EXHIBIT A - SCOPE OF SERVICES.pdf

PDF 92 KB Posted

Attached to
Seventeen Electric Forklifts. Pre-Bid Documents added. update 8/25
Solicitation number
DR140108(2)
Issued by
California

About this file

This is a Scope of Services exhibit for a contract between the Los Angeles County Metropolitan Transportation Authority (LACMTA) for the purchase of seventeen (17) electric forklifts. The equipment must be new, latest factory model year, and complete with all required components for immediate operation upon delivery. Delivery is required within 150 days from the contract effective date of July 23, 2026, and must occur Monday through Friday between 7:30 a.m. and 1:00 p.m. at LACMTA Division 10 - Non-Revenue Maintenance Operation located at 742 North Mission Road, Los Angeles, CA 90033. The contractor must notify LACMTA personnel two working days prior to delivery to facilitate pre-delivery inspections and pre-acceptance at the factory. All equipment shall be delivered fully charged if electric or with full fuel tanks, and the contractor is responsible for providing transportation with a lift gate for offloading.

The equipment must comply with all current applicable local, California State, and Federal regulations, including FRA, AQMD, ARB, EPA Tier 4, and OSHA standards, with no rebuilt or remanufactured components permitted. Only OEM components are acceptable unless otherwise specified. Payment terms are Net 30, with separate invoices required for each piece of equipment including the VIN or serial number. California sales tax applies to purchases from licensed California dealers, while use tax liability falls to LACMTA for out-of-state purchases. The contractor must provide all required DMV documentation including the Report of Sale form (Reg. 397), Manufacturer's Statement of Origin for out-of-state vehicles, weight certificates where applicable, delivery receipts, and transportation permits. Final acceptance occurs only after post-delivery inspection confirms full operational status and compliance with all technical specifications, with all punch list items resolved.

View the file

Other files

File Type Posted
Pre-Bid Package IFB No. DR140108(2).pdf PDF
EXHIBIT H - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT F - RELEASE OF CLAIMS.pdf PDF
EXHIBIT J - 29 CFR 5.5.pdf PDF
Thumbs.db —
EXHIBIT C - WORK-COMPLETION_DELIVERABLE SCHEDULE (RESERVED).pdf PDF
EXHIBIT 8 - ETHICS DECLARATION.pdf PDF
EXHIBIT 10 - CERTIFICATE OF COMPLIANCE WITH 49 CFR PART 655.pdf PDF
EXHIBIT 5 - BID LETTER.pdf PDF
FORM 5 - BIDDERS LIST FORM.pdf PDF
FORM 1 - SBE-DVBE SUBS & SUPPLIERS.pdf PDF
Exhibit B Post-Assessment Form.pdf PDF
EXHIBIT 6 - LIST OF CURRENT CONTRACTS - BACKLOG.pdf PDF
IFB DR140108(2).pdf PDF
EXHIBIT A-3 - TECHNICAL SPECIFICATIONS - STAND-ON REACH FORKLIFTS.pdf PDF
EXHIBIT B - PRICING AGREEMENT.pdf PDF
EXHIBIT E-1 - PAYMENT CERTIFICATION (CONTINUOUS).pdf PDF
EXHIBIT E-2 - PAYMENT CERTIFICATION (FINAL).pdf PDF
EXHIBIT I - 49 CFR PART 20 RESERVED.pdf PDF
EXHIBIT 9 - GENERAL CERTIFICATIONS.pdf PDF
EXHIBIT A-1 - TECHNICAL SPECIFICATIONS - WALK-BEHIND STACKER FORKLIFTS.pdf PDF
SUBCONTRACTOR LISTING FORM.pdf PDF
FORM 4 - SBE-DVBE AFFIRMATION.pdf PDF
EXHIBIT 3 - RESERVED.pdf PDF
EXHIBIT G - APPROVED SUBCONTRACTORS AND SUPPLIERS (RESERVED).pdf PDF
EXHIBIT A-2 - TECHNICAL SPECIFICATIONS - WALKIE REACH FORKLIFTS.pdf PDF
EXHIBIT D - DEOD CONTRACT COMPLIANCE MANUAL (STATE-LOCAL).pdf PDF
EXHIBIT 12 - MISCELLANEOUS (RESERVED).pdf PDF
EXHIBIT 7 - LIST OF COMPLETED CONTRACTS - LAST FIVE (5) YEARS.pdf PDF
EXHIBIT 11 - NONCOLLUSION AFFIDAVIT TO BE EXECUTED BY BIDDER.pdf PDF
FORM 3 - BUSINESS DATA SHEET.pdf PDF
Exhibit A Pre-Assessment Form.pdf PDF
FORM 2 - AFFIDAVIT.pdf PDF
FORM 6 - SBE-DVBE DEALER-DISTR AFFIRMATION.pdf PDF
EXHIBIT 4 - LIST OF CERTIFIED FIRMS (RESERVED).pdf PDF
EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DR140108(2) -

Seventeen Electric Forklifts

July 23, 2026

EXHIBIT A – SCOPE OF SERVICES

DR140108(2) – Seventeen Electric Forklifts

1.0 Scope

1.1 This Contract is for the purchase of seventeen (17) electric forklifts. THE CONTRACTOR

SHALL PROVIDE THE REQUESTED EQUIPMENT IN FULL COMPLIANCE WITH

LACMTA’S TECHNICAL REQUIREMENTS IDENTIFIED IN EXHIBITS A-1, A-2, AND A-3.

1.2 The Contractor shall furnish, deliver, and warrant each equipment according to these specifications and shall include all items and/or accessories not mentioned, but required, for operation of the equipment.

2.0 General Requirements

2.1 All equipment classified as standard and/or required to operate the equipment shall be provided at no additional cost to LACMTA. Items inadvertently omitted from this specification that are classified and or otherwise designated by the equipment manufacturer as required to operate the specified equipment shall be brought to the attention of the designated LACMTA representative.

2.2 OEM & Aftermarket Components

The equipment with their components shall be new and the latest factory model year released at the time the purchase order is awarded. They shall be complete, and ready to operate upon delivery. No rebuilt or remanufactured components will be acceptable. All components shall be Original Equipment Manufacturer (OEM), no aftermarket components shall be acceptable unless referenced in this specification and/or approved by the designated

LACMTA representative.

All accessory installations shall be securely affixed and comply with OEM, Federal, State and

OSHA standards. No installation shall interfere with the OEM systems nor render the equipment warranty invalid.

All electrical installations shall have all wires securely affixed to the running path. Wiring shall have protective shielding with loom, fabric, or PVC, as well as rubber grommets to protect wires that pass-through plates and panels, and insulated wire clamps for mounting. All accessory circuits shall have proper circuit protection adequately to prohibit damage to the unit’s OEM systems and prevent electrical shorts or fires.

2.3 Regulatory Compliance

The equipment shall be, on the date of the delivery, in compliance with all current applicable local, California State and Federal Code of Regulations.

Regulatory compliance shall include, but not limited to, compliance with all current and applicable Federal Railroad Administration (FRA), California State Air Quality Management District (AQMD), Air Resources Board (ARB), US Environmental Protection Agency (EPA) Tier 4, California Code of Regulations, Title 8, section 8470 and local laws pertaining to this equipment. Contractor may be required to furnish proof of compliance.

2.4 Delivery Requirements

Requested delivery is within 150 days from date of Contract effective date.

Contractor must notify designated LACMTA personnel two (2) working days prior to equipment delivery to LACMTA so that LACMTA staff can make the necessary scheduling and travel arrangements to perform pre-delivery inspections and pre-acceptance of the equipment at the factory.

The equipment shall be prepared and cleaned before it is presented for the post-delivery inspection.

Delivery must be made Monday through Friday between 7:30am to 1:00pm.

It is the Contractor’s responsibility to make a delivery by a truck equipped with a lift gate to offload the equipment and any equipment to a location as designated by Metro personnel.

The equipment shall be delivered to Metro fully charged, if electric, or with a full fuel tank.

2.5 Delivery Location

All equipment shall be delivered to:

Los Angeles County Metropolitan Transportation Authority

Division 10 - Non-Revenue Maintenance Operation

742 North Mission Road

Los Angeles, CA 90033

Attention: Sona Darakjian

Equipment Engineering Supervisor

2.6 DMV Registration

All vehicles’ registration and license plates shall be processed by METRO. Vendors should not submit to DMV any DMV paperwork on behalf of Metro.

2.7 Delivery of DMV Documents and Others

Please provide the following required documents stated herein at the time of delivery:

DMV Report of Sale form (Reg. 397- Application for Registration of New Vehicle/Trailer) and Statement of Fact.

o For each vehicle sold by CA dealers, submit to METRO, DMV Report of Sale form (Reg. 397- Application for Registration of New Vehicle/Trailer) and Statement of Fact, if required.

o Sold to name and address must be filled out EXACTLY as follows:

L A CNTY METRO TRANS AUTHORITY (with a space between L and A) One Gateway Plaza (NOT 1 Gateway Plaza) Los Angeles, CA 90012

Lien holder: None

Do not countersign areas that require LA CNTY METRO signature.

o Temporary license plates.

Manufacturer’s Statement of Origin (MSO)

For out-of-state vehicle delivery, please submit the following documents for each vehicle:

o Manufacturer’s Statement of Origin (MSO), the original copy.

o A copy of the invoice for the vehicle that needs to be registered with a cost breakdown.

Weight certificate o A weight certificate is required for vehicles with two-axle or three-axle commercial vehicles between 8,000 and 10,000 pounds unladen.

o Dealers shall certify the unladen weight for new commercial vehicles weighing up to 8,000 pounds unladen and over 10,001 unladen for all trailers.

o Weight certificates shall be obtained from California or adjacent state’s (Arizona, Nevada, or Oregon) weight stations.

Delivery Receipt o Delivery receipts or bill of lading must be provided for each vehicle at the time of delivery.

Transportation Permits o It is the responsibility of the bidder, if required, to pay and obtain transportation permits to Metro’s delivery address.

2.8 Sales Tax & Use Taxes

California Sales Tax:

o California sales tax applies to all vehicles and/or other equipment purchased from a licensed California dealer.

o Dealers are required to collect taxes by invoicing LACMTA and then paying it directly to the BOE.

Use Tax:

o Use tax applies to all vehicles and/or other equipment purchased from an out-of-state dealer.

o Use tax is the liability of the buyer to pay at the time of registration either to the

DMV or BOE.

o Paying California use taxes on behalf of LACMTA by the sellers and/or manufacturers that are located out-of-state and not a licensed California dealer is not preferred per the California DMV manual and California Board of Equalization (BOE) publications.

If the Contractor elects not to pay use tax, tax will still be calculated on the price page at the rate indicated but will not be invoiced as LACMTA will pay use tax directly to the DMV.

If the seller unintentionally pays use taxes to California Board of Equalization (BOE) on behalf of Metro and then invoices Metro, the seller or manufacturer then must provide the following documents at the time of delivery:

o Proof of use tax payment to BOE o Seller’s BOE account/certificate

2.9 Inspection & Acceptance

The equipment shall not be inspected or accepted without prior compliance with this specification’s requirement.

The equipment shall be subjected to a pre-delivery inspection, if required, and to post-delivery inspection by LACMTA to determine if the equipment delivered is fully operational and in their final configuration, are in full compliance with the technical and performance specification and they did not sustain any damage upon delivery to LACMTA.

The Contractor shall conduct a vehicle walk-through with Metro staff after the delivery of the vehicle. This walk-through is intended to make Metro staff aware of vehicle’s features, functions, proper operations and safety-related systems and procedures.

Final acceptance shall be made after post-delivery inspection is performed by LACMTA to determine full compliance with the technical specification with all “punch list” items and pending issues are resolved and satisfied. This includes provision, if specified, operating and maintenance manuals, and training to demonstrate that the equipment is fully operational.

2.10 Technical Specification Compliance Requirements

The equipment must meet all requirements, including the technical requirements in Exhibit

A.1.

2.11 Payments

Payment terms are Net 30. Refer to Contract Article IV – Compensation and Payment for additional requirements.

2.12 Invoices

Separate Invoices shall be provided for each equipment. The Contractor is responsible for submitting the original invoices to Accounts Payable. Refer to Contract Article IV –

Compensation and Payment for additional requirements.

Each invoice must include the VIN number or serial number of the equipment delivered.

File details come from the government source that posted it. Updated .