EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE.pdf
PDF 584 KB Posted
- Attached to
- Purchase of 4 Stake Bed Trucks
- Solicitation number
- DR141429
- Issued by
- California
About this file
This is a Work-Completion/Deliverable Schedule exhibit for a state or local contract that establishes milestone completion dates and associated liquidated damages. The document is structured as a template for defining up to six major contract milestones, with each milestone specified as a number of calendar days after the effective start date of the contract. The contractor is required to furnish sufficient forces, facilities, equipment, and materials necessary to complete each deliverable, including provisions for extra shifts and overtime operations as needed to meet the scheduled milestones.
The exhibit includes a placeholder for establishing a daily liquidated damages amount that applies to the contractor's failure to meet any or all milestones. The specific milestone descriptions, calendar day counts for completion, and the per-day damages amount are left blank in this template, indicating these terms are to be completed during contract negotiation or award. This document serves as the framework for performance accountability and scheduling enforcement for the contracted work or deliverables.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - WORK-COMPLETION / DELIVERABLE SCHEDULE
Contractor shall furnish sufficient forces, facilities equipment and materials necessary along with such hours, including extra shifts and overtime operations, so as to prosecute the Work/Deliverable to completion in accordance with the following major Contract dates:
* The maximum liquidated damages for which the Contractor shall be liable shall be $________ per day for failure to meet any or all Milestones.
Work / Deliverable Schedule
Description Schedule Liquidated
Damages Amount Per Calendar Day*
No. 1 ______ calendar days after effective start date of .
No. 2 ______ calendar days after effective start date of .
No. 3 ______ calendar days after effective start date of .
No. 4 ______ calendar days after effective start date of .
No. 5 ______ calendar days after effective start date of .
No. 6 ______ calendar days after effective start date of .
| Text1: |
| Text2: |
| ComboBox3: [Contract] |
| Text4: |
| Text5: |
| Text6: |
| ComboBox7: [Contract] |
| Text8: |
| Text9: |
| Text10: |
| ComboBox11: [Contract] |
| Text12: |
| Text13: |
| Text14: |
| ComboBox15: [Contract] |
| Text16: |
| Text17: |
| Text18: |
| ComboBox20: [Contract] |
| Text21: |
| Text22: |
| Text23: |
| ComboBox24: [Contract] |
| Text25: |
| Text26: |
File details come from the government source that posted it. Updated .