encl 4_qasp - SAT CW Filtration and Upgrades.docx

DOCX document 38 KB Posted

Attached to
Raised Floor Upgrade Federal contract opportunity
Solicitation number
HC102821R0012
Issued by
Defense Information Systems Agency

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide condenser water filtration and upgrades at a Defense Information Systems Agency data center in San Antonio, Texas. The QASP outlines performance standards and methods for monitoring the contractor's work, which includes replacing raised access floor panels with concrete core panels, upgrading the floor structure, lifting existing racks, and cleaning the structural floor. Performance will be evaluated through 100% inspection of submittals and completion of tasks, with an acceptable quality level of 100% due to the sensitive computer room environment. The contractor must meet standards such as completing 97% of tasks with little rework, submitting all documents and shop drawings according to contract requirements, and adhering to technical specifications for inventory, testing, as-built drawings, spare parts, and operations/maintenance materials.

View the file

Other files for this federal contract opportunity

Other files attached to Raised Floor Upgrade, newest first.
File Type Posted
Solicitation Q and A Rounds1-4 (21June2021).xlsx XLSX spreadsheet
HC102821R00120009.pdf PDF
Solicitation Q and A Rounds1-3 (26May2021).xlsx XLSX spreadsheet
HC102821R00120008.pdf PDF
HC102821R00180007.pdf PDF
Revised Solicitation Q and A Round 2 Date 4.12.21.xlsx XLSX spreadsheet
Appendix I - SRG Drawing.pdf PDF
HC102821R00120006.pdf PDF
Appendix B - Raised Grid Access Flooring.docx DOCX document
Appendix C - Signal Reference Grid for Grounding.docx DOCX document
Appendix J - SRG Testing Report 2012.pdf PDF
HC102821R00120005.pdf PDF
HC102821R00120004.pdf PDF
ELEC-DATA CENTER SAN ANTONIO.pdf PDF
SAT Raised Floor Pre-Proposal Site Visit Sign-in.pdf PDF
Solicitation Q and A Rounds 1 and 2 (23Mar2021).xlsx XLSX spreadsheet
DISA - Raised Floor System Report San Antonio TX -Revised 20180206.pdf PDF
MECH-DATA CENTER SAN ANTONIO.pdf PDF
HC102821R0012-0003.pdf PDF
Solicitation Q and A Round 1.xlsx XLSX spreadsheet
HC102821R0012-0002.pdf PDF
HC102821R0012-0001.pdf PDF
encl 4_final qasp - SAT Raised Floor Upgrade.pdf PDF
HC102821R0012-CLIN Pricing Worksheet (2).xlsx XLSX spreadsheet
Appendix G - SEC Inventory Format (excel spreadshhet).xlsx XLSX spreadsheet
Appendix E - MIL-STD-188.pdf PDF
Appendix F - Contractor NDA.docx DOCX document
Appendix D - SRG Grounding System Commissioning.docx DOCX document
SCA WD 2015-5253 Rev 12.pdf PDF
Appendix H - Electrical Safety Program.pdf PDF
Appendix A - Raised Floor Upgrade Drawing.pdf PDF
Appendix C - Signal Reference Grid for Grounding.docx DOCX document
Appendix B - Raised Grid Access Flooring.pdf PDF
HC102821R0012-Raised Floor Upgrade RFP.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

1. Contract or Task Order Title: Condenser Water Filtration & Upgrades – DISA Data Center San Antonio

2. Purpose:

This QASP provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored?

· How monitoring will take place.

· Who will conduct the monitoring?

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

3. Roles and Responsibilities:

The following personnel shall oversee and coordinate surveillance activities.

Program/Project Manager (PM) – The PM provides program oversight and supports the COR’s performance assessment activities.

Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.

Contracting Officer’s Representative (COR) – The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance. The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.

Other Key Government Personnel – This may include performance monitors, inspectors, technical experts, workforce service division and center directorate level security personnel, requirements office, or others (i.e. users) who provide information that helps the COR monitor contractor performance.

4. Primary Method of Surveillance:

All tasks shall be evaluated with 100% inspection as the surveillance method.

· 100 Percent Inspection. This is usually only the most appropriate method for infrequent tasks or tasks with stringent performance requirements, e.g., where safety or health is a concern. With this method, performance is inspected/evaluated at each occurrence. One hundred percent inspection is too expensive to be used in most cases.

Surveillance Matrix

The Surveillance Matrix (Appendix 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.

Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performance surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The AQL performance Standard Table should be used to form the foundation of the COR’s inspection checklist.

5. Performance Standards:

Performance Standard
Acceptable Quality Level (AQL)
Method of Surveillance
6.1 - Detailed project schedule, investigate existing conditions, conduct weekly project status meetings, and prepare and submit shop drawings/product data
100% schedule with complete phasing plan showing no planned data center operational interruptions.
100% completion inspection prior to acceptance.
6.1-6.8 Submittals and Shop Drawings
100% of the documents were submitted and approved in compliance with contract requirements.
100% completion inspection prior to acceptance.
6.2 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.3 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.4 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.5 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.6 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.7 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.8 Tasks
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.10 Requirements
Performance occurs with little to no required re-work 97% of the time.
Routine inspection during installation; 100% completion inspection prior to acceptance.
6.9.1 Inventory Tasks
99% Compliance with Contract Requirements.
100% completion inspection prior to acceptance.
6.9.2 Testing and Testing Reports
Successful Pre-functional and Functional Testing (PFT & FT), TAB and Commissioning to include all testing of control sequences and failure methods
100% review and validation.
6.9.3 As-Built Drawings
100% Compliance with Contract Requirements.
100% inspection and validation.
6.9.5 Spare Parts
100% Compliance with Contract Requirements.
100% inspection and validation.
6.9.6 - Operations & Maintenance (O&M) Binder
Material submissions, As-built drawings, Operation & Maintenance Manuals, require only minor modifications to comply with technical requirements. Revisions that occur are minor and resolved to meet contract requirement.
100% completion inspection prior to acceptance for technical compliance review by the Government facility management personnel.

6. Documenting Performance:

Acceptable Performance.

The Government shall document positive performance. A Performance Assessment Report (PAR) template is attached (Appendix 2). Any report may become part of the supporting documentation for fixed price payments, award/incentive fee payments, Contractor Performance Assessment Reporting System (CPARS) entries, or other actions. Government acceptance of services permits the contractor to invoice for the service fee.

Unacceptable performance.

Unacceptable contractor performance can be identified by customer complaints (Appendix 3) or upon schedule surveillance evaluations. When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. The COR shall document the discussion and place it in the COR file and provide a copy to the KO.

When the COR determines formal written communication is required, the COR shall prepare a Corrective Action Report (CAR). The CAR is forwarded to the KO for dissemination to the contractor. A CAR template is attached to this QASP (Appendix 4).

The contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the contractor has to present this corrective action plan to the KO and COR. The Government may withhold payment for services until corrective action is taken. The Government shall review the contractor's corrective action plan to determine acceptability. Upon Government acceptance of the corrected services the contractor will be permitted to invoice for the service fee.

Any CAR may become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment, CPARS or other actions deemed necessary by the KO.

7. Mandatory or regulatory compliance items

The contractor will provide initial proof of compliance with regulatory and compliance items contained in the contract. The Contracting Officer's Representative (COR) and the Contracting Officer (KO) will evaluate the initial submission and will conduct ad hoc reviews of the contractor's compliance throughout the remainder of the contract. The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the KO.

8. Acceptable Quality Level (AQL):

The AQL for this project is 100% due to the raised floor computer room environment this project supports.

9. Evaluation Method:

There will be a 100% review of the submittals by the COR, as defined by PWS. Once the package has been approved of and all comments have been addressed, the contractor can proceed onto the installation phase.

At the close-out of the project a walkthrough will be to verify that the installation was properly done and that there are no deficiencies. Any existing deficiencies shall be added to a punch list and will be addressed in a timely manner.

10. Performance Rating

In evaluating the quality of contractor’s performance, the following performance ratings may be used (same as CPAR ratings).

Performance Rating Criteria

Exceptional
Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Appendix 1 - Surveillance Matrix

Performance Standards
Acceptable Quality Levels
Methods of

Calulation

Surveillance
Results/Ratings

Performance is based on timely delivery of all tasks as specified in PWS Section 6.

High level of government satisfaction with the Contractor’s work includes the successful delivery of all technical tasks on schedule as specified in PWS Section 6.

Target Criteria:

Equipment and installation work meets technical requirements 95% of the time, as specified in PWS Section 6.

Minimum Acceptable:

Deficient work is corrected in a timely manner.

Calculation:

The number of required equipment items, 100% of the total, are satisfactorily installed correctly and on schedule.

The Government technical personnel (site Facility Manager) must inspect the completed work for correct equipment installation for the results to have at least a 100% completeness rate.

Measurement Interval:

The Measurement Interval is at completion of each specified task in the PWS Section 6.

Measurement Period:

The Measurement Period begins at issuance of Notice to Proceed (NTP) and ends at final acceptance of technical compliance of the contract.

Source of Measurement Data: Data will be collected from site Facility Manager inspection of the completed work for timely and correct equipment installation.

Method of Surveillance:

Facility Manager on-site 100% inspection of the completed work.

Timing of Measurement: Measurements are based on inspection of completed work when notified by the Contractor that task is complete.

Reporting Frequency: Reporting to commence upon Contract NTP and continue throughout the Period of Performance on a monthly schedule or as needed when Contractor completes tasks.

Exceptional - All work completed without corrections. Delivered ahead of schedule.

Very Good - All work completed with minor corrections. Delivered on Schedule

Satisfactory - Work completed within PWS technical requirements. Close monitoring by Govt required. Formally identified deficiencies corrected within 1 week. Delivered on Schedule.

Marginal - Project delivered in compliance but outside the POP.

Unsatisfactory- Contractor unable to fulfill PWS requirements

(A rollup of assessment of the Surveillance Inspection Results to develop an overall rating for this objective)

PERFORMANCE ASSESSMENT REPORT (PAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACT/TASK ORDER NUMBER
2. CONTRACTOR
3. TYPE OF SERVICES

4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE

5. COR PHONE
6. SUSPENSE DATE

I. PERFORMANCE

7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)

|_| NEW

|_| REPEAT

|_| NO DEFICIENCY NOTED

8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED

9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT

II. CONTRACTOR VALIDATION

11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR

12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE

13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY

III. ACTION CORRECTED

14. |_| CONCUR |_| NON-CONCUR COR SIGNATURE AND DATE

15. COR REMARKS (REQUIRED)

6. CONTRACTOR REPRESENTATIVE REMARKS

Appendix 2 – Performance Assessment Report

Appendix 3 – Customer Complaint Record

CUSTOMER COMPLAINT RECORD

DATE/TIME OF COMPLAINT

SOURCE OF COMPLAINT

ORGANIZATION

BUILDING NUMBER

INDIVIDUAL

PHONE NUMBER

NATURE OF COMPLAINT

CONTRACT REFERENCE

VALIDATION

DATE/TIME CONTRACTOR INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR

RECEIVED/VALIDATED BY

Appendix 4 – Corrective Action Report

CORRECTIVE ACTION REPORT (CAR)

(If more space is needed, use reverse and identify by number)

1. CONTRACTOR

2. CONTRACT NUMBER

3. TYPE OF SERVICES

4. FUNCTIONAL AREA

5. SUSPENSE DATE

6. CONTROL NUMBER

7. DEFICIENCY |_| MAJOR |_| MINOR

FINDING:

FINDING IMPACT:

Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.

8. QUALITY ASSURANCE PERSONNEL (COR)

TYPED NAME AND GRADE

SIGNATURE AND DATE

9. ISSUING AUTHORITY

TYPED NAME AND GRADE

SIGNATURE AND DATE

10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE

11. COR DETERMINATION

|_| ACCEPTED |_| REJECTED

12. CLOSE DATE

Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2

Encl 4, QASP 23Jun2017/v3