UHHZ_060184_-_Special_Standards_of_Responsibility.pdf

PDF 69 KB Posted

Attached to
Demolition BLDG 181 (Cells 1 ~ 8)
Solicitation number
F3Q2AD5096A001
Issued by

About this file

Special Standards of Responsibility (SSR)

View the file

Other files

File Type Posted
F3Q2AD5096A001_FA8501-15-B-0001_Bid_attendee_list.pdf PDF
F3Q2AD5096A001_FA8501-15-B-0001_Bid_Abstract_SF1419.pdf PDF
RFI_Questions_Answers_(3).pdf PDF
RFI_Questions_(2).docx DOCX document
FA8501-15-B-0001-0003.pdf PDF
RFI_Questions_(2).docx DOCX document
UHHZ060184_B181_Proj_Dwgs_Binder_20150713.pdf PDF
FA8501-15-B-0001-0002.pdf PDF
UHHZ060184_B181_Proj_Specs_Binder_20150713.pdf PDF
FA8501-15-B-0001-0001.pdf PDF
Site_Visit_Registration_bldg_181_Demo.xlsx XLSX spreadsheet
UHHZ_060184_-_Submittal_Register.pdf PDF
FINAL_Landscape_Guidelines_3-15-2011.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__8_of_8.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__1_of_8.pdf PDF
FA8501-15-B-0001_IFB.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__7_of_8.pdf PDF
B181_Project_Drawings_2_of_3.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__3_of_8.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__5_of_8.pdf PDF
B181_Project_Drawings_3_of_3.pdf PDF
01560C_Standard_Robins_ESPCP_Template_-_Contractor_to_Fill_Out.doc DOC document
B181_Project_Drawings__1_of_3.pdf PDF
UHHZ_060184_-_Project_Specifications.pdf PDF
BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__2_of_8.pdf PDF
UHHZ_060184_-_Bid_Schedule.pdf PDF
Wage_Determination_GA152.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__4_of_8.pdf PDF
01560F_NPDES_NOT_Stormwater_Permittee_-_Contractor_to_Fill_Out.doc DOC document
UHHZ_060184_-_App_C.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__6_of_8.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Special Standards of Responsibility

Researched 8a’s submit a proposal to meet the following criteria:

1. The Contractor shall have Hazardous Waste Operations and Emergency Response (HAZWOPER) certification for removal of hazardous waste and universal waste.

Acceptable Documentation: Provide verification employment with Prime Provide copy of individual’s HAZWOPER Certification

2. The Contractor shall be in compliance with Georgia Soil and Water Conservation Commission requirements for Level II Certification for preparation of permit documents and inspections.

Acceptable Documentation: Provide verification employment with Prime Provide copy of individual’s Level II Certification

3. The Contractor shall be in compliance with Georgia Soil and Water Conservation Commission requirements for a person with Level 1A certification to be on-site DURING all periods of land disturbing activity.

Acceptable Documentation: Provide verification employment with Prime Provide copy of individual’s Level 1A Certification

File details come from the government source that posted it. Updated .