GENERAL INFORMATION
Worksheet 3.0: General Information
Prime: _________________________ (if proposing as a Subcontractor)
GENERAL REQUIRED INFORMATION The following General Information
Tab continues through line 69
To the Offerors: Please provide the information requested below:
1. Offeror ABC CORP
St. Address PO Box 100
City,State ANYWHERE, USA
Zip XXXXXX
Telephone XXXXXX
Tax ID No. XXXXXX
2. Profit Rate
3. Cognizant DCAA Auditor
Name Mr. John Doe
Office Cognizant DCAA
St. Address Anywhere
City,State USA
Zip XXXXXX
Telephone XXXXXX e-mail XXXXXX
FAX XXXXXX
4. Are you Proposing using FPRAs?
YES Provide Copy of FPRA
NO Provide Support/Justification for Rates Used
Partly (explain)
5. Escalation: Identify the escalation used to generate the Direct Labor Rates
Year 1
Year 2
Year 3
Year 4
Year 5
Escalation Index Used:
Other Method of
Escalation:
6. Uncompensated Overtime (UOT): Note: The Government does not encourage the use of UOT
Are the proposed rates generated assuming UOT? NO
YES
If Yes, Answer the following:
a. UOT discount directed by DCAA? _______________________
b. Go To Tab "UOT"
7. Provide the following information about your overhead pools and Effective Work Year below:
Total Work Year in Hrs 2,080
Vacation Days * 8Hrs/Day: Note: These are the days in the Fringe and/or Overhead pools -- NOT
Sick Days * 8Hrs/Day: the days that individuals may receive.
Holidays * 8Hrs/Day:
Jury/Military/Etc Hrs:
Training Hrs If there is more than one OH pool for the proposed labor categories, use
Unexpected Down Time Hrs the MISC worksheet to provide the above information for all the pools
Total Productive Work Year 2,080
Uncompensated O/T* Hrs
Work Year 2,080
* The Government discourages the use of uncompensated overtime.
8. Cost of Money
Year 1 Year 2 Year 3 Year 4 Year 5
COM Categories COM Rate COM Rate COM Rate COM Rate COM Rate
4.0 Offeror Calculations
Worksheet 4.0: Offeror Calculations
Calculates the Average/Maximum FBLR for the Prime (or Subcontractor)
Insert columns only in the green area
Note: Offerors have the option of either using the offered formulae or direct imputing values for the indirect columns.
YEAR 1
Yearly Base Prime Ktr
Disciplines/Skill Levels Salary Rate Fringe Overhead G&A C.O.M. Profit FBLR
FY 10 Proposed Indirect Rates
Management
Senior Advisor V $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0
Project Manager III $ - 0 $ - 0
Project Manager II $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0
Analyst III $ - 0 $ - 0
Analyst II $ - 0 $ - 0
Analyst I $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0
Engineer II $ - 0 $ - 0
Engineer I $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0
Logistician I $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0
Technician I $ - 0 $ - 0
Technician Entry $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0
Illustrator I $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0
Instructor II $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0
Insert columns only in the green area
YEAR 2
Base Prime Ktr
Disciplines/Skill Levels Rate Fringe Overhead G&A C.O.M. Profit FBLR
ESCALATION
FY 11 Proposed Indirect Rates
Management
Senior Advisor V $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0
Project Manager III $ - 0 $ - 0
Project Manager II $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0
Analyst III $ - 0 $ - 0
Analyst II $ - 0 $ - 0
Analyst I $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0
Engineer II $ - 0 $ - 0
Engineer I $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0
Logistician I $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0
Technician I $ - 0 $ - 0
Technician Entry $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0
Illustrator I $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0
Instructor II $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0
Insert columns only in the green area
YEAR 3
Base Prime Ktr
Disciplines/Skill Levels Rate Fringe Overhead G&A C.O.M. Profit FBLR
ESCALATION
FY 12 Proposed Indirect Rates
Management
Senior Advisor V $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0
Project Manager III $ - 0 $ - 0
Project Manager II $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0
Analyst III $ - 0 $ - 0
Analyst II $ - 0 $ - 0
Analyst I $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0
Engineer II $ - 0 $ - 0
Engineer I $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0
Logistician I $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0
Technician I $ - 0 $ - 0
Technician Entry $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0
Illustrator I $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0
Instructor II $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0
Insert columns only in the green area
YEAR 4
Base Prime Ktr
Disciplines/Skill Levels Rate Fringe Overhead G&A C.O.M. Profit FBLR
ESCALATION
FY 13 Proposed Indirect Rates
Management
Senior Advisor V $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0
Project Manager III $ - 0 $ - 0
Project Manager II $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0
Analyst III $ - 0 $ - 0
Analyst II $ - 0 $ - 0
Analyst I $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0
Engineer II $ - 0 $ - 0
Engineer I $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0
Logistician I $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0
Technician I $ - 0 $ - 0
Technician Entry $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0
Illustrator I $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0
Instructor II $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0
Insert columns only in the green area
YEAR 5
Base Prime Ktr
Disciplines/Skill Levels Rate Fringe Overhead G&A C.O.M. Profit FBLR
ESCALATION
FY 14 Proposed Indirect Rates
Management
Senior Advisor V $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0
Project Manager III $ - 0 $ - 0
Project Manager II $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0
Analyst III $ - 0 $ - 0
Analyst II $ - 0 $ - 0
Analyst I $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0
Engineer II $ - 0 $ - 0
Engineer I $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0
Logistician I $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0
Technician I $ - 0 $ - 0
Technician Entry $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0
Illustrator I $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0
Instructor II $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0
Insert columns only in the green area
YEAR 6
Base Prime Ktr
Disciplines/Skill Levels Rate Fringe Overhead G&A C.O.M. Profit FBLR
ESCALATION
FY 14 Proposed Indirect Rates
Management
Senior Advisor V $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0
Project Manager III $ - 0 $ - 0
Project Manager II $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0
Analyst III $ - 0 $ - 0
Analyst II $ - 0 $ - 0
Analyst I $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0
Engineer II $ - 0 $ - 0
Engineer I $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0
Logistician I $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0
Technician I $ - 0 $ - 0
Technician Entry $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0
Illustrator I $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0
Instructor II $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0
&CAtch 7A &P of &N ramirez:
Composite COM rate generated against total costs.
SmithJF:
Fully Burdened Labor Rate
SmithJF:
Fully Burdened Labor Rate
SmithJF:
Fully Burdened Labor Rate
SmithJF:
Fully Burdened Labor Rate
SmithJF:
Fully Burdened Labor Rate ramirez:
Composite COM rate generated against total costs.
ramirez:
Composite COM rate generated against total costs.
ramirez:
Composite COM rate generated against total costs.
ramirez:
Composite COM rate generated against total costs.
ramirez:
Composite COM rate generated against total costs.
SmithJF:
Fully Burdened Labor Rate
5.0 Composite Calculations
Worksheet 5.0 Composite Calculation.
Calculates the "composite" Average FBLR used in Worksheet 6.0
Composite Fully Burdened Labor Rates (FBLR) YEAR 1
AVERAGE Prime Subkr 1 Subkr 2 Subkr 3 N/A N/A YEAR 1
Disciplines/Skill Levels Contractor Composite
FBLR FBLR FBLR FBLR FBLR FBLR FBLR
Management
Senior Advisor V $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 1 COMPOSITE SUMMARY
Management
Senior Advisor V $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 2
AVERAGE Prime Subkr 1 Subkr 2 Subkr 3 N/A N/A YEAR 2
Disciplines/Skill Levels Contractor Composite
FBLR FBLR FBLR FBLR FBLR FBLR FBLR
Management
Senior Advisor V $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 2 COMPOSITE SUMMARY
Management
Senior Advisor V $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 3
AVERAGE Prime Subkr 1 Subkr 2 Subkr 3 N/A N/A YEAR 3
Disciplines/Skill Levels Contractor Composite
FBLR FBLR FBLR FBLR FBLR FBLR FBLR
Management
Senior Advisor V $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 3 COMPOSITE SUMMARY
Management
Senior Advisor V $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 4
AVERAGE Prime Subkr 1 Subkr 2 Subkr 3 N/A N/A YEAR 4
Disciplines/Skill Levels Contractor Composite
FBLR FBLR FBLR FBLR FBLR FBLR FBLR
Management
Senior Advisor V $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 4 COMPOSITE SUMMARY
Management
Senior Advisor V $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Aircrew Controller II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technician Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Admin
Clerical Specialist Entry $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program/Project Admin Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
IT
Media Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Media Specialist I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Illustrator I $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor
Instructor III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Instructor II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Training Specialist II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Repair
Avionics Technician III $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Avionics Technician II $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
YEAR 5
AVERAGE Prime Subkr 1 Subkr 2 Subkr 3 N/A N/A YEAR 5
Disciplines/Skill Levels Contractor Composite
FBLR FBLR FBLR FBLR FBLR FBLR FBLR
Management
Senior Advisor V $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Program Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Project Manager II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst
Analyst IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Analyst I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer
Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Engineer I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer IV $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Systems Engineer III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
TECH Support
Logistician II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Logistician I $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst III $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Technical Analyst II $ - 0
100% 0% 0% 0% 0% 0% 100%
$ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
Security…
This is the start of the file's text. The full file is on GovTribe.