This document provides the minimum technical specifications for installing a signal reference grid for grounding in a Defense Information Systems Agency data center. The specifications require installing a copper strap grid in a 2 foot by 2 foot pattern under the access floor, secured either to the subfloor for new installations or to floor pedestals for existing floors. The grid must be bonded to the perimeter loop, ductwork, conduits, and every third pedestal. Grounding conductors must connect the grid to each equipment enclosure within 24 inches. Continuity must be tested and record to certify connections less than 1 ohm. The related federal contract opportunity is to upgrade an existing raised access floor to support higher loading, replacing panels with concrete core panels and stringers to meet 2,500 pound static and 2,000 pound rolling load requirements. Work includes lifting racks, floor replacement, cleaning, and equipment installation, testing and warranty. The requirement stems from DoD Core Data Center architecture and engineering standards. The solicitation is from the Defense Information Systems Agency for this raised floor upgrade project.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED – FOR OFFICIAL USE ONLY
Minimum Technical Specification for Signal Reference Grid for Grounding Data Center San Antonio – Appendix C
Date: 24 August 2020
PURPOSE
This specification details the requirements Signal Reference Grid (SRG) for grounding. All DISA data centers are required to utilize SRG systems to prevent excessive impedance and excessive voltage from developing between equipment enclosures.
SCOPE
Provide a complete SRG in accordance with applicable codes and standards by installation of a complete new system or by modifying an existing SRG.
References The publications listed below form a part of this specification to the extent referenced. The publications are referred within the text by the basic designation only. The current revision of the reference, including all issued updates, must be followed.
DEFENSE INFORMATION SYSTEMS AGENCY (DISA)
DISA Facilities Engineering Circular
NATIONAL FIRE PROTECTION AGENCY (NFPA)
NFPA 70 National Electric Code
U.S. DEPARTMENT OF DEFENSE (DOD)
| MIL-HDBK-419 | Grounding: Bonding, and Shielding for Electronic Equipments and Facilities; Volume 1 (Basic Theory) and Volume 2 (Application) |
| MIL-STD-188/124 | Grounding, Bonding and Shielding |
Modification of References The advisory provisions are mandatory. Substitute "must" for "should" wherever it appears and interpret all references to the "authority having jurisdiction" and "owner" to mean the Contracting Officer and DISA.
DEFINITIONS
AWG. American Wire Gauge CRAC. Computer Room Air Conditioning CRAH. Computer Room Air Handling PDU. Power Distribution Unit.
DISA. Defense Information Systems Agency, Facilities Engineering Denver.
SRG. Signal Reference Grid.
Requirements
EXISTING CONDITIONS
When modifying an existing SRG, update the SRG to meet the minimum requirements of this standard. When the installed SRG does not require replacement of components, the modification to the SRG typically uses the same configuration. For computer rooms with access floors, ensure the floor tile metallic underside is not galvanized by an electroplating process. Galvanized by a hot-dipped process is acceptable.
REFERENCE GROUNDING BOND GRID
As a basis for the SRG, a reference bonding grid shall be installed in accordance with Figure 1 and MILHDBK-419.
Figure 1: Reference Grounding Bond Grid
The SRGs of different computer rooms are only bonded together when the rooms are on the same floor. All other connections as shown in Figure 1 apply to all SRGs in the building.
SRG CONFIGURATION for Computer Rooms with Access Floors Plan the layout of the SRG based on the exact layout of all computer room equipment (i.e., metal power conduits or raceways, equipment cables, floor pedestals, computer equipment). Use of an access floor itself to create the SRG is not acceptable. The incorporation of a separate SRG, located under the access floor, and connected to all equipment as well as the metallic undersurface of the access floor is required.
Configure the SRG in 2 foot by 2 foot (maximum) grids in accordance with one of the following:
Secure SRG to Subfloor (New Access Floor Installations) This configuration is required for all new access floors where equipment is not physically in the computer room at the start of the project. Configure a grid arrangement in accordance with the following:
The continuous two-inch-wide copper straps (#26 AWG) are placed in a 2 foot by 2 foot grid (maximum), bonded at every intersection (see Figure 2). Note, the copper strap grid is typically installed after the floor pedestals but before other equipment.
Figure 2: Integrated Access Floor with Copper Strap SRG
Bond the SRG to the 4/0 copper perimeter loop at not less than 6 foot centers.
Install the SRG Grounding Bond system in accordance with Figure 1.
Additional signal reference grounding conductors are required at the following locations:
Bond SRG to all ducts, metal pipes, metal conduits, and cable trays under the access floor entering the computer room using a #6 AWG (minimum) bare copper conductor.
Bond every 3rd access floor pedestal (minimum, 6 foot centers) to the SRG with a #6 AWG concentric copper conductor (See Figure 2).
Bond conductors between each system or peripheral enclosure (except PDUs, transformers, humidifiers, CRAC or CRAH units) to the SRG using a #6 AWG bare copper conductor with the length as short as possible, not to exceed 24 inches.
When the SRG is installed, bonded and grounded, ensure the continuity of the SRG by measuring the resistance. If the resistance exceeds 1 ohm, all connections must be rechecked (between floor pedestals, SRG straps, and equipment enclosures) to ensure the connections are secure.
Record all testing to certify connections are verified and less than 1 ohm.
Once acceptable continuity is confirmed, the remaining floor tiles may be installed.
Secure SRG to Floor Pedestals (Existing Access Floor) Connection of the SRG to the Floor Pedestals is permitted for computer rooms where the access floor and equipment are physically in the computer room at the start of the project. This configuration is used for a new SRG or when modifying an existing SRG. Configure a grid arrangement (see Figure 3) in accordance with the following:
Figure 3: Grid Pattern Secured to Floor Pedestals
Mount the SRG to the bare metal just below the stanchions on each floor pedestals using UL listed pedestal bonding clamps and one of the following:
Two-inch-wide #26 AWG continuous copper straps (see Figure 4, preferred method)
Figure 4: Mounting for Copper Straps
One-inch-wide continuous flat metal braids with copper core (see Figure 5).
#6 AWG continuous bare copper conductors (see Figure 5).
Figure 5: Mounting for Flat Metal Braids or Bare Copper Conductors
Bond the SRG to the 4/0 copper perimeter loop at not less than 6 foot centers.
Install the SRG Grounding Bond system in accordance with Figure 1.
Additional signal reference grounding conductors are required at the following locations:
Bond SRG to all ducts, metal pipes, metal conduits, and cable trays under the access floor entering the computer room using a #6 AWG (minimum) bare copper conductor.
Bond every 3rd access floor pedestal (minimum, 6 foot centers) to the SRG with a #6 AWG concentric copper conductor (See Figure 2).
Connect to the existing SRG bonding system (See Figure 1).
Install grounding conductors between each equipment enclosure (except PDUs, transformers, CRAC or CRAH units) and the SRG using a #6 AWG bare copper conductor with the length as short as possible, not to exceed 24 inches.
When the SRG is installed, bonded and grounded, ensure the continuity of the SRG by measuring the resistance. If the resistance exceeds 1 ohm, all connections must be rechecked (between floor pedestals, SRG straps, and equipment enclosures) to ensure the connections are secure.
Record all testing to certify connections are verified and less than 1 ohm.
Once acceptable continuity is confirmed, the remaining floor tiles may be installed.
- - End of Document - -
UNCLASSIFIED – FOR OFFICIAL USE ONLY Page 1 of 5 image2.png image3.emf
Microsoft_Visio_Drawing1.vsdx image4.emf
Microsoft_Visio_Drawing2.vsdx image5.emf
Microsoft_Visio_Drawing3.vsdx image1.emf
Microsoft_Visio_Drawing.vsdx
File details come from the government source that posted it. Updated .