Bridge_Inspection_Report_5140-084P.pdf
PDF 5 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00020
About this file
Bridge Inspection Report_5140-084P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-077P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-132P.pdf | ||
| Bridge_Inspection_Report_5140-076P.pdf | ||
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-082P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| VETS-4212_Form.pdf | ||
| Bridge_Inspection_Report_5140-080P.pdf | ||
| Bridge_Inspection_Report_5140-079P.pdf | ||
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| Report_Pavement.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG PINE CREEK BRIDGE #7
BLUE RIDGE PARKWAY OVER BIG PINE CREEK
BLUE RIDGE PARKWAY
LS
STRUCTURE NO. 5140-084P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/9/15
Report prepared by: EU
MILE POINT: 225.01
Federal Highway Administration KILOMETER POINT: 362.11 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-084P
BIG PINE CREEK BRIDGE #7 INSPECTION DATE: 6/9/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... STEEL CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 5 STRUCT. TOTAL LENGTH: .. 239.6 FT (73.0 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 48.9 FT (14.9 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 27.2 FT (8.3 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 24.3 FT (7.4 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... MASONRY / STEEL YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2A3 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO STRUCTURE HISTORY: ...... 1980-JOINT REPAIR. 12/04-PRELIMINARY SCOUR ASSESSMENT. 2008-PAINT STR. STEEL, DECK JOINT REPAIR, SCOUR REPAIR.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 225.01 (KM PT 362.11)
STATE: ................................. NORTH CAROLINA LOCATION: 0.1 MILES FROM NC ROUTE 1463
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. BIG PINE CREEK
STRUCTURE EVALUATION SUMMARY
This continuous steel multi beam bridge is in good condition overall. Problems include deterioration of the asphalt wearing surface and approach pavement; debris accumulation in the channel both upstream and downstream and under the bridge; soil accumulation and vegetation growth in the compression joint over the north abutment;
deterioration of the abutment breastwall, approach parapet, and wingwall masonry mortar joints; several loose stones at the south parapet ends; debris accumulation in the curblines; and a rivet missing from the east side of pier #3.
In addition, installation of a bridge rail system that meets current safety requirements should be considered.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. REGER, H. SALAD
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-084P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
222.3 RESET LOOSE PARAPET MASONRY STONES ON BOTH SIDES OF SOUTH
APPROACH.
2 CY
58.6, 60.1,6 REPOINT ABUTMENT BREASTWALL, APPROACH PARAPET, AND WINGWALL
MASONRY MORTAR JOINTS AS NECESSARY.
100 LF
58.2 REMOVE SOIL AND VEGETATION FROM COMPRESSION JOINT OVER NORTH
ABUTMENT.
1 LS
60.13 REPLACE MISSING RIVET ON EAST SIDE OF PIER #3. 1 LS
58.7 REMOVE DEBRIS ACCUMULATION FROM CURBLINES. 1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58.3, 222.4 REPLACE WEARING SURFACE OVER BRIDGE AND REPAVE
APPROACHES.
1 LS
61.4 REMOVE TREE AND DEBRIS ACCUMULATION FROM UPSTREAM AND
DOWNSTREAM CHANNEL.
1 LS
58, 61, 222 CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND
DESIGN/CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-084P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N NOT APPLICABLE
9 EXCELLENT CONDITION
8 VERY GOOD CONDITION - no problems noted.
7 GOOD CONDITION - some minor problems.
6 SATISFACTORY CONDITION - structural elements show some minor deterioration.
5 FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
4 POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
58. DECK 7
1. DECK SLAB G
2. EXPANSION JOINTS G
3. WEARING SURFACE F
4. RIDEABILITY F
5. CURBS, SIDEWALKS, AND MEDIAN G
6. PARAPETS AND/OR RAILINGS F
7. DRAINS AND DRAINAGE F
8. UTILITIES N
9. DEFLECTION AND/OR VIBRATION G
10. OTHER N
59. SUPERSTRUCTURE 7
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10. ALIGNMENT
11. OTHER
60. SUBSTRUCTURE
ABUTMENTS
1. BREASTWALLS OR COLUMNS
2. PILE BENTS
3. CAPS AND/OR BEARING SEATS
4. BACKWALLS AND/OR BULKHEADS
5. FOUNDATIONS
6. WINGWALLS
7. WEEP HOLES
8. EXPANSION JOINTS
9. EROSION AND/OR SCOUR
10. SETTLEMENT OR DEFLECTION
11. SLOPE PROTECTION
12. OTHER
PIER(S)
13. WALLS AND/OR COLUMNS
14. PILE BENTS
15. CAPS AND/OR BEARING SEATS
16. FOUNDATIONS
17. EROSION AND/OR SCOUR
18. SETTLEMENT OR DEFLECTION
19. OTHER
G G N N N G G N G G N
G N G G N F F N G G N N
G N G G G G N
58.1
58.2
58.3
58.4
58.5,6
58.7
59.1,7
60.1
60.3
ITEM REFERENCE AND REMARKS
MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK
UNDERSIDE IN SEVERAL ISOLATED LOCATIONS. PATCHED CORE
SAMPLE HOLE IN SPAN #4 NEAR PIER #4 AND SPAN #2 NEAR
MIDSPAN IN SOUTHBOUND LANE.
MODERATE SOIL ACCUMULATION WITH VEGETATION GROWTH IN
COMPRESSION JOINT OVER NORTH ABUTMENT. MINOR SPALLING
ALONG JOINT.
MINOR TO MODERATE RANDOM CRACKING AND AREAS OF
DETERIORATION OF WEARING SURFACE; SEVERAL PATCHED
AREAS HAVE DEVELOPED MINOR POTHOLES. ADDITIONAL
POTHOLES IN SPANS 4 AND 5.
ROUGH TRANSITION AT SOUTH ABUTMENT DUE TO 1" OF
APPROACH SETTLEMENT (SEE 222.6).
MINOR TO MODERATE CRACKING WITH EFFLORESCENCE
THROUGHOUT CURBS AND RAILINGS WITH MODERATE MOSS
GROWTH. TWO AREAS OF DELAMINATION ON WEST CURB IN SPAN
#1 AND SPAN #4. EXPOSED STEEL REINFORCEMENT DUE TO
INSUFFICIENT COVER ON SEVERAL RAIL POSTS, EAST RAIL IN SPAN
#2 NEAR PIER #1, AND BOTH RAILS IN SPAN #4 NEAR PIER #4.
MODERATE DEBRIS ACCUMULATION AND VEGETATION GROWTH IN
CURBLINES.
RUST STAINING BEGINNING TO BLEED THROUGH PAINT ON
BEARINGS AT SOUTH ABUTMENT (SEE ALSO 60.3).
MINOR CRACKING OF GROUT PADS AT PIER BEARINGS. MODERATE
DETERIORATION OF EAST GROUT PAD FOR PIER #1 COLUMN.
MINOR CRACKING OF ABUTMENT MASONRY MORTAR JOINTS WITH
MINOR TO MODERATE EFFLORESCENCE AND LEAKAGE.
ABUTMENT BEARING SEATS ARE DAMP; PONDING ON NORTH AND
SOUTH ABUTMENT BEARING SEATS.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-084P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
G F N F N
LOW
SUFF
30 FT.
ROCK, GRAVEL, SILT
222. APPROACHES 6
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N F G G G F G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.6 MODERATE TO SEVERE DETERIORATION OF WINGWALL MASONRY
MORTAR JOINTS WITH MINOR VEGETATION GROWTH.
60.7 LOSS OF FILL THROUGH SOUTH ABUTMENT WEEP HOLES; 3' VOID
BEHIND SOUTH ABUTMENT BREASTWALL.
60.13 RIVET MISSING ON EAST SIDE OF PIER #3, APPROXIMATELY 6' FROM
TOP OF PIER. MINOR CRACKING WITH EFFLORESCENCE ON EAST
COLUMN OF PIER #3.
60.16 MINOR CRACKING OF CONCRETE PEDESTALS WITH
EFFLORESCENCE. MINOR SPALLING WITH EXPOSED STEEL
REINFORCEMENT ON BOTH PEDESTALS AT PIER #1.
61.2,4 MINOR TO MODERATE SLOUGHING OF CHANNEL BANKS HAS
UNDERMINED SEVERAL TREES ON UPSTREAM AND DOWNSTREAM
CHANNEL BANKS. HEAVY DEBRIS ACCUMULATION IN UPSTREAM
AND DOWNSTREAM CHANNEL. LARGE TREES DOWN UNDER
STRUCTURE PARTIALLY BLOCKING CHANNEL.
222.3 MINOR MORTAR JOINT DETERIORATION WITH MOSS GROWTH AT
APPROACH PARAPETS; SEVERAL LOOSE STONES DUE TO
COLLISION DAMAGE AT SOUTH PARAPET ENDS.
222.4 MINOR CRACKING OF APPROACH PAVEMENT; SEVERAL PATCHED
AREAS HAVE DEVELOPED NUMEROUS POTHOLES.
222.6 MINOR SETTLEMENT AT SOUTH APPROACH.
222.7 "BIG PINE CREEK" SIGN AT SOUTH APPROACH. NO REFLECTIVE
OBJECT MARKERS PRESENT.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-084P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 19 18 32 29
TYPE 3 18 16 30 27
TYPE 3S2 28 25 46 42
TYPE 3-3 34 31 56 51
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-084P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BIG PINE CREEK BRIDGE #7 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY
(204) STRUCTURE NUMBER: ..... 5140-084P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG PINE CREEK
(207) ROAD SECTION NO: .......... 084P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140084P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES FROM NC ROUTE
(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2A3 (11) MILE POINT: ............................. 225.01 (KM PT 362.11)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
4 - STEEL CONTINUOUS
02 - STRINGER/MULTI-BEAM or GIRDER
48.9 FT (14.9 M)
239.6 FT (73.0 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... NO
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 19.4 TONS (17.6 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 32.3 TONS (29.3 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 5 - SCOUR
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-084P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°29'04.68" (51) CURB TO CURB WIDTH: ........... 24.3 FT (7.4 M)
(17) LONGITUDE: ......................... 80°58'43.38" (52) DECK WIDTH: ............................ 27.2 FT (8.3 M)
(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 24.0 FT (7.3 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 2.0 FT (0.6 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 2.0 FT (0.6 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 1347 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 1482 (47) TOTAL HORIZ. CLEARANCE: .... 24.3 FT (7.4 M)
(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 2 - MOUNTED ON PARAPET
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 1 - CONCRETE
DESIGN TYPE: ........................ 3 - SIMPLE RAIL (joints at eachLATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.71 FT (0.83 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
3 - Scour critical; foundations un
2 - REHAB/RECONSTRUCTION
D - MINOR
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1980-JOINT REPAIR. 12/04-PRELIMINARY SCOUR ASSESSMENT. 2008-PAINT STR. STEEL, DECK JOINT REPAIR, SCOUR REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-084P
APPENDIX STRUCTURE NO. 5140-084P
PHOTOGRAPHS STRUCTURE NO. 5140-084P
PHOTO #1 - LOOKING NORTHBOUND TO CUMBERLAND KNOB
FLOW
PHOTO #2 - WEST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - GENERAL VIEW OF STRIP SEAL JOINT AT NORTH
APPROACH
PHOTO #5 - SOIL ACCUMULATION WITH VEGETATION GROWTH IN
NORTH JOINT
PHOTO #6 - TYPICAL CONDITION OF JOINT SEAL, NORTH JOINT
SHOWN; NOTE SPALLING ALONG JOINT
PHOTO #7 - DETERIORATION OF WEARING SURFACE IN SPAN #1
DEVELOPING INTO POTHOLES
PHOTO #8 - DETERIORATION OF WEARING SURFACE IN SPAN #2; NOTE
PATCHED CORE HOLES
PHOTO #9 - DETERIORATION OF WEARING SURFACE IN SPAN #4; NOTE
PATCHED AREA
PHOTO #10 - SETTLEMENT OF SOUTH APPROACH; NOTE TRANSVERSE
CRACKING AND PATCHED POTHOLES
PHOTO #11 - PATCHED AREA OF WEARING
SURFACE OVER SPAN #5; NOTE
DETERIORATION OF WEARING SURFACE
PHOTO #12 - DEBRIS ACCUMULATION AND
VEGETATION GROWTH ALONG EAST
CURBLINE
PHOTO #13 - CRACKING WITH EFFLORESCENCE ON WEST CURB IN
SPAN #1
PHOTO #14 - DISPLACED STONES AT SOUTHWEST END OF PARAPET
PHOTO #15 - SPALLING OF WEST CURB IN SPAN #5
PHOTO #16 - TYPICAL EXPOSED STEEL REINFORCEMENT IN RAIL POST
DUE TO INSUFFICIENT CONCRETE COVER, EAST RAIL POST IN SPAN #4
SHOWN
PHOTO #17 - EXPOSED REINFORCEMENT ON TOP OF EAST RAIL OVER
SPAN #4 NEAR PIER#3
PHOTO #18 - DISPLACED STONES AND DETERIORATED MORTAR JOINT
AT SOUTHEAST END OF PARAPET
PHOTO #19 - GENERAL UNDERSIDE OF LOOKING NORTH, SPAN #1
PHOTO #20 - TYPICAL TRANSVERSE CRACKING ON UNDERSIDE OF
DECK, EAST SIDE OF SPAN #5 SHOWN
PHOTO #21 - TYPICAL CONDITION OF
STRUCTURAL STEEL, BEAM #1 IN SPAN #5
SHOWN
PHOTO #22 - PAINT FAILURE ON EXTERIOR
BEAM #1, EAST SIDE OF SOUTH ABUTMENT
PHOTO #23 - PAINT FAILURE WITH RUSTING ON ANCHOR BOLT NUT AT
BEARING #5 ON SOUTH ABUTMENT
PHOTO #24 - TYPICAL CONDITION OF BEARINGS, BEARING #5 AT
NORTH ABUTMENT SHOWN; NOTE PONDING ON ABUTMENT BEARING
SEAT
PHOTO #25 - TYPICAL CONDITION OF BEARINGS, BEARING #5 AT
SOUTH ABUTMENT SHOWN; NOTE WATER LEAKAGE ONTO BEARING
SEAT
PHOTO #26 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #27 - CRACKING OF MORTAR JOINTS UNDERNEATH WEST
BEARING SUPPORT ON NORTH ABUTMENT
PHOTO #28 - CRACKING OF MASONRY WALL UNDERNEATH EAST
BEARING AT NORTH ABUTMENT
PHOTO #29 - GENERAL VIEW OF PIER #1
PHOTO #30 - SPALLING WITH EXPOSED REBAR ON WEST PEDESTAL
OF PIER #1
PHOTO #31 - TYPICAL SPALL WITH EXPOSED
REBAR DUE TO LACK OF COVER AT BENT #1
ON BOTH EAST AND WEST PEDESTAL
PHOTO #32 - DETERIORATED GROUT PAD
FILLET AROUND EAST BEARING OF BENT #1
SHOWN
PHOTO #33 - TYPICAL CONDITION OF PIER BEARINGS AND PEDESTALS,
WEST BEARING AT PIER #2 SHOWN; NOTE RUST STAINING THROUGH
PAINT
PHOTO #34 - CRACKING WITH EFFLORESCENCE ON PEDESTAL OF
PIER #2, EAST SIDE
PHOTO #35 - VIEW OF MISSING RIVET FROM EAST SIDE OF PIER #3
PHOTO #36 - CRACKING WITH EFFLORESCENCE PROPAGATING FROM
ANCHOR BOLTS INTO PEDESTAL, NORTH SIDE OF BENT #3 SHOWN
PHOTO #37 - DRIFT DEBRIS AT NOSE OF BENT #3, UPSTREAM SIDE;
NOTE THREE BIG TREES UNDERNEATH OF STRUCTURE
PHOTO #38 - DRIFT DEBRIS ACCUMULATION IN FRONT OF BENT #3
PHOTO #39 - CRACKING WITH
EFFLORESCENCE OF PEDESTAL FOUNDATION
FOR BENT #3, EAST COLUMN SUPPORT,
SOUTH FACE SHOWN
PHOTO #40 - RIPRAP PLACED AT NOSE OF
PIER #3, SOUTH FACE SHOWN
PHOTO #41 - GENERAL VIEW OF PIER #4 LOOKING NORTH; NOTE
FLOOD DEBRIS ACCUMULATION UNDER SPAN #4
PHOTO #42 - CRACKING WITH EFFLORESCENCE ON EAST COLUMN OF
PIER #4, NORTH FACE
PHOTO #43 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE WATER
LEAKAGE AND EFFLORESCENCE
PHOTO #44 - ACTIVE WATER LEAKAGE FROM BEARING SEAT AT SOUTH
ABUTMENT
PHOTO #45 - WATER LEAKAGE ONTO EAST SIDE OF SOUTH ABUTMENT
BEARING SEAT AT BEARING #1; NOTE VINE GROWTH
PHOTO #46 - PONDING OF WATER ON SOUTH ABUTMENT BEARING
SEAT BEARING #1
PHOTO #47 - TYPICAL CRACKING OF MASONRY MORTAR JOINTS ON
SOUTH ABUTMENT BREASTWALL, NEAR WEST END
PHOTO #48 - WATER LEAKAGE ON WEST SIDE OF SOUTH ABUTMENT
PHOTO #49 - UPSTREAM CHANNEL; NOTE FALLEN TREES IN CHANNEL
PHOTO #50 - DOWNSTREAM CHANNEL; NOTE FALLEN TREES AND
DEBRIS ACCUMULATION IN CHANNEL
File details come from the government source that posted it. Updated .