Exhibit A - Contract Data Requirements List (CDRL) 5Sep18.pdf

PDF 309 KB Posted

Attached to
M34 HELLFIRE DUMMY MISSILE
Solicitation number
W31P4Q-20-R-0004
Issued by

About this file

This document contains a Contract Data Requirements List (CDRL) and statement of work for the M34 HELLFIRE Dummy Missile federal contract opportunity. The Army Contracting Command-Redstone requires the manufacture of 56 M34 HELLFIRE Dummy Missiles delivered in a HELLFIRE II Universal Container for the basic award. The resultant contract includes two option years to manufacture up to 100 dummy missiles per year. Offerors must procure the universal container from a vendor source. The CDRL includes test/inspection and production status reports due monthly after hardware build begins via a DoD file sharing site. The statement of work requires meeting technical data package and SOW requirements.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

W31 P4Q-20-R-0004

Exhibit A

Form Approved 0MB No. 0704-0188

Public reporting Durden ror lhis collection of information is eslimated to average 11 o hours per response, including lhe time ror reviewing instruclions, searching existing data sources, gathering and maintaining the data needed, and compleUng and reviewing the collection of inronnalion. Send comments regarding this burden estimate or any other aspect of lhls collecllon or information, including suggestions for reducing Lhis burden, to Department of Defense, Washington Headquarters Services, Directorate for lnfonnation Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA, 22202-4302, and to the Office of Management and Budge!, Paperwork Reduction Project (0704-0188), Weshinglon, DC 20503_ Please DO NOT RETURN your form lo eilher of these addresses Send comoleled form lo the Govemmenl lssulna Contrectina Officer for ContracVPR No, listed in Block E.

A. CONTRACT LINE ITEM NO. B EXHIBIT C. CATEGORY:

A TOP TM OTHER NDTI

D. SYSTEM/ITEM I E. CONTRACT/PR NO. F. CONTRACTOR

HELLFIRE Dummy Missiles W3 l P4Q-2O-R-OOO4

I. DATA ITEM NO,

2 TITLE0F0ATAITEM 3 SUBTITLE

AOOl Test/Inspection Report First Article Inspection Report 4, AUTHORITY (Data Acquisition Document No) 15. CONTRACT REFERENCE 6 REQUIRING OFFICE

DI-NDTI-8O8O9B SOW C-3.7 SF AE-MSL-JAP

7. DD 250 REQ 9.DIST STATEMENT 10 FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION REQUIRED

LT NIA SEE 1 6

b. COPfES

B. APP CODE

C

11 AS OF DATE 13. DATE OF SUBSEQUENT a. Final SUBMISSION ADDRESSEE Draft

A NIA NIA Reg Repro

SEE16 0 1 0

16. REMARKS:

9. DISTRIBUTION STATEMENT C. Distribution authorized to US Government agencies and their contractors; Administrative or Operational Use, Export Controlled. Date of Determination: 04 Aug 2018. Other requests for this document shall be referred to Project Manager, Joint Attack Munition Systems Project Office; ATTN: SFAE- MSL-JAS, Redstone Arsenal, AL 35898-5610.

EXPORT CONTROL ACT WARNING - Required. Mark IA W DoDI 5230.24, Enclosure 4, Paragraph 2g.

8, 12. Inspection report shall be submitted 7 calendar days after completion of First Article Test/Inspection. Government approval/ disapproval shall be made within 30 days after receipt. Resubmittal of reports shall be within 30 calendar days after receipt of Government disapproval or comments. Data may be submitted in contractor format.

14. Reports shall be delivered via DoD Safe Access File Exchange Site to the JAMS Data Manager.

15.TOTAL 0 1 0

G PREPARED BY I H04

T

Aug 2018 1

1 APPROVED BY J DATE

Andrea Aldridge Anthony Howard 04 Aug 2018

17 PRlCEGROlJP f8 E STIMATEO

AL PRICE TOT

j I�, a:

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

W31 P4Q-20-R-0004 Exhibit A

Form Approved 0MB No. 0704-0188

Public reporting t>un:2en for this collection or informelion is estimated lo average 110 hours per response, including lhe time for reviewing inslructions, searching existing dale sources, gathering and maintaining lhe data needed, and completing and reviewing lhe collection of information. Send commenls regarding this burden estimate or any olher aspect of this collection of infonnalion, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Dired.orele for lnformalion Operelions end Reports, 1215 Jefferson Davis Highway, Suile 1204, Ar1ington, VA 22202-4302, end to !he Office of Management and Budget, Paperwork Reduction Project (0704•0188), Washinglon, DC 20503 Please DO NOT RETURN your form to either of lhese audressa,, Send c.omale:led form to t ha Go...c.m,n411I lssuino contrectino Officer for Contract/PR No listed in Block E.

A. CONTRACT LINE ITEM NO. B, EXHIBIT C. CATEGORY:

TOP TM OTHER MGMT

D. SYSTEM/ITEM

I

E. CONTRACT/PR NO. F CONTRACTOR

HELLFIRE Dummy Missiles W31P4Q-20-R-0004

I, DATA ITEM NO, 12 TITLEOFDATAITEM 3 SUBTITLE

A002 Production Status Report NIA

4. AUTHORITY (Data Acquisition Document No) 15 CONTRACT REFERENCE 6. REQUIRING OFFICE

DI -MGMT-81255 SOW C-3.1.1 SFAE-MSL-JAP

7. DD 250 REQ 9 DIST STATEMENT 10. FREQUENCY 12, DATE OF FIRST SUBMISSION 14, DISTRIBUTION REQUIRED

LT SEE 16 SEE 16 b. COPIES

8. APP CODE C 11 AS OF DATE 13. DATE OF SUBSEQUENT a Final SUBMISSION ADDRESSEE Draft

A NIA SEE 16 Reg Repro

SEE16 0 1 016. REMARKS:

9. DISTRIBUTION STATEMENT - C. Distribution aqthorized to US Government agencies and their contractors; Administrative or Operational Use, Export Controlled. Date of Determination: 04 Aug 2018. Other requests for this document shall be referred to Project Manager, Joint Attack Munition Systems Project Office; ATTN: SFAE- MSL-JAS, Redstone Arsenal, AL 35898-5610.

EXPORT CONTROL ACT WARNING - Required. Mark IAW DoDI 5230.24, Enclosure 4, Paragraph 2g.

8. Government approval/disapproval within 30 calendar days after receipt. If report is disapproved, resubmit within 30 calendar days.

10, 12, 13. First submission shall be received by the Government NL T COB CST on the third working day of the month, after the first month in which hardware build begins. Subsequent submittals shall be received by the Government NL T COB CST on the third working day of each month.

14. Reports shall be delivered via DoD Safe Access File Exchange Site to the JAMS Data Manager. Data shall be submitted in a mutually acceptable format.

15.TOTAL 0 1 0

G, PREPARED BY

I

H DATE 11. APPROVED BY J DATE

A ndrea A ldridge 04 A ug 2018 Anthony Howard 04 A ug 2018

17. PRICE GROUP

18, ESTIMATED

TOTAL PRICE

INSERT

IN

SECT. B