B320_DRAWING_-_PAFP105.pdf
PDF 105 KB Posted
- Attached to
- Repair Base Fire Systems
- Solicitation number
- F8R3CE7177AW02-01
About this file
B320 DRAWING - 5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MASTER_Q&A_DOCUMENT.pdf | ||
| B320_DRAWING_-_PAFP101.pdf | ||
| B320_DRAWING_-_PAFP106.pdf | ||
| B320_DRAWING_-_PAFP102.pdf | ||
| B320_DRAWING_-_PAFP103.pdf | ||
| B320_DRAWING_-_PAFP104.pdf | ||
| B320_DRAWING_-_PAFP201.pdf | ||
| B258_Fire_Alarm_Control_panel__4.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__5.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__2.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__1.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__6.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__3.jpg | JPG image |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN CONNECTION ON DISCHARGE SIDE OF PUMPS 5 ft.
FLANGES ON THE SUCTION TANK TO THE UNDERGROUND
CONTRACTORS SCOPE IS FROM THE INLET/OUTLET
NFPA 24-1992, AND NFPA 37-1994.
REQUIREMENTS OF NFPA 20-1993, NFPA 13-1994,
THE ENTIRE INSTALLATION SHALL CONFORM TO ALL
PUMP HOUSE NOTES:
NOT TO SCALE
SECTION
8'
FIN. FLOOR
LINE (1-1/2")
JOCKEY PUMP DISCHARGE ROUTE DRAIN LINE TO TRENCH
TEST & DRAIN CONNECTION
SPRINKLERS
TO PUMPHOUSE
4"
13 8" GLOBE VALVE
GLOBE VALVE
OS & Y VALVE WITH TAMPER SWITCH
INDICATING BUTTERFLY VALVE
CHECK VALVE
ECCENTRIC REDUCER
CONCENTRIC INCREASER
RELIEF VALVE
RELIEF VALVE WASTE CONE
TEE
ELBOW
WATERFLOW SWITCH (VANE TYPE)
PUMP HOUSE LEGEND
VALVE (TYP. 3)
6" MAIN RELIEF
RELIEF CONE
6"x 10" CLOSED
FLOOR
FINISHED
TRENCH COVER
METAL GRATE
TRENCH BOTTOM
2'
PUMP ¡
SECTION
NOT TO SCALE
NOT TO SCALE
SECTION
8'
10"
8"
FLANGED TEE
10x10x6
12" DISCHARGE LINE
FIN. FLOOR
8" TEST LINE
PUMP ¡
PUMP EQUIPMENT LIST
O.S.&Y VALVE WITH TAMPER SWITCH
ECCENTRIC REDUCER (14x10) FLAT ON TOP
2000 GPM @ 125 PSI UL/FM DIESEL-DRIVEN FIRE PUMP
CONCENTRIC INCREASER (8x10)
6" RELIEF VALVE W/CLOSED WASTE CONE
10" CHECK VALVE
10" BUTTERFLY VALVE WITH TAMPER SWITCH
8" BUTTERFLY VALVE WITH TAMPER SWITCH
DIESEL FUEL STORAGE TANK (280 GAL. CAPACITY)
O.S.&Y VALVE (UNSUPERVISED)
20 GPM JOCKEY PUMP
1 " CHECK VALVE
AWAY FROM THE EXTERIOR WALL.
14 12" BUTTERFLY VALVE WITH TAMPER SWITCH
AFFF EQUIPMENT ROOM
SCALE: 1/4" = 1'-0"
AFFF TANK DETAIL
NOT TO SCALE
AFFF
PREACTION VALVE
(TYP.)
SUPPLY
OSCILLATING MONITOR NOZZLES
FLOW METER
DELUGE VALVE
NOT TO SCALE
FIRE SUPRESSION SYSTEMS RISER SCHEMATIC
PREACTION SYSTEMS
OVERHEAD AFFF
W/MANUAL OVERRIDE
CONCENTRATE VALVES
WATER POWERED AFFF
AFFF CONCENTRATE
(TYP.)
CONTROLLER
AFFF RATIO
F.P. WATER SUPPLY
W/ TAMPER SWITCH
POST INDICATOR VALVE
CONNECTION
TEST
SUPPORT AREA
WET PIPE SYSTEM EAST
ADMIN/SUPPORT AREAS
WET PIPE SYSTEM NORTH
SYSTEM RISER
WET PIPE
ALARM CHECK
PUMP HOUSE PLAN AND DETAILS
SCALE: 1/4"=1'-0"
12'8'4'2'0 1'
SCALE: 1/4" = 1'-0"
DIESEL FUEL TANK
SUPPLY (FILL)
LOCATED 8' AFF
STAINLESS STEEL
BALL VALVE
IN DROP (TYP)
SE
NS
IN
G
LIN
E (T
YP
B
RA
SS
FIRE PUMP 7CONTROLLER714
DIESEL ENGINE
PUMP
TRENCH SLOPE
„" PER FT.
8"
MU
FF
LE
R
BATTERIES
METAL
DIKE (TYP)
PUMP
DIESEL ENGINE
BATTERIES
MU
FF
LE
R
10"
FUEL
TANK
BIRD SCREEN
STAINLESS STEEL
TANK
FUEL
BIRD SCREEN
TRENCH SHALL CONNECT
TO A PIPE WHICH CONNECTS
TO THE EXT'G STORM DRAINAGE
SYSTEM (BY OTHERS)
14" DUCTILE IRON PIPE
FUEL LINE FILL CAPCONTROLLER
FIRE PUMP
CONTROLLER
JOCKEY PUMP
B
RA
SS
OVERHEAD DISCHARGE LINE (8' AFF)
12"
8"
OVERHEAD TEST LINE (8' AFF)
LINE LOCATED 7' AFF
2' WIDE OPEN TRENCH
WITH METAL GRATE
FIRE PUMP HOUSE PLAN
SCALE: 1/4" = 1'-0"
10"
FIRE LOOP
TO UNDERGROUND
W/ REMOVABLE ˆ"
WIRE MESH SCREEN
FROM THE SUCTION PIPE.
STEEL SUCTION TANK
200,000 GAL.
8" TEST RETURN / FILL LINE
SHALL DISCHARGE OVER THE TOP
AND ON THE OPPOSITE SIDE
2'-4" SQUARE
VORTEX PLATE
8" O
VE
RH
EA
D
TE
ST
L
IN
E (8
AF
F)
DIESEL ENGINE
PUMP
TRENCH 2'
DEEP THIS
END
MU
FF
LE
R
BATTERIES
8"
1 " JOCKEY PUMP DISCHARGE
JOCKEY PUMP
2'-4 AFF
BIRD SCREEN
STAINLESS STEEL
14"
TANK
FUEL
2"
TEST HEADER WITH
6 - 2 " HOSE VALVES
8"
6'-9"
AFF
FLOWMETER GAUGE
MOUNTED TO INSIDE WALL
AN
NU
BA
R
EL
EM
EN
T
4'-6" A.F.F.
6'-9" A.F.F.
VENT/FILL
BLADDER
BLADDER
DRAIN/FILL
CONCENTRATE
SUPPORT LEG (TYP)
OUTLET
AFFF FOAM
CONCENTRATE
DIAPHRAGM TANK
AFFF
SHELL
DRAIN
WATER
INLET
RELIEF
VALVE
BALL DRIP AT
LOW POINT
BUTTERFLY VALVE
IN DROP C L
3'-9" A.F.F.
FIRE PUMP
CONTROLLER
6" REDUCED PRESSURE
PRINCIPLE BACKFLOW
PREVENTER
2'
2'
INSTALL VALVES AT
TEE CONNECTION
2'
4JOCKEY PUMP SENSING
LINE CONNECTION (7' A.F.F.)
RRR
BALL DRIP
FP105
FP105
FP105
SHELL
VENT
TO FLOOR
DRAIN
RELIEF VALVE
FP105
VALVE (TYP.)
4"
TO
B
LA
DD
ER
TA
NK
N o.
TA
NK
N o.
TO
B
LA
DD
ER
2-1/2"
FROM FIRE PUMPS 14"
12"
12"
6"
BLADDER
TANK #1
TANK #2
BLADDER
6" 6" 6"
O.S.&Y CONTROL
VALVE (TYP.)
DRESSER-TYPE FLEXIBLE COUPLING
FP105
FP105
FP105
FP105
FP105
FP105
2'-4 AFF
9'
MI
N.
P
IP
E
LE
NG
TH
TY
P.
PUMP #2
PUMP #1
PUMP #3
FP105
8" DUCTILE IRON
PIPE FROM POTABLE
WATER SYSTEM
2'-6 A.F.F.
12" 10"
1.
2.
3. ALL COOLING WATER, RELIEF VALVE, PUMP PACKING,
WEEPAGE, TEST CONNECTIONS, AND OTHER DRAINS SHALL
BE PIPED TO THE DRAINAGE TRENCH.
14" DRESSER-TYPE FLEXIBLE COUPLING15
AF
FF
P
RE
AC
TIO
N
SY
ST
EM
N o.1
AF
FF
P
RE
AC
TIO
N
SY
ST
EM
N o.3
AF
FF
P
RE
AC
TIO
N
SY
ST
EM
N o.2
HO
SE
S
YS
TE
M
NO
ZZ
LES
AF
FF
M
ON
ITO
R
6"
6"12"
4"
6"
14" DUCTILE IRON
FROM FIRE PUMPS
12"
FOAM CONCENTRATE
SUPPLY TO AFFF
SYSTEMS2-1/2"
2-1/2"
2-1/2"
BLADDER
TANK #1 TANK #2
BLADDERFLOOR
DRAINDRAIN
FLOOR
RELIEF
VENT DRAIN
700 GALLON
CAPACITY
EACH TANK
TO EAST
SUPPORT AREAS
4"
BLADDER TANK
WATER SUPPLY
WET PIPE
SPRINKLER RISER
12"
12" BASKET
TYPE STRAINER
TO NORTH
ADMIN/SUPPORT
AREAS
3'-0"A.F.F.
AFFF SYSTEMS
CONTROL PANEL
SYSTEMS SUBPANEL
UV/IR DETECTION
O 'K O N
C O M P A N Y
R
EM
A R K S
D A
TE
N O
REVISIONS
PROJECT NO.: 9141
DATE:
CHECKED:
DRAWN:
SHEET NUMBER:
En gi ne er s/
D es ig ne rs
P ea ch tr ee S tr ee t N .E
Su it e
A tl an ta G eo rg ia
(4
5-
FU
EL
S
YS
TE
M S
M A
IN
TE
N A N C E D O C K
1s t A
IR
R
EF
U
EL
IN
G W
IN
G
P
IT
TS
B U R G H I N
TE
R N A
TI
O N A L A
IR
P O R T, P
A
P
EN
N
SY
LV
A N
IA
A
IR
N
A
TI
O N A L G U A R D
P R O
JE
C T
JL
SQ
12/5/94
FINAL SUBMITTAL
4"
SY
ST
EM
HO
SE
3'
TY
P.
6"
HEAT TRACING AND INSULATION
ON ALL LINES BETWEEN TANK
AND PUMP HOUSE BY OTHERS.
COUPLINGS TO BE SPACED
AS FAR APART AS POSSIBLE
Model
File details come from the government source that posted it. Updated .