EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE.pdf
PDF 584 KB Posted
- Attached to
- Thirty-Five (35) Electric Carts
- Solicitation number
- DR141431
- Issued by
- California
About this file
This is an Exhibit C Work-Completion/Deliverable Schedule template for a state or local government contract. The document establishes the framework for contractor performance timelines and associated penalties for non-compliance. The exhibit requires contractors to provide sufficient forces, facilities, equipment, and materials—including extended shifts and overtime operations as necessary—to complete work and deliverables according to specified major contract milestones. The schedule accommodates up to six distinct work or deliverable items, with each milestone defined by a number of calendar days after the effective start date of the contract.
The document specifies liquidated damages provisions to incentivize on-time performance, with a daily penalty amount to be determined for failure to meet any or all milestones. The exhibit is a blank template with unfilled fields for the specific number of calendar days for each milestone, descriptions of work items, and the dollar amount of daily liquidated damages. The actual contract details, milestone descriptions, timeframes, and financial penalties would be populated during contract development based on the specific requirements of the procurement opportunity. This standardized format allows flexibility for various contract types while maintaining consistent scheduling and performance accountability mechanisms.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT C - WORK-COMPLETION / DELIVERABLE SCHEDULE
Contractor shall furnish sufficient forces, facilities equipment and materials necessary along with such hours, including extra shifts and overtime operations, so as to prosecute the Work/Deliverable to completion in accordance with the following major Contract dates:
* The maximum liquidated damages for which the Contractor shall be liable shall be $________ per day for failure to meet any or all Milestones.
Work / Deliverable Schedule
Description Schedule Liquidated
Damages Amount Per Calendar Day*
No. 1 ______ calendar days after effective start date of .
No. 2 ______ calendar days after effective start date of .
No. 3 ______ calendar days after effective start date of .
No. 4 ______ calendar days after effective start date of .
No. 5 ______ calendar days after effective start date of .
No. 6 ______ calendar days after effective start date of .
| Text1: |
| Text2: |
| ComboBox3: [Contract] |
| Text4: |
| Text5: |
| Text6: |
| ComboBox7: [Contract] |
| Text8: |
| Text9: |
| Text10: |
| ComboBox11: [Contract] |
| Text12: |
| Text13: |
| Text14: |
| ComboBox15: [Contract] |
| Text16: |
| Text17: |
| Text18: |
| ComboBox20: [Contract] |
| Text21: |
| Text22: |
| Text23: |
| ComboBox24: [Contract] |
| Text25: |
| Text26: |
File details come from the government source that posted it. Updated .