EMG Professional Rate Schedule Demo 02192021 (2).xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Emergency Residential Demolition: 2971 Seyburn
Solicitation number
300000152836437
Issued by
Michigan

About this file

This is a contractor rate schedule submitted by Doe Demolition, Inc., a demolition contractor based in Detroit, Michigan (48226), in response to the Emergency Residential Demolition project at 2971 Seyburn in Michigan. The schedule outlines pricing for demolition services and backfill/site finalization work. Demolition services include administration, supervisor, laborer, and equipment rates on an hourly basis, along with hourly rates for regulated and non-regulated material trucking. Disposal services are priced per ton for asbestos-containing materials and construction and demolition waste, with an additional per-parcel charge for air monitoring. Backfill, grading, and site finalization services include hourly rates for administration, supervisor, laborer, and equipment, as well as per-ton pricing for backfill material below 12 inches and topfill material for the top 12 inches.

The rate schedule lists all proposed unit rates at $0.00 across all service categories, indicating this is a template or demonstration document rather than a completed bid submission. The contractor's point of contact is Jane D. Doe, President, reachable at jane.doe@doedemolition.com or 313.313.3113. No specific contract terms, funding sources, award dates, or renewal options are detailed in this rate schedule document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Rate Schedule

Organization Name:Doe Demolition, Inc.
Business Address:1234 Fifth Street, 48226
Point(s)-of-Contact:Jane D. Doe, President
E-mail Address(es):jane.doe@doedemolition.com
Phone #(s):313.313.3113
Service TypeUnit TypeUnit Rate
DEMOLITION
AdministrationHourly$0.00
SupervisorHourly$0.00
LaborerHourly$0.00
EquipmentHourly$0.00
Trucking: Regulated MaterialHourly$0.00
Trucking: Non-Regulated MaterialHourly$0.00
Disposal: Asbestos Containing MaterialPer Ton$0.00
Disposal: Construction & DemolitionPer Ton$0.00
Air MonitoringPer Parcel$0.00
BACKFILL, GRADE, & SITE FINALIZATION
AdministrationHourly$0.00
SupervisorHourly$0.00
LaborerHourly$0.00
EquipmentHourly$0.00
Backfill Material (Below 12 inches)Per Ton$0.00
Topfill Material (Top 12 inches)Per Ton$0.00

File details come from the government source that posted it. Updated .