This is a Bid Price Sheet (Exhibit G) for the Van Avenue Seawall Project (25-B-104IF, Revision 1) in Daytona Beach Shores, Florida, a FEMA-funded Hurricane Nicole dune walkover repair project. The project scope includes mobilization and demobilization, construction and as-built survey, environmental compliance, temporary traffic control, demolition and disposal, excavation and grading, imported beach-quality fill (100 cubic yards), concrete sidewalk installation (32 square yards), UC-95 composite sheet pile installation (38 linear feet), concrete caps (44 linear feet), concrete plugs (2 each), helical anchors (4 each), aluminum fence (29 linear feet), aluminum railing (65 linear feet), and site restoration with Bahia sod (60 square yards). The project addresses significant damage sustained during the 2022 hurricane season to the Van Avenue Beach Approach Park, replacing the damaged concrete seawall with UC-95 composite panels to protect upland park facilities and restore safe public access to the Volusia County Beach.

The bid price sheet contains 15 line items with unit pricing for each component, though all unit prices are currently listed as zero dollars, indicating this is a template document awaiting contractor pricing submissions. The sheet includes provisions for subtotal bid price, payment and performance bond costs, and a total bid price inclusive of bonding. Bidders are required to submit pricing for all line items in both contractor's cost and FEMA-funded columns. The project is entirely FEMA-funded, reflecting disaster recovery assistance for hurricane damage restoration at this public beach park facility in Florida.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1 Exhibit G - Bid Price Sheet 25-B-104IF - REVISION 1 Hurricane Nicole Dune Walkover Repairs - Van Ave.

Contractor's Cost
ITEM No.DESCRIPTIONQUANTITYUNITPRICE / UNITPRICE
FEMA Funded
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction and As-Built Survey1LS$ - 0$ - 0
3Environmental Compliance1LS$ - 0$ - 0
4Temporary Traffic Control1LS$ - 0$ - 0
5Demolition, Hauling and Disposal1LS$ - 0$ - 0
6Excavation, Grading, and Compaction1LS$ - 0$ - 0
7Imported Beach Quality Fill100CY$ - 0$ - 0
86" Concrete Sidewalk32SY$ - 0$ - 0
9CMI UC-95 Composite Sheet Pile38LF$ - 0$ - 0
10Concrete Cap44LF$ - 0$ - 0
11Concrete Plug2EA$ - 0$ - 0
12Helical Anchors4EA$ - 0$ - 0
13Aluminum Fence29LF$ - 0$ - 0
14Aluminum Railing65LF$ - 0$ - 0
15Site Restoration Bahia Sod60SY$ - 0$ - 0
Subtotal Bid Price$ - 0
Payment and Performance Bond$ - 0
Total Bid Price (inclusive of Payment and Performance Bond)$ - 0
LS=Lump Sum; LF= Linear Foot; CY=Cubic Yard; SY= Square Yard; SF= Square Foot; EA= Each; TN=Ton