Operations & Maintenance Description/Specification/Statement of Work
Operations & Maintenance Table of Contents
OPERATIONS & MAINTENANCE TABLE OF CONTENTS
OPERATIONS & MAINTENANCE SERVICES PERFORMANCE LOCATIONS
C. MECHANICAL SPECIFICATION INTRODUCTION
C.1. SCOPE OF WORK
C.1.1 Contractor Responsibility for Equipment and System C.1.2 Contractor Responsibilities for Management and Communication C.1.3 Excluded from this scope:
C.2. DEFINITIONS
C.2.1 Acceptance C.2.2 Acts of God C.2.3 Additional Services C.2.4 Advanced Meters C.2.5 Advanced Metering Systems C.2.6 Approval C.2.7 Architectural and Structural Systems C.2.8 Basic Services C.2.9 Building Automation System (BAS) C.2.10 GSA Link C.2.11 Building Operating Plan C.2.12 Commissioning C.2.13 Ongoing Commissioning C.2.14 Computerized Maintenance Management System (CMMS) C.2.15 Consumable Parts C.2.16 Contracting Officer (CO) C.2.17 Contracting Officer's Representative (COR) or Designee C.2.18 Contractor C.2.19 Contractor’s Other Than Normal Working/Duty Hours C.2.20 Controls and Control System C.2.21 Defective Service C.2.22 Emergency C.2.23 Emergency Callback C.2.24 Environmentally Sustainable C.2.25 Existing Deficiency List Report C.2.26 Exterior C.2.27 Federal Holidays C.2.27.1 State Holiday Recognized in Utah as a Federal Holiday C.2.28 Federal Executive Holidays, Unanticipated C.2.29 Fire Protection and Life Safety Systems C.2.30 Guiding Principles for Sustainable Existing Buildings C.2.31 GSA Green Purchasing Program (GPP) C.2.32 Indefinite Quantity C.2.33 Maintenance Repair
August 11, 2016
R-8 Operations & Maintenance Specification
Section C: Mechanical Services Specification 2 of 83
C.2.34 Miscellaneous Work C.2.35 Modification of Contract C.2.36 Negligence C.2.37 Non-Reimbursable Repair C.2.38 Normal Working Hours C.2.39 Occupant Emergency Plan (OEP) C.2.40 Open Systems C.2.41 Operations C.2.42 Performance Based Service Contracting C.2.43 Performance Work Statement (PWS) C.2.44 Predictive Maintenance C.2.45 Preventive Maintenance (Scheduled and Unscheduled) C.2.46 Product Preference C.2.47 Quality Assurance Surveillance Plan (QASP) C.2.48 Quality Control Plan C.2.49 Repair C.2.50 Reimbursable Repair C.2.51 Sequence of Operations C.2.52 Service Request C.2.53 Shave Energy C.2.54 Standard Services C.2.55 Stewardship C.2.56 Supervisor, On-site C.2.57 Tour C.2.58 Vertical Transportation Systems C.2.58 Watch
C.3 REFERENCES (CONTAINED IN A SEPARATE REFERENCE DOCUMENT)
C.4 EXISTING DEFICIENCY/CONTRACT CLOSEOUT
C.4.1 Existing Deficiency Inspection and Closeout Inspection C.4.2 Existing Deficiency List and Contract Closeout List:
C.5. STARTUP PHASE/TRANSITION PHASE
C.5.1 Transition Phase Startup [DELIVERABLE] C.5.2 (Reserved) C.5.3 Adjustments and Corrections
C.6. PHASE-OUT TRANSITION PERIOD
C.7. DEFICIENCY/CONTRACT CLOSE OUT LIST COMPLETION AND WITHHOLDING OF FINAL PAYMENT
C.8. GENERAL AND ADMINISTRATIVE REQUIREMENTS
C.8.1 Minimum staffing and ability to contact and communicate with the CO or their designee C.8.2 Communication Equipment [DELIVERABLE] C.8.3 Onsite Records C.8.4 (Reserved) C.8.5 Use of CMMS/N-CMMS [DELIVERABLE] C.8.6 Quality Control Program [DELIVERABLE] C.8.7 Government Quality Assurance Surveillance Program
C.9. BUILDING OPERATING PLAN
C.9.1 Purpose of Building Operating Plan (For additional info refer to References) [DELIVERABLE] C.9.2 Components of the Building Operating Plan (BOP) (Refer to Exhibit 7 BOP Template)
C.10. EQUIPMENT INVENTORY
C.11. MONTHLY PROGRESS REPORT [DELIVERABLE]
C.12. REGULAR PROGRESS AND PERFORMANCE REVIEW MEETINGS [DELIVERABLE]
C.13. EQUIPMENT CONDITION ASSESSMENT [DELIVERABLE]
C.14. (RESERVED)
C.15. REFERENCE LIBRARY [DELIVERABLE]
C.16. REVIEW OF DESIGN DOCUMENTS [DELIVERABLE]
Section C: Mechanical Services Specification 3 of 83
C.17. BUILDING MANAGEMENT SUPPORT SERVICES [DELIVERABLE]
C.18. INSPECTION ASSISTANCE FOR SPACE BUILD OUTS [DELIVERABLE]
C.19. (RESERVED)
C.20. LABELING OF ELECTRICAL CIRCUITS [DELIVERABLE]
C.21. OPERATIONAL REQUIREMENTS
C.21.1 General C.21.2 (Reserved) C.21.3 Continuity of Operations (COOP) C.21.4 Emergency Operations Plan C.21.5 Tenant Environment C.21.6 Energy and Water Efficiency
C.22. SYSTEM PERFORMANCE STANDARDS OR PROCEDURES
C.22.1 Control Systems C.22.2 Smart Buildings
C.23. SERVICE REQUESTS
C.23.1 General C.23.2 Emergency Service Request [DELIVERABLE] C.23.3 Emergency Call Back (after hours) [DELIVERABLE] C.23.4 Urgent Service Request [DELIVERABLE] C.23.5 Routine Service Request [DELIVERABLE]
C.24. TOURS [DELIVERABLE]
C.24.1 General C.24.2 Operating Logs [DELIVERABLE] C.24.3 (Reserved) C.24.4 Condensate Drip Pans C.24.5 (Reserved)
C.25. DEMAND RESPONSE PROGRAMS
C.26. CURTAILMENT PROGRAM
C.27. BAS ALARM RESPONSE
C.28. ADVANCED METERING PROGRAM
C.28.1 Verification and Calibration [DELIVERABLE]
C.29. PROTECTION AND DAMAGE
C.30. NEGLIGENCE
C.31. KEY CONTROL
C.32. DISRUPTIVE OR HAZARDOUS TOOLS [DELIVERABLE]
C.33. SCHEDULED DISRUPTION TO UTILITIES, LIGHTING, FIRE PROTECTION & LIFE SAFETY SYSTEMS, OR SPACE
CONDITIONING [DELIVERABLE]
C.34. PLUMBING AND RESTROOMS
C.35. MAINTENANCE PROGRAM
C.35.1 General [DELIVERABLE] C.35.2 Maintenance Standard C.35.3 Application of Diagnostic Software C.35.4 BAS Control Systems [DELIVERABLE] C.35.5 (Reserved) C.35.6 (Reserved)
C.36. WATER TREATMENT
C.36.1 General C.36.2 Tolerances C.36.3 Initial Report and Development of Program [DELIVERABLE] C.36.4 Cooling Tower Water Management Plan C.36.5 Corrosion Monitoring for Open Loop water systems C.36.6 Monthly Testing [DELIVERABLE]
C.37. OIL ANALYSIS AND OIL CHANGES
Section C: Mechanical Services Specification 4 of 83
C.37.1 Periodic Oil Analysis [DELIVERABLE] C.37.2 Oil and Refrigerant Additives
C.38. LAMPS AND BALLASTS [DELIVERABLE]
C.39. ARCHITECTURAL AND STRUCTURAL SYSTEMS MAINTENANCE
C.39.1 General C.39.2 Maintenance and Repair C.39.3 Repair and Replacement Work C.39.4 Painting C.39.5 (Reserved) C.39.6 Finishes Maintenance C.39.7 Historic Building Preservation C.39.8 Vertical Transportation and Associated Equipment C.39.9 (Reserved)
C.40. REPAIRS
C.40.1 General [DELIVERABLE] C.40.2 Non-reimbursable Repairs C.40.3 Reimbursable Repairs C.40.4 Utility Work Hours C.40.5 Repair Shared Liability Example:
C.40.6 Approval of Work C.40.7 Invoicing C.40.8 Ordering Repairs from Outside Source C.40.9 Force Majeure (Uncontrollable events) C.40.10 Warranties [DELIVERABLE] C.40.11 Quality of Materials and Replacement Parts
C.41 SAFETY AND ENVIRONMENTAL MANAGEMENT
C.41.1 General C.41.2 Scheduling and Recordkeeping [DELIVERABLE] C.41.3 Refrigerants C.41.4 Local Air Quality Management Operating Permits [DELIVERABLE] C.41.5 Fuel Storage Tanks C.41.6 (Reserved) C.41.7 Polychlorinated Biphenyl (PCB) Control [DELIVERABLE] C.41.8 Facility Hazards C.41.9 Workplace Safety [DELIVERABLE] C.41.10 Electrical Safety C.41.11 Fall Protection [DELIVERABLE] C.41.12 Powered Platforms (Most sites do not have these) [DELIVERABLE] C.41.13 Lock Out/Tag Out [DELIVERABLE] C.41.14 Confined Spaces [DELIVERABLE] C.41.15 Asbestos Management [DELIVERABLE] C.41.16 Hazardous Materials C.41.17 Boiler/Pressure Vessel Operation and Inspection Standards C.41.18 Labeling and signage [DELIVERABLE] C.41.19 (Reserved)
C.42. FIRE PROTECTION AND LIFE SAFETY EQUIPMENT AND SYSTEMS
C.42.1 General C.42.2 Fire Alarm System Services C.42.3 Water-Based Fire Suppression Systems C.42.4 Fire-rated Door, Smoke and Fire Curtain Assemblies C.42.5 Fire Damper and Combination Fire/Smoke Dampers-Fire Shutters, Mechanical and Electronic C.42.6 Smoke Doors Assemblies Mechanical/Electronic/Fusible Link C.42.7 Smoke Dampers Mechanical and Electronic C.42.8 Portable Fire Extinguishers
Section C: Mechanical Services Specification 5 of 83
C.42.9 Non-Water-Based Fire Extinguishing Systems C.42.10 Smoke Control Systems / Pressurization Systems C.42.11 Emergency and Standby Power Systems C.42.12 Emergency Lighting Systems and Exit Signage C.42.13 Clean Agent Suppression Systems C.42.14 Air Sampling Detection Systems C.42.15 Mass Notification Systems C.42.16 Fire Pumps, Jockey Pumps, and Auxiliary Pumps C42.17 Fire Hydrants/Post Indicator Valves C.42.18 Fire Alarm System Central Station Monitoring
C.43. MAINTENANCE AND REPAIR OF VERTICAL TRANSPORTATION SYSTEMS (RESERVED)
C.44 SUBMITTALS CHART (CONTRACTOR DELIVERABLES)
C.45 FEDERAL REQUIREMENTS:
CUSTODIAL DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
Section C: Mechanical Services Specification 6 of 83
THIS PAGE IS INTENTIONALLY LEFT BLANK
Section C: Mechanical Services Specification 7 of 83
Operations & Maintenance Services Performance Locations
LOCATIONS: FRANK E. MOSS COURTHOUSE; SALT LAKE CITY, UT
US DISTRICT COURTHOUSE; SALT LAKE CITY, UT
WALLACE F. BENNETT FEDERAL BUILDING; SALT LAKE CITY, UT
J WILL ROBINSON FEDERAL BUILDING; PROVO, UT
PROVO IRS BUILDING; PROVO, UT
JAMES V. HANSEN FEDERAL BUILDING; OGDEN, UT
FOREST SERVICE BUILDING; OGDEN, UT
Section C: Mechanical Services Specification 8 of 83
C. Mechanical Specification Introduction
This is a Performance Based Service Contract and the success of the Contract depends on the satisfaction of the requirements, but also the satisfaction of our shared customer. Rather than a mere list of activities, this is a written expression of the GSA’s expectation of the service to be performed by the Contractor. A higher level of effective communication between the Government and Contractor is essential for partnering and for the performance based service contract to succeed. The purpose of partnering is to adopt procedures wherein the scope of work where the Contractor and Government can work together in achieving Contract objectives. Partnering involves the development of a cooperative management team that seeks to identify common goals and objectives. The success of this Contract is shared between the Government and the Contractor.
More emphasis is placed on the Contractor’s self-management of quality, not the usual external inspection by Government Inspectors, although that is a part of this Contract as well. All parties should act proactively to reduce service cost, therein providing an incentive for the Contractor.
The Contractor, through innovation, technology, or other means, shall perform the required maintenance of these facilities by following the Guiding Principles for Sustainable Existing Buildings:
I. Employ Integrated Assessment, Operation and Management Principles
a. Ensure incorporation of GSA’s performance goals for energy, water, material use and recycling, and indoor environmental quality goals throughout the life of this Contract.
b. Ensure that operating decisions are carried out with regard to sustainable operations.
c. Meet ASHRAE standards as noted throughout the SOW for thermal comfort and indoor air quality.
d. Use low emitting materials Volatile organic compounds (VOC) or other for maintenance. In particular, use products that have low pollutant emissions, adhesives, sealants, and solvents.
e. Use products meeting or exceeding EPA’s recycled content recommendations for building maintenance. For other products such as ceiling tiles, use materials with recycled content. For more information, see EPA’s Comprehensive Procurement Guideline website.
f. Use materials with the highest content level per USDA’s bio-based content recommendations for maintenance of or use in the building.
g. Use environmentally sustainable products that have a lesser or reduced effect on human health and the environment. See the Green Products Compilation.
h. Provide salvage, reuse and recycling services for waste generated from building operations, maintenance, and repair and discarded equipment.
i. Eliminate the use of ozone depleting compounds where alternative environmentally sustainable products are available consistent with the Clean Air Act.
II. Optimize Energy Performance – Operate all equipment to optimize efficiency to reduce energy use and otherwise seek operating costs reductions wherever possible.
III. Protect and Conserve Water where possible inside and outside. Where available, use EPA’s Water Sense-labeled products or other water conserving products.
IV. Be aware that the building(s) and management involved with this Contract may be in the process of establishing new initiatives, instituting plans, and operational procedures to meet energy efficiency goals either through receiving an ENERGY STAR rating, Upgrade or conversion of BAS to BACNET, Shave Energy, Smart Building, GSA link technology, or comparable programs. The Contractor will play an integral part of obtaining these goals and should be aware of the programs and processes.
This is a fixed-price Contract and while working with the Government in obtaining goals the Contractor is motivated to find improved methods of performance in order to increase its profits. Results of an effective partnership should reflect a “mutual win” situation.
Section C: Mechanical Services Specification 9 of 83
C.1. SCOPE OF WORK
C.1.1 Contractor Responsibility for Equipment and System The Contractor shall provide management, supervision, labor, materials, equipment, and supplies and is responsible for the efficient, effective, economical, and satisfactory operation, scheduled and unscheduled maintenance, and repair of equipment and systems located within the property line of the following building(s):
Ogden, UT
UT0010 Forest Service Building UT0035 James V Hansen Federal Building
Salt Lake City, UT
UT0017 Frank E Moss Courthouse UT0018 US District Courthouse UT0032 Wallace F Bennett Federal Building
Provo, UT
UT0014 J Will Robinson Federal Building UT0039 IRS Federal Building
a. Electrical systems and equipment.
b. Mechanical, plumbing, Building Automation System (BAS) where applicable BAS systems are connected to the GSA network, the Contractor’s employees will need to obtain a GSA ENT account to access systems) and heating, ventilation, exhaust systems and air conditioning (HVAC) systems and equipment.
c. Fire protection and life safety systems and equipment.
d. All control systems (i.e. Building Automation Systems (BAS), Public Address Systems, Computerized Lighting
Systems, etc.) that are within the scope of this Contract.
e. Architectural and structural systems, fixtures, and equipment within the site (to the property line). Limited to the building(s) non-reimbursable repair threshold up to an annual threshold at which time GSA picks up all remaining costs for the rest of that year. (See Section C.40.2 Non-Reimbursable Repairs)
f. Service request desk operations includes record keeping using a computerized maintenance management system (CMMS/N-CMMS) or by other means as well as other administrative functions. Please note that GSA Region 8 in the process of converting from a regional CMMS to the National CMMS (N-CMMS) and the contractor will be expected to be proficient in either system and will be expected to participate in this transition.
g. (Reserved)
h. Locks, keys, keycard systems (except perimeter doors and agency equipment), vehicle barrier systems and static and dynamic bollard systems.
i. Lighting, dock levelers and bumpers and roll-up and sliding garage doors.
j. (Reserved)
k. Storm drainage systems - reduce storm water pollution by minimizing discharges and runoff to the storm sewer system and environment.
l. The Contractor shall complete roofing system investigations and repairs up to the repair threshold.
m. The Contractor shall maintain and repair U.S. flag pole, lighting and pulley system.
n. The Contractor shall maintain kitchen/concessions area drains.
o. The Contractor shall maintain conveying equipment, parking control equipment, and loading dock equipment.
p. The Contractor shall update/install software/firmware to latest revision and update software licenses for BAS controls only. The Contractor is not responsible for the costs of software, firmware updates, and licensing for the BAS, however, the Contractor is responsible for letting the CO or their designee and the Region 8 Facilities Management office know when updates are required. The Contractor is responsible for keeping the systems operating properly.
q. Sanitary sewage equipment and systems.
r. Domestic water filtration/pumping (JV Hansen and WF Bennett Federal Buildings only) and fire supply tank systems (US District Courthouse only).
Section C: Mechanical Services Specification 10 of 83
C.1.2 Contractor Responsibilities for Management and Communication
The Contractor Shall:
a. Be responsible to make the management and operational decisions to meet the quality standards required under this contract.
b. Use innovation, technology and other means and methods to develop and perform the most efficient services for the building.
c. Implement an effective Quality Control Plan (QCP). GSA Region 8 no longer requires quarterly corporate Quality Control visits.
d. Implement an effective service call system, as specified under the Special Requirements section of this contract that results in prompt, professional, and courteous resolution of tenant concerns.
e. Keep the Contracting Officer (CO) or designee informed in writing of all equipment that is not fully operational, on an equipment status log, current status of the work being performed, provide work schedules, provide a major equipment and critical system break down or impairment form, and provide other pertinent information needed by the CO or their designee.
f. Reduce the environmental impacts of work performed under this contract by using, to the maximum extent, environmentally sound practices, processes, and products.
g. Provide training to their employees to ensure they understand and can comply with the Regional Sustainability and Environment Management System (SEMS) and Guiding Principles requirements and that will stress stewardship in maintenance practices i.e., the proper use, disposal, recycling of chemicals, dispensing equipment and packaging. Provide documentation that their employees are completing training in the core competences and participating in continual educational training according to the Federal Building Personnel Training Act and the Shave Energy Program. Ensure that their employees are properly licensed and/or certified to operate necessary building systems or equipment for which licensed and/or certified personnel are required by federal, state or local law, codes or ordinances (H.15. Personnel Qualifications).
h. Federal Requirements: The Contractor shall comply with all applicable Federal, state and local laws, regulations and codes, including any supplements or revisions. The Contractor shall obtain all applicable licenses training, and permits. If a change in law or regulation requires the Contractor to implement an action that will result in an increase or decrease in Contract price, the Contractor shall implement the required action and within 30 calendar days submit to the CO or their designee a price proposal for such change. If the CO or their designee determines an equitable adjustment is substantiated a modification to the Contract will be negotiated or issued, as appropriate.
C.1.3 Excluded from this scope:
a. Security systems (the Contractor shall be responsible to maintain mechanical components of the door. For example, closers, keepers, hinges, crash bars, etc.)
b. Telecommunication systems.
c. Equipment owned and operated by tenant agencies (i.e. holding cells, CRAC units, security equipment, etc.)
(unless included and tracked and paid for separately and shown on the building(s) equipment inventory).
d. Furnishings (not installed as fixtures).
e. Paper, soap, and hand-sanitizer dispensing equipment in restrooms.
f. Kitchen appliances and equipment (ductwork above the ceiling, grease traps with associated piping, and any fire suppression or fire alarm equipment are included in the scope).
g. Equipment owned by servicing public utilities.
h. Fitness center equipment.
i. (Reserved)
j. Additional services as needed by various agencies
k. Vertical transportation systems (refer to the building(s) equipment inventory list).
C.2. DEFINITIONS
C.2.1 Acceptance “Acceptance” means an authorized representative of the Government has inspected and agreed that the work meets all requirements of this contract, to include documentation requirements.
Section C: Mechanical Services Specification 11 of 83
C.2.2 Acts of God These are unanticipated grave natural disasters or other natural phenomenon of an exceptional, inevitable, and irresistible character; the effects of which could not have been prevented or avoided by the exercise of due care or foresight.
C.2.3 Additional Services “Additional services” are services that the Contractor will provide at an additional cost to the Government, to include all labor, supervision, supplies and materials specifically identified as being outside the provisions of the basic services and included in the offeror’s overall pricing. The CO or their designee will issue a separate delivery order before work may proceed.
C.2.4 Advanced Meters Advanced meters are those that have the capability to measure and record interval data (at least hourly for electricity), and communicate the data to a remote location in a format that can be easily integrated into an advanced metering system.
C.2.5 Advanced Metering Systems A system that collects time-differentiated energy usage data from advanced meters via a network system on either an on-request or defined schedule basis. The system is capable of providing usage information on at least a daily basis and can support desired features and functionality related to energy use management, procurement, and operations, U.S. Department of Energy, EERE: Guidance for Electric Metering in Federal Buildings, (February 3, 2006).
C.2.6 Approval “Approval” means the Government has reviewed submittals, deliverables, and administrative documents (e.g., insurance certificates, installation schedules, planned utility interruptions, etc.) and has determined the documents conform to contract requirements. Government approval shall not relieve the Contractor of responsibility for complying with Federal, State, and local laws and regulations.
C.2.7 Architectural and Structural Systems “Architectural and structural” systems include all building structure, envelope, building improvements and finishes, and site improvements (e.g., paving, walkways, asphalt, etc.) to the property line, walls, floors, doors, windows, and all items that are part of or otherwise associated with them (including toilet paper dispensers, paper towel dispensers, and soap dispensers.
C.2.8 Basic Services The Basic Services of the contract consist of the recurring contract requirements for which the Contractor is paid as a base price, i.e., the requirements established by the contract statement of work and related general and administrative requirements that do not contain provisions for separate reimbursement. Indefinite Quantity requirements (Additional Services and Reimbursable Repairs) are requirements outside of Basic Services, for which payment is made on a case-by-case basis.
C.2.9 Building Automation System (BAS) The “building automation system” is a system controlling and monitoring building HVAC, and possibly other systems, to include all device, field, and global controllers, instrumentation, networking infrastructure, computers and peripherals, software, programming, database files, and licenses.
C.2.10 GSA Link The GSA Link initiative is one of GSA’s strategic projects. The purpose of this initiative is to leverage automated building analytics technology to measure and substantially lower operational expenses in the existing owned building portfolio. GSA Link is a hardware and software solution to capture real-time building systems point data, apply rules-based analytics software to the data, and spot trends and deficiencies while reporting actionable events to building operators, O&M contractors, and GSA Service Center property managers.
C.2.11 Building Operating Plan The “building operating plan” is a mandatory plan that the Contractor prepares for Government approval that describes the Contractor’s program for operating and maintaining the building, to include both normal circumstances and contingencies.
Section C: Mechanical Services Specification 12 of 83
C.2.12 Commissioning
A practice used to optimize and verify performance of fundamental building systems.
C.2.13 Ongoing Commissioning The practice of optimizing system performance by continuing to fine-tune equipment so will result in actively preventing problems for the lifetime of the building. GSA’s Ongoing Commissioning efforts will focus on maintaining the facility in the optimized state resulting from TBC and Re/Retro Commissioning efforts. GSA will achieve this though this contract’s operation and maintenance requirements of major equipment and through its relationship with its service providers (Operations and Maintenance/Custodial/Repair and Alterations/IT/Utilities) and the use of technology (networked systems/Advanced Meters/Smart Buildings).
C.2.14 Computerized Maintenance Management System (CMMS) A “computerized maintenance management system” is a database and application software package that automates the O&M and repairs record keeping requirements. A CMMS is designed to enhance efficiency and effectiveness of maintenance activities. Typical features include planning, scheduling and monitoring of work orders and maintenance needs.
The National CMMS (N-CMMS) is a central repository (database) for all maintainable GSA Assets. The N-CMMS provides a mandatory, Agency-Wide means and method for processing and reporting all maintenance work done for GSA regardless of Region or Contractor.
C.2.15 Consumable Parts “Consumable parts” or components are parts or components that customarily require regular replacement rather than repair in a maintenance program and shall be disposed of properly. Examples include, but are not limited to: oil, grease, belts, filters, ballasts, lamps, etc.
NOTE: Air filters shall be replaced according to industry standards, the frequency is no longer prescribed by GSA (See Section C.35.1 General).
The Contractor is responsible for any consumables (including fuel) used during day-to-day operation of a generator, i.e., exercising the generator, testing, etc. Operation of a generator for an extended period (more than 4 hours per event) or due to a power loss would be treated as a reimbursable expense. If the operation of the generator is caused by Contractor negligence, the Contractor shall be liable for the full cost of refueling, any other provisions notwithstanding. The contractor shall not allow the fuel level to drop below 75%. The contractor shall provide fuel up to [insert average annual fuel cost] per contract year. The contractor shall submit a running log containing the amount of fuel used with associated costs the first Monday of each month to the CO or their designee [Deliverable] Section
C.11.l). GSA will pay for all fuel after the average annual fuel cost limit is reached each year the contract is in effect.
C.2.16 Contracting Officer (CO) The Contracting Officer (CO) has the overall responsibility for the administration of this contract. The CO alone, without delegation, is authorized to take actions on behalf of the Government to amend, modify or deviate from the contract terms, conditions, requirements, specifications, details and/or delivery schedules. However, the CO may delegate certain other responsibilities to authorized Government representatives.
C.2.17 Contracting Officer's Representative (COR) or Designee The Contracting Officer's Representatives (COR) shall be appointed by letter from the CO. CORs will be the primary Government representatives for the administration of Contract, shall have proper training and experience in inspecting contracts, but will not have the authority to modify the contract.
C.2.18 Contractor
“Contractor” as used in this document refers to the company or firm awarded this contract.
C.2.19 Contractor’s Other Than Normal Working/Duty Hours
Hours other than those identified as Normal Working Hours.
Section C: Mechanical Services Specification 13 of 83
C.2.20 Controls and Control System A “control system” is any pneumatic or low-voltage control, communication and monitoring system, including but not limited to stand alone devices, field and global controllers; instrumentation; networking infrastructure; computers and peripherals; software; programming; database files; and licenses. Examples are the BAS, Advance Metering System (AMS), and lighting control systems. Fire protection systems and security systems are excluded from this definition for purposes of this contract and are defined separately. Gateway devices and mapping software and files for data interchange between a control system and a fire protection or security system are considered part of the control system. Government-furnished Equipment (GFE) is any required computer or server hardware (i.e. PC, laptop) and peripherals (i.e. mouse, keyboard, monitor) and/or routing and switching equipment, used to provide GSA network connectivity, must be government-furnished and must be provided by the GSA.
C.2.21 Defective Service A unit of service that does not conform with specified contract requirements.
C.2.22 Emergency The term “Emergency” includes bombings, and bomb threats, civil disturbances, fires, explosions, electrical failure, loss of water pressure, building flooding, sanitary and sewer line stoppage, chemical and gas leaks, medical emergencies, hurricanes, tornadoes, floods, and earthquakes. The term does not apply to civil defense matters such as potential or actual enemy attacks.
C.2.23 Emergency Callback An “emergency callback” is a service request or other request for service placed outside of normal working hours and of such a nature that response cannot wait for the resumption of the next day’s normal working hours.
C.2.24 Environmentally Sustainable Products or services that have a lesser or reduced effect on human health and the environment when compared with competing products or services that serve the same purpose. This comparison may consider raw materials acquisition, production, manufacturing, products and chemicals, packaging, distribution, reuse, operation, maintenance, or disposal of the product or service. Attributes of environmentally sustainable products include those that are energy efficient, water-efficient, biodegradable, environmentally preferable, non-ozone depleting, contain recycled content, non or less toxic, EPA-designated and biobased.
C.2.25 Existing Deficiency List Report The “existing deficiency list report” or “existing deficiency list” is a list of deficiencies that may exist in the equipment and systems covered by this performance work statement, as well as the Contractor's itemized price (including, but not limited to, labor, materials, overhead, and profit) for correcting each deficiency.
C.2.26 Exterior This includes entrances; landings; steps; sidewalks; parking areas; arcades; courts; planters; lawns; irrigation systems;
fountains; security bollards; gates; fences; flagpoles; building-mounted, pole, and ground lighting; etc. located adjacent to the facility extending to the legal property line.
C.2.27 Federal Holidays “Federal holidays” for the purposes of this contract are New Year’s Day, Martin Luther King Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
When Federal holidays fall on weekends, a weekday is typically designated as the holiday. Holidays that fall on Saturday are observed on the previous Friday and holidays that fall on a Sunday are observed on the following Monday. Veterans’ Day is always on the 11th of November and Thanksgiving is always the 4th Thursday of November.
C.2.27.1 State Holiday Recognized in Utah as a Federal Holiday Good Friday is recognized as a Federal Holiday in Utah under the Department of Labor Wage determination and is subject to overtime pay. The Contractor shall provide mechanical and custodial services on this day and be prepared for Holiday Pay.
Section C: Mechanical Services Specification 14 of 83
C.2.28 Federal Executive Holidays, Unanticipated Unanticipated holidays declared by the President will count as Federal holidays. As long as the Contractor pays employees as if it were an anticipated Federal holiday, the Contractor will be paid for the unanticipated holiday as if it were a normal Federal Holiday.
C.2.29 Fire Protection and Life Safety Systems “Fire protection and life safety systems “ are systems and equipment installed in the building to (1) detect fire and products of combustion, (2) notify building occupants and emergency responders, (3) initiate smoke control systems
(4) initiate fire suppression systems, (5) control or suppress fires and (6) facilitate or enhance emergency egress.
These systems also may communicate with other major building systems for fire and smoke control, elevator recall, and utilities control. Life safety systems and equipment includes emergency lighting, exit signage, special egress door locking arrangements, and exit stair markings.
C.2.30 Guiding Principles for Sustainable Existing Buildings A practice of using processes that is environmentally responsible and resource-efficient throughout a building's life-cycle. The goal is to minimize and offset consumption of energy, water, and other resources and to eliminate all waste and pollution in building operations and activities. The result is to reduce the environmental impact of the Federal government, which will expand and complement the building design economy, utility, durability, and comfort. The common objective is to reduce the overall impact of the building environment on human health and the natural environment by:
a. Improving energy efficiency and reductions in greenhouse gas emissions.
b. Reducing water consumption intensity.
c. Acquiring green products and services.
d. Implementing pollution prevention measures, including reduction or elimination of the use of toxic and hazardous chemicals and materials.
e. Implementing cost-effective waste prevention and recycling programs.
f. Increasing diversion of solid waste.
g. Adapting to climate change, physical security and other risks as they apply to mission criticality of GSA and tenant agencies and assist with facility adaptation and resiliency assessments and initiatives
C.2.31 GSA Green Purchasing Program (GPP) The GPP specifies requirements to promote the purchase of environmentally sustainable products and services.
C.2.32 Indefinite Quantity “Indefinite quantity” provisions permit the Government to order work, in addition to the basic services, and upon acceptance permit additional payment to the Contractor.
C.2.33 Maintenance Repair Work required preventing a breakdown of a piece of equipment or system, or put equipment or systems back in service after a breakdown or failure.
C.2.34 Miscellaneous Work “Miscellaneous work” is additional labor that is performed at the request of GSA at no additional cost to the Government (i.e., they are part of basic services). The Contractor may also have to provide consumable materials to complete the request. Miscellaneous work is treated as a Service Call and is included in the Basic Operations and Maintenance price quoted per month on the bid sheet. During normal duty hours minor tasks related to routine, day-to-day operational requirements requested by the which will consist of, but not be limited to: hanging pictures, maps, and bulletin boards; trimming door bases; painting; installing electrical outlets; moving power poles; moving light fixtures over work areas when tenant space is rearranged; replace bulbs in task lighting in PBS occupied space; moving thermostats; clean air grills; snow removal at building exits; policing grounds around the buildings; escorting various personnel; and other similar functions as directed. Miscellaneous work shall be accomplished in the same time frame as routine service calls unless otherwise directed by the CO or their designee.
C.2.35 Modification of Contract
Modification is a bilateral or unilateral change in terms of a contract.
Section C: Mechanical Services Specification 15 of 83
C.2.36 Negligence “Negligence” is the failure to use due care under the circumstances. It is the doing of some act which a person of ordinary prudence would not have done under similar circumstances or failure to do what a person of ordinary prudence would have done under similar circumstances.
C.2.37 Non-Reimbursable Repair A “non-reimbursable repair” is a repair that is the Contractor’s responsibility with no additional reimbursement from the Government (See Paragraph C.40.2 Non-Reimbursable Repairs).
C.2.38 Normal Working Hours “Normal working hours” is the hours of building operations under most circumstances when all services shall be provided to all occupants. Refer to (Exhibit A.1)
C.2.39 Occupant Emergency Plan (OEP) The lead agency in each building is responsible for development and enforcement of the building’s “Occupant Emergency Plan” (OEP). The OEP details what the building tenants shall do in case of an emergency. The plan identifies floor wardens, shelter in place locations etc.
C.2.40 Open Systems An “open systems” solution is based on industry standard open protocols. This environment and solution is typically designed, procured, installed and maintained in a manner that provides the building owner with as many competitive configuration options as possible while maintaining the integrity of the supported manufacture system. The solution must be procured and installed so that the result delivers device level interoperability amongst different manufactures residing on a common network. In addition, the solution must be maintained with no future need for the original (installing) contractor. Additions, modifications, and retrofits can easily, without significant additional cost, be made to the system without dependence on the original installing contractor nor require substantial engineering or other technical development. Contractors shall specify Open Systems solutions where feasible and reasonably possible.
C.2.41 Operations “Operations” is the continual process of using building equipment systems to accomplish their function, optimize building performance, and improve energy efficiency. Operations includes analysis of requirements and systems capabilities, operating controls and control systems, responding to service requests, touring and observing equipment performance and condition, adjusting equipment, identifying needed maintenance and repairs to equipment, and maintaining lubrication and chemical treatments, etc.
C.2.42 Performance Based Service Contracting The procurement strategy that seeks to issue technical requirements that set forth outcomes for performance instead of specific requirements on how to perform the service. This strategy shifts the risk of performance to the Contractor by allowing the Contractor to design the methods of achieving desired results as defined by the performance quality standards established by the Government.
C.2.43 Performance Work Statement (PWS)
The Performance Work Statement details the work requirement and can be referred to as the specification.
C.2.44 Predictive Maintenance “Predictive maintenance” is a program of maintenance activities in which scheduling of maintenance is derived from monitoring the operating condition, or changes in the operating condition, of equipment being maintained.
C.2.45 Preventive Maintenance (Scheduled and Unscheduled) “Scheduled preventive maintenance” is a program of maintenance activities performed based on a fixed schedule or on equipment runtimes. “Unscheduled preventive maintenance” is all work performed including adjustments and procedures necessary to sustain the proper operation of all building equipment and systems pending a scheduled procedure. Examples are: ensuring sequences of operation; operational schedules; heating and cooling reset schedules; optimum start and stop procedures are utilized and ensuring that all equipment such as dampers and valves are kept fully functional, and repaired immediately should a failure occur.
Section C: Mechanical Services Specification 16 of 83
C.2.46 Product Preference Use of “environmentally sustainable” products is mandatory for performance of this contract. As such, products identified as “environmentally sustainable” will be selected over those which do not carry such designations. The following factors should be considered when selecting products: environmental performance, cost performance, bio-based, recycled content, biodegradability, technical performance, and availability. (Refer to Exhibit 4 Summary of Environmentally Sustainable Product Attributes)
C.2.47 Quality Assurance Surveillance Plan (QASP) The QASP is the Government’s surveillance method of monitoring and evaluating the Contractor's performance under a Performance Based Statement of Work (PBSOW).
C.2.48 Quality Control Plan The QCP is the Contractor’s complete written system for identifying and correcting deficiencies in the quality of services before the level of performance becomes unacceptable. Preparation of this document is the responsibility of the Contractor.
C.2.49 Repair A “repair” is an act of restoring inoperable, dysfunctional or deteriorated equipment, systems, or material to a fully functional, non-deteriorated state. Repairs usually involve some combination of labor and replacement parts, components or materials.
C.2.50 Reimbursable Repair A “reimbursable repair” is a repair that is reimbursable to the Contractor, in whole or in part, in accordance with the provisions in this document. (Refer to Section C.40.3 Reimbursable Repairs)
C.2.51 Sequence of Operations A “sequence of operations” is the control logic used to operate a system normally put into effect through a control program.
C.2.52 Service Request A “service request” is a response to a GSA, tenant, or agency request or a response to an observation that some equipment, system or material covered by the contract is inoperable, dysfunctional, deteriorated, or not within normal operating parameters, or that performance standard of the contract is not being met. Service request response involves analysis of the problem and adjustment of operating or monitoring controls or other immediate corrective action. A requirement to perform a repair may result from the analysis stage of a service request. Service requests may be generated automatically from interfaces such as BAS or diagnostic software such as GSALink.
C.2.53 Shave Energy The Shave Energy program involves the following training and work. Building Operating Plan: Acquaints user with zone‐by‐zone equipment operations and schedules; Space Audit: Measure, record, and compare readings for space temperature, humidity, and luminance. Energy Audit Checklist: Enumerate specific efficiency measures for every building space including instructions for implementation. Night Audit: Identify equipment running during unoccupied hours. Outside Air Verification: Measure, record, and compare outside air flows to set points and standard ventilation requirements. Controls & Sequences: Compares controls/sequences for operational HVAC equipment to prescribed optimization strategies
C.2.54 Standard Services Standard services are defined as all services that are included in the monthly price or as defined in the Contract document. Prices are to include all applicable labor, materials, supplies, training/certifications, equipment (except as otherwise provided), supervision, and management.
C.2.55 Stewardship The act of stewardship is to take the responsibility for managing, conducting or supervising the quality, state or condition of a commercial building. A Stewardship program in addition to caring for the building, its occupants and visitors includes among other things a sense of shared responsibility, occupant participation and communications amongst building management, Contractor custodial and mechanical personnel, occupants, sub-contractors and others who have an impact on/in the building.
Section C: Mechanical Services Specification 17 of 83
C.2.56 Supervisor, On-site The term “on-site supervisor” means a person designated in writing by the Contractor who has authority to act for the contract on a day-to-day basis at the work site.
C.2.57 Tour A “tour” is generally a scheduled walkthrough of equipment rooms and installations including computer rooms, restrooms, etc. by Contractor operating personnel for the purpose of ensuring that equipment is running properly, ensuring that equipment rooms are in good order and without safety hazards, and making any necessary adjustments to operating controls or to lubricate equipment. A tour may also involve a combination of such physical visits in addition to using automated systems for the monitoring of equipment and systems. Equipment log sheets are a part of the tour plan/program. All tours are "inspection" work orders in the CMMS/N-CMMS and shall comply with all work order requirements, C.2.58 Vertical Transportation Systems
“Vertical transportation systems” include elevators, escalators, dumbwaiters, lifts, etc.
C.2.58 Watch A “watch” involves performing certain tasks required for the operation of the HVAC equipment (central systems over 300 tons), boilers, compressors, and related equipment in a centralized location. Watches include, but are not limited to starting equipment, checking at designated intervals all operating equipment in the area, recording readings, shifting equipment and loads, making adjustments at the central control center, taking water samples, making tests, and adding chemicals as required.
C.3 REFERENCES (CONTAINED IN A SEPARATE REFERENCE DOCUMENT)
C.4 EXISTING DEFICIENCY/CONTRACT CLOSEOUT
The existing deficiency and contract closeout inspection and list is meant to identify and document all deficiencies that exist in the equipment and systems covered by this performance work statement.
C.4.1 Existing Deficiency Inspection and Closeout Inspection The outgoing Contractor, incoming Contractor, and the CO or their designee shall make a complete and systematic initial inspection together during the transition phase of the contract (See Section C.5.1 Transition Phase Startup). The purpose of this inspection shall be to discover and list in an existing deficiency/contract closeout list all deficiencies that may exist in the equipment and systems covered by this performance work statement, as well as the incoming Contractor's itemized price (including, but not limited to labor, materials, overhead, and profit) for correcting each deficiency. The Government may elect to have all or any part of this work performed by the outgoing contractor (at no additional cost) prior to contract expiration or the incoming Contractor (at the price or prices quoted), by Government employees, or by other Contractors.
C.4.2 Existing Deficiency List and Contract Closeout List:
Contract Closeout deficiency items that can be corrected by service call, preventive or predictive maintenance or repairs below the repair threshold will be corrected by the outgoing contractor prior to expiration of the contract. Any contract closeout deficient items not completed prior to contract expiration will result in the withholding of monies from the final payment. The existing deficiency list and contract closeout list shall be submitted to the CO or their designee not later than 7 calendar days after completion of the inspection. [DELIVERABLE] Any dispute between the Government and the Contractor as to classification of initial deficiency list items will be resolved under the Disputes Clause in this document. The incoming Contractor’s itemized estimates for correcting each deficiency shall be submitted to the CO or their designee not later than 30 days after submission of the list and these estimates shall remain in effect for a minimum of 180 days. [DELIVERABLE] Deficiencies discovered after the submission of the existing deficiency/contract closeout list will not be considered pre-existing for purposes of this Contract, unless equipment is operational and cannot be secured and inspected. Any piece of equipment or system that cannot be inspected shall be highlighted at the beginning of the existing deficiency list stating why it cannot be secured and inspected. An estimate of when the Contractor reasonably expects to be able to inspect the piece of equipment shall be provided. When an existing deficiency is corrected, the Contractor shall assume full responsibility for the subsequent repair of the item as covered under the terms of this Contract. Nothing in the existing deficiency list shall be construed as diminishing the obligations imposed by this Contract upon the Contractor to operate any deficient item
Section C: Mechanical Services Specification 18 of 83
(to the extent operable) or to adjust or maintain any such item. Items that may be replaced, repaired, or adjusted during the performance of normal preventive or predictive maintenance or service call will not be identified on this list.
C.5. STARTUP PHASE/TRANSITION PHASE
C.5.1 Transition Phase Startup [DELIVERABLE]
The Contractor shall provide 60 days of transition startup services, prior to the Contract start date, to assist transitioning between Contractors. The purpose of this phase is to permit a transition that is seamless to the tenants and to assess the condition of the building and incomplete maintenance work at the time of Contractor transition.
During this period the Contractor shall:
a. Review and update existing BOP with the CO or their designee by the end of the startup phase.
b. Inspect the condition of all equipment and systems for which the Contractor will assume responsibility.
c. Review work order history and equipment inventory information.
d. Complete the government-furnished CMMS/N-CMMS training.
e. Update the preventive maintenance schedule, if needed. The new periodic maintenance schedule shall be based off of the last time PMs were performed.
f. Develop and…