This is a set of construction document drawings for the Lamar North and South Plant Chiller Replacement project located at Lamar University in Beaumont, Texas. The project involves the replacement of existing chillers CH-1 and CH-2 at both the North Central Plant and South Central Plant facilities. The scope of work includes demolition of four existing 800-ton water-cooled chillers, removal of associated piping and electrical systems, installation of four new 800-ton chillers with R-513A refrigerant, and replacement of selected balance and isolation valves, control devices, and magnetic flow meters. The new chillers will feature marine water boxes on the condenser barrels with side connections and stacked chilled water supply and return flange connections. The project documents are dated March 19, 2026, and include mechanical demolition plans, piping renovation plans, ductwork and refrigerant monitoring plans, electrical power renovation plans, mechanical schedules, and detailed construction specifications. The drawings indicate that existing chiller CH-3 will remain in service and that existing refrigerant relief piping, exhaust fans, and isolation valves will be retained where applicable.
The project requires coordination with existing building systems including the chilled water distribution system serving North and West campus areas, condenser water supply and return headers, and refrigerant exhaust and monitoring systems. New refrigerant monitoring panels compliant with MSA Chillgard 5000 standards will be installed to support the new R-513A refrigerant while maintaining compatibility with the existing R-134A refrigerant used in chiller CH-3. Electrical work includes installation of new medium-voltage reduced-voltage soft-start starters, branch circuits with 5kV cable, and control circuits for each new chiller. The contractor must field-verify existing equipment locations, obtain owner approval for service interruptions, coordinate with the construction manager and owner to minimize operational disruption, and comply with all National Electrical Code requirements and fire-resistance rating standards. The project documents specify that demolition and installation work will be fast-tracked to allow all four chillers to be operational simultaneously, with existing housekeeping pads reused to support the new equipment on neoprene isolation pads.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS - EQUIPMENT
AC - AIR CONDITIONING UNIT /
AIR COMPRESSOR
ACB - ACTIVE CHILLED BEAM
ACC - AIR COOLED CONDENSER
ACCU - AIR COOLED CONDENSING UNIT
ACU - AIR CONDITIONING UNIT
ACDH - AIR CURTAIN DOOR HEATER
ADS - AIR AND DIRT SEPARATOR
AHU - AIR HANDLING UNIT
AMD - AIR MIXING DEVICE
AS - AIR SEPARATOR
AT - AIR TERMINAL DEVICE
B - BOILER
BBS - BOILER BLOWDOWN
SEPARATOR
BCU - BLOWER COIL UNIT
BFS - BOILER FEEDWATER SYSTEM
BH - BOOSTER HUMIDIFIER
BHRS - BOILER BLOWDOWN HEAT
RECOVERY SYSTEM
C - CONVECTOR
CC - COOLING COIL
CD - CEILING DIFFUSER
CH - CHILLER
CP - CONDENSATE PUMP /
CONTROL PANEL
CRAC - COMPUTER ROOM
AIR CONDITIONER
CT - COOLING TOWER
CTS - COOLING TOWER SUMP
CUH - CABINET UNIT HEATER
CV - CONVERTOR
D - DAMPER
DA - DEAERATOR
DC - DUST COLLECTOR /
DRY COOLER
DH - DEHUMIDIFIER
DOAS - DEDICATED OUTSIDE AIR
SYSTEM
DT - DAY TANK
EF - EXHAUST FAN
EG - EXHAUST GRILLE
EH - EXHAUST HOOD /
ELECTRIC HEATER
EJ - EXPANSION JOINT
ERW - ENERGY RECOVERY WHEEL
ET - EXPANSION TANK
EV - EXHAUST VALVE
EXV - ELECTRONIC EXPANSION VALVE
F - FILTER
FAI - FRESH AIR INTAKE
FCU - FAN COIL UNIT
FD - FLOOR DRAIN /
FLOOR DIFFUSER
FFU - FAN FILTER UNIT
FOP - FUEL OIL PUMP
FOT - FUEL OIL TANK
FR - FIN TUBE RADIATION
FT - FLASH TANK
FU - FURNACE
G - GRILLE
H - HUMIDIFIER
HC - HEATING COIL
HP - HEAT PUMP
HRC - HEAT RECOVERY COIL
HR - HOSE REEL
HRD - HEAT RECLAIM DEVICE
HRW - HEAT RECOVERY WHEEL
HRU - HEAT RECOVERY UNIT
HT - HEAT TRACE
HX - HEAT EXCHANGER
IH - INTAKE HOOD
IRH - INFRARED RADIANT HEATER
L - LOUVER
LD - LINEAR DIFFUSER\
LG - LINEAR GRILLE
MAU - MAKE-UP AIR UNIT
MCC - MOTOR CONTROL CENTER
P - PUMP
PCB - PASSIVE CHILLED BEAM
PHC - PREHEAT COIL
PRV - PRESSURE REDUCING VALVE /
PRESSURE REGULATING VALVE
RCP - RADIANT CEILING PANEL
RF - RETURN FAN
RH - RELIEF HOOD
RC - REHEAT COIL
RTU - ROOF TOP AIR HANDLING UNIT
RV - RELIEF VALVE
SAD - SOUND ATTENUATING DEVICE
SC - SOLAR COLLECTOR
SCR - SILICON CONTROLLED RECTIFIER
SD - SUCTION DIFFUSER
SF - SUPPLY FAN
SG - SUPPLY GRILLE
SRV - SAFETY RELIEF VALVE
ST - STEAM TRAP
T - TANK
TF - TRANSFER FAN
TG - TRANSFER GRILLE
TXV - THERMAL EXPANSION VALVE
UH - UNIT HEATER
USG - UNFIRED STEAM GENERATOR
UST - UNDERGROUND STORAGE TANK
UV - UNIT VENTILATOR
V - VALVE
VFD - VARIABLE FREQUENCY DRIVE
VRF - VARIABLE REFRIGERANT FLOW
WCC - WATER COOLED CONDENSER
WCCU - WATER COOLED CONDENSING
UNIT
WF - WATER FILTER
WFM - WATER FLOW METER
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AL - ALUMINUM
ALT - ALTERNATE
AP - ACCESS PANEL
AVG - AVERAGE
BAS - BUILDING AUTOMATION SYSTEM
BE - BATTERY EXHAUST
BHP - BRAKE HORSEPOWER
BOD - BOTTOM OF DUCT
BOP - BOTTOM OF PIPE
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNITS
PER HOUR
BWE - BAKED WHITE ENAMEL
CA - COMBUSTION AIR
CAP - CAPACITY
CAV - CONSTANT AIR VOLUME
CE - CAGEWASH EXHAUST
CFCI - CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CFH - CUBIC FEET PER HOUR
CFM - CUBIC FEET PER MINUTE
CL - CENTERLINE
CLG - CEILING
COND - CONDENSATE /
CONDENSER
CONN - CONNECTION
COP - CENTER OF PIPE
CS - CARBON STEEL
CU - COPPER
DAT - DISCHARGE AIR TEMPERATURE
DB - DRY BULB
DDC - DIRECT DIGITAL CONTROL
DE - DISHWASHER EXHAUST
DIA - DIAMETER
DIM - DIMENSION
DP - DEW POINT
DX - DIRECT EXPANSION
EA - EXHAUST AIR / EACH
EAT - ENTERING AIR TEMPERATURE
EC - ELECTRICAL CONTRACTOR
ECM - ELECTRICALLY COMMUTATED
MOTOR
EDR - EQUIVALENT DIRECT RADIATION
EFF - EFFICIENCY
EG - ETHYLENE GLYCOL
EL - ELEVATION
ESP - EXTERNAL STATIC PRESSURE
ETR - EXISTING TO REMAIN
EWT - ENTERING WATER
TEMPERATURE
EXH - EXHAUST
FA - FIELD ADJUSTABLE
FAT - FINAL AIR TEMPERATURE
FC - FAIL CLOSED
FHE - FUME HOOD EXHAUST
FLA - FULL LOAD AMPS
FLP - FAIL LAST POSITION
FLR - FLOOR
FO - FAIL OPEN
FPI - FINS PER INCH
FPM - FEET PER MINUTE
FPS - FEET PER SECOND
FT - FEET
GA - GAUGE
GAL - GALLONS
GC - GENERAL CONTRACTOR
GE - GENERAL EXHAUST
GPM - GALLONS PER MINUTE
GR - GRAINS
GS - GALVANIZED STEEL
H - HEIGHT
HP - HORSE POWER /
HIGH POINT
HR - HUMIDITY RATIO /
HOUR
HZ - HERTZ
IA - INSTRUMENT AIR
IE - INVERT ELEVATION
IN - INCH
KE - KITCHEN EXHAUST
KO - KNOCK-OUT
KW - KILOWATT
KWH - KILOWATT - HOUR
L - LENGTH
LAT - LEAVING AIR TEMPERATURE
LB - POUND
LBS - POUNDS
LEA - LABORATORY EXHAUST AIR
LGE - LABORATORY GENERAL EXHAUST
LP - LOW POINT
LSA - LABORATORY SUPPLY AIR
LWT - LEAVING WATER TEMPERATURE
MAX - MAXIMUM
MBH - THOUSANDS OF BTU PER HOUR
MC - MECHANICAL CONTRACTOR
MEP - MECHANICAL, ELECTRICAL,
AND PIPING
MER - MECHANICAL EQUIPMENT ROOM
MIN - MINIMUM
NA - NOT APPLICABLE
NC - NORMALLY CLOSED
NIC - NOT IN CONTRACT
NO - NORMALLY OPEN
NOM - NOMINAL
NPS - NOMINAL PIPE SIZE
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTSIDE AIR
OC - ON CENTER
OED - OPEN END DUCT
OFCI - OWNER FURNISHED,
CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED,
OWNER INSTALLED
OV - OUTLET VELOCITY
PA - PLANT AIR
PC - PLUMBING CONTRACTOR
PCF - POUNDS PER CUBIC FOOT
PD - PRESSURE DROP
PG - PROPYLENE GLYCOL
PH - PHASE
PP - POLYPROPYLENE
PPH - POUNDS PER HOUR
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSIA - POUNDS PER SQUARE INCH
ABSOLUTE
PSIG - POUNDS PER SQUARE INCH
GAUGE
QTY - QUANTITY
RA - RETURN AIR
RH - RELATIVE HUMIDITY
RPM - REVOLUTIONS PER MINUTE
SA - SUPPLY AIR
SCCR - SHORT CIRCUIT CURRENT RATING
SCH - SCHEDULE
SOG - SLAB ON GRADE
SP - STATIC PRESSURE
SQ - SQUARE
SS - STAINLESS STEEL
TA - TRANSFER AIR
TBR - TO BE REMOVED
TCC - TEMPERATURE CONTROL
CONTRACTOR
TE - TOILET EXHAUST
TOB - TOP OF BEAM
TOD - TOP OF DUCT /
TOP OF DECK
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB
TSP - TOTAL STATIC PRESSURE
TYP - TYPICAL
V - VOLTS
VAV - VARIABLE AIR VOLUME
VEA - VIVARIUM EXHAUST AIR
VEL - VELOCITY
VP - VELOCITY PRESSURE
VSA - VIVARIUM SUPPLY AIR
VTR - VENT THRU ROOF
W - WATT /
WIDTH
WB - WET BULB
WC - WATER COLUMN
WG - WATER GAUGE
WMG - WIRE MESH GRILLE
WPD - WATER PRESSURE DROP
WWM - WELDED WIRE MESH
X - EXISTING
ABBREVIATIONS - GENERAL
RHG
LPG
FOS
FOR
FOV
FOF
FOG
LOS
LOR
RWS
RWR
LPS
LPC
HPS(XX)
HPC(XX)
CPD
HWS
HWR
CHWS
CHWR
BFW
BBD
GWR
GWS
D
PCWS
PCWR
RL
RS
FUEL RETURN
FUEL SUPPLY
IA(XX)
CA(XX)
FUEL OIL FILL
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
LIQUIFIED PETROLEUM GAS
FUEL OIL SUPPLY
FUEL OIL RETURN
FUEL OIL VENT
FUEL OIL GAUGE
LUBRICATION OIL RETURN
LUBRICATION OIL SUPPLY
JACKET WATER SUPPLY
JACKET WATER RETURN
COMPRESSED AIR (XX=PSI)
RECLAIM WATER RETURN
RECLAIM WATER SUPPLY
INSTRUMENT AIR (XX=PSI)BOILER FEED WATER
LOW PRESSURE STEAM
LOW PRESSURE CONDENSATE
HIGH PRESSURE STEAM
HIGH PRESSURE CONDENSATE
CONDENSATE PUMP DISCHARGE
HEATING HOT WATER SUPPLY
HEATING HOT WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
TOWER WATER SUPPLY
TOWER WATER RETURN
BOILER BLOW DOWN
GLYCOL WATER SUPPLY
GLYCOL WATER RETURN
PROCESS COOLING
WATER RETURN
PROCESS COOLING
WATER SUPPLY
VENT
DRAIN
TWR
TWS
FS
FR
JWS
JWR
V
CCC COOLING COIL CONDENSATE
NG(XX) NATURAL GAS (XX=PSI)
NP NON-POTABLE WATER
PHWS
PHWR PREHEAT WATER RETURN
PREHEAT WATER SUPPLY
PIPING SYSTEM LABELS
(FC) = FAIL CLOSED (CONTROL VALVE)
(FO) = FAIL OPEN (CONTROL VALVE)
(NC) = NORMALLY CLOSED (CONTROL VALVE)
(NO) = NORMALLY OPEN (CONTROL VALVE)
(XX) = DEFINES FAIL POSITION OR NORMAL POSITION
BUTTERFLY VALVE DRAIN VALVE W/ HOSE
CONNECTION
VALVES
GATE VALVE
GLOBE VALVE
BALL VALVE
SHUTOFF VALVE (BUTTERFLY
VALVE FOR 2-1/2" AND LARGER.
BALL VALVE FOR 2" AND
SMALLER)
GAUGE VALVE
PLUG VALVE
BALANCING VALVE
THERMAL EXPANSION VALVE
SPRING CHECK VALVE
SWING CHECK VALVE
DIAPHRAGM VALVE
2-WAY SOLENOID CONTROL VALVE
(VALVE BODY AS SPECIFIED)
S
XX
2-WAY MOTOR CONTROL VALVE
(VALVE BODY AS SPECIFIED)
M
XX
2-WAY CONTROL VALVE
(VALVE BODY AS SPECIFIED)XX
3-WAY MIXING VALVE WITH ARROW
INDICATING FAIL POSITION
3-WAY DIVERTING VALVE WITH
ARROW INDICATING FAIL POSITION
TRIPLE DUTY VALVE
GAS SHUTOFF VALVE
ANGLE VALVE
DRAIN VALVE W/ HOSE
CONNECTION AND CAP
LOCKSHIELD VALVE
PRESSURE REDUCING VALVE -
PRV (DOWNSTREAM CONTROL
POINT)
INLET PRESSURE
REGULATING VALVE
(UPSTREAM CONTROL POINT)
AIR-LOADED PRESSURE
REDUCING VALVE - PRV
(DOWNSTREAM CONTROL
POINT)
PRESSURE RELIEF VALVE
(RV) OR SAFETY VALVE (SV)
VACUUM RELIEF/VACUUM
BREAKER
RUPTURE DISK - VACUUM
RELIEF
FLOAT OPERATED VALVE
QUICK OPENING VALVE
RPBP
OR
ECCENTRIC REDUCER
CONCENTRIC REDUCER
PIPING
TOP CONNECTION
(45° OR 90°)
BOTTOM CONNECTION
(45° OR 90°)
45° PIPE RISE(R) / DROP(D)
TEE (REFER TO
SPECIFICATION FOR SIDE,
TOP OR BOTTOM TEE)
EXISTING PIPING
TO BE REMOVED
EXISTING PIPING TO REMAIN
LINE CONTINUATION BREAK
ELBOW UP
ELBOW DOWN
DOUBLE-LINESINGLE-LINE
OR
FLOW DIRECTION
CONNECTION POINT
R
N/A
GENERAL PIPELINE STRAINER
WITHOUT DRAIN BLOWDOWN
VALVE
GENERAL PIPELINE STRAINER
WITH DRAIN BLOWDOWN VALVE
STEAM & CONDENSATE
PIPELINE STRAINER WITH
BLOWDOWN VALVE
WATER SYSTEM PIPELINE
STRAINER WITH BLOWDOWN
VALVE
DUPLEX BASKET STRAINER
BASKET STRAINER
FLANGE
UNION
2" AND SMALLER, CAP OR PLUG
2-1/2" AND LARGER, BLIND FLANGE
INVERTED BUCKET STEAM TRAP
FLOAT AND THERMOSTATIC
STEAM TRAP
THERMOSTATIC STEAM TRAP
EXPANSION JOINT
PIPE FLEXIBLE CONNECTOR
BALL JOINT
FILTER/REGULATOR
THERMOMETER
PRESSURE GAUGE
(WITH GAUGE VALVE)
FLOW ELEMENT
(SENSOR)
FLOW SWITCH
AUTOMATIC AIR VENT
MANUAL AIR VENT
THERMOSTATIC AIR VENT
TEST PLUG
(PRESSURE/TEMP.)
ECCENTRIC REDUCER
DIRECTION OF PITCH (DOWN)
PIPE GUIDE
PIPE SLEEVE
PIPE ANCHOR
CONCENTRIC REDUCER
SUCTION DIFFUSER
PIPING SPECIALTIES
SYMBOLS INDICATED HERE AND NOT USED IN THE CONTRACT DOCUMENTS DO NOT
APPLY TO THIS PROJECT. ADDITIONAL SYMBOLS MAY BE INDICATED IN THE
CONTRACT DOCUMENTS.
MECHANICAL SYMBOLS AND ABBREVIATIONS
PILOT POSITIONER
MODULATING WITH
SOLENOID
MODULATING
GENERAL
MANUAL
FUSIBLE LINK
TWO POSITION
SPRING RETURN
DOUBLE ACTING
TWO POSITION
ELECTRIC MOTOR DRIVEN
S
M
ACTUATORS
DOUBLESINGLE
W
R=1.5W
EXHAUST AIR (EA) DUCT (SOLID LINES
TYPICAL FOR EXHAUST AIR UP,
HIDDEN LINE DOWN)
DUCT RISE/DROP W/ 90° ELBOWS
(OVAL DUCTS)
DUCT RISE (R)/DROP(D) W/ 45° ELBOWS
(RECTANGULAR DUCTS)
DUCT RISE/DROP W/ 90° ELBOWS
(ROUND DUCTS)
DUCT RISE(R)/DROP(D) W/ 45°
ELBOWS (ROUND OR OVAL DUCTS)
DUCT RISE/DROP W /90° ELBOWS
(SUPPLY RECTANGULAR DUCT SHOWN)
RETURN AIR (RA), RELIEF AIR, OR
TRANSFER AIR (TA) DUCT (SOLID LINES
TYPICAL FOR RETURN, RELIEF,OR
TRANSFER AIR UP, HIDDEN LINE DOWN)
SUPPLY AIR (SA) OR OUTDOOR AIR (OA)
DUCT (SOLID LINES TYPICAL FOR
SUPPLY AIR AND OUTDOOR AIR UP,
HIDDEN LINE DOWN)
EXISTING DUCT TO BE REMOVED
EXISTING DUCT TO REMAIN
TRANSITION - CONCENTRIC
TRANSITION - ECCENTRIC
SQUARE TEE (FOR LOW
PRESSURE SA DIVERGING ONLY)
ROUND/ROUND BRANCH TAKE-OFF
RECTANGULAR/ROUND BRANCH TAKE-OFF
R=1.5W
BULLHEAD TEE (FOR LOW
PRESSURE SA DUCTWORK ONLY)
15° MAX. FOR DIVERGING,
25° MAX FOR CONVERGING
RADIUS TEE
W
OR
15° MAX. FOR DIVERGING,
25° MAX FOR CONVERGING
45° LATERAL BRANCH
LINE CONTINUATION BREAK
(RECTANGULAR, ROUND)
RADIUS ELBOW
DUCTWORK
R R
R
G - RETURN OR EXHAUST GRILLE
SG - SUPPLY GRILLE
LD - LINEAR DIFFUSER
LG - LINEAR RET/EXH GRILLE
TG - TRANSFER GRILLE
12x6 G-1
12x6 EA
EXHAUST AIR DUCT
RETURN AIR DUCT (RA)
NECK SIZE IN INCHES
AIR QUANTITY (CFM)
DUCT SIZE IN INCHES
(NET INSIDE DIMENSIONS)
FIRST FIGURE: SIDE SHOWN
SECOND FIGURE: SIDE NOT
SHOWN
GRILLE, REGISTER NOTATION
10ø CD-1
10ø SA
SUPPLY AIR DUCT
NECK SIZE IN
INCHES
CEILING DIFFUSER
(CD) IDENTIFICATION
AIR QUANTITY (CFM)
DUCT SIZE IN INCHES
(NET INSIDE DIMENSIONS)
(ROUND SHOWN)
ø INDICATES ROUND.
#/# INDICATES OVAL.
FIRST FIGURE: SIDE SHOWN
SECOND FIGURE: SIDE NOT SHOWN
DIFFUSER AIR PATTERN
1 ARROW: 1 WAY
2 ARROWS: 2 WAY
3 ARROWS: 3 WAY
4 ARROWS: 4 WAY
NO ARROWS: 4 WAY
DIFFUSER NOTATION
(FC) = FAIL CLOSED (DAMPER)
(FO) = FAIL OPEN (DAMPER)
(NC) = NORMALLY CLOSED (DAMPER)
(NO) = NORMALLY OPEN (DAMPER)
(XX) = DEFINES FAIL POSITION OR NORMAL POSITION
1-1/2 HOUR RATED FIRE DAMPER
3 HOUR RATED FIRE DAMPER
BACKDRAFT DAMPER
CONTROL DAMPER
MANUAL BALANCING DAMPER
BD
F
FA
PARALLEL BLADE DAMPER
OPPOSED BLADE DAMPER
COMBINATION FIRE/
SMOKE DAMPER
GENERAL
SMOKE DAMPER
BUBBLE TIGHT DAMPER
BT
OR
FS
S
DAMPERS
SUPPLY DIFFUSER OR GRILLE
(HORIZONTAL MOUNT)
RETURN REGISTER OR
GRILLE (HORIZONTAL MOUNT)
EXHAUST REGISTER OR GRILLE
(HORIZONTAL MOUNT)
EXHAUST OR RETURN
REGISTER OR GRILLE
(VERTICAL MOUNT)
SUPPLY REGISTER OR
GRILLE (VERTICAL
MOUNT)
ROUND
DIFFUSER
SINGLE LINE-HARD
OR FLEXIBLE
CONNECTION
DOUBLE LINE-HARD OR
FLEXIBLE CONNECTION
DUCTWORK AT DIFFUSERS & GRILLES
DUCTWORK SPECIALTIES
FLEXIBLE DUCT
DUCT FLEXIBLE CONNECTION
POINT OF CHANGE IN DUCT
CONSTRUCTION BY
PRESSURE CLASS
DUCT REHEAT COIL
ACCESS DOOR
BUTTERFLY TYPE VALVE
WITH CONTROLLER ANGLED
DOWN, SEE DETAIL
OR
BUTTERFLY TYPE VALVE
WITH CONTROLLER LOCATED
ON SIDE OF VALVE
VAV SUPPLY AIR VALVE
AIR FLOW MEASURING
STATION
AM
VENTURI VALVE WITH
CONTROLLER ANGLED DOWN,
SEE DETAIL
OR
VENTURI VALVE WITH
CONTROLLER LOCATED ON
SIDE OF VALVE
TEMPERATURE INDICATOR
(THERMOMETER) WITH
THERMOWELL
TI
OR
TI
TEMPERATURE
INDICATOR
(THERMOMETER)
WITHOUT THERMOWELL
(DIRECT INSERTION)
TW
THERMOWELL
TE
TEMPERATURE ELEMENT
(DIRECT INSERTION)
TS
STRAP ON PIPE
TEMPERATURE
INSTRUMENT (AQUASTAT)
TE
TEMPERATURE ELEMENT
WITH TRANSMITTER AND
THERMOWELL
TT
PRESSURE INDICATOR
(PRESSURE GAUGE)
WITH GAUGE VALVE
PI
OR
PDT PRESSURE
DIFFERENTIAL
TRANSMITTER
FE
FLOW ELEMENT
(FLOW SENSOR)
OR
FE FLOW ELEMENT WITH
TRANSMITTER (FLOW
METER)
FT
FI
FLOW
INDICATOR/FLOW
METER
FLOW SWITCH
FS
OR
GAUGE CONNECTION
WITH GAUGE VALVE
COMMON INSTRUMENTATION DEVICES
T THERMOSTAT OR TEMPERATURE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
NIGHT CYCLE CONTROL THERMOSTAT
THERMOSTAT WITH INSULATING BASE
PRESSURE TRANSMITTER
PRESSURE DIFFERENTIAL TRANSMITTER
H
T N
T B
PT
PDT
DUCT SMOKE DETECTOR
PRESSURE SENSOR
CARBON DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
OXYGEN SENSOR
VOC SENSOR
REFRIGERANT SENSOR
F
SD
P
A
CO2
A
CO
A O2
A
VOC
A R
FIELD MOUNTED CONTROLS
DCW DOMESTIC COLD WATER
ULTRA-LOW PRESSURE
CONDENSATE
ULTRA-LOW PRESSURE STEAMULPS
ULPC
HRS
HRR
HEAT RECOVER WATER SUPPLY
HEAT RECOVER WATER RETURN
CS CLEAN STEAM
CSC CLEAN STEAM CONDENSATE
CSW COLD SOFT WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
RHWR REHEAT WATER RETURN
RHWS REHEAT WATER SUPPLY
RO REVERSE OSMOSIS WATER
SCHR SECONDARY CHILLED WATER
RETURN
SCHS SECONDARY CHILLED WATER
SUPPLY
HTHWR HIGH TEMPERATURE HOT
WATER RETURN
HTHWS HIGH TEMPERATURE HOT
WATER SUPPLY
RUPTURE DISK - PRESSURE
RELIEF
GAS PRESSURE REGULATOR
REDUCED PRESSURE
BACKFLOW PREVENTER
(RPBP)
THERMODYNAMIC STEAM TRAP
B BIMETAL STEAM TRAP
SHEET SYMBOLS
A/15B-6
SPECIALTY ITEMS
(I.E. GAUGE FILTER, ETC.)
REFER TO EQUIPMENT LIST
M-1
ROOM NAME & NUMBER
DESIGNATION
SECTION DESIGNATION.
-TOP INDICATES SECTION NUMBER,
-BOTTOM INDICATES ON WHICH
SHEET SECTION APPEARS
MATCHLINE
DESIGNATION
DETAIL REFERENCE.
-TOP INDICATES SECTION NUMBER,
-BOTTOM INDICATES ON WHICH
SHEET SECTION APPEARS
REVISION REFERENCE.
REFER TO SHEET REVISION
BLOCK
SHEET KEYNOTE REFERENCE
PLAN CONTINUATION REFERENCE.
-BOTTOM INDICATES ON WHICH
SHEET CONTINUATION APPEARS
SCHEDULED EQUIPMENT DESIGNATION.
-TOP INDICATES EQUIPMENT
ABBREVIATION
-BOTTOM INDICATES EQUIPMENT
NUMBER
REFER TO EQUIPMENT SCHEDULES
ELEVATION DESIGNATION.
REFERENCE OFFICIAL
PROJECT DATUM
EQ
POINT OF NEW
CONNECTION TO EXISTING
REFER
M-1
M-1
ROOM NAME
HALFTONE LIGHT LINE
INDICATES EXISTING WORK
HEAVY DASHED LINE WITH
HATCH INDICATES
EXISTING WORK TO BE
DEMOLISHED
HEAVY LINE INDICATES
NEW WORKDETAIL REFERENCE, INDICATING
DETAIL NUMBER / SHEET ON WHICH
DETAIL APPEARS.
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
12" = 1'-0"
25174-02
03/19/2026
M001
XZRR
MECHANICAL
SYMBOLS &
ABBREVIATIONS
4400 S M L King Jr Pkwy, Beaumont, TX 77705
Rev Date Description
03/19/2026
0' - 4 1/2"
MD201
18 19
EXISTING CHILLER
CH-2
EXISTING CHILLER
CH-1
EXISTING CHILLER
CH-3
EXIST.
CHWP-3
EXIST.
CHWP-2
EXIST.
CHWP-1
EXISTING HOT WATER BOILERS
EXISTING HOT WATER
PUMPS
M600
LEVEL 01
0' - 0"
LEVEL 01
0' - 0"
LEVEL 1
0' - 0"
ROOF
20' - 0"
ROOF
20' - 0"
ROOF
20' - 0"
CH-1 CH-2
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
1/4" = 1'-0"
25174-02
03/19/2026
MD201
XZRR
MECHANICAL
DEMOLITION
PLAN - LEVEL 01 -
NORTH PLANT
4400 S M L King Jr Pkwy, Beaumont, TX 77705
GENERAL NOTES
A. WORK SHALL CONFORM TO OWNERS CONSTRUCTION AND INFLECTION CONTROL
PROCEDURES.
B. WHERE DEMOLITION WORK NECESSARILY DIMINISHES OR ADVERSELY AFFECTS
LIFE-SAFETY SYSTEM SUCH AS SPRINKLER SYSTEMS AND/OR FIRE ALARM SYSTEMS
COORDINATE SUCH WORK THROUGH CONSTRUCTION MANAGER, OWNER AND FIRE
MARSHAL.
C. SERVICES SHALL NOT BE INTERRUPTED OR CHANGED WITHOUT WRITTEN
PERMISSION AND SCHEDULE APPROVED BY OWNER. WHERE DEMOLITION WORK
INTERFERES WITH OWNERS USE OF PREMISES, SCHEDULE WORK THROUGH OWNER
TO MINIMIZE INCONVENIENCE TO OWNER.
D. CONSTRUCTION MANAGER AND CONTRACTOR SHALL COORDINATE AND FIELD
VERIFY EXISTING PIPING, DUCTWORK, AND CONTROL DISCONNECTION POINTS.
PROVIDE VALVES, TEMPORARY CAPS AND/OR PLUGS TO ISOLATE PORTIONS OF
SYSTEMS TO FACILITATE PHASING OR WORK OR TO ISOLATE PORTIONS OF
SYSTEMS TO REMAIN FROM PORTIONS TO BE DEMOLISHED.
E. EXISTING DUCTWORK, PIPING AND EQUIPMENT LOCATIONS SHOWN ARE BASED ON
AVAILABLE DOCUMENTATION OF EXISTING CONDITIONS AND FIELD OBSERVATIONS.
DRAWINGS DO NOT SHOW IN DETAIL FULL EXTENT OF REQUIRED DEMOLITION WORK.
CONTRACTOR SHALL VISIT SITE AND REVIEW PRIOR TO BID OR NEGOTIATED
CONTRACT TO DETERMINE SCOPE O DEMOLITION WORK. PROVIDE COMPLETE
DEMOLITION WORK REQUIRED TO ACCOMPLISH PROJECT SCOPE. COORDINATE
EXTENT OF DEMOLITION WORK WITH DRAWING INDICATING NEW WORK.
F. WHERE EQUIPMENT, PIPING, DUCTWORK AND OR OTHER ITEMS ARE INDICATED TO
BE REMOVED, REMOVE RELATED SUPPORTS BACK TO ATTACHMENTS TO BUILDING
STRUCTURE. IN PERFORMING DEMOLITION WORK, DO NOT DAMAGE OR MODIFY
BUILDING STRUCTURE, INCLUDING REMOVAL OF CONCRETE OR STEEL STRUCTURAL
MATERIALS OR COMPONENTS TO ACCOMPLISH REMOVAL OF ATTACHMENTS TO
BUILDING STRUCTURE WITHOUT WRITTEN APPROVAL OF STRUCTURAL ENGINEER OF
RECORD.
G. OTHER THAN STRUCTURAL ATTACHMENTS, WHERE EXISTING WORK IS REMOVED,
MATERIALS SHALL BE REMOVED TO A POINT BELOW FINISHED FLOORS OR BEHIND
FINISHED WALLS TO ALLOW FOR THE INSTALLATION OF NEW FINISHED MATERIALS.
SUPPORT REMAINING WORK IN ACCORDANCE WITH REQUIREMENTS FOR NEW
INSTALLATION.
H. WHERE CONTROL DEVICES ARE REMOVED, REMOVE ASSOCIATED WIRING, CONDUIT,
AND PNEUMATIC TUBING AS APPLICABLE.
I. PATCH OPENINGS IN WALLS, CEILINGS, ROOF AND FLOOR SURFACES DAMAGED,
CREATED, OR LEFT BY DEMOLITION WORK. PATCHING SHALL MATCH EXISTING FIRE-
RESISTANCE RATINGS AND WHERE POSSIBLE,SHALL MATCH EXISTING ADJACENT
SURFACES AS TO THICKNESS, TEXTURE, MATERIALS AND COLORS TO SATISFACTION
OF OWNER.
J. EXISTING TO REMAIN INSULATION DAMAGED BY CONTRACTOR SHALL BE REPAIRED
OR REPLACED IN KIND.
K. PROTECT EXISTING DUCTWORK, DIFFUSERS, AND GRILLES TO REMAIN FROM
CONSTRUCTION DUST AND DEBRIS.
SCALE: 1/4" = 1'-0"
MECHANICAL DEMOLITION - LEVEL-1 - NORTH PLANT
SHEET KEYED NOTES#
1. EXISTING HOUSE KEEPING PADS FOR EXISTING CHILLER CH-1 AND CH-2 SHALL REMAIN
IN PLACE TO PROVIDE SUPPORT FOR NEW CHILLERS CH-1 AND CH-2.
2. DISCONNECT POWER TO EXISTING ELECTRICAL DISCONNECT FOR EXISTING CHILLER
CH-1 AND CH-2 TO PREPARE FOR REMOVAL OF THE CHILLERS. REFER TO ELECTRICAL
DRAWINGS.
3. DISCONNECT ELECTRICAL POWER TO EXISTING STARTER CABINETS AND REMOVE
STARTERS FROM EXISTING PAD AND THE BUILDING. REFER TO ELECTRICAL DRAWINGS
FOR ADDITIONAL INFORMATION AND DETAILS .
4. DISCONNECT ELECTRICAL POWER TO EXISTING CHILLER CH-1 AND CH-2 TO PREPARE
FOR CHILLER REMOVAL. REFER TO ELECTRICAL DRAWINGS FOR DISCONNECT
REQUIREMENTS.
5. CLOSE EXISTING ISOLATION VALVES FOR EXISTING CONDENSER WATER SUPPLY LINES
TO PREPARE FOR DISCONNECT AND REMOVAL OF THE EXISTING CONDENSER WATER
SUPPLY CONNECTIONS TO CHILLER CH-1 AND CH-2.
6. CLOSE EXISTING ISOLATION VALVES FOR EXISTING CONDENSER WATER RETURN LINES
TO PREPARE FOR DISCONNECT AND REMOVAL OF THE EXISTING CONDENSER WATER
RETURN CONNECTIONS TO CHILLER CH-1 AND CH-2.
7. CLOSE EXISTING ISOLATION VALVE FOR EXISTING CHILLED WATER RETURN LINES TO
PREPARE FOR DISCONNECT AND REMOVAL OF THE EXISTING CHILLED WATER RETURN
CONNECTIONS TO CHILLER CH-1 AND CH-2.()
8. DISCONNECT EXISTING CONDENSER WATER SUPPLY PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-1 AND THE FLANGE CONNECTION TO
THE EXISTING CONTROL-VALVE MOUNTED OVERHEAD AND REMOVE THE EXISTING
PIPING BETWEEN THE TWO POINTS AND THE CONTROL VALVE TO ALLOW FOR
REMOVAL AND NEW CHILLER TO BE INSTALLED.
9. DISCONNECT EXISTING CONDENSER WATER RETURN PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-1 AND THE FLANGE CONNECTION IN
THE OVERHEAD LINE AND REMOVE THE EXISTING PIPING BETWEEN THE TWO POINTS
TO ALLOW FOR REMOVAL OF THE CHILLER
10. DISCONNECT EXISTING CHILLED WATER RETURN PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-1 AND THE FLANGE CONNECTION
OVERHEAD AND REMOVE THE EXISTING PIPING BETWEEN THE TWO POINTS TO ALLOW
FOR REMOVAL OF THE CHILLER.
11. DISCONNECT EXISTING CHILLED WATER SUPPLY PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-1 AND THE FLANGE CONNECTION FOR
THE EXISTING ISOLATION VALVE AND REMOVE THE EXISTING PIPING AND FAILED
BALANCE VALVE BETWEEN THE TWO POINTS TO ALLOW FOR REMOVAL OF THE
CHILLER.
12. EXISTING REFRIGERANT RELIEF PIPING TO BE REMOVED TO ALLOW EXISTING
CHILLERS TO BE REMOVED AND THE NEW CHILLERS TO BE INSTALLED. COORDINATE
REMOVAL OF THE CHILLERS FROM THE SITE WITH THE OWNER.
SCALE: 1/4" = 1'-0"
CHILLER CH-1 -CH-2 DEMOLITION SECTION
13. DISCONNECT EXISTING CONDENSER WATER SUPPLY PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-2 AND THE FLANGE CONNECTION TO
THE EXISTING CONTROL-VALVE MOUNTED OVERHEAD AND REMOVE THE EXISTING
PIPING BETWEEN THE TWO POINTS TO ALLOW FOR THE REMOVAL OF THE CHILLER.
14. DISCONNECT EXISTING CONDENSER WATER RETURN PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-2 AND THE FLANGE CONNECTION IN
THE OVERHEAD LINE AND REMOVE THE EXISTING PIPING BETWEEN THE TWO POINTS
TO ALLOW FOR REMOVAL OF THE CHILLER.
15. DISCONNECT EXISTING CHILLED WATER RETURN PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-2 AND THE FLANGE CONNECTION
MOUNTED OVERHEAD AND REMOVE THE EXISTING PIPING BETWEEN THE TWO POINTS
TO ALLOW FOR REMOVAL OF THE CHILLER.
16. DISCONNECT EXISTING CHILLED WATER SUPPLY PIPING FROM THE FLANGE
CONNECTION ON THE FACE OF THE CHILLER CH-2 AND THE FLANGE CONNECTION TO
THE EXISTING ISOLATION VALVE MOUNTED OVERHEAD AND REMOVE THE EXISTING
PIPING BETWEEN THE TWO POINTS TO ALLOW FOR REMOVAL OF THE CHILLER.
17. EXISTING EXPANSION TANK AND EXISTING CONNECTIONS SHALL REMAIN IN PLACE
AND IN-SERVICE AS THE EXISTING CHILLER IS REMOVED. PROTECT TANK AND PIPING
FROM DAMAGE AS THE CHILLER IS REMOVED.
18. EXISTING ELECTRICAL DISCONNECTS MOUNTED ON SOUTH WALL ADJACENT TO
EXISTING CHILLER CH-1 SHALL REMAIN IN-PLACE AND IN-SERVICE AS THE EXISTING
CHILLERS ARE REMOVED.
19. REMOVE EXISTING REFRIGERANT MONITORING PANEL AND ASSOCIATED TUBING TO
CH-1 AND CH-2. EXISTING CH-3 TUBING, CONTROL WIRING TO EXISTING REFRIGERANT
EXHAUST FANS, PUSH BUTTONS AND AUDIO/VISUAL ALARMS SHALL BE
DISCONNECTED AND REMAIN IN PLACE FOR NEW REFRIGERANT MONITORING PANEL
CONNECTION. RE: M203 FOR RENOVATION WORK.
NORTH PLANT
MD301
MD301
CH-1 STARTER
CABINET
CH-2
CH-1
CH-3
CHWP-1 CHWP-2
CH-2 STARTER
CABINET
MAIN ELECTRICAL ROOM
BOILER AND HW PUMP ROOM
CH-1
CH-2
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
As indicated
25174-02
03/19/2026
MD301
XZRR
MECHANICAL
DEMOLITION
PLAN - LEVEL 01 -
SOUTH PLANT
4400 S M L King Jr Pkwy, Beaumont, TX 77705
GENERAL NOTES
SHEET KEYED NOTES#
1. TO PREPARE FOR THE DEMOLITION OF EXISTING CHILLERS CH-1 AND CH-2, EXISTING
CHILLER CH-3 MUST BE TAKEN OFF-LINE AND ALL ISOLATION VALVES ON THE CHILLED
WATER AND CONDENSER WATER CONNECTIONS CLOSED.
2. DISCONNECT CONDENSER WATER RETURN CONNECTION AT THE WATER-BOX OUTLET
AND THE FLANGE CONNECTION AT THE ISOLATION VALVE CONNECTED TO THE
CONDENSER WATER RETURN HEADER OVERHEAD AND REMOVE ALL PIPING BETWEEN
THE TWO POINTS. SET ASIDE ALL PIPING, FITTINGS AND ACCESSORIES FOR RE-
INSTALLATION ONCE NEW CHILLERS HAVE BEEN SET IN PLACE.
3. DISCONNECT CONDENSER WATER SUPPLY CONNECTION AT THE WATER-BOX INLET
AND THE FLANGE CONNECTION AT THE ISOLATION VALVE CONNECTED TO THE
CONDENSER WATER SUPPLY HEADER OVERHEAD AND REMOVE ALL PIPING BETWEEN
THE TWO POINTS. SET ASIDE ALL PIPING, FITTINGS AND ACCESSORIES FOR RE-
INSTALLATION ONCE NEW CHILLERS HAVE BEEN SET IN PLACE.
4. ONCE BOTH SETS OF PIPING CONNECTIONS ARE REMOVED, DISCONNECT WATER-BOX
FROM THE CHILLER CONDENSER BARREL AND SET ASIDE TO CLEAR THE PATH TO
REMOVE EXISTING CHILLERS CH-1 AND CH-2 FROM THE BUILDING.
5. TO PREPARE FOR THE DEMOLITION OF EXISTING CHILLERS CH-1 AND CH-2, ISOLATE
POWER AT THE EXISTING MAIN DISCONNECT SWITCHES LOCATED IN THE MAIN
ELECTRICAL ROOM. ONCE POWER IS ISOLATED, DISCONNECT EXISTING ELECTRICAL
FEEDERS TO EXISTING CHILLERS CH-1 AND CH-2 AT THE STARTER CABINET ENTRANCE
CONNECTIONS AND AT THE CHILLERS. ONCE ELECTRICAL FEEDERS AND CONDUITS
ARE DISCONNECTED, REMOVE EXISTING STARTER CABINETS. REFER TO ELECTRICAL
DRAWINGS FOR ADDITIONAL DETAILS.
6. CLOSE EXISTING ISOLATION AND CONTROL VALVES ON THE EXISTING CONDENSER
WATER SUPPLY, CONDENSER WATER RETURNS, CHILLED WATER SUPPLY AND CHILLED
WATER RETURN PIPING TO EXISTING CHILLERS CH-1 AND CH-2 TO STOP FLOW TO THE
CHILLERS.
7. DISCONNECT EXISTING CONDENSER WATER SUPPLY FLANGE CONNECTION AT THE
FACE OF THE EXISTING CHILLER CH-2 AND THE FLANGE CONNECTION TO THE EXISTING
CONTROL VALVE OVERHEAD AND REMOVE ALL PIPING, FITTINGS AND ACCESSORIES
BETWEEN THE TWO POINTS. SET ASIDE ALL REMOVED COMPONENTS FOR POSSIBLE
FUTURE REUSE.
8. DISCONNECT EXISTING CONDENSER WATER RETURN FLANGE CONNECTION AT THE
FACE OF THE EXISTING CHILLER CH-2 AND THE FLANGE CONNECTION OVERHEAD AND
REMOVE ALL PIPING, FITTINGS AND ACCESSORIES BETWEEN THE TWO POINTS. SET
ASIDE ALL REMOVED COMPONENTS FOR POSSIBLE FUTURE REUSE.
9. DISCONNECT EXISTING CHILLED WATER RETURN FLANGE CONNECTION AT THE FACE
OF THE EXISTING CHILLER CH-2 AND THE FLANGE CONNECTION IN THE RETURN PIPE
ABOVE THE EXISTING CHILLER AND REMOVE ALL PIPING, FITTINGS, VALVES AND
ACCESSORIES BETWEEN THE TWO POINTS. SET ASIDE ALL REMOVED COMPONENTS
FOR POSSIBLE FUTURE REUSE.
10. DISCONNECT EXISTING CHILLED WATER SUPPLY FLANGE CONNECTION AT THE FACE
OF THE CHILLER CH-2 AND THE FLANGE CONNECTION IN THE SUPPLY PIPE ABOVE AND
REMOVE ALL PIPING, FITTINGS AND ACCESSORIES BETWEEN THE TWO POINTS. SET
ASIDE ALL REMOVED COMPONENTS FOR POSSIBLE FUTURE REUSE.
11. EXISTING REFRIGERANT RELIEF PIPING BELOW ROOF TO BE REMOVED TO ALLOW
EXISTING CHILLERS TO BE REMOVED AND NEW CHILLERS TO BE INSTALLED. ONCE
ELECTRICAL POWER AND PIPING CONNECTIONS ARE REMOVED, REMOVE EXISTING
CHILLERS CH-1 AND CH-2 FROM THE BUILDING. EXISTING HOUSEKEEPING PADS WILL
STAY IN PLACE FOR FUTURE USE.
12. DISCONNECT EXISTING CHILLED WATER SUPPLY CONNECTION TO THE FLANGE
CONNECTION AT THE FACE OF THE EXISTING CHILLER CH-1 AND THE FLANGE
CONNECTION TO THE EXISTING ISOLATION VALVE IN THE PIPING ABOVE THE CHILLER
AND REMOVE ALL PIPING, FITTINGS AND ACCESSORIES BETWEEN THE TWO POINTS.
SET ASIDE ALL REMOVED COMPONENTS FOR POSSIBLE FUTURE REUSE.
13. DISCONNECT EXISTING CHILLED WATER RETURN CONNECTION TO THE FLANGE
CONNECTION AT THE FACE OF THE EXISTING CHILLER CH-1 AND THE FLANGE
CONNECTION IN THE VERTICAL PIPE AND REMOVE ALL PIPING, FITTINGS, VALVES AND
ACCESSORIES BETWEEN THE TWO POINTS. SET ASIDE ALL REMOVED COMPONENTS
FOR POSSIBLE FUTURE REUSE.
14. DISCONNECT EXISTING CONDENSER WATER RETURN CONNECTION TO THE FLANGE
CONNECTION AT THE FACE OF THE EXISTING CHILLER CH-1 AND THE FLANGE
CONNECTION AT THE ISOLATION VALVE IN THE RETURN PIPE AND REMOVE ALL PIPING,
FITTINGS, VALVES AND ACCESSORIES BETWEEN THE TWO POINTS. SET ASIDE ALL
REMOVED COMPONENTS FOR POSSIBLE FUTURE REUSE.
15. DISCONNECT EXISTING CONDENSER WATER SUPPLY CONNECTION AT FACE OF
CHILLER CH-1 AND THE FLANGE TO THE EXISTING CONTROL VALVE OVERHEAD AND
REMOVE ALL PIPING, FITTINGS AND ACCESSORIES BETWEEN THE TWO POINTS. SET
ASIDE ALL REMOVED COMPONENTS FOR POSSIBLE FUTURE REUSE.
16. REMOVE EXISTING REFRIGERANT MONITORING PANEL AND ASSOCIATED TUBING AND
SENSORS TO CH-1 AND CH-2. EXISTING CH-3 TUBING, SENSORS, CONTROL WIRING TO
EXISTING REFRIGERANT EXHAUST FANS, PUSH BUTTONS AND AUDIO/VISUAL ALARMS
SHALL REMAIN IN PLACE FOR NEW REFRIGERANT MONITORING PANEL CONNECTION.
RE: M302 FOR RENOVATION WORK.
SCALE: 3/16" = 1'-0"
MECHANICAL DEMOLITION - LEVEL 01 - SOUTH PLANT
SCALE: 1/4" = 1'-0"
CHILLER CH-1 DEMOLITION
SCALE: 1/4" = 1'-0"
CHILLER CH-2 DEMOLITION
A. WORK SHALL CONFORM TO OWNERS CONSTRUCTION AND INFLECTION CONTROL
PROCEDURES.
B. WHERE DEMOLITION WORK NECESSARILY DIMINISHES OR ADVERSELY AFFECTS
LIFE-SAFETY SYSTEM SUCH AS SPRINKLER SYSTEMS AND/OR FIRE ALARM SYSTEMS
COORDINATE SUCH WORK THROUGH CONSTRUCTION MANAGER, OWNER AND FIRE
MARSHAL.
C. SERVICES SHALL NOT BE INTERRUPTED OR CHANGED WITHOUT WRITTEN
PERMISSION AND SCHEDULE APPROVED BY OWNER. WHERE DEMOLITION WORK
INTERFERES WITH OWNERS USE OF PREMISES, SCHEDULE WORK THROUGH OWNER
TO MINIMIZE INCONVENIENCE TO OWNER.
D. CONSTRUCTION MANAGER AND CONTRACTOR SHALL COORDINATE AND FIELD
VERIFY EXISTING PIPING, DUCTWORK, AND CONTROL DISCONNECTION POINTS.
PROVIDE VALVES, TEMPORARY CAPS AND/OR PLUGS TO ISOLATE PORTIONS OF
SYSTEMS TO FACILITATE PHASING OR WORK OR TO ISOLATE PORTIONS OF
SYSTEMS TO REMAIN FROM PORTIONS TO BE DEMOLISHED.
E. EXISTING DUCTWORK, PIPING AND EQUIPMENT LOCATIONS SHOWN ARE BASED ON
AVAILABLE DOCUMENTATION OF EXISTING CONDITIONS AND FIELD OBSERVATIONS.
DRAWINGS DO NOT SHOW IN DETAIL FULL EXTENT OF REQUIRED DEMOLITION WORK.
CONTRACTOR SHALL VISIT SITE AND REVIEW PRIOR TO BID OR NEGOTIATED
CONTRACT TO DETERMINE SCOPE O DEMOLITION WORK. PROVIDE COMPLETE
DEMOLITION WORK REQUIRED TO ACCOMPLISH PROJECT SCOPE. COORDINATE
EXTENT OF DEMOLITION WORK WITH DRAWING INDICATING NEW WORK.
F. WHERE EQUIPMENT, PIPING, DUCTWORK AND OR OTHER ITEMS ARE INDICATED TO
BE REMOVED, REMOVE RELATED SUPPORTS BACK TO ATTACHMENTS TO BUILDING
STRUCTURE. IN PERFORMING DEMOLITION WORK, DO NOT DAMAGE OR MODIFY
BUILDING STRUCTURE, INCLUDING REMOVAL OF CONCRETE OR STEEL STRUCTURAL
MATERIALS OR COMPONENTS TO ACCOMPLISH REMOVAL OF ATTACHMENTS TO
BUILDING STRUCTURE WITHOUT WRITTEN APPROVAL OF STRUCTURAL ENGINEER OF
RECORD.
G. OTHER THAN STRUCTURAL ATTACHMENTS, WHERE EXISTING WORK IS REMOVED,
MATERIALS SHALL BE REMOVED TO A POINT BELOW FINISHED FLOORS OR BEHIND
FINISHED WALLS TO ALLOW FOR THE INSTALLATION OF NEW FINISHED MATERIALS.
SUPPORT REMAINING WORK IN ACCORDANCE WITH REQUIREMENTS FOR NEW
INSTALLATION.
H. WHERE CONTROL DEVICES ARE REMOVED, REMOVE ASSOCIATED WIRING, CONDUIT,
AND PNEUMATIC TUBING AS APPLICABLE.
I. PATCH OPENINGS IN WALLS, CEILINGS, ROOF AND FLOOR SURFACES DAMAGED,
CREATED, OR LEFT BY DEMOLITION WORK. PATCHING SHALL MATCH EXISTING FIRE-
RESISTANCE RATINGS AND WHERE POSSIBLE,SHALL MATCH EXISTING ADJACENT
SURFACES AS TO THICKNESS, TEXTURE, MATERIALS AND COLORS TO SATISFACTION
OF OWNER.
J. EXISTING TO REMAIN INSULATION DAMAGED BY CONTRACTOR SHALL BE REPAIRED
OR REPLACED IN KIND.
K. PROTECT EXISTING DUCTWORK, DIFFUSERS, AND GRILLES TO REMAIN FROM
CONSTRUCTION DUST AND DEBRIS.
SOUTH PLANT
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
25174-02
03/19/2026
M101
XZRR
MECHANICAL
SITE PLANS
4400 S M L King Jr Pkwy, Beaumont, TX 77705
GENERAL BEAUMONT, TEXAS AREA
LAMAR UNIVERSITY CAMPUS
NORTH CENTRAL PLANT
SOUTH CENTRAL PLANT
GENERAL LAMAR CAMPUS AREA
EXISTING CHWS &CHWR
DISTRIBUTION TO NORTH
CAMPUS
EXISTING CHWS &CHWR
DISTRIBUTION TO WEST
CAMPUS
EXISTING CH-2 MAIN
DISCONNECT CABINET
EXISTING CH-1 MAIN
DISCONNECT CABINET
CH-2N
CH-1N
CHWP-1
CHWP-2
CHWP-3
12"CHR
14"CHS
12"CHR
10"CHR
10"CHS
12"CHR 12"CHS
12"TWS
12"TWR
18"CHR 18"CHR
12"TWR
16"TWR
14"TWS14"TWS12"TWS
12"TWR
10"CHR
14"CHS
12"CHR
12"CHR
8"CHR
8"CHS
10"CHR
10"CHS
10"CHR
14"CHS
8"CHR
8"CHS
6"CHS
6"CHR
M600
CH-3
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
1/4" = 1'-0"
25174-02
03/19/2026
M201
XZRR
MECHANICAL
PIPING
RENOVATION
PLAN - LEVEL 01 -
NORTH PLANT
4400 S M L King Jr Pkwy, Beaumont, TX 77705
SCALE: 1/4" = 1'-0"
MECHANICAL PIPING RENOVATION PLAN - LEVEL 01 - NORTH PLANT
GENERAL NOTES SHEET KEYED NOTES#
A. FLOOR PLANS AND SECTIONS INCLUDE PIPE ROUTING, MAJOR VALVES, AND MAJOR
PIPING SPECIALITIES. REFER TO DETAILS AND SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
B. INSULATE ALL NEW PIPING, VALVES, FITTINGS AND ACCESSORIES REQUIRED TO
CONNECT NEW CHILLERS.
C. REPAIR/REPLACE ANY INSULATION DAMAGED DURING DEMOLITION OR THE
INSTALLATION OF NEW PIPING.
D. EXISTING PIPE SUPPORTS SHALL BE REUSED TO SUPPORT NEW PIPING WHERE
POSSIBLE. PROVIDE NEW PIPE SUPPORTS WHERE REQUIRED TO MATCH EXISTING AND
PROVIDE ADEQUATE SUPPORT TO THE NEW PIPING.
E. PROVIDE FLOOR SUPPORTS FOR NEW ELBOWS CONNECTED TO THE FRONT OF THE
CHILLERS TO PROVIDE ADDITIONAL SUPPORT, SUPPORTS MUST BE REMOVABLE TO
ALLOW FOR FUTURE SERVICE TO THE CHILLERS.
1. EXISTING HOUSEKEEPING PADS SHALL BE UTILIZED TO SUPPORT THE NEW CHILLERS
CH-1N AND CH-2N. CONTRACTOR SHALL FIELD VERIFY THE SIZE OF THE EXISTING
PADS AND MAKE ADJUSTMENTS AS REQUIRED TO PROVIDE ALL REQUIRED SUPPORT
FOR THE NEW CHILLERS.
2. NEW CHILLERS CH-1N AND CH-2N SHALL BE PLACED ON THE EXISTING HOUSEKEEPING
PADS ON NEOPRENE PADS WITH A MINIMUM THICKNESS OF 1 1/2" UNDER THE
SUPPORT POINTS OF THE CHILLERS IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
3. PROVIDE NEW 12" DIA. CWR PIPE FROM THE UPPER CONDENSER WATER BOX
CONNECTION UP TO THE EXISTING CWR FLANGE CONNECTION OVERHEAD. RE: M800
DETAIL 5 FOR CONNECTION REQUIREMENTS.
4. PROVIDE NEW 12" DIA. CWS PIPE FROM THE LOWER CONDENSER WATER BOX
CONNECTION UP TO THE EXISTING CWS CONTROL VALVE OVERHEAD. RE: M800
DETAIL 5 FOR CONNECTION REQUIREMENTS.
5. PROVIDE NEW 12" DIA. CHWR PIPE FROM THE LOWER CHILLED WATER RETURN
FLANGE CONNECTED TO THE FACE OF THE EVAPORATOR BARREL UP TO EXISTING
FLANGE IN THE EXISTING CHWR HEADER OVERHEAD. RE-INSTALL EXISTING
ISOLATION VALVE IN THE VERTICAL RISER AT A SUFFICIENT HEIGHT TO ALLOW FOR
REMOVAL OF LOWER CONNECTION FOR CHILLER MAINTENANCE. RE: M800 DETAIL 5
FOR CONNECTION REQUIREMENTS.
6. PROVIDE NEW 12" DIA. CHWS PIPE FROM THE CHILLED WATER SUPPLY FLANGE AT
THE FACE OF THE NEW CHILLER EVAPORATOR BARREL UP TO EXISTING CHWS PIPE
OVERHEAD WHERE THE EXISTING BALANCE WAS REMOVED DURING DEMOLITION AND
INSTALL NEW 12" DIA. BALANCE VALVE BEFORE THE EXISTING 12" ISOLATION VALVE.
PROVIDE NEW CONNECTION FLANGES IN THE NEW SUPPLY PIPING TO ALLOW
REMOVAL OF THE CONNECTION TO THE CHILLER FACE TO PROVIDE ACCESS FOR
CHILLER MAINTENANCE. RE: M800 DETAIL 5 FOR CONNECTION REQUIREMENTS.
7. THE EXISTING ISOLATION VALVE AT THE CONNECTION POINT OF THE EXISTING 12"
CHWS TO THE CHWS HEADER OVERHEAD SHALL REMAIN IN SERVICE.
8. SET NEW CHILLER CH-1 AND CH-2 STARTER CABINETS ON EXISTING HOUSE KEEPING
PADS AND CONNECT EXISTING ELECTRICAL FEEDERS FOR THE NEW CHILLER CH-1N
AND CH-2N TO THW NEW STARTER CABINETS AND EXISTING DISCONNECT CABINETS
FOR CHILLER THE TWO CHILLERS LOCATED AT THE WEST END OF THE MECHANICAL
ROOM. RE: ELECTRICAL DRAWINGS FOR WIRING DETAILS.
9. PROVIDE NEW REFRIGERANT RELIEF PIPING TO CONNECT NEW REFRIGERANT RELIEF
POINTS ON THE NEW CHILLER TO THE EXISTING REFRIGERANT RELIEF PIPING
OVERHEAD THAT RUNS UP THROUGH THE ROOF. CONTRACTOR SHALL VERIFY LINE
SIZE OF THE EXISTING PIPING UP THROUGH ROOF BASED ON THE REFRIGERANT
SELECTED FOR THE NEW CHILLER AND ADJUST PIPE SIZE AS REQUIRED.
10. PROVIDE NEW 12" DIA. CWR PIPE FROM THE UPPER CONDENSER WATER BOX
CONNECTION UP TO EXISTING CONNECTION FLANGE IN THE EXISTING CWR PIPE
OVERHEAD. RE: M800 DETAIL 5 FOR CONNECTION REQUIREMENTS.
NEW CHILLER CH-1N
NEW CWR CONNECTION-CH-1N
EXISTING CHILLED WATER PUMPS
CAMPUS DISTRIBUTION TUNNEL-
SOUTH
NEW FLOW
METER-
FM-4N -CH-1N
CWR
NEW CWS CONNECTION-CH-1N
NEW CHWR CONNECTION-CH-1N
NEW CHWS CONNECTION-CH-1N
NEW FLOW
METER-FM-1N -
CH-1N CHWR
EXISTING CONTROL
VALVE CH-1N CWS
EXISTING CONTROL
VALVE -CH-2N - CWR
EXISTING CONTROL
VALVE - CH-2N -CHWR
EXISTING CONTROL
VALVE CH-1N - CHWR
NEW FLOW FLOW
METER- FM-5N -
CH-2N CWR
NEW FLOW FLOW METER-
FM-2N - CH-2N CHWR
EXISTING CONTROL
VALVE - CH-2N
CHWS BY-PASS
NEW EMERGENCY
PUSH BUTTON AND
STROBE
NEW REFRIGERANT
RELIEF PIPING.
11. PROVIDE NEW 12" DIA. CWS PIPE FROM THE LOWER CONDENSER WATER BOX
CONNECTION U P TO THE CONNECTION FLANGE FOR THE EXISTING CWS CONTROL
VALVE IN THE CWS PIPE OVERHEAD. EXISTING CONTROL VALVE SHALL REMAIN IN
SERVICE. RE: M800 DETAIL 5 FOR CONNECTION REQUIREMENTS.
12. PROVIDE NEW 12" DIA. CHWR PIPE TO THE LOWER CHILLED WATER FLANGE
CONNECTED TO THE FACE OF THE EVAPORATOR BARREL UP TO EXISTING
CONNECTION FLANGE IN THE EXISTING CHWR PIPE OVERHEAD. RE-INSTALL EXISTING
ISOLATION VALVE IN THE VERTICAL SECTION OF PIPE AT A SUFFICIENT ELEVATION TO
ALLOW FOR REMOVAL OF THE CONNECTION ELBOW FOR FUTURE CHILLER
MAINTENANCE. RE: M800 DETAIL 5 FOR CONNECTION REQUIREMENTS.
13. PROVIDE NEW 12" DIA. CHWS PIPE FROM THE CHILLED WATER SUPPLY FLANGE AT THE
FACE OF THE NEW CHILLER EVAPORATOR BARREL UP TO THE POINT OF DEMOLITION
IN THE EXISTING CHWS PIPE OVERHEAD AND ADD A NEW BALANCE VALVE. EXISTING
ISOLATION VALVE IN THE EXISTING CHWS CONNECTION TO THE EXISTING CHWS
HEADER OVERHEAD SHALL REMAIN IN SERVICE. PROVIDE CONNECTION FLANGES AT
A SUITABLE LOCATION TO ALLOW REMOVAL OF THE CONNECTION ELBOWS FOR
FUTURE CHILLER MAINTENANCE. RE: M800 DETAIL 5 FOR CONNECTION
REQUIREMENTS.
14. REPLACE EXISTING FLOW METER FOR THE CH-1N CHWR WITH NEW MAGNETIC FLOW
METER - FM-1N.
15. REPLACE EXISTING FLOW METER FOR THE CH-1N CWR WITH NEW MAGNETIC FLOW
METER - FM-4N.
16. REPLACE EXISTING FLOW METER FOR THE CH-2N CHWR WITH NEW MAGNETIC FLOW
METER - FM-5N.
17. REPLACE EXISTING FLOW METER FOR THE CH-2N CWR WITH NEW MAGNETIC FLOW
METER - FM-2N.
18. PROVIDE NEW REFRIGERANT MONITORING PANEL TO SUPPORT NEW CHILLERS CH-1N
AND CH-2N AND EXISTING CHILLER CH-3. PROVIDE NEW SENSOR LINES FOR NEW
CHILLERS CH-1N AND CH-2N FROM NEW PANEL AND RECONNECT EXISTING SENSOR
LINES TO EXISTING CHILLER CH-3 TO NEW PANEL. RE: M202 FOR ADDITIONAL DETAIL.
NORTH PLANT
NEW CHILLER CH-2N
30x16
30x16 x
16X24
CHILLER CH-2N
CHILLER CH-1N
12 11
M600
14 14
NORTH CENTRAL PLANT VENTILATION CALCULATIONS
CHILLERS CH-1N AND CH-2N (WEST SECTION)
(CALCULATION IS BASED ON NEW REFRIGERANT R513A
AND ON THE ASSUMPTION THAT ONE CHILLER WILL BE
LEAKING. CONTRACTOR SHALL VERIFY CALCULATION
IF R514A OR OTHER REFRIGERANT IS UTILIZED. )
PURGE SYSTEM EXPANSION
CHILLER REFRIGERANT LBS: - 2,499
Q=100 X 2499√
Q= 100 X 49.00 = 4,999 CFM
USE 5,000 CFM
EXISTING EXHAUST FAN EF-1 - RATED AT 5000 CFM
AND TWO EXISTING DROPS AT 2,500 CFM EACH WILL
CONTINUE TO BE UTILIZED.
(RE-BALANCE FAN FOR 5,000 CFM)
GENERAL EXHAUST:
TOTAL WEST AREA: 3,100 S.F.
0.5 CFM/S.F. = 3,100 S.F. X 0.5
= 1,550 CFM
EXISTING GENERAL EXHAUST - EF-2 = 8,000 CFM
EXISTING GENERAL EXHAUST - EF-3 = 600 CFM
CURRENT GENERAL EXHAUST IS SUFFICIENT
NORTH CENTRAL PLANT VENTILATION CALCULATIONS
CHILLERS CH-3 (EAST SECTION)
(CALCULATION IS BASED ON EXISTING REFRIGERANT
R134A AND ON THE ASSUMPTION THAT ONE CHILLER
WILL BE LEAKING.
PURGE SYSTEM EXPANSION
CHILLER REFRIGERANT LBS: - 1,250
Q=100 X 1,250√
Q= 100 X 35.36 = 3,536 CFM
USE 4,000 CFM
EXISTING REFRIGERANT EXHAUST FAN EF-4 - RATED
AT 8,000 CFM
(CURRENT REFRIGERANT EXHAUST IS SUFFICIENT)
GENERAL EXHAUST:
TOTAL WEST AREA: 1,600 S.F.
0.5 CFM/S.F. = 1, 600 X 0.5 =
= 800 CFM
EXISTING GENERAL EXHAUST - EF-5 = 3,500 CFM
CURRENT GENERAL EXHAUST IS SUFFICIENT
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
As indicated
25174-02
03/19/2026
M202
XZRR
DUCTWORK AND
REFRIGERANT
MONITORING
PLAN - NORTH
PLANT
4400 S M L King Jr Pkwy, Beaumont, TX 77705
GENERAL NOTES SHEET KEYED NOTES#
A. A 1. EXISTING 16" X 24" EXHAUST DROP DOWN TO 12" ABOVE FINISH FLOOR SHALL REMAIN
IN-PLACE AND IN-SERVICE TO SUPPORT REFRIGERANT EXHAUST REQUIREMENTS FOR
NEW CHILLER CH-1N. DUCT MUST BE PROTECTED WHILE ORIGINAL CHILLER IS BEING
REMOVED AND THE NEW CHILLER INSTALLED.
2. EXISTING 30" X 16" REFRIGERANT EXHAUST DUCT OVERHEAD WILL REMAIN IN-PLACE
AND IN-SERVICE.
3. EXISTING 16" X 24" EXHAUST DROP DOWN TO 12" ABOVE FINISH FLOOR SHALL REMAIN
IN-PLACE AND IN-SERVICE TO SUPPORT REFRIGERANT EXHAUST REQUIREMENTS FOR
EXISTING CHILLER CH-2N THAT WILL REMAIN IN SERVICE.
4. EXISTING 24" X 30" EXHAUST DUCT UP TO EXISTING EXHAUST FAN EF-1 ON ROOF SHALL
REMAIN IN PLACE AND IN-SERVICE TO SUPPORT THE NEW REFRIGERANT EXHAUST
REQUIREMENTS. REFER TO SHEET M204 FOR ADDITIONAL INFORMATION ON EXISTING
FAN ON ROOF.
5. EXISTING EXHAUST FAN DISCONNECT SHALL REMAIN IN-PLACE AND IN-SERVICE TO
SUPPORT EXISTING EXHAUST FAN ON ROOF.
6. NEW REFRIGERANT MONITORING PANEL CAPABLE OF BEING CALIBRATED FOR NEW
REFRIGERANT SELECTED FOR NEW CHILLERS CH-1N AND CH-2N (R513A, R514A) AND
EXISTING REFRIGERANT R134A FOR EXISTING CHILLER CH-3. PANEL SHALL BE MSA
CHILLGARD 5000 OR APPROVED EQUAL. PANEL SHALL HAVE SUFFICIENT NUMBER
PORTS TO CONNECT THREE CHILLERS AND CAPABLE OF BEING CALIBRATED TO R513A,
R514A AND R134A REFRIGERANTS. CONNECT EXISTING EXHAUST FANS ON ROOF, PUSH
BUTTONS, AUDIO/VISUAL ALARMS AND BAS SYSTEM TO NEW PANEL.
7. REUSE EXISTING SENSOR TUBING OR RUN TWO NEW SENSOR LINES IN CONDUIT FROM
THE NEW MONITOR PANEL TO EXISTING CHILLER CH-3.
8. EXISTING REFRIGERANT SENSORS FOR CHILLER CH-3 CALIBRATED FOR R134A
REFRIGERANT SHALL BE REPLACED WITH NEW IR TYPE SENSORS CALIBRATED FOR
R134A.
9. RUN NEW SENSOR LINES FROM NEW WALL MOUNTED PANEL OVERHEAD TO SW AND NE
CORNERS OF NEW CHILLERS CH-1N AND CH-2N IN 1/2" CONDUIT.
10. PROVIDE NEW IR SENSORS CALIBRATED FOR NEW SELECTED REFRIGERANT ON
OPPOSITE CORNERS OF THE NEW CHILLERS AND CONNECT TO NEW SENSOR LINES.
11. PROVIDE NEW EMERGENCY PUSH BUTTON, SIMILAR TO EXISTING PUSH BUTTONS ON
INTERIOR WALL NEXT TO EXISTING EXIT DOOR FROM THE NORTH PLANT AND CONNECT
TO NEW REFRIGERANT MONITORING PANEL AND EXISTING ROOF MOUNTED
REFRIGERANT EXHAUST FAN.
12. NEW WALL MOUNTED EMERGENCY STROBE LIGHT ON THE INTERIOR OF THE
EXTERIOR WALL NEXT TO NORTH PLANT ENTRY DOOR AND CONNECT TO NEW
MONITORING PANEL. NEW STROBE WILL BE ACTIVATED IF A REFRIGERANT LEAK IS
INDICATED BY THE MONITORING PANELS.
13. EXISTING AIR BREATHING DEVICE CABINET AND BREATHING DEVICE SHALL BE
REPLACED WITH NEW CABINET AND BREATHING DEVICE.
14. EXISTING WALL MOUNTED PUSH BUTTONS AND AUDIO/VISUAL DEVICES SHALL REMAIN
IN SERVICE.
SCALE: 1/4" = 1'-0"1
DUCTWORK AND REFRIGERANT MONITORING PLAN -NORTH PLANT
SCALE: 3/16" = 1'-0"2
NORTH PLANT EXHAUST
NORTH PLANT
EF-2 -
GENERAL
EXHAUST
(EXISTING)
EF-1 -
REFRIGERANT
EXHAUST
(EXISTING)
EF-4 -
REFRIGERANT
EXHAUST
(EXISTING)
EF-3 -
GENERAL
EXHAUST
(EXISTING)
EF-5 -
BOILER
EXHAUST
(EXISTING)
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
1/4" = 1'-0"
25174-02
03/19/2026
M203
RR
MECHANICAL
ROOF PLAN -
NORTH PLANT
4400 S M L King Jr Pkwy, Beaumont, TX 77705
GENERAL NOTES SHEET KEYED NOTES#
A. A 1. EXISTING ROOF MOUNTED GENERAL EXHAUST FAN EF-2 SHALL REMAIN IN SERVICE TO
PROVIDE GENERAL EXHAUST TO THE WEST SECTION OF NORTH CENTRAL PLANT. -
APPROXIMATE CAPACITY - 8,000 CFM. CLEAN EXISTING FAN AND VERIFY CURRENT AIR
FLOW.
2. EXISTING ROOF MOUNTED REFRIGERANT EXHAUST FAN EF-1 SHALL REMAIN IN PLACE
AND IN-SERVICE TO PROVIDE EMERGENCY EXHAUST TO NEW CHILLERS CH-1N AND
CH-2N. EF-1 SHALL BE CLEANED, REPAIRED AS REQUIRED AND RE-BALANCED TO
PROVIDE A TOTAL EMERGENCY EXHAUST FLOW OF 5,000 CFM TO SUPPORT THE
EXHAUST REQUIREMENTS FOR NEW CHILLERS CH-1 AND CH-2. (LOREN COOK - MODEL
225R8B 1.5 HP)
3. EXISTING CONTINUOUS RUN GENERAL EXHAUST FAN EF-3 SHALL STAY IN-SERVICE.
(GREENHECK MODEL GB-240-10-V - S/N-11095042 0712 - 600 CFM @0.25" SP - .75 HP) FAN
PROVIDES ADDITIONAL GENERAL EXHAUST TO THE NORTH PLANT WEST SECTION.
CLEAN EXISTING FAN AND VERIFY CURRENT AIR FLOW.
4. EXISTING ROOF MOUNTED REFRIGERANT EXHAUST FAN EF-4 SHALL REMAIN IN PLACE
AND IN-SERVICE TO PROVIDE EMERGENCY EXHAUST TO EXISTING CHILLER CH-3.
CURRENT ESTIMATED AIR FLOW IS 8,000 CFM. EF-4 SHALL BE CLEANED, REPAIRED AS
REQUIRED AND CURRENT AIRFLOW READINGS TAKEN TO VERIFY AVAILABLE AIR FLOW.
(DAYTON - MODEL 4YYH - S/N-11565624 0311 - .125" SP - 3/4 HP)
5. EXISTING CONTINUOUS RUN GENERAL EXHAUST FAN EF-5 FOR THE BOILER AREA
SHALL STAY IN-SERVICE. (TWIN CITY MODEL -120BE - APPROXIMATE CAPACITY 3,500)
NO VERIFICATION OF AIR FLOW IS REQUIRED.
6. EXISTING ROOF HATCH OPENING WITH LADDER UP FROM LEVEL-1.
7. EXISTING REFRIGERANT RELIEF PIPING SERVING CHILLER CH-1N SHALL REMAIN IN-
PLACE AND IN-SERVICE TO PROVIDE REFRIGERANT RELIEF FOR NEW CHILLER CH-1N.
8. EXISTING REFRIGERANT RELIEF PIPING SERVING CHILLER CH-2N SHALL REMAIN IN-
PLACE AND IN-SERVICE TO CONTINUE TO PROVIDE REFRIGERANT RELIEF FOR
EXISTING CHILLER CH-2N.
9. EXISTING EXHAUST STACKS FOR EXISTING HOT WATER BOILERS SHALL STAY IN-PLACE
AND IN-SERVICE.
10. EXISTING REFRIGERANT RELIEF PIPING SERVING CHILLER CH-3 SHALL REMAIN IN-
PLACE AND IN-SERVICE TO CONTINUE TO PROVIDE REFRIGERANT RELIEF FOR
EXISTING CHILLER CH-3.
SCALE: 1/4" = 1'-0"
MECHANICAL DUCT RENOVATION PLAN - ROOF - NORTH
NORTH PLANT
Rev Date Description
XZ
EXISTING CHILLER
CH-3
EXIST.
CHWP-3
EXIST.
CHWP-2
EXIST.
CHWP-1
EXISTING HOT WATER BOILERS
EXISTING HOT WATER
PUMPS
7'-7"
15'-7" x 8'-2" x 6"
15'-7" x 8'-2" x 6"
5'-0"
5'-6"
EDGE OF EXISTING
HOUSE KEEPING PAD
EDGE OF EXISTING
HOUSE KEEPING PAD
STARTER CABINET
HOUSEKEEPING PADS
FOR NEW CHILLERS
EXISTING CHILLER
MAIN DISCONNECT
CABINETS
CH-1 CH-2
CH-1
CH-2
EXISTING PIPE
TUNNEL
EXISTING PIPE
TUNNEL
CHILLERS WILL ENTER
NORTH PLANT THROUGH
EXISTING ROLL-UP DOOR.
EXIST.
HWP-1
CH-1
CH-2
Project Number
Date Issued
Issuance and Revisions
Sheet Title
Scale
Project Title
Drawn By Checked By
Sheet Number
Affiliated
Affiliated Engineers, Inc.
Twenty Greenway Plaza, Suite 410
Houston, Texas 77046
Tel 713.548.8900 Fax 713.548.9801
Engineers
TEXAS REGISTERED ENGINEERING FIRM F-8301
LAMAR NORTH AND
SOUTH PLANT CHILLER
REPLACEMENT
100% CONSTRUCTION
DOCUMENTS
03/19/2026
1/4" = 1'-0"
25174-02
03/19/2026
M204
XZRR
CHILLER
REPLACEMENT
PLAN- NORTH
PLANT
4400 S M L King Jr Pkwy, Beaumont, TX 77705
GENERAL NOTES
SCALE: 1/4" = 1'-0"
CHILLER PLACEMENT PLAN - NORTH PLANT
SHEET KEYED NOTES#
CHILLER PLACEMENT PLAN - NORTH PLANT (FOR REFERENCE)
THE CHILLER REPLACEMENT PROJECT FOR THE NORTH CENTRAL PLANT WILL INCLUDE THE REPLACEMENT OF EXISTING CHILLERS CH-1 AND CH-2 LOCATED IN THE FRONT SECTION OF THE NORTH
PLANT. EXISTING CHILLER CH-3, LOCATED IN THE REAR EQUIPMENT ROOM OF THE NORTH PLANT WILL REMAIN IN PLACE AND IN SERVICE. THE REPLACEMENT PROJECT WILL INCLUDE THE REPLACEMENT OF EXISTING CHILLERS CH-1 AND CH-2, ALONG WITH THE REPLACEMENT OF SELECTED BALANCE AND ISOLATION VALVES. SELECTED CONTROL DEVICES AS WELL AS MAGNETIC FLOW
METERS WILL ALSO BE INCLUDED IN THE REPLACEMENT
THE NEW CHILLERS WILL INCLUDE A MARINE WATER BOX ON THE CONDENSER BARREL FOR EACH CHILLER. SINCE NEW CHILLER CH-1 WILL HAVE THE CONDENSER ON THE LEFT SIDE OF THE CHILLER AND CH-2 WILL BE OPPOSITE HAND AND WILL HAVE THE CONDENSER WATER BOX ON THE RIGHT, IT WILL BE BENEFICIAL TO BRING CHILLER CH-2 INTO THE PLANT FIRST AND SET IT ON THE EXISTING SUPPORT PAD BEFORE CHILLER CH-1 IS BROUGHT IN. THE DEMOLITION AND INSTALLATION PROCESS WILL BE FAST-TRACKED TO ALLOW ALL FOUR CHILLERS TO BE INSTALLED AT ONE TIME. CHILLER CHILLERS CH-1 AND CH-2 WILL BE TWO PASS EVAPORATOR /CONDENSER MACHINES WITH A CONDENSER WATER-BOX WITH SIDE CONNECTIONS AND STACKED CHILLED WATER SUPPLY AND RETURN FLANGE CONNECTIONS ATTACHED TO THE END OF THE EVAPORATOR BARREL. ALL CONNECTIONS WILL BE ON THE SAME END WITH THE CONDENSER BARREL ON THE LEFT OR RIGHT WHEN FACING
THE MACHINE.
THE EXISTING CHILLERS WILL BE DISMANTLED AS REQUIRED,AND REMOVED THROUGH THE OVERHEAD DOOR IN THE SOUTH EXTERIOR WALL. THE NEW CHILLERS WILL BE BROUGHT INTO THE NORTH PLANT THROUGH THE OVERHEAD DOOR. ONCE INSIDE THE PLANT, THE CHILLER MUST BE ROTATED AND MOVED ONTO THE EXISTING SUPPORT PAD.
A. FOR THE CHILLER CH-1 AND CH-2 REPLACEMENT, ALL PIPING, VALVES, FITTINGS,
CONTROL DEVICES AND OTHER ACCESSORIES WILL BE REMOVED CAREFULLY AND SET
ASIDE AND STORED FOR POSSIBLE REUSE TO INSTALL THE NEW CHILLERS. THE GOAL
WILL BE TO REUSE AS MUCH OF THE EXISTING COMPONENTS AS POSSIBLE.
B. THE EXISTING CONCRETE HOUSE KEEPING PADS WILL BE REUSED TO SUPPORT
THE NEW CHILLERS. ONCE THE CHILLERS ARE REMOVED, THE CONTRACTOR SHALL
REPAIR THE SURFACE OF THE PADS TO PROVIDE A CLEAN MOUNTING SURFACE. DUE
TO THE SIZE OF THE SUPPORT PADS FOR THE NEW CARRIER CHILLERS, THE EXISTING
PADS CAN BE USED AS IS, BUT THE ENDS OF THE NEW CHILLERS MAY EXTEND PAST
THE END EDGES OF THE PADS. IF DESIRED, ADDITIONAL SECTIONS OF PAD CAN BE
ADDED.
C. PLACEMENT OF THE NEW CHILLER ON THE EXISTING PAD WILL BE FIELD
DETERMINED TO MINIMIZE PIPING REMOVAL AND REPLACEMENT WHILE MAINTAINING
MAXIMUM ACCESS SPACE AROUND THE CHILLERS.
NEW CHILLER ENTRY
POINT - SOUTH ROLL-UP
DOOR
NORTH PLANT
1. EXISTING HOUSEKEEPING PAD DIMENSIONS ARE FOR REFERENCE. CONTRACTOR
TO FIELD VERIFY BEFORE RIGGING.
NORTH PLANT
NEW CHILLER
CH-1S
EXISTING
CHILLER CH-3
EXISTING
CHWP-1
EXISTING
CHWP-2
EXISTING STARTER
CABINET-CH-1
EXISTING STARTER
CABINET-CH-2
NEW CHILLER
CH-1 MAIN
DISCONNECT
CABINET
NEW CHILLER
CH-2 MAIN
DISCONNECT
CABINET
EXISTING
CHWP-3
NEW CHILLERS WILL BE
BROUGHT INTO THE SOUTH
PLANT THROUGH THE
SOUTH OVERHEAD DOOR.
THE NEW CHILLERS WILL
NEED TO STAY CLOSE TO
THE WALL SO THAT THEY
WILL SQUEEZE THROUGH
THE SPACE BETWEEN
CHILLER CH-3 AND THE WALL
AS THE NEW CHILLERS MOVE
THROUGH THE SECOND DOOR
OPENING, THE CHILLERS WILL NEED
TO START ROTATING TO MISS THE
WALLS ON THE RIGHT SIDE.
AS THE NEW CHILLERS CONTINUE
TO MOVE NORTH IN THE PLANT, THE
CHILLERS WILL NEED TO CONTINUE
ROTATING TO MISS THE WALLS ON
THE RIGHT SIDE THAT ARE FARTHER
WEST THAT ARE FARTHER WEST
THAN THE SECOND WALL OPENING.
THE FIRST CHILLER TO BE SET WILL BE
CH-1 THAT WILL BE FARTHEST BACK. THE
EXISTING PADS WILL BE UTILIZED AND
SHOULD BE LARGE ENOUGH TO
SUPPORT THE NEW CHILLER FRAME.
THE SECOND CHILLER TO BE SET WILL
BE CH-2 THAT WILL BE CLOSER TO THE
FRONT. ONCE IT IS…