B320_DRAWING_-_PAFP101.pdf
PDF 93 KB Posted
- Attached to
- Repair Base Fire Systems
- Solicitation number
- F8R3CE7177AW02-01
About this file
B320 DRAWING - 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MASTER_Q&A_DOCUMENT.pdf | ||
| B320_DRAWING_-_PAFP105.pdf | ||
| B320_DRAWING_-_PAFP104.pdf | ||
| B320_DRAWING_-_PAFP106.pdf | ||
| B320_DRAWING_-_PAFP102.pdf | ||
| B320_DRAWING_-_PAFP103.pdf | ||
| B320_DRAWING_-_PAFP201.pdf | ||
| B258_Fire_Alarm_Control_panel__4.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__5.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__2.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__1.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__6.jpg | JPG image | |
| B258_Fire_Alarm_Control_panel__3.jpg | JPG image |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24'16'8'4'0 1'2'
SCALE: 1/8" = 1'-0"
SCALE: 1/8"=1'-0"
NOZZLES AND HOSE STATIONS
FIRE PROTECTION PLAN - OSCILLATING MONITOR
H2
N2
N3
N
WATER MOTOR GONG
OSCILLATING MONITOR NOZZLE
PREACTION VALVE & RISER (SIDE)
LEGEND
SYSTEM WATER VALVE & RISER (PLAN)
O.S.& Y. VALVE OR INDICATING BUTTERFLY VALVE (N.O.)
SELF CONTAINED AFFF HOSE & REEL
AFFF SYSTEM TEST HEADER
WATER POWERED AFFF CONCENTRATE VALVE
DELUGE SYSTEM WATER VALVE & RISER (SIDE)
AFFF RATIO CONTROLLER
FLOW METER
CHECK VALVE (ARROW INDICATES DIRECTION OF FLOW)
BASKET STRAINER (PLAN AND SIDE)
WET PIPE SPRINKLER VALVE & RISER (SIDE)
FIRE DEPARTMENT CONNECTION
WATERFLOW SWITCH (VANE TYPE)
SWING CHECK VALVE WITH RESILIENT SEAT
MANUAL RELEASE STATION - AFFF MONITOR NOZZLE SYSTEM
R
O.S.& Y. VALVE OR INDICATING BUTTERFLY VALVE (N.C.)
WATERFLOW SWITCH (PRESSURE TYPE)
RATE COMPENSATION TYPE HEAT DETECTOR
PREACTION SYSTEMS.
OVERHEAD PREACTION SYSTEM OF THE AFFECTED ZONE AND
SUPPLEMENTARY LOW LEVEL AFFF AUTOMATIC OSCILLATING MONITOR NOZZLES.
THE SYSTEMS SHALL BE DESIGNED & INSTALLED AS PER NFPA 11, 13, 16A
AND 409 AS MODIFIED HEREIN AND BY SPECIFICATIONS.
GENERAL NOTES:
HANGAR AREA INCLUDING HANGAR DOOR POCKETS SHALL BE PROTECTED
BY OVERHEAD AFFF AUTOMATIC PREACTION SPRINKLER SYSTEMS.
IN ADDITION TO OVERHEAD AFFF PREACTION SPRINKLER SYSTEMS, THE
HANGAR FLOOR AREA BENEATH THE AIRCRAFT SHALL BE PROTECTED BY
1.
THE ADMINISTRATION AREA AND ALL OTHER AREAS OF HANGAR
FACILITY NOT PROVIDED WITH OVERHEAD AFFF SPRINKLER SYSTEMS
SHALL BE PROVIDED WITH AUTOMATIC WET PIPE SPRINKLER
SYSTEMS. THE SYSTEMS SHALL BE DESIGNED AND INSTALLED PER
NFPA 13.
2.
AUTOMATIC FIRE DETECTION AND CONTROL SYSTEMS SHALL BE
PROVIDED FOR EACH AFFF SYSTEM AS SHOWN AND AS SPECIFIED.
3.
THE SYSTEM SEQUENCE OF OPERATION SHALL BE AS FOLLOWS:
ANY OVERHEAD HEAT DETECTOR WILL ACTIVATE THE HANGAR
THE OSCILLATING MONITOR NOZZLE SYSTEM.
4.
ANY TWO UV/IR OPTICAL DETECTORS WILL ACTIVATE THE
HANGAR OSCILLATING MONITOR NOZZLES BUT NOT THE OVERHEAD
ANY AFFF WATERFLOW SWITCH, WHEN ACTIVATED
WILL OPERATE THE MOTOR-OPERATED DRAIN VALVE DIVERTING
AFFF SOLUTION DRAINAGE AWAY FROM THE SEWERAGE SYSTEM.
EACH DELUGE, PREACTION AND ALARM CHECK VALVE SHALL BE
PROVIDED WITH A PRESSURE-TYPE WATERFLOW SWITCH. THE WET
EACH CONTROL VALVE 2-1/2" AND LARGER IN SIZE SHALL BE
PROVIDED WITH A VALVE TAMPER SWITCH.
5.
6.
TANK SIZE SPACED ON THE SPECIFIC REQUIREMENTS OF THE FOAM
7.
THE CONTRACTOR SHALL PERFORM FINAL CALCULATIONS AND SELECT
SCHEDULES IS APPROXIMATE BASED ON PRELIMINARY CALCULATIONS.
THE CAPACITY OF THE BLADDER TANKS SHOWN ON THE
FP101
A.
B.
C.
PIPE SYSTEMS SHALL ADDITIONALLY BE PROVIDED WITH VANE-TYPE
WATERFLOW SWITCHES AS INDICATED.
EQUIPMENT MANUFACTURER SELECTED.
THE SPECIFIC REQUIREMENTS OF THE FOAM EQUIPMENT MANUFACTURER
SHALL BE FOLLOWED IN POSITIONING THE RATIO CONTROLLERS.
APPROPRIATE DISTANCES FROM UPSTREAM AND DOWNSTREAM VALVES,
FITTINGS AND OTHER COMPONENTS.
8.
THE AFFF SYSTEMS AND WET PIPE SPRINKLER SYSTEMS SHALL BE
HYDRAULICALLY CALCULATED BASED ON SIMULTANEOUS OPERATION
OF FIRE PUMPS 2 & 3 WITH 10 FEET OF WATER IN THE SUCTION TANK.
THE CONTRACTOR SHALL MAINTAIN A MINIMUM 10 PSI SAFETY MARGIN
BELOW THE COMBINED PUMP CURVE AT THE TOTAL FLOW DEMAND.
9.
ALL HYDRAULIC CALCULATIONS SHALL BE PREFORMED USING THE ASSUMPTION
THAT THE DEMAND OF 500 GPM IS SUPPLIED FROM THE BASE POTABLE
WATER SYSTEM.
10.
FP105
FP104
FP104
OVERHEAD
PREACTION
HOSE SYSTEM
MONITOR
NOZZLES
14" DUCTILE IRON
PIPE FROM FIRE
PUMP HOUSE
H3
N1
H1
84' RADIUS
65° ARC
84' RADIUS
65° ARC
60' RADIUS
80° ARC
100' OF 1-1/2" HOSE ON CONTINUOUS
FLOW REEL WITH SELF CONTAINED
36 GALLON FOAM CONCENTRATE
BLADDER TANK (TYP. OF 3)
FP104 VALVE TAMPER SWITCH
RECESSED PENDENT SPRINKLER HEAD
UPRIGHT HEAD
BLADDER TANK
WET-PIPE SYSTEM
F.1
5.7
B.5
B.1
7.3
6.7
8.1
5.9
A.5
6.1
H
7.4
6.9
5.3
A.9A B B.3
B.8
C D E F
F.3
G.5
GF.6
F.7
O 'K O N
C O M P A N Y
R
EM
A R K S
D A
TE
N O
REVISIONS
PROJECT NO.: 9141
DATE:
CHECKED:
DRAWN:
SHEET NUMBER:
En gi ne er s/
D es ig ne rs
P ea ch tr ee S tr ee t N .E
Su it e
A tl an ta G eo rg ia
(4
5-
FU
EL
S
YS
TE
M S
M A
IN
TE
N A N C E D O C K
1s t A
IR
R
EF
U
EL
IN
G W
IN
G
P
IT
TS
B U R G H I N
TE
R N A
TI
O N A L A
IR
P O R T, P
A
P
EN
N
SY
LV
A N
IA
A
IR
N
A
TI
O N A L G U A R D
P R O
JE
C T
JL
SQ
12/5/94
FINAL SUBMITTAL
UPRIGHT HEAD ON RISER NIPPLE
1 1/2"
2"
4"
6"
1 1/2"
4"
2" 6"
2" 6"
2" 6"
2" 6"
1 1/2"
4"
2 1/2"
Model
File details come from the government source that posted it. Updated .