FA8501-15-B-0001-0002.pdf

PDF 36 KB Posted

Attached to
Demolition BLDG 181 (Cells 1 ~ 8)
Solicitation number
F3Q2AD5096A001
Issued by

About this file

Amendment 0002 (Updated material and Bid Opening date 24 July 2015 at 2pm EST)

View the file

Other files

File Type Posted
F3Q2AD5096A001_FA8501-15-B-0001_Bid_attendee_list.pdf PDF
F3Q2AD5096A001_FA8501-15-B-0001_Bid_Abstract_SF1419.pdf PDF
RFI_Questions_Answers_(3).pdf PDF
RFI_Questions_(2).docx DOCX document
FA8501-15-B-0001-0003.pdf PDF
RFI_Questions_(2).docx DOCX document
UHHZ060184_B181_Proj_Dwgs_Binder_20150713.pdf PDF
UHHZ060184_B181_Proj_Specs_Binder_20150713.pdf PDF
FA8501-15-B-0001-0001.pdf PDF
Site_Visit_Registration_bldg_181_Demo.xlsx XLSX spreadsheet
UHHZ_060184_-_Submittal_Register.pdf PDF
FINAL_Landscape_Guidelines_3-15-2011.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__8_of_8.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__1_of_8.pdf PDF
FA8501-15-B-0001_IFB.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__7_of_8.pdf PDF
B181_Project_Drawings_2_of_3.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__3_of_8.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__5_of_8.pdf PDF
B181_Project_Drawings_3_of_3.pdf PDF
UHHZ_060184_-_Special_Standards_of_Responsibility.pdf PDF
01560C_Standard_Robins_ESPCP_Template_-_Contractor_to_Fill_Out.doc DOC document
B181_Project_Drawings__1_of_3.pdf PDF
UHHZ_060184_-_Project_Specifications.pdf PDF
BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__2_of_8.pdf PDF
UHHZ_060184_-_Bid_Schedule.pdf PDF
Wage_Determination_GA152.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__4_of_8.pdf PDF
01560F_NPDES_NOT_Stormwater_Permittee_-_Contractor_to_Fill_Out.doc DOC document
UHHZ_060184_-_App_C.pdf PDF
UHHZ_060184_-_Appendices_(Reports)_Attachment__6_of_8.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3Q2AD5096A002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:1) Incorporate revised Specif ications, update draw ings and remove the bid schedule from the Liist of Attachments. NOTE: The bid amount shall be entered into the Schedule B CLIN 0001 and submitted w ith the signed BID. 2) Revise clauses 252.219-7009 and 52.232-27.

NOTE: **Emailed bids w ill not be accepted. The bid opening w ill occur on 24 Jul 2015, 2:00PM EST.

Bid Opening w ill be located in the Rotunda Eagle Building by the F15 Static Display at the Robins AFB Museum of Aviation at 2:00pm (EST) on 24 July 2015. Directions can be found at w w w .museumofaviation.org. Bids can be brought to this location approximately one hour prior up to bid opening. At 2:00pm (EST) on 24 July 2015 Bid opening shall begin and no further bids w ill be accepted. Ensure your Sealed bid includes the signed IFB (acknow ledging amendments), bid amount (on Section B), completed Reps/Certs, completed clause 252.209-7992 and original bid bond. Optional bid submissions still applies up to 1:00 PM (EST) 24 Jul 2015.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8501-15-B-0001

X 9B. DATED (SEE ITEM 11)

09-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2015

CODE

AFSC/PZIOC

INFRASTRUCTURE SUPPORT

375 PERRY STREET

BLDG 255

ROBINS AFB GA 31098-1672

FA8501 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8501-15-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been added by reference:

52.232-27 Prompt Payment for Construction Contracts MAY 2014

The following have been modified:

252.219-7009 SECTION 8(A) DIRECT AWARD (SEP 2007)

(a) This contract is issued as a direct award between the contracting office and the 8(a) Contractor pursuant to the Partnership Agreement between the Small Business Administration (SBA) and the Department of Defense.

Accordingly, the SBA, even if not identified in Section A of this contract, is the prime contractor and retains responsibility for 8(a) certification, for 8(a) eligibility determinations and related issues, and for providing counseling and assistance to the 8(a) Contractor under the 8(a) Program. The cognizant SBA district office is:

To be filled in at award

(b) The contracting office is responsible for administering the contract and for taking any action on behalf of the Government under the terms and conditions of the contract; provided that the contracting office shall give advance notice to the SBA before it issues a final notice terminating performance, either in whole or in part, under the contract. The contracting office also shall coordinate with the SBA prior to processing any novation agreement. The contracting office may assign contract administration functions to a contract administration office.

(c) The 8(a) Contractor agrees that--

(1) It will notify the Contracting Officer, simultaneous with its notification to the SBA (as required by SBA's 8(a) regulations at 13 CFR 124.308), when the owner or owners upon whom 8(a) eligibility is based plan to relinquish ownership or control of the concern. Consistent with Section 407 of Pub. L. 100-656, transfer of ownership or control shall result in termination of the contract for convenience, unless the SBA waives the requirement for termination prior to the actual relinquishing of ownership and control; and

(2) It will not subcontract the performance of any of the requirements of this contract without the prior written approval of the SBA and the Contracting Officer.

(End of Clause)

The following have been deleted:

52.232-27 Prompt Payment for Construction Contracts MAY 2014

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 UHHZ 060184 Project

Specifications

631 14-MAY-2015

Attachment 10 01560F NPDES NOT Stormwater Permittee

6 01-MAR-2011

Attachment 11 FINAL Landscaping Guidelines

32 15-MAR-2011

Attachment 12 UHHZ 060184 Bid Schedule

1 28-APR-2015

Attachment 13 UHHZ 060184 Special Standards of Responsibility

1 14-MAY-2015

Attachment 14 Wage Determination

GA152

5 30-JAN-2015

Attachment 2 060184 B181 Project Drawings

98 27-MAR-2015

Attachment 3 UHHZ 060184 Appendices (Reports)

5267 03-APR-2015

Attachment 4 Base Facility Standards

REV23

440 23-JUN-2014

Attachment 5 Appendix C 14 18-MAY-2012 Attachment 6 UHHZ 060184 Submittal

Register

1 02-APR-2015

Attachment 7 01560C Standard Robins ESPCP Template

75 31-MAR-2015

Attachment 8 01560D GAEPD ESCP Checklist

8 01-DEC-2011

Attachment 9 01560E NPDES NOI Stormwater Primary Permittee

6 01-MAR-2011

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 UHHZ060184 B181 Proj

Specs Binder 20150713

581 13-JUL-2015

Attachment 10 01560F NPDES NOT Stormwater Permittee

6 01-MAR-2011

Attachment 11 FINAL Landscaping Guidelines

32 15-MAR-2011

Attachment 12 UHHZ 060184 Special Standards of Responsibility

1 14-MAY-2015

Attachment 13 Wage Determination

GA152

5 30-JAN-2015

Attachment 14 UHHZ060184 B181 Proj Dwgs Binder 20150713

49 13-JUL-2015

Attachment 2 060184 B181 Project Drawings

98 27-MAR-2015

Attachment 3 UHHZ 060184 Appendices (Reports)

5267 03-APR-2015

Attachment 4 Base Facility Standards

REV23

440 23-JUN-2014

Attachment 5 Appendix C 14 18-MAY-2012 Attachment 6 UHHZ 060184 Submittal

Register

1 02-APR-2015

Attachment 7 01560C Standard Robins ESPCP Template

75 31-MAR-2015

Attachment 8 01560D GAEPD ESCP Checklist

8 01-DEC-2011

Attachment 9 01560E NPDES NOI Stormwater Primary Permittee

6 01-MAR-2011

(End of Summary of Changes)

File details come from the government source that posted it. Updated .