EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES.pdf
PDF 189 KB Posted
- Attached to
- Grease Interceptor Services
- Solicitation number
- OP137196(3)
- Issued by
- California
About this file
This is a Schedule of Quantities and Prices exhibit for a grease interceptor services contract (IFB No. OP137196(3)) issued by Metro for a five-year term. The contract encompasses maintenance and as-needed interior tank cleanup services at multiple locations, including current locations at the Cafeteria and Child Care Center (both at P1 Level) and future locations at USG-West Portal. Maintenance services are charged on a monthly basis with specified annual service frequencies. As-needed interior tank cleanup services may be performed up to twice during the contract term and will be conducted in conjunction with monthly maintenance services. The quantities and locations listed are estimates for proposal assessment purposes only, with no guaranteed minimum or maximum quantities, and Metro reserves the right to add or remove services and locations as needed throughout the contract period.
All unit rates quoted by bidders must remain firm for the entire five-year contract duration. Bidders are required to complete the pricing schedule by entering service costs per location and calculating annual and five-year totals for both maintenance services and as-needed cleanup services. The total cost must be all-inclusive, covering all materials, labor, equipment, taxes, insurance, travel time, overhead, and applicable fees and profit. Bidders must provide separate cost calculations for current locations and future locations, with a final consolidated five-year contract cost summary. The pricing structure requires bidders to establish fixed unit costs that will apply consistently across all service periods throughout the contract term.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bidder:_____________________
EXHIBIT 2 - SCHEDULE OF QUANTITIES AND PRICES
GREASE INTERCEPTOR SERVICES
IFB NO. OP137196(3)
FIVE YEAR CONTRACT
Quantities listed herein are not to be construed as a commitment and are to be used for proposal assessment purposes only. No minimum or maximum is guaranteed or implied. All unit rates as quoted will remain firm for the term of this contract. Total cost shall include all materials, labor, equipment, taxes, insurance, travel time, company's overhead along with any applicable fees and profit. Metro reserves the right to add or remove services and/or locations as needed.
MAINTENANCE COST-Current locations
Location (A)
Service Cost
(B)
Annual Service
Frequency
(C)
Annual Cost
(A x B)
Cafeteria – P1 Level $ 12 $
Child Care Center – P1 Level $ 12 $
Total Annual Cost (D) $
(E) Years 1 to 5 - Total Maintenance Cost (D x 5): $
MAINTENANCE COST-Future locations
(F)
Service Cost
(G)
Annual Service
Frequency
(H)
Annual Cost
(F x G)
USG-West Portal $ 4 $
(I) Years 1 to 5 - Total Maintenance Cost (H x 5): $
(E) Years 1 to 5 - Total Maintenance Cost - Current locations $
(I) Years 1 to 5 - Total Maintenance Cost - Future locations $
(J) Total 5 Year Maintenance Cost (E +J) $
Quantities listed herein are not to be construed as a commitment and are to be used for proposal assessment purposes only. No minimum or maximum is guaranteed or implied. All unit rates as quoted will remain firm for the term of this contract. Total cost shall include all materials, labor, equipment, taxes, insurance, travel time, company's overhead along with any applicable fees and profit. Metro reserves the right to add or remove services and/or locations as needed.
AS NEEDED SERVICES-INTERIOR TANK CLEANUP-Current locations (Refer to Exhibit A – Statement of Work, Section V., Paragraph
J.)
(K)
Quantity
(L)
Unit Cost
(M)
Total Cost
(K x L)
Cafeteria – P1 Level 2 $ $
Child Care Center– P1 Level 2 $ $
(N) Total As Needed Services Cost $
AS NEEDED SERVICES-INTERIOR TANK CLEANUP-Future locations
(O)
Quantity
(P)
Unit Cost
(Q)
Total Cost
(O x P)
USG-West Portal 2 $ $
(R) Total As Needed Services Cost (R) $
*As-needed services may be performed twice (2) during the life of the contract term and will be performed in conjunction with the monthly services of the grease interceptors.
(N) Years 1 to 5 – As Needed Services Cost - Current locations $
(R) Years 1 to 5 – As Needed Services Cost - Future locations $
(S) Total 5 Year As Needed Services Cost (N + R) $
Quantities listed herein are not to be construed as a commitment and are to be used for proposal assessment purposes only. No minimum or maximum is guaranteed or implied. All unit rates as quoted will remain firm for the term of this contract. Total cost shall include all materials, labor, equipment, taxes, insurance, travel time, company's overhead along with any applicable fees and profit. Metro reserves the right to add or remove services and/or locations as needed.
FIVE (5) YEAR CONTRACT SUMMARY
(J) Total 5 Year Maintenance Cost
(S) Total 5 Year As Needed Services
(T) Total 5 Year Contract Cost (J + S) $
File details come from the government source that posted it. Updated .