ROBO_-_FTNP-BLRI_2A15.pdf
PDF 22 KB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| Bridge_Inspection_Report_5140-077P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-132P.pdf | ||
| Bridge_Inspection_Report_5140-076P.pdf | ||
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-084P.pdf | ||
| Bridge_Inspection_Report_5140-082P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| VETS-4212_Form.pdf | ||
| Bridge_Inspection_Report_5140-080P.pdf | ||
| Bridge_Inspection_Report_5140-079P.pdf | ||
| Report_Pavement.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Blue Ridge Parkway
PROJECT: FTNP-BLRI 2A15
SOLICITATION NO. DTFH71-17-B-00020
April 6, 2017 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. DTFH71-17-B-00020, Project: FTNP-BLRI 2A15 April 6, 2017, 2:00 p.m. local time
Maximum Time Allowed for the Contract if Schedules A, B, and C are Awarded at the Same Time will be 205 calendar days.
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Bryant’s Land & Development Industries, Inc.
SCHEDULE A
$3,235,593.20
OPTION 1
$977,889.30
OPTION 2
$356,763.00
SCHEDULE A SCHEDULE A + OPTION 1 + OPTION 2
$4,570,245.50
Estes Bros., Const., Inc. SCHEDULE A $3,175,529.42
OPTION 1
$1,035,092.38
OPTION 2
$601,878.12
SCHEDULE A SCHEDULE A + OPTION 1 + OPTION 2
$4,812,499.92
Engineer’s Estimate SCHEDULE A $2,200,000.00
OPTION 1
$685,000.00
OPTION 2
$525,000.00
SCHEDULE A - 160
OPTION 1 - 75
OPTION 2 - 35
SCHEDULE A + OPTION 1 + OPTION 2
$3,410,000.00