Exhibit_B-_Sample_Work_Order.pdf

PDF 622 KB Posted

Attached to
Wastewater Pump Station R & R
Solicitation number
CC-7100-26/HSM (A)
Issued by
Seminole County, Florida

About this file

This is a sample work order form template for the Seminole County Board of County Commissioners Construction Master Service Agreement. The document establishes the framework for issuing individual work orders under an existing master agreement for construction projects. The work order incorporates by reference multiple exhibits including the Scope of Services/Specifications, Pricing/Proposal/Fee Schedule, Drawing Plans, and Supplemental Conditions. Contractors must substantially complete assigned work within a specified number of calendar days from the Notice to Proceed date, with final completion required within an additional specified period. Failure to meet the completion schedule subjects the contractor to liquidated damages assessed at a daily rate or potential termination of the work order and master agreement for cause.

The work order specifies that the county will compensate the contractor a stated amount for satisfactory work completion, with payments made in accordance with contract documents and subject to a five percent retainage withholding. The template requires signature by both county and contractor representatives, with authorization documented by Seminole County Administrative Code Section 3.554. The related wastewater pump station repair and refurbishment project (CC-7100-26/HSM) requires qualified contractors with a minimum of eight municipal pump station projects completed within the past five years, including five rehabilitation projects and three new construction projects, with demonstrated experience across all eighteen defined scopes of work. Contractors must have been in business continuously for at least three years and are required to provide detailed project narratives demonstrating relevant experience.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION MSA WORK ORDER #WO #

Seminole County, Florida Board of County Commissioners

Master Agreement No. Click to enter text Dated: Click to enter date Master Agreement Title: Click or tap here to enter text Project Title: Click or tap here to enter text

Contractor: Contractor Name Address: Contractor Address

City/State/Zip

ATTACHMENTS TO THIS WORK ORDER:

☐ EXHIBIT A - Scope of Services/Specifications ☐EXHIBIT D - Supplemental Conditions ☐ EXHIBIT B - Pricing/Proposal/Fee Schedule ☐EXHIBIT E - ☐ EXHIBIT C - Drawing Plans

Attachments to this Work Order, as indicated above, are incorporated by reference as if they had been set out in their entirety. Contractor shall complete the Work in accordance with this Work Order, the Attachments, and the Contract Documents, as amended (if applicable). In the event of a conflict between the Contract Documents, as identified in Section 7 of the Master Agreement, the Master Agreement will govern.

TIME FOR COMPLETION: The Contractor must substantially complete the Work in accordance with this Work Order, and the Contract Documents, as provided herein, within Days (#) calendar days of the Notice to Proceed date, and must reach Final Completion within Days (#) calendar days of the County’s acceptance of Substantial Completion.

Contractor’s failure to complete the Work in accordance with this schedule is grounds for assessment of liquidated damages, at the rate of ($Amount) per day, for each day the Contractor does not meet Substantial Completion, and/or Termination of this Work Order and the Master Agreement for Cause.

The County shall compensate the Contractor Choose an item. $Amount for satisfactory completion of the Work.

Payment(s) must be made to the Contractor in accordance with the Contract Documents. The County shall withhold retainage in the amount of [5%] from payments to the Contractor in accordance with the Master Agreement.

IN WITNESS WHEREOF, the parties have executed this Work Order on this _____ day of ____________, 20 ____. A Notice to Proceed will be issued to the Contractor by the County for the Contractor to begin work. The Completion Time above must be calculated from the Notice to Proceed date. Upon execution by both parties, this Work Order will be incorporated as a Contract Document under the Master Agreement. (THIS SECTION TO BE COMPLETED BY THE COUNTY)

SEMINOLE COUNTY:

By: ___________________________________________ Signature – County Representative

Date: _________________

Printed Name: Robert Bradley_____________________

Title: Procurement Administrator__________________ (Authorized by Section 3.554, Seminole County Admin Code)

As authorized for execution by the Board of County Commissioners on ________________, 20____, if applicable.

Witness: ______________________________________ Signature

Printed Name: _________________________________

OC #: OC# OM #: OM#

CONSULTANT: Consultant

By: ___________________________________________ Signature – Consultant Representative

Date: _________________

Printed Name: _________________________________

Title: _________________________________________

Witness: ______________________________________ Signature

Printed Name: _________________________________

EXHIBIT B