Form_2519_-_Welding_ _Safety_Checklist.doc

DOC document 35 KB Posted

Attached to
Construct Addition to Corrosion Control Facility Bldg 180 Federal contract opportunity
Solicitation number
F3QCCL6062A003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Welding and Safety

View the file

Other files for this federal contract opportunity

Other files attached to Construct Addition to Corrosion Control Facility Bldg 180, newest first.
File Type Posted
Revised_17_Jun_2016_-_Specifications_130401_-_Volume_2_of_2.pdf PDF
FA8501-16-R-0013-0003.pdf PDF
Revised_17_Jun_2016_-_Specifications_130401_-_Volume_1_of_2.pdf PDF
Amendment_2_130401.pdf PDF
RFI_Questions_and_Answers_Bldg_180_.docx DOCX document
Amendment_for_Bldg_180.pdf PDF
RFI_Questions_and_Answers_for_Bldg_180__3.docx DOCX document
RFI_Questions_and_Answers_Bldg_180__2.docx DOCX document
UHHZ130401_Contractors_Site_Visit_Attendees.pdf PDF
RFI's_and_Answers_for_Bldg_180.docx DOCX document
Special_Warranty_Requirements.doc DOC document
Master_Utility_Outage.pdf PDF
Specifications_Vol._1_of_2.pdf PDF
Specifications_Vol._2_of_2.pdf PDF
App_C_UHHZ_130401.pdf PDF
11-Mar-2016_Wage_Determination.pdf PDF
Govt._Project_Time_Estimate_Sheet.xlsx XLSX spreadsheet
FA8501-16-R-0013.pdf PDF
Half_Size_Drawings.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALL PURPOSE CHECKLIST

PAGE 1 of 1 PAGES

UHHZ 130401 Addition/Alterations to Aircraft Corrosion Control Facility, Building #180
OPR

DATE

WELDING & CUTTING SAFETY

References: a. AFISC/SE Msg 192000Z Dec 85, ALSAFECOM 001/1985 Welding & Cutting Safety

b. AFLC/ISC Msg 201830Z 0001/1985 Welding & Cutting Safety

c. 78 CEG/CEF Ltr 27 Jan 86, ALSFECOM 001/1985 Welding & Cutting Safety Message

ENGINEERING

1. Has the project been reviewed to insure that the cutting, welding or brazing required or allowed in the project is necessary for technical or economical reasons in lieu of a safe method?

YES

NA ____

Signatures:

2. Are specific required precautions that are over and above those required by the General Requirements (Section 1A) and by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1) adequately covered in the design documents? YES

NA _____

3. Are requirements for welder testing or certification specified in the project documents? YES

NA _____

4. Have all Safety, Health and Fire comments been satisfactorily addressed? Have they signed the project drawings when required?

YES _____

NA _________

CONSTRUCTION MANAGEMENT

5. Have specified and general precautions for cutting and welding safety been covered at the preconstruction conference?

YES

NA _________

6. Is the contractor's welder properly certified and knowledgeable of the materials and facility hazards involved in his work?

YES

NA __________

7. For any change in the contract that involves cutting or welding, has it been coordinated with the project engineer and all necessary Safety, Health of Fire agencies?

8. Was fire prevention inspection performed by the welding permit issuing authority (CEF) at the job site? Is all required protective equipment in place?

ON-SITE SUPERVISOR

9. Are you, the on-site Air Force and/or contractor supervisor, fully aware of fire safety prevention requirements? If the on-site supervisor is a replacement or was not in attendance at the preconstruction conference, has he been briefed on fire prevention and safety requirements prior to welding or cutting?

YES

AF FORM 2519 - Alternate 10 Jun 2002