EXHIBIT A - STATEMENT OF WORK.pdf

PDF 209 KB Posted

Attached to
APS COOLING AND PROPULSION FANS (OEM)
Solicitation number
DR141705
Issued by
California

About this file

Summary

This Statement of Work is issued by the Los Angeles County Metropolitan Transportation Authority (Metro) for the procurement of replacement cooling fans for P3010 Light Rail Vehicles manufactured by Kinko Sharyo. Metro seeks to procure 220 Auxiliary Power Supply (APS) cooling fans and 1,630 Propulsion cooling fans to support component-level overhauls across six rail divisions throughout Los Angeles County during a scheduled 600,000-mile maintenance interval. The APS fans operate at 26 VDC nominal voltage with a backward-curved blade design, while the Propulsion Inverter fans consist of AC 208V three-phase units, with eight fan motors installed per vehicle. Deliveries must occur at a minimum rate of six kits per month across six specified Metro division locations with delivery hours limited to Monday through Friday, 6:30 AM to 2:30 PM PST. The delivery schedule spans from June 2027 through June 2030, with APS fans delivered in six semi-annual shipments of 36 units each and Propulsion fans delivered in six semi-annual shipments of 288 units, except for the final shipment of 190 units. The contract term is five years with a Firm Fixed Price contract type.

The vendor must provide a standard one-year manufacturer's warranty for both fan types and must notify Metro's Project Manager no later than 60 days prior to any anticipated production delays. Additionally, vendors must provide written notification 48 business hours prior to shipment delivery with specific details including kit quantities, tracking numbers or bill of lading information, freight carrier name, and estimated time of arrival. Both APS and Propulsion cooling fan motors must meet IEEE 1478 electrical and mechanical standards and NFPA 130 fire safety standards for rolling stock vehicles. Qualified suppliers include EbmPapst Mulfingen GmbH & Co. KG for APS fans and Orion Fans and Knight Electronics Inc for Propulsion fans, with specified part numbers referenced for each fan type.

View the file

Other files

File Type Posted
EXHIBIT 15 - MISCELLANEOUS (RESERVED).pdf PDF
FORM 1 - DBE SUBS AND SUPPLIERS.pdf PDF
FORM H -CERTIFICATION OF GOOD FAITH EFFORTS.pdf PDF
EXHIBIT 7 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
EXHIBIT 14 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY PROPOSER.pdf PDF
EXHIBIT 12 - CERT OF COMPLIANCE WITH FED LOBBYING REQ (49 CFR PART 20).pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (FTA).pdf PDF
DR141705_0_US.pdf PDF
EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES. .pdf PDF
FORM G - WRITTEN SOLICITATION SUBMITTAL FORM.pdf PDF
Exhibit A Pre-Assessment Form.pdf PDF
FORM 5 - BIDDERS LIST FORM.pdf PDF
FORM C - SELECTED WORK CATEGORIES.pdf PDF
FORM 3 - DBE BUSINESS DATA SHEET.pdf PDF
FORM D - SAMPLE LETTER OF SOLICITATION.pdf PDF
EXHIBIT 9 - ETHICS DECLARATION.pdf PDF
EXHIBIT 11 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS (RESERVED).pdf PDF
EXHIBIT I - (RESERVED) 49 CFR PART 20 COMPLIANCE WITH FED LOBBYING.pdf PDF
EXHIBIT I - 49 CFR PART 20 COMPLIANCE WITH FED LOBBYING.pdf PDF
EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE (RESERVED).pdf PDF
FORM A - SAMPLE ADVERTISEMENT.pdf PDF
FORM 6 - DBE REGULAR DEALER DIST AFFIRMATION.pdf PDF
FORM 4 - DBE AFFIRMATION.pdf PDF
FORM F - LIST OF ALL FIRMS-SOLICITATION RESPONSES RECEIVED.pdf PDF
SUBCONTRACTOR LIST.pdf PDF
Exhibit B Post-Assessment Form.pdf PDF
EXHIBIT 6 - PROPOSAL LETTER.pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS (RESERVED).pdf PDF
EXHIBIT 8 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT H - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT I - RESERVED.pdf PDF
EXHIBIT 5 - BIDDERS LIST FORM.pdf PDF
EXHIBIT 10 - GENERAL CERTIFICATIONS.pdf PDF
FORM B - NEWSPAPER ADVERTISEMENT LOG.pdf PDF
FORM 2 - DBE AFFIDAVIT.pdf PDF
FORM E - SOLICITATION FOLLOW-UP LOG.pdf PDF
EXHIBIT 13 - CERT OF PROSPECTIVE CONTRACTOR AND LOWER TIER PARTICIPANT.pdf PDF
EXHIBIT 3 -EVALUATION CRITERIA. COOLING AND PROPULSION FANS.pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

P3010 APS Cooling Fan (203016)

P3010 Propulsion Cooling fan (195529)

July 8, 2026

1.0 OVERVIEW

1.1 INTRODUCTION

The Los Angeles County Metropolitan Transportation Authority (Metro) is preparing for a component level overhaul on the P3010 Light Rail Vehicles manufactured by Kinko

Sharyo and its sub suppliers. This overhaul consists of many tasks including overhaul of the couplers, traction motors, gearbox, pantograph, high speed circuit breaker, slewing ring, master controller, and heating ventilation and air conditioning equipment.

Metro is seeking proposals from qualified and experienced vendors to furnish cooling fans for the Auxiliary Power Supply (APS) and Propulsion Inverter equipment. Replacement of these fans will occur during the 600k mileage overhaul interval as recommended by the

Toyo Denki Original Equipment Manufacturer.

1.2 BACKGROUND

The P3010 fleet size consists of 235 rail cars with a production schedule of six kits per month performed at six rail divisions (shops) located throughout Los Angeles County. The APS system consists of one Electrically Commutated (EC) centrifugal fan - RadiCal motor that operates at 26 vdc nominal voltage fitted into a mounting frame. The fan has a backward-curved single intake fan blade designed for rail equipment cooling applications. The cooling fan(s) will be installed onto the APS and Propulsion equipment by Metro staff utilizing the existing housing before installation onto the rail car.

The P3010 rail car consists of two propulsion inverter assemblies; each assembly consists of four 208 VAC – 3-phase fan motors totaling eight fan motors per vehicle.

Metro expects that both the APS and Propulsion Inverter fan motors meet IEEE 1478

(Electrical / Mechanical) and NFPA 130 (Fire Safety) standard equipment used on rolling stock vehicles meeting required schedule.

1.3 GENERAL

The Los Angeles Metropolitan Transportation Authority (METRO) has identified a need to procure two hundred twenty (220) APS fans and one thousand six hundred and thirty (1,630) Propulsion cooling fans to support Metro Rail Division Overhaul projects for the next five years.

2.0 DESCRIPTION OF WORK

The vendor shall schedule deliveries in the amount of no less than Six kits per month. The material covered by this specification shall consist of the manufacturer item from

KINKISHARYO International Inc., their subs or a vendor that supplies the individual item.

Metro item code number

Qualified

Product

Descriptions

Qualified Manufacturers

Name

Qualified

Supplier's Part

Number(s)

195529

FAN -

BLOWER, AC

208V, AXIAL,

7"X7"X3.5", PROPULSION

INVERTER,

TOYO DENKI

• KINKISHARYO

INTERNATIONAL, LLC

• TOYO DENKI USAF

INC

• Orion Fans (fan OEM)

230vac

• Knight Electronics Inc

TD31701-F

TD31701-F

OA180AN-22-

1*B1856

284911H70

203016

FAN MOTOR

ONLY

LVPS

BLOWER

UNIT (Fan).

BG-

0006/06-02

26VDC

NOMINAL

• ABB

• EbmPapst Mulfingen

GmbH & Co. KG (fan

OEM)

6AAT000000

04704/ABB#T

048706

R3G280 -

RU26-81

2.1 EQUIPMENT

The Vendor shall deliver the above-listed equipment to the Metro location specified by

Metro in section 3.1.

3.0 SUBMITTALS / DELIVERABLES

A. Vendor shall provide standard manufacture one (1) year warranty for both types of fans.

B. Vendor shall advise Project Manager in writing of any production delays no later than 60 days prior to ship date. Metro has the expectation that the vendor will provide reasonable notifications and production remedies when warranted to avoid delays.

C. Vendor shall notify Project Manager 48 business hours prior to shipment delivery to obtain delivery information such as confirm number of kits, tracking number or BOL number, freight carrier name and estimated time of arrival (ETA).

3.1 DELIVERY LOCATIONS

RAIL DIVISION ADDRESSES FOR PARTS ROOM STAFF

Division 11

4350 E 208th St

Long Beach, CA 90810

(Del Amo Bl & Santa Fe Av)

Supervisor Eddie Serrano

Ph: 310-816-5583

EMAIL: Serranoh@metro.net

Division 14

1805 Stewart St

Santa Monica, CA 90404

(West entrance)

Supervisor George Cuevas

Ph: 424-231-9222

Email: Cuevasg@metro.net

Division 16

Crenshaw Line Division

5600 Arbor Vitae St

Los Angeles, CA 90045

(Arbor Vitae near Aviation Bl) mailto:Serranoh@metro.net mailto:Cuevasg@metro.net

Supervisor George Cuevas

Ph: 424-231-9222

Email: Cuevasg@metro.net

Division 21

Metro Gold Line Division

1800 Baker St

Los Angeles, CA 90012

Supervisor Roger Potter

Ph: 323-224-4055

Email: Potterr@metro.net

Division 22

Metro Green Line Division

14724 Aviation 131

Lawndale, CA 90260

Supervisor Eddie Serrano

Ph: 310-816-5583

Email: SerranoFlOrnetro.net

Division 24

Metro Gold Line Division

1600 S California Av Monrovia, CA 91016

Supervisor Roger Potter

Ph: 323-224-4055

Email: Potterr@metro.net mailto:Cuevasg@metro.net mailto:Potterr@metro.net file:///C:/Users/margonim/Desktop/REQ63237%20FAN%20BLOWER.%20TOKYO%20DENKI/REQ63238.%20FAN%20BLOWER%20UNIT.%20BG-0006%20Combined/Pre-Planning%20Docs/Serranoh@metro.net mailto:Potterr@metro.net

3.2 DELIVERY SCHEDULE

Vendor shall provide a minimum of 36 APS fan motors every six months and a minimum of 288 propulsion fan motors every six months, or sooner based on product availability:

SCHEDULE FOR P3010 APS Cooling Fan

(Total Qty 220)

SHIPMENT

NO.

DELIVERY

MONTH

QTY PER

MONTH

1 Jun-27 36

2 Nov-27 36

3 Jun-28 36

4 Nov-28 36

5 Jun-29 36

6 Nov-29 36

7 Jun-30 4

TOTAL: 220

SCHEDULE FOR P3010 Propulsion Cooling Fan

(Total Qty 1,630)

SHIPMENT

NO.

DELIVERY

MONTH

QTY PER

MONTH

1 Jun-27 288

2 Nov-27 288

3 Jun-28 288

4 Nov-28 288

5 Jun-29 288

6 Nov-29 190

KIT TOTAL: 1,630

3.3 DIVISION DELIVERY HOURS

Monday through Friday 6:30 AM to 2:30 PM PST

4. ADDITIONAL REQUIREMENTS

None

5. CONTRACT TYPE:

Firm Fixed Price (FFP)

6. PERIOD OF PERFORMANCE

5 years

7. ATTACHMENTS

None

END OF SOW