Master_Utility_Outage.pdf
PDF 614 KB Posted
- Attached to
- Construct Addition to Corrosion Control Facility Bldg 180 Federal contract opportunity
- Solicitation number
- F3QCCL6062A003
About this file
Master Utility Outage
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_17_Jun_2016_-_Specifications_130401_-_Volume_2_of_2.pdf | ||
| FA8501-16-R-0013-0003.pdf | ||
| Revised_17_Jun_2016_-_Specifications_130401_-_Volume_1_of_2.pdf | ||
| Amendment_2_130401.pdf | ||
| RFI_Questions_and_Answers_Bldg_180_.docx | DOCX document | |
| Amendment_for_Bldg_180.pdf | ||
| RFI_Questions_and_Answers_for_Bldg_180__3.docx | DOCX document | |
| RFI_Questions_and_Answers_Bldg_180__2.docx | DOCX document | |
| UHHZ130401_Contractors_Site_Visit_Attendees.pdf | ||
| RFI's_and_Answers_for_Bldg_180.docx | DOCX document | |
| Form_2519_-_Welding_ _Safety_Checklist.doc | DOC document | |
| Special_Warranty_Requirements.doc | DOC document | |
| App_C_UHHZ_130401.pdf | ||
| 11-Mar-2016_Wage_Determination.pdf | ||
| Govt._Project_Time_Estimate_Sheet.xlsx | XLSX spreadsheet | |
| FA8501-16-R-0013.pdf | ||
| Half_Size_Drawings.pdf | ||
| Specifications_Vol._1_of_2.pdf | ||
| Specifications_Vol._2_of_2.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UTILITY OUTAGE REQUEST
DATE:
CHECK OUTAGE TYPE: Electrical Water Steam Chilled Water Other
IF OTHER, EXPLAIN:
FACILITY NUMBER(S):
FACILITY MANAGER SIGNATURE AND ANY REQUIRED USER COORDINATION
LABOR RELATIONS COORD REQUIRED: YES NO
(DATE) AT REQUEST OUTAGE BEGINNING:
SIGNATURE:
ENDING ON: (DATE) AT (TIME)
REASON FOR
OUTAGE:
REQUESTER:
PROJECT NUMBER:
COMPANY:
PHONE NUMBER:
PROJECT/CONTRACT MONITOR NAME:
PHONE NUMBER:
SHOP COORDINATION Facilities Super Infrastructure Super Utilities Super INITIAL AS NEEDED Alarms Industrial Mechanical Utilities
Interior HVAC Fire Dept Exterior Zone 1 Other Power Production
78 CES/CEPC (SERVICE CALL MUST COORDINATE ON ALL OUTAGES AND RECEIVE A COPY OF
SIGNED OUTAGE REQUEST)
OUTAGE IS APPROVED/DISAPPROVED:
This form effective 03/17/2006
(TIME) AND
78 CES/CL
After electronically completing top portion of form, print for coordination initials and approval signature.
UTILITY OUTAGE REQUEST
DATE:
CHECK OUTAGE TYPE:
IF OTHER, EXPLAIN:
FACILITY NUMBER(S):
FACILITY MANAGER SIGNATURE AND ANY REQUIRED USER COORDINATION
LABOR RELATIONS COORD REQUIRED:
YES
NO
(DATE) AT
REQUEST OUTAGE BEGINNING:
SIGNATURE:
ENDING ON:
(DATE) AT
(TIME)
REASON FOR
OUTAGE:
REQUESTER:
PROJECT NUMBER:
COMPANY:
PHONE NUMBER:
PROJECT/CONTRACT MONITOR NAME:
PHONE NUMBER:
SHOP COORDINATION
Facilities Super Infrastructure Super Utilities Super
INITIAL AS NEEDED
Alarms Industrial Mechanical Utilities Interior
HVAC
Fire Dept Exterior Zone 1 Other Power Production
78 CES/CEPC
(SERVICE CALL MUST COORDINATE ON ALL OUTAGES AND RECEIVE A COPY OF
SIGNED OUTAGE REQUEST)
OUTAGE IS APPROVED/DISAPPROVED:
This form effective 03/17/2006
(TIME) AND
78 CES/CL
After electronically completing top portion of form, print for coordination initials and approval signature.
UTILITY OUTAGE REQUEST
Preferred Customer Normal.dot william.fowler Microsoft Office Word
3/10/2006 1:32:00 PM
3/10/2006 1:30:00 PM
3/10/2006 1:32:00 PM
Dell Computer Corporation 28672
| : |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox2: 0 |
| CheckBox1: 0 |
| CheckBox1: 0 |
| PrintButton1: |
File details come from the government source that posted it. Updated .