Exhibit 2 - Section B Vessel Maintenance.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Vessel Maintenance and Logistics Services”. Federal contract opportunity
Solicitation number
70B02C20R00000028
Issued by
Department of Homeland Security Customs and Border Protection

About this file

This document outlines a cost reimbursement contract for vessel maintenance and logistics services for the U.S. Customs and Border Protection. The contract includes a base year and up to nine option years, with various cost-plus and firm fixed price contract line items covering program management, vessel maintenance, materials, travel, training, facilities, and surge activities. Estimated costs total over $211 million for the potential contract duration. The solicitation requests proposals from small businesses due by 5 calendar days after receipt for vessel maintenance and logistics services to support the Office of Air and Marine Operations. The selected contractor will provide labor, materials, equipment and logistical support to meet the requirements in the performance work statement and contract terms.

View the file

Other files for this federal contract opportunity

Other files attached to Vessel Maintenance and Logistics Services”., newest first.
File Type Posted
Vessel Maintenance RFP Questions and Answers 9.14.20.pdf PDF
70B02C20R00000028-A0001 VMLS 9.14.20.pdf PDF
Att (2) Quality Assurance Surveillance Plan--Maintenance Contract.pdf PDF
Att (4) Award Fee-Plan.pdf PDF
Att (3) QASP Appendix 1-Performance Parameters.pdf PDF
Att (6) SCA WDOL List R1.pdf PDF
Att (1) NMC VMLS PWS 7-21-2020.pdf PDF
Att (5) Maintenance Contract Brief DW Industry Day.pptx PPTX presentation
Exhibit 1 - Cost Price Proposal Worksheet Template.xlsx XLSX spreadsheet
70B02C20R00000028 VMLS 8.27.20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit 2 _ Section B

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
NATIONAL VESSEL MAINTENANCE AND LOGISTICS (RFP 70B02C0R00000028)
The Contractor shall provide all labor, material, equipment, tools, data, and etc (total logistics support) to meet the requirements of the Performance Work Statement (PWS), terms and conditions of the contract, and Contractor’s proposal (as incorporated into said contract) in support of Customs and Border Protection Vessel fleet.
TRANSITION PERIOD (TD)
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
TDPHASE INPHZ-INPhase In/TransitionFFP2/1/213/31/212$ - 0$ - 0$0
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
ABASE0001Program Management/Key PersonnelFFP4/1/213/31/2212$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BBASE0002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/213/31/2212$ - 0$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
CBASE0003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/213/31/2212$ 9,000,000$9,000,000
CBASE0004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/213/31/2212$ 500,000$500,000
CBASE0005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/213/31/2212$ 10,000$10,000
CBASE0006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/213/31/2212$ 2,700,000$2,700,000
CBASE0007Sites/Facilities/LeaseCR4/1/213/31/2212$ 3,000,000$3,000,000
CBASE0008SURGE: UNFORSEEN ACTIVITIES
CR4/1/213/31/2212$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-BYContract Deliverables (Appendix 3 of Attachment (2) PWS) NSP BASE YEARS TOTAL ALL CLINS$19,210,000
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 11001Program Management/Key PersonnelFFP4/1/223/31/2312$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 11002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/223/31/2312$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 11003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/223/31/2312$ 9,300,000$9,300,000
COption Year 11004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/223/31/2312$ 520,000$520,000
COption Year 11005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/223/31/2312$ 10,000$10,000
COption Year 11006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/223/31/2312$ 2,800,000$2,800,000
COption Year 11007Sites/Facilities/LeaseCR4/1/223/31/2312$ 3,000,000$3,000,000
COption Year 11007SURGE: UNFORSEEN ACTIVITIES
CR4/1/223/31/2312$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY1Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 1 TOTAL ALL CLINS$19,630,000
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 22001Program Management/Key PersonnelFFP4/1/233/31/2412$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 22002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/233/31/2412$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 22003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/233/31/2412$ 9,600,000$9,600,000
COption Year 22004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/233/31/2412$ 500,000$500,000
COption Year 22005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/233/31/2412$ 10,600$10,600
COption Year 22006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/233/31/2412$ 3,000,000$3,000,000
COption Year 22007Sites/Facilities/LeaseCR4/1/233/31/2412$ 3,000,000$3,000,000
COption Year 22008SURGE: UNFORSEEN ACTIVITIES
CR4/1/233/31/2412$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY2Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 2 TOTAL ALL CLINS$20,110,600
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 33001Program Management/Key PersonnelFFP4/1/243/31/2512$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 33002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/243/31/2512$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 33003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/243/31/2512$ 9,900,000$9,900,000
COption Year 33004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/243/31/2512$ 550,000$550,000
COption Year 33005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/243/31/2512$ 10,900$10,900
COption Year 33006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/243/31/2512$ 3,100,000$3,100,000
COption Year 33007Sites/Facilities/LeaseCR4/1/243/31/2512$ 3,000,000$3,000,000
COption Year 33008SURGE: UNFORSEEN ACTIVITIES
CR4/1/243/31/2512$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY3Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 3 TOTAL ALL CLINS$20,560,900
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 44001Program Management/Key PersonnelFFP4/1/253/31/2612$ - 0$ - 0$ - 0$ - 0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 44002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/253/31/2612$ - 0$ - 0$ - 0$ - 0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 44003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/253/31/2612$ 10,200,000$10,200,000.00
COption Year 44004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/253/31/2612$ 570,000$570,000.00
COption Year 44005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/253/31/2612$ 11,000$11,000
COption Year 44006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/253/31/2612$ 3,100,000$3,100,000
COption Year 44007Sites/Facilities/LeaseCR4/1/253/31/2612$ 3,000,000$3,000,000
COption Year 44007SURGE: UNFORSEEN ACTIVITIES
CR4/1/253/31/2612$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY4Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 4 TOTAL ALL CLINS$20,881,000
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 55001Program Management/Key PersonnelFFP4/1/263/31/2712$ - 0$ - 0$ - 0$ - 0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 55002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/263/31/2712$ - 0$ - 0$ - 0$ - 0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 55003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/263/31/2712$ 10,500,000$10,500,000
COption Year 55004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/263/31/2712$ 580,000$580,000
COption Year 55005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/263/31/2712$ 11,500$11,500
COption Year 55006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/263/31/2712$ 3,200,000$3,200,000
COption Year 55007Sites/Facilities/LeaseCR4/1/263/31/2712$ 3,000,000$3,000,000
COption Year 55008SURGE: UNFORSEEN ACTIVITIES
CR4/1/263/31/2712$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY5Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 5 TOTAL ALL CLINS$21,291,500
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 66001Program Management/Key PersonnelFFP4/1/273/31/2812$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 66002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/273/31/2812$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 66003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/273/31/2812$ 10,800,000$10,800,000
COption Year 66004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/273/31/2812$ 600,000$600,000
COption Year 66005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/273/31/2812$ 11,900$11,900
COption Year 66006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/273/31/2812$ 3,300,000$3,300,000
COption Year 66007Sites/Facilities/LeaseCR4/1/273/31/2812$ 300,000$3,000,000
COption Year 66008SURGE: UNFORSEEN ACTIVITIES
CR4/1/273/31/2812$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY6Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 6 TOTAL ALL CLINS$21,711,900
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 77001Program Management/Key PersonnelFFP4/1/283/31/2912$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 77002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/283/31/2912$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 77003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/283/31/2912$ 11,200,000$11,200,000
COption Year 77004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/283/31/2912$ 620,000$620,000
COption Year 77005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/283/31/2912$ 12,200$12,200
COption Year 77006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/283/31/2912$ 3,400,000$3,400,000
COption Year 77007Sites/Facilities/LeaseCR4/1/283/31/2912$ 3,000,000$3,000,000
COption Year 77008SURGE: UNFORSEEN ACTIVITIES
CR4/1/283/31/2912$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY7Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 7 TOTAL ALL CLINS$22,232,200
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 88001Program Management/Key PersonnelFFP4/1/293/31/3012$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 88002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/293/31/3012$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 88003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/293/31/3012$ 11,500,000$11,500,000
COption Year 88004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/293/31/3012$ 640,000$640,000
COption Year 88005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/293/31/3012$ 12,600$12,600
COption Year 88006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/293/31/3012$ 3,500,000$3,500,000
COption Year 88007Sites/Facilities/LeaseCR4/1/293/31/3012$ 3,000,000$3,000,000
COption Year 88008SURGE: UNFORSEEN ACTIVITIES
CR4/1/293/31/3012$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY8Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 8 TOTAL ALL CLINS$22,652,600
PART A – FIRM FIXED PRICE (IAW FAR 16.202-1) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsFixed CostProfitTOTAL FIRM FIXED PRICE
AOption Year 99001Program Management/Key PersonnelFFP4/1/303/31/3112$ - 0$ - 0$ - 0$0
PART B – COST PLUS AWARD FEE (IAW FAR 16.305) CONTRACT LINE ITEM - -
Part IDPeriodCLIN #DescriptionContract TypePOP StartPOP EndMonthsEstimated CostBase Fee - NTE 3%Estimated Cost Plus Base FeeAward Fee - NTE 9%TOTAL COST PLUS AWARD FEE
BOption Year 99002VESSEL MAINTENANCE & LOGISTICS SUPPORT (EXCLUDING Part A above) Cost Plus Award Fee for all labor, & ODCs (costs directly related to a vessel).CPAF4/1/303/31/3112$ - 0$ - 0$ - 0$0
PART C – COST REIMBURSEMENT CONTRACT LINE ITEMS - -
COption Year 99003MATERIAL (Reimbursement shall be limited vendors’ material invoices, shipping charges, ODCs and applicable overhead and G&A)
CR4/1/303/31/3112$ 11,800,000$11,800,000
COption Year 99004TRAVEL

(Reimbursement shall be limited to FAR 31.205-46 and applicable overhead and G&A)

CR4/1/303/31/3112$ 660,000$660,000
COption Year 99005TRAINING

(Allowable on a case-by-case basis-If allowable, reimbursement shall be limited to registration fee, course cost, testing fee, text material cost, related travel costs (IAW FAR 31.205-46), and applicable G&A)

CR4/1/303/31/3112$ 13,000$13,000
COption Year 99006TOOLS, OUTSIDE SERVICES, CONSUMABLES, MACHINES, ETC,

Other indirect costs incurred in the performance of this contract.

CR4/1/303/31/3112$ 3,600,000$3,600,000
COption Year 99007Sites/Facilities/LeaseCR4/1/303/31/3112$ 3,000,000$3,000,000
COption Year 99008SURGE: UNFORSEEN ACTIVITIES
CR4/1/303/31/3112$ 4,000,000$4,000,000
PART D – NOT SEPARATELY PRICE (NSP) CONTRACT LINE ITEMS
DCDRL-OY9Contract Deliverables (Appendix 3 of Attachment (2) PWS) NSP OPTION YEAR 9 TOTAL ALL CLINS$23,073,000
Item #DescriptionQTYUnitUnit PriceExt Price
10CONUS$ - 0$0
Total Funded Award$211,353,700