Bridge_Inspection_Report_5140-076P.pdf
PDF 3 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00020
About this file
Bridge Inspection Report_5140-076P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| Report_Pavement.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Bridge_Inspection_Report_5140-077P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-132P.pdf | ||
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-084P.pdf | ||
| Bridge_Inspection_Report_5140-082P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| VETS-4212_Form.pdf | ||
| Bridge_Inspection_Report_5140-080P.pdf | ||
| Bridge_Inspection_Report_5140-079P.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG PINE CREEK BRIDGE #2
BLUE RIDGE PARKWAY OVER BIG PINE CREEK
BLUE RIDGE PARKWAY
LN
STRUCTURE NO. 5140-076P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/9/15
Report prepared by: WU
MILE POINT: 223.05
Federal Highway Administration KILOMETER POINT: 359.04 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-076P
BIG PINE CREEK BRIDGE #2 INSPECTION DATE: 6/9/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... FRAME NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 55.8 FT (17.0 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 25.5 FT (7.8 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 33.7 FT (10.3 M)
ABUT. FOUNDATIONS: ........ UNKNOWN CURB TO CURB WIDTH: ..... 29.7 FT (9.1 M)
PIER FOUNDATION(S): ........ UNKNOWN YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2A2 / NONE SKEW ANGLE: ..................... 30 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1985-JOINT REPAIR.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 223.05 (KM PT 359.04)
STATE: ................................. NORTH CAROLINA LOCATION: 1.3 MILES FROM NC ROUTE 1461
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. BIG PINE CREEK
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in fair condition overall. The main problem is deterioration of the concrete deck overhangs and the west side of the pier with cracking, spalling, delamination, and efflorescence. Other problems include southward migration of the channel causing erosion and scour at the south abutment and south channel banks, vegetation growth along both curblines, sinkholes in both shoulders of south approach, and a displaced stone at the southwest parapet end.
In addition, installation of a bridge rail system that meets current safety requirements should be considered.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. REGER, H. SALAD
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-076P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
222.3 RESET STONE AT SOUTHWEST PARAPET END. 1 CY
58.7 REMOVE VEGETATION GROWTH ALONG CURBLINES. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.1, 59.3, 60.13
REPAIR DETERIORATED CONCRETE ON DECK OVERHANGS AND
WEST SIDE OF PIER TO ORIGINAL DIMENSIONS.
1 LS
61.1,2,3 PLACE ENGINEERED RIPRAP ALONG SOUTH CHANNEL BANK AND
SOUTH ABUTMENT TO STOP CHANNEL MIGRATION AND PREVENT
FURTHER SCOUR.
12 LS
58, 59, 60 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-076P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N N F N N N N N G
N G
G F N G G N
N
N
G
F
58.1, 59.3 MODERATE TO SEVERE CRACKING, DELAMINATION, AND SPALLING
ALONG SIDES OF CONCRETE DECK SLAB WITH EFFLORESCENCE.
MINOR CRACKING WITH EFFLORESCENCE ON UNDERSIDE OF
DECK. THREE PIECES OF TIMBER FORMWORK EMBEDDED IN
UNDERSIDE OF DECK OVER NORTH SPAN.
58.4 MINOR SETTLEMENT OF WEARING SURFACE AT DECK SLAB HAS
BEEN PATCHED TO RAISE GRADE; HOWEVER, VERTICAL
MISALIGNMENT REMAINS, CAUSING ROUGH TRANSITION. POT
HOLES AND DELAMINATION OF WEARING SURFACE IN
SOUTHBOUND LANE OVER STRUCTURE.
58.6 MINOR CRACKING OF PARAPET MASONRY MORTAR JOINTS, SOME
HAVE BEEN REPOINTED, WITH MINOR TO MODERATE MOSS
GROWTH IN JOINTS. STONE AT SOUTHWEST PARAPET END IS
LOOSE.
58.7 MINOR TO MODERATE VEGETATION GROWTH AND DEBRIS
ACCUMULATION ALONG CURBLINES.
60.1 MINOR CRACKING ON ABUTMENT BREASTWALLS WITH
EFFLORESCENCE. MODERATE SCALING ON SOUTH ABUTMENT
BREASTWALL AT WATERLINE.
60.5,9 MINOR SCOUR EXPOSING FOOTING (4" DEEP X 15' LONG) ON
UPSTREAM SIDE OF SOUTH ABUTMENT DUE TO SHIFTING OF
STREAM (NOT SEEN THIS INSPECTION). EROSION OF SOUTHEAST
STREAM BANK AT SOUTHEAST WINGWALL. 12 INCH DEEP
SINKHOLE IN SHOULDER BEHIND SOUTHWEST WINGWALL AND 9
INCH DEEP SINKHOLE IN SHOULDER BEHIND SOUTHEAST
WINGWALL.
60.6 MINOR TO MODERATE CRACKING OF WINGWALL MASONRY
MORTAR JOINTS WITH MODERATE EFFLORESCENCE AND MINOR
MOSS GROWTH.
BREASTWALLS OR COLUMNS1. G
PILE BENTS 2. N
CAPS AND/OR BEARING SEATS 3. G
BACKWALLS AND/OR BULKHEADS 4. N
FOUNDATIONS 5. G
WINGWALLS 6. G
WEEP HOLES7. N
EXPANSION JOINTS 8. N
EROSION AND/OR SCOUR9. F
SETTLEMENT OR DEFLECTION10. G
SLOPE PROTECTION11. N
OTHER 12. N
PIER(S)
WALLS AND/OR COLUMNS 13. F
PILE BENTS 14. N
CAPS AND/OR BEARING SEATS 15. G
FOUNDATIONS 16. N
EROSION AND/OR SCOUR17. G
SETTLEMENT OR DEFLECTION18. G
OTHER 19. N
FIELD INSPECTION REPORT STRUCTURE NO. 5140-076P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
F F N G N
MED
SUFF
7 FT.
SILT, GRAVEL
222. APPROACHES 7
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N N G G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N N N
60.13 MINOR TO MODERATE DELAMINATION AND SPALLING ON WEST SIDE
OF PIER WITH MODERATE EFFLORESCENCE; MODERATE TO
SEVERE CRACKING AND SCALING AT WATERLINE. MINOR
CRACKING WITH EFFLORESCENCE ON EAST SIDE OF NORTH PIER
FACE. REBAR PROJECTING FROM PIER FOOTING AT WEST END OF
PIER (FROM ORIGINAL CONSTRUCTION). FULL LENGTH VERTICAL
CRACK ON BOTH FACES OF PIER.
61.1 CHANNEL MIGRATING SOUTHWARD; FLOW IS CONCENTRATED
ENTIRELY THROUGH SOUTH SPAN AND AGAINST SOUTH ABUTMENT.
61.2 MINOR EROSION AND SCOUR OF SOUTH CHANNEL BANK AT BOTH
SIDES OF BRIDGE.
61.4 SILT AND SEDIMENT ACCUMULATION IN NORTH SPAN.
222.4,6 MINOR CRACKING ON NORTHBOUND LANE OF NORTH APPROACH.
36.A PARAPET HEIGHT OF 1'-10" DOES NOT MEET CURRENT HEIGHT
REQUIREMENT OF 2'-3" FOR TRAFFIC BARRIERS.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-076P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 25 23 42 38
TYPE 3 21 19 35 31
TYPE 3S2 31 28 52 47
TYPE 3-3 40 36 67 61
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-076P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BIG PINE CREEK BRIDGE #2 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY
(204) STRUCTURE NUMBER: ..... 5140-076P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG PINE CREEK
(207) ROAD SECTION NO: .......... 076P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140076P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.3 MILES FROM NC ROUTE
(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2A2 (11) MILE POINT: ............................. 223.05 (KM PT 359.04)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
07 - FRAME
25.5 FT (7.8 M)
55.8 FT (17.0 M)
0 - UNKNOWN
0 - UNKNOWN
0 - UNKNOWN
0 - UNKNOWN
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 25.2 TONS (22.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 42.1 TONS (38.2 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 1 - DECK SURVEY (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-076P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°29'54.00" (51) CURB TO CURB WIDTH: ........... 29.7 FT (9.1 M)
(17) LONGITUDE: ......................... 80°57'21.10" (52) DECK WIDTH: ............................ 33.7 FT (10.3 M)
(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 29.0 FT (8.8 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 5.0 FT (1.5 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 1347 (34) SKEW ANGLE: ............................ 30 °
(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 1482 (47) TOTAL HORIZ. CLEARANCE: .... 39.7 FT (12.1 M)
(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 3 - PARAPET ONLY
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 9 - OTHER
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 1.83 FT (0.56 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
5 - Stable; scour within limits of
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JOINT REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-076P
PHOTOGRAPHS STRUCTURE NO. 5140-076P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD BLOWING ROCK
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - SETTLEMENT OF APPROACH PAVEMENT, SOUTH
APPROACH PAVEMENT SHOWN, NORTH APPROACH SIMILAR; NOTE
ASPHALT TRANSITION RAMP
PHOTO #5 - MOSS GROWTH AND DEBRIS
ACCUMULATION ALONG EAST CURB
PHOTO #6 - DISPLACED STONE AT
SOUTHWEST PARAPET END
PHOTO #7 - POTHOLES DEVELOPING IN SOUTHBOUND LANE NEAR
SOUTH ABUTMENT
PHOTO #8 - SETTLEMENT HOLE ON SOUTHEAST CORNER SHOULDER
PHOTO #9 - EROSION HOLE DEVELOPING AT SOUTHWEST EDGE OF
DECK
PHOTO #10 - GENERAL UNDERSIDE VIEW LOOKING NORTH IN SOUTH
SPAN; NOTE ALSO CRACKING WITH EFFLORESCENCE
PHOTO #11 - CRACKING WITH EFFLORESCENCE, SPALLING, AND
DELAMINATION ON EAST DECK EDGE NEAR SOUTH END; NOTE SPALL
OVER PIER
PHOTO #12 - TYPICAL CRACKING WITH EFFLORESCENCE, SPALLING,
AND DELAMINATION ON UNDERSIDE OF DECK OVERHANG, EAST DECK
OVERHANG IN SOUTH SPAN SHOWN
PHOTO #13 - TYPICAL CRACKING WITH
EFFLORESCENCE ALONG EAST EDGE OF
DECK OVER NORTH SPAN
PHOTO #14 - TYPICAL CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF WEST
DECK OVERHANG, NORTH SPAN SHOWN
PHOTO #15 - TYPICAL CRACKING WITH EFFLORESCENCE, SPALLING,
AND DELAMINATION ON WEST EDGE OF DECK, NORTH SPAN SHOWN
PHOTO #16 - CLOSE-UP VIEW OF CRACKING WITH EFFLORESCENCE,
SPALLING, AND DELAMINATION OF WEST EDGE OF DECK IN NORTH
SPAN
PHOTO #17 - CRACKING WITH EFFLORESCENCE, SPALLING, AND
DELAMINATION ON WEST EDGE OF DECK IN SOUTH SPAN
PHOTO #18 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #19 - CRACKING WITH EFFLORESCENCE ON WEST FACE OF
SOUTH ABUTMENT
PHOTO #20 - TYPICAL SCALING OF SOUTH ABUTMENT BREASTWALL AT
WATERLINE
PHOTO #21 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #22 - CRACKING WITH EFFLORESCENCE ON NORTH FACE OF
PIER
PHOTO #23 - GENERAL VIEW OF PIER, SOUTH
FACE SHOWN
PHOTO #24 - TYPICAL FULL HEIGHT VERTICAL
CRACK ON WEST END OF SOUTH PIER FACE,
NORTH PIER FACE SIMILAR
PHOTO #25 - DETERIORATION OF CONCRETE
AND EXPOSED REBAR OUTSIDE OF PIER
WALL, UPSTREAM NOSE OF PIER
PHOTO #26 - EFFLORESCENCE ON EAST END
OF PIER
PHOTO #27 - SPALL AT SOUTHEAST CORNER OF STRUCTURE
PHOTO #28 - DETERIORATED MORTAR JOINT ON NORTHEAST
WINGWALL
PHOTO #29 - TYPICAL CONDITION OF
WINGWALLS, NORTHEAST WINGWALL
SHOWN; NOTE CRACKING AND
EFFLORESCENCE
PHOTO #30 - EROSION AT END OF SOUTH
ABUTMENT AND SOUTHEAST WINGWALL
INTERFACE
PHOTO #31 - EROSION OF SOUTHEAST CHANNEL BANK
PHOTO #32 - DEBRIS ACCUMULATION AT UPSTREAM END OF CENTER
PIER
PHOTO #33 - SCOUR HOLE AT SOUTHWEST CORNER OF SOUTH
ABUTMENT
PHOTO #34 - UPSTREAM CHANNEL; NOTE FLOOD DEBRIS
PHOTO #35 - DOWNSTREAM CHANNEL
File details come from the government source that posted it. Updated .