EMG Professional Rate Schedule Instructions 02192021.docx

DOCX document 19 KB Posted

Attached to
Emergency Residential Demolition: 5467 Moran
Solicitation number
300000152665973
Issued by
Michigan

About this file

This document provides instructions for completing the Emergency Professional Rate Schedule for the City of Detroit's Emergency Residential Demolition project at 5467 Moran in Michigan. Respondents must submit detailed pricing for two primary service categories: Demolition (which includes administration, supervisor, laborer, equipment, regulated and non-regulated material trucking, and disposal of asbestos-containing and construction/demolition materials) and Backfill, Grade, & Site Finalization (which includes administration, supervisor, laborer, equipment, backfill material, and topfill material). All highlighted cells on the Professional Rate Schedule must be completed with unit rates corresponding to specified unit types.

Respondents must provide mean (average) pricing per unit of measure only and cannot submit rates as ranges, include qualifying notes, propose alternate unit types, or leave any unit rate fields blank. The City of Detroit reserves the right to deem incomplete or non-responsive any submissions that do not comply with these requirements. Additionally, the City retains the authority to question or request clarification on any submitted unit rates, with respondents required to provide such clarification within twenty-four hours of request. Completion of the Professional Rate Schedule does not constitute City acceptance of the stated unit rates.

View the file

Other files

File Type Posted
186857_SUPPLIER.pdf PDF
Signed 5467 Moran EMG letter.pdf PDF
RFP Note to Include_EMG Demo_5467 Moran.docx DOCX document
Price Sheet_EMG Demo_5467 Moran.xlsx XLSX spreadsheet
EMG Commercial Demolition Timeline 2.24.22.pdf PDF
Attachment Fencing Plan- Emergency Commercial (2).pdf PDF
20260914_110736.jpg JPG image
20260914_110712.jpg JPG image
20260914_110628.jpg JPG image
20260914_110614.jpg JPG image
20260914_110610.jpg JPG image
5467 Moran Base Unit Tools _ City of Detroit.pdf PDF
OCP, Demolition_Signature_Page 2 25 2020.doc DOC document
EMG Professional Rate Schedule Demo 02192021.xlsx XLSX spreadsheet
Price Sheet EMG Demo (15).xlsx XLSX spreadsheet
Scope of Service_EMG Demo (Residential)_01.08.2026 (25).pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS ON COMPLETING THE EMERGENCY PROFESSIONAL RATE SCHEDULE

02.19.2021 Respondents must complete the business and contact information at the top of the Professional Rate Schedule. For each of the following Service Types, Respondents must enter a dollar value under the “Unit Rate” which corresponds to the “Unit Type”:

I. Demolition

a. Administration

b. Supervisor

c. Laborer

d. Equipment

e. Trucking: Regulated Material

f. Trucking: Non-Regulated Material

g. Disposal: Asbestos Containing Material (ACM)

h. Disposal: Construction & Demolition Material

II. Backfill, Grade, & Site Finalization

a. Administration

b. Supervisor

c. Laborer

d. Equipment

e. Backfill Material

f. Topfill Material If Respondents need clarification on the Service Types above, they should refer to the applicable sections of the corresponding Scope of Services and/or contact the City of Detroit as directed.

Respondents must enter information into every highlighted cell. Respondents may only enter a mean (average) per unit of measure (i.e. $50 hourly).

The City of Detroit reserves the right to consider Professional Rate Sheets with the following as incomplete and/or non-responsive:

· Unit values expressed as a range (e.g. $60.00 - $90.00);

· Notes or any other text which attempts to qualify the rate(s) provided;

· Alternate Unit Types (i.e. monthly instead of hourly, or yards instead of tons);

· Any blank Unit Rate fields.

The City of Detroit reserves the right to question or request clarification on any Unit Rate for any Service Type provided on the Professional Rate Schedule, and the Respondent must provide clarification within twenty–four hours of request.

Completion of Professional Rate Schedule does not constitute acceptance by the City of Detroit of the Unit Rates contained therein.