Exhibit A -- CM-523 CDRLs.pdf
PDF 21 MB Posted
- Solicitation number
- W31P4Q-22-R-0034
About this file
This document provides details for a federal contract solicitation seeking a battery operated, handheld spectrum analyzer. The solicitation number is W31P4Q-22-R-0034 and is being issued by the Department of the Army Materiel Command Contracting Command located at Redstone Arsenal. The opportunity is for a pre-solicitation to procure a spectrum analyzer that can accurately measure input signals between 9 kHz and 26.5 GHz to support Army avionic, missile, ordnance, and signal equipment. The spectrum analyzer, if awarded, will be fielded to the Army under the nomenclature Analyzer, Spectrum: CM-523/U. Respondents are directed to review the attached statement of work and specifications for requirements regarding the analyzer's measurement abilities and operation across various military communication and weapon systems.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE J. DATE
Page of Pages
A MGMT
CM-523/U Spectrum Analyzer
A001 Status Report Contract Data Status and Schedule Report
DI-MGMT-80368A SOW 3.1 SFAE-CSS-FP-TM-TEMOD
DD
A C
MTHLY
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 1 0
1 1 0
Block 4:
The Contractor shall follow format of the Contract Data Status and Schedule Report (CDSSR) In Accordance With DI-MGMT-80368A located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 11, 12, 13:
A draft CDSSR shall be provided to the Government no later than 5 days prior to the Start of Work Meeting
The first submission of the CDSSR shall be provided to the Government no later than 5 days after the Start of Work Meeting. After receiving the submission, allow 2 days for the Government to review/approve the CDSSR. If the CDSSR is not approved, the re-submission is due 2 days after receiving notification of Government disapproval.
Notification of Government disapproval will either be by letter of transmittal or electronically. Allow 2 days for the Government to review/approve the resubmitted CDSSR. If the resubmitted CDSSR is not approved, the disapproval path as outlined above will be followed until the CDSSR is approved.
Subsequent submissions of the CDSSR are due no later than the 10th of each month. The report shall cover the preceding month. Each monthly submission shall make changes and updates easily noticeable.
If a submission date occurs on a Saturday, the contractor shall submit the CDSSR the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the CDSSR the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the CDSSR the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the CDSSR on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Danelle M. Crisler
I. APPROVED BY
FOR Kevin J. Gould
1 3 Adobe Professional 8.0
26 Oct 21 26 Oct 21
Wood-MS Stamp
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
A MGMT
CM-523/U Spectrum Analyzer
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
Block 14:
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
Export - Control Act Warning - Not required.
2 3
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
ADMN
CM-523/U Spectrum Analyzer
A002 Conference Minutes
DI-ADMN-81250B SOW 3.2 SFAE-CSS-FP-TM-TEMOD
DD
A C
AS REQ
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 1 0
1 1 0
Block 4:
The Contractor shall follow format of the Conference Minutes In Accordance With DI-ADMN-81250B located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 10, 11, 12, 13:
The first submission shall be for the Start of Work Meeting held at the Government’s facility.
A copy of the Draft Conference Minutes shall be submitted to the Government before each occurrence of the Start of Work Meeting, In-Process Review, and other conferences have been adjourned.
The Final Conference Minutes are due no later than 5 days after the conclusion of each occurrence of the Start of Work Meeting, In-Process Review, or conference. After receiving the submission, the Government has 5 days to provide review/approval of the Final. If the Final Conference Minutes are not approved, the re-submission of the Final is due 5 days after receiving notification of Government disapproval. Allow 5 days for the Government to review/approve the resubmitted Final Conference Minutes. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final Conference Minutes are approved.
If a submission date occurs on a Saturday, the contractor shall submit the minutes the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the minutes the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the minutes the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the minutes on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Danelle M. Crisler Kevin J. Gould
1 1 Adobe Professional 7.0
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
ADMN
CM-523/U Spectrum Analyzer
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
Block 14:
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SAFT
CM-523/U Spectrum Analyzer
A003 Safety Assessment Report (SAR)
DI-SAFT-80102C SOW 3.4.1 SFAE-CSS-FP-TM-TEMOD
DD
A C
SEE BLK 16
N/A
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 1 0
1 1 0
Block 4:
The Contractor shall follow the format of the Safety Assessment Report (SAR) In Accordance With DI-SAFT-80102C located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 10, 12, 13:
The Draft SAR is due no later than 30 days after the Start of Work Meeting. After receiving the submission, allow 30 days for the Government to review/approve the Draft. If the Draft SAR is not approved, the re-submission of the Draft is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the resubmitted Draft SAR. If the resubmitted Draft is not approved, the disapproval path as outlined above will be followed until the Draft SAR is approved.
The Final SAR is due 15 days after the Technical Manual Verification is complete. The Final shall incorporate all Government comments. After receiving the submission, the Government has 30 days to provide review/approval of the Final. If the Final SAR is not approved, the re-submission of the Final is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final SAR. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final SAR is approved.
If there are design changes during the acquisition process, the updated SAR is due no later than 30 days after the Government is notified of the design changes. After receiving the submission, the Government has 30 days to review/approve the updated SAR. If the updated SAR is not approved, the re-submission of the updated SAR is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the re-submitted updated SAR. If the re-submitted update is not approved, the disapproval path as outlined above will be followed until the updated SAR is approved.
If a submission date occurs on a Saturday, the contractor shall submit the SAR the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the SAR the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the SAR the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the SAR on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Danelle M. Crisler Kevin J. Gould
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SAFT
CM-523/U Spectrum Analyzer
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
Block 14:
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
MISC
CM-523/U Spectrum Analyzer
A004 Hazardous Materials Management Program (HMMP) Report
DI-MISC-81397C SOW 3.4.2 SFAE-CSS-FP-TM-TEMOD
DD
A C
ANNUALLY
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 0 1 0
0 1 0
Block 4:
The Contractor shall follow format of the Hazardous Materials Management Program (HMMP) Report In Accordance With DI-MISC-81397C located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 11, 12, 13:
The Initial HMMP Report is due no later than 90 days after the Start of Work Meeting.
After receiving the submission, allow 30 days for the Government to review/approve the Initial Report. If the Initial HMMP report is not approved, the re-submission of the Initial Report is due 15 days after receiving notification of Government non-approval. Allow 15 days for the Government to review/approve the resubmitted Initial HMMP Report. If the resubmitted Report is not approved, the disapproval path as outlined above will be followed until the Initial HMMP Report is approved.
Each subsequent HMMP Report shall be submitted on the same day annually and shall follow the process outlined in the above paragraph.
If a submission date occurs on a Saturday, the contractor shall submit the HMMP Report the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the HMMP Report the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the HMMP Report the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the HMMP Report on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
Danelle M. Crisler Kevin J. Gould
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
MISC
Block 14:
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
QCIC
CM-523/U Spectrum Analyzer
A005 Calibration and Measurements Requirements Summary
DI-QCIC-80278C SOW 3.5.1 SFAE-CSS-FP-TM-TEMOD
DD
A C
SEE BLK 16
N/A
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 1 0
1 1 0
Block 4:
The Contractor shall follow format of the Calibration and Measurements Requirements Summary (CMRS) In Accordance With DI-QCIC-80278C located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 10, 12, 13:
The CMRS data item requirement is not intended to be a separate submittal by the contractor. The required documentation shall be included in CDRL A006 (MTSERL) submission.
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
See CDRL A006 (MTSERL).
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
Export - Control Act Warning - Not Required.
Danelle M. Crisler Kevin J Gould
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SESS
CM-523/U Spectrum Analyzer
A006 Maintenance Test and Support Equipment List Maintenance, Test, and Support Equipment Requirements List (MTSERL)
DI-SESS-80294B SOW 3.5.1, 3.5.2.2, 3.5.3 SFAE-CSS-FP-TM-TEMOD
DD
A C
ONE/R
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 1 1
1 1 1
Block 4:
The Contractor shall follow format of the Maintenance Test and Support Equipment List In Accordance With DI-SESS-80294B located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 11, 12, 13:
A list of test equipment or tools not contained within the sources listed in SOW paragraph
3.5.2 the contractor is due no later than 15 days after the Start of Work Meeting to the Government project leader and logistician in writing.
The Draft Calibration and Measurements Requirements Summary (CMRS) (CDRL A005) and MTSERL submissions are due 45 days after Start of Work Meeting. After receiving the submissions, allow 30 days for the Government to review/approve the Drafts. If the Draft CMRS and MTSERL are not approved, the re-submission of the Drafts are due 10 days after receiving notification of the Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Draft CMRS and MTSERL. If the resubmitted Drafts are not approved, the disapproval path as outlined above will be followed until Draft CMRS and MTSERL are approved.
The Final CMRS and MTSERL submissions are due no later than 15 days after the successful completion of all Technical Manual Verifications and Logistics Demonstration.
The Finals shall incorporate all Government comments that were provided during Verification and Logistics Demonstration. After receiving the submission, allow 15 days for the Government to review/approve the Finals. If the Final CMRS and MTSERL are not approved, the re-submissions of the Finals are due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final CMRS and MTSERL. If the resubmitted Finals are not approved, the disapproval path as outlined above will be followed until the Final CMRS and MTSERL are approved. The Reproducible CMRS and MTSERL are due no later than 5 days after Government approval of the Final CMRS and MTSERL.
Danelle M. Crisler Kevin J. Gould
1 2
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SESS
If a submission date occurs on a Saturday, the contractor shall submit the CMRS and MTSERL the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the CMRS and MTSERL the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the CMRS and MTSERL the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the CMRS and MTSERL on the first business day the week following the holiday. Submission(s) occurring on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil Government Project Lead email to: danelle.m.crisler.civ@mail.mil Government Project Logistician email to: michael.l.milani.civ@mail.mil
Export - Control Act Warning - Not Required.
2 2
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
IPSC
CM-523/U Spectrum Analyzer
A007 Software Product Specification (SPS)
DI-IPSC-81441A SOW 3.5.6 SFAE-CSS-FP-TM-TEMOD
DD
A C
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 0 1 0
0 1 0
16. REMARKS
Block 4:
The Contractor shall follow format of the Software Product Specification (SPS) In Accordance With DI-IPSC-81441A located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 10, 11, 12, 13:
The Software Product Specification (SPS) (including the remote programming commands, software, and procedure(s)) submission is due no later than 60 days after the final signature of the delivery order. After receiving the submission, allow 30 days for the Government to review/approve the SPS. If the SPS is not approved, the re-submission of it is due 10 days after receiving notification of the Government disapproval. Allow 10 days for the Government to review/approve the resubmitted SPS. If the resubmitted SPS is not approved, the disapproval path as outlined above will be followed until it is approved.
If a submission date occurs on a Saturday, the contractor shall submit the SPS the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the SPS the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the SPS the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the SPS on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
Block 14:
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil Export - Control Act Warning - Not required.
Danelle M. Crisler Kevin J Gould
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SESS
CM-523/U Spectrum Analyzer
A008 Reliability and Maintainability (R & M) Block Diagrams and Mathematical Models Report
Failure Mode, Effects, and Criticality Analysis
DI-SESS-81496B SOW 3.10.3 SFAE-CSS-FP-TM-TEMOD
DD
A A
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 1 0
1 1 0
Block 4:
The Contractor shall follow the format of the Reliability and Maintainability (R & M) Block Diagrams and Mathematical Models Report In Accordance With DI-SESS-81496B located at https://quicksearch.dla.mil/qsSearch.aspx
Block 8, 10, 11, 12, 13:
The draft submission is due 45 days after the Start of Work Meeting. After receiving the submission, allow 20 days for the Government to review/approve the draft. If the draft is not approved, the re-submission of the draft is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the resubmitted draft. If the resubmitted draft is not approved, the disapproval path as outlined above will be followed until the draft is approved.
The Final draft submission is due 150 days after the Start of Work Meeting. After receiving the submission, allow 10 days for the Government to review/approve the final draft. If the final draft is not approved, the re-submission of the final draft is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted final draft. If the resubmitted final draft is not approved, the disapproval path as outlined above will be followed until the final draft is approved in final format.
If a submission date occurs on a Saturday, the contractor shall submit the previous Friday.
If the submission date occurs on a Sunday, the contractor shall submit the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Block 9:
Distribution Statement A. Approved for public release; distribution is unlimited.
Block 14:
Electronic submissions are preferred.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
Export - Control Act Warning - Not required.
Danelle M. Crisler Kevin J. Gould
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SESS
CM-523/U Spectrum Analyzer
A009 Logistics Product Data Summaries Maintenance Allocation Chart
DI-SESS-81759A SOW 3.6.1 SFAE-CSS-FP-TM-TEMOD
DD
A C
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD
LSA-004 2 1 0
2 1 0
Block 4:
The Contractor shall follow the format of the Logistics Product Data Summaries (LPDS) In Accordance With DI-SESS-81759A located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks: 8, 11, 12, 13:
The Draft LPDS submission is due 30 days after the Start of Work Meeting. After receiving the submission, allow 20 days for the Government to review/approve the Draft. If the Draft LPDS is not approved, the re-submission of the Draft is due 15 days after receiving notification of Government disapproval. Allow 15 days for the Government to review/approve the resubmitted Draft LPDS. If the resubmitted Draft is not approved, the disapproval path as outlined above will be followed until the Draft LPDS is approved.
The Final Draft LPDS submission is due 150 days after the Start of Work Meeting. After receiving the submission, allow 10 days for the Government to review/approve the Final Draft. If the Final Draft LPDS is not approved, the re-submission of the Final Draft is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final Draft LPDS. If the resubmitted Final Draft is not approved, the disapproval path as outlined above will be followed until the Final Draft LPDS is approved.
The Final LPDS submission is due no later than 20 days after the successful completion of all Technical Manual Verifications and Logistics Demonstration. The Final LPDS shall incorporate all Government comments that were provided during Technical Manual Verification and Logistics Demonstration. After receiving the submission, allow 15 days for the Government to review/approve the Final LPDS. If the Final LPDS is not approved, the re-submissions of the Final is due 10 days after receiving notification of Government disapproval. Allow 10 days for the Government to review/approve the resubmitted Final LPDS. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final LPDS is approved.
The approved Final LPDS shall be incorporated into the Maintenance Manual (CDRL A012) as an appendix and any other manuals/documents as required in the contract.
Danelle M. Crisler Kevin J. Gould
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SESS
CM-523/U Spectrum Analyzer
If a submission date occurs on a Saturday, the contractor shall submit the LPDS the previous Friday. If the submission date occurs on a Sunday, the contractor shall submit the LPDS the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the LPDS the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the LPDS on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Administrative or Operational Use 7 September 2021. Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
Export - Control Act Warning - Not required
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
SESS
CM-523/U Spectrum Analyzer
A010 Product Engineering Design Data and Associated Lists
DI-SESS-81000F SOW 3.12.3.1 SFAE-CSS-FP-TM-TEMOD
DD
A C
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD 1 2 0
1 2 0
Block 4:
The Contractor shall follow the format of the Product Engineering Design Data and Associated Lists In Accordance With DI-SESS-81000F located at https://quicksearch.dla.mil/qsSearch.aspx
Blocks 8, 10, 11, 12, 13:
The Draft Product Engineering Design Data and Associated Lists are due 60 days after the Start of Work Meeting. After receiving the submission, allow 45 days for the Government to review/comment on the Draft Product Engineering Design Data and Associated Lists. If the draft Product Engineering Design Data and Associated Lists are not approved, the resubmitted Draft is due 30 days after receiving notification of Government disapproval.
Allow 30 days for the Government to review/approval the resubmitted Draft Product Engineering Design Data and Associated Lists. If the resubmitted Draft is not approved, the disapproval path as outlined above will be followed until the Draft Product Engineering Design Data and Associated Lists are approved.
The Provisioning Conference will be held in conjunction with the Operator's Manual Verification (CDRL A011) that starts no later than 45 days after the Preliminary Technical Manual is submitted. Product Engineering Design Data and Associated Lists changes shall be incorporated as agreed to at the Provisioning Conference.
The Final Product Engineering Design Data and Associated Lists are due 30 days after Provisioning Conference has concluded. Final Product Engineering Design Data and Associated Lists are required for each item that is a non-commercial off-the-shelf part.
After receiving the submission, the Government has 30 days to provide review/approval of the Final. If the final Product Engineering Design Data and Associated Lists are not approved, the resubmitted Final is due 30 days after receiving notification of Government disapproval. Allow 30 days for the Government to review/approval the resubmitted Final Product Engineering Design Data and Associated Lists. If the resubmitted Final is not approved, the disapproval path as outlined above will be followed until the Final Product Engineering Design Data and Associated Lists are approved.
Submissions shall be accompanied by Letter of Transmittal (LT).
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
SESS
CM-523/U Spectrum Analyzer
If a submission date occurs on a Saturday, the contractor shall submit the Product Engineering Design Data and Associated Lists the previous Friday.
If the submission date occurs on a Sunday, the contractor shall submit the Product Engineering Design Data and Associated Lists the following Monday. For any holiday, other than Thanksgiving and Christmas, the contractor shall submit the Product Engineering Design Data and Associated Lists the following business day. If a submission date occurs the week of Thanksgiving or Christmas, the contractor shall submit the Product Engineering Design Data and Associated Lists on the first business day the week following the holiday. The submission(s) that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other submission dates as written.
If the conference occurs on a weekend, the contractor shall plan to attend the event the following week. For any holiday, other than Thanksgiving and Christmas, the contractor shall plan to attend the conference the following business day. If the conference occurs the week of Thanksgiving or Christmas, the contractor shall plan to attend the event within the following two weeks, at the Government’s discretion. The conference that occurs on a weekend or holiday is the only occurrence that will be moved out of sequence, the contractor shall adhere to all other meeting, IPR, and conference dates as written.
Block 9:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors Export Controlled 7 September 2021.
Other requests for this document shall be referred to PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN: SFAE-CSS-FP-TM-TEMOD Redstone Arsenal, AL 35898-5000.
Block 14:
Submit 1 each hard copy and 1 each electronic copy for each drawing.
Mail to:
Product Director, Test Measurement & Diagnostic Equipment ATTN: SFAE-CSS-FP-TM-TEMOD (OS-307/U Project) Building #3651 Army TACMS Drive Redstone Arsenal, AL 35898-5000 or email to: usarmy.redstone.peo-cs-css.mbx.pd-tmde-temod1@mail.mil
WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
2 1
*NOTE: 3Di viewable will be in ISO 32000 pdf format unless otherwise specified.
13781659 - 13781673
*NOTE: USE OF SEPARATE PARTS OR WIRING LISTS ARE NOT RECOMMENDED ESPECIALLY WITH TYPE 3D TDPS.
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
A
CM-523/U Spectrum Analyzer
A011 Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs)
Operator's Manual
MIL-STD-40051-2D SEE BLK 16 SFAE-CSS-FP-TM-TEMOD
DD
A A
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
SFAE-CSS-FP-TM-
TEMOD
30% Draft 1 0 0 70% Draft 2 0 0
PTM 1 0 0
FRC 0 1 1
100% Maintenance Software CD-ROM 0 2 0 Master Source Code 0 2 0
Detailed Report 0 1 0
4 6 1
Block B:
Refer to Exhibit A (Table A-II. TM Requirements Matrix for CM-523/U).
Block 4:
The Contractor shall follow the format of the Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs), hereinafter referred to as Operator's Manual, In Accordance With MIL-STD-40051-2D located at https://quicksearch.dla.mil/qsSearch.asp
Block 5: SOW 3.7.1.1, 3.7.1.3, 3.7.1.5, 3.7.1.6.1, 3.7.1.8.3, 3.7.1.8.4, 3.9.5
Blocks 8, 10, 11, 12, 13:
The 30% Operator's Manual submission is due 45 days after the Start of Work Meeting.
After receiving the submission, allow 15 days for the Government to review/comment on the 30% Manual. The contractor shall incorporate all provided Government comments into the Manual before the 70% Operator's Manual is submitted.
The 70% Operator's Manual content XML-tagged files and related illustrations submission is due 95 days after the Start of Work Meeting. After receiving the submission, allow 20 days for the Government to review/comment on the 70% Manual. The contractor shall incorporate all provided Government comments into the Manual before contractor validation begins.
The contractor shall notify the Government 15 days prior to the start of the validation of the Operator's Manual, and shall submit a 100% Operator's Manual content, XML-tagged files, and related illustrations to the Government. The Contractor shall complete the validation no later than 180 days after the Start of Work Meeting.
The Preliminary Technical Manual is due 15 days after the validation is complete, and shall be accompanied by a separate list of all validated proposed faults that are identified in the PTM. Government Verification of the Preliminary Technical Manual starts no later than 45 days after the Preliminary Technical Manual is submitted.
Five days after completing the Verification and Logistics Demonstration, a detailed report shall be submitted.
Danelle M. Crisler Kevin J Gould
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .