Bridge Inspection Report_5140-080P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-077P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-132P.pdf | ||
| Bridge_Inspection_Report_5140-076P.pdf | ||
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-084P.pdf | ||
| Bridge_Inspection_Report_5140-082P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| VETS-4212_Form.pdf | ||
| Bridge_Inspection_Report_5140-079P.pdf | ||
| Report_Pavement.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
BIG PINE CREEK BRIDGE #6
BLUE RIDGE PARKWAY OVER BIG PINE CREEK
BLUE RIDGE PARKWAY
LN
STRUCTURE NO. 5140-080P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/9/15
Report prepared by: WU
MILE POINT: 224.70
Federal Highway Administration KILOMETER POINT: 361.63 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-080P
BIG PINE CREEK BRIDGE #6 INSPECTION DATE: 6/9/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... SLAB NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 59.5 FT (18.1 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 29.8 FT (9.1 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 34.8 FT (10.6 M) ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 32.3 FT (9.8 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... MASONRY YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2A2 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 1983-JOINT REPAIR.
LOCATION
BLUE RIDGE PARKWAY MILE POINT: ..................... 224.70 (KM PT 361.63)
STATE: ................................. NORTH CAROLINA LOCATION: 0.3 MILES FROM NC ROUTE 1463
FACILITY CARRIED: ............ BLUE RIDGE PARKWAY
FEATURE INTERSECTED: .. BIG PINE CREEK
STRUCTURE EVALUATION SUMMARY
This concrete slab bridge is in poor condition overall. The main problem is deterioration of the concrete deck slab, with severe cracking, delamination, spalling with exposed and corroded steel reinforcement, and heavy efflorescence present along the sides of the slab.
Other problems include deterioration of the pier, wingwall, and abutment breastwall stone masonry mortar joints;
migration of the channel toward the south, resulting in scour at the south abutment; and settlement and transverse cracking of the asphalt pavement at both approaches, with potholes also present in the north approach pavement. It should also be noted that the bridge railing system does not meet current safety requirements for traffic barriers.
This bridge is scheduled for replacement in the near future under Project BLRI 2A16.
INSPECTION TEAM: M. REGER, H. SALAD
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-080P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
B226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
58, 59, 60 REPLACE BRIDGE. 1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Bridge is scheduled for replacement in the near future under Project BLRI 2A16.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-080P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N N P N N N N N G
N G
F N G N N G G N F G N N
F N G G F G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
(CONCRETE FTG)
58.1, 59.3 SEVERE CRACKING WITH EFFLORESCENCE, DELAMINATION, AND
SPALLING WITH EXPOSED STEEL REINFORCEMENT (UP TO 1/16" OF
SECTION LOSS) ALONG EAST FACE OF DECK. SEVERE CRACKING
WITH EFFLORESCENCE, DELAMINATION, AND SPALLING ALONG TOP
OF WEST SIDE OF DECK; NO STEEL REINFORCEMENT EXPOSED.
MINOR CRACKING WITH EFFLORESCENCE ALONG LONGITUDINAL
CONSTRUCTION JOINTS AND OTHER ISOLATED AREAS ON DECK
UNDERSIDE. VOID ON DECK UNDERSIDE (4" L X 1" W X 5" D) IN
NORTHEAST CORNER OF SOUTH SPAN.
58.2 SEVERE DETERIORATION OF EXPANSION JOINT FILLER AT FACE OF
BACKWALLS WITH MODERATE VEGETATION GROWTH IN JOINTS.
58.3 WEARING SURFACE DOES NOT COVER ENTIRE SLAB.
TRANSVERSE CRACKING OF WEARING SURFACE OVER BOTH
ABUTMENTS. VEGETATION GROWTH ALONG EDGES OF WEARING
SURFACE. AREAS OF MINOR LONGITUDINAL CRACKING
DEVELOPING OVER NORTH ABUTMENT.
58.6, 222.3 DELAMINATION AND MINOR SPALLING OF ONE CONCRETE POST ON
EAST RAILING OVER NORTH SPAN; MINOR DELAMINATION OF
REMAINING POSTS. SOME PREVIOUS REPAIRS TO RAIL POSTS ARE
BREAKING UP.
60.1,3,6 MINOR DETERIORATION OF ABUTMENT BREASTWALL AND
WINGWALL MASONRY MORTAR JOINTS WITH EFFLORESCENCE AND
MODERATE VEGETATION GROWTH. MINOR SPALL (6 FEET LONG) AT
SOUTH ABUTMENT BEARING SEAT.
60.5, 61.1 SOUTHWARD CHANNEL MIGRATION; FLOW IS CONCENTRATED
ENTIRELY THROUGH SOUTH SPAN AND ALONG SOUTH ABUTMENT;
HOWEVER, FOOTING IS NOT EXPOSED AT THIS TIME.
60.9 MINOR TO MODERATE CHANNEL BANK SLOUGHING AND MINOR
SCOUR AT UPSTREAM SIDE OF SOUTH ABUTMENT DUE TO
CHANNEL MIGRATION.
60.13,15 MINOR MASONRY MORTAR JOINT DETERIORATION WITH HEAVY
EFFLORESCENCE ON BOTH SIDES OF PIER. MODERATE TO HEAVY
VEGETATION GROWTH ON TOP OF PIER ON EAST SIDE. SOME
JOINTS APPEAR TO HAVE BEEN REPOINTED.
F G N G G N
N
P
G
P
FIELD INSPECTION REPORT STRUCTURE NO. 5140-080P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
F G N G N
MED
SUFF
8 FT.
ROCK, SAND, SILT
222. APPROACHES 7
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N G G G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 0
N
60.16,17 SCOUR AT PIER HAS EXPOSED FOOTING (13" L X 13" W X 3" D) AT
DOWNSTREAM SIDE.
222.4,6 MINOR SETTLEMENT WITH MINOR TRANSVERSE CRACKING OF
PAVEMENT AT BOTH APPROACHES. MINOR DETERIORATION OF
NORTH APPROACH PAVEMENT; POTHOLES AT CENTERLINE OF
ROADWAY WITH SOME PATCHING IN PLACE.
222.5 SINKHOLE AREAS DUE TO MINOR EROSION IN WEST SHOULDER
NEAR NORTH ABUTMENT AND AT BOTH SHOULDERS NEAR SOUTH
ABUTMENT AT BRIDGE ENDS.
36.A,C,D RAILING HEIGHT OF 1'-6" DOES NOT MEET CURRENT MINIMUM
HEIGHT REQUIREMENT OF 2'-3" FOR TRAFFIC BARRIERS. RAIL
ENDS ARE NOT TERMINATED SAFELY.
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-080P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 25 22 41 37
TYPE 3 21 19 35 31
TYPE 3S2 31 28 51 46
TYPE 3-3 40 36 67 61
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-080P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 374 - NORTH CAROLINA (NC)
(202) STRUCTURE NAME: .......... BIG PINE CREEK BRIDGE #6 (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 005 - ALLEGHANY
(204) STRUCTURE NUMBER: ..... 5140-080P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... BIG PINE CREEK
(207) ROAD SECTION NO: .......... 080P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140080P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.3 MILES FROM NC ROUTE
(210) OPERATING UNIT: ............. BLUFFS (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 2A2 (11) MILE POINT: ............................. 224.70 (KM PT 361.63)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
2 - CONCRETE CONTINUOUS
01 - SLAB
29.8 FT (9.1 M)
59.5 FT (18.1 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 24.8 TONS (22.5 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 41.3 TONS (37.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: Y - 1 - DECK SURVEY (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-080P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 36°29'14.70" (51) CURB TO CURB WIDTH: ........... 32.3 FT (9.8 M)
(17) LONGITUDE: ......................... 80°58'29.10" (52) DECK WIDTH: ............................ 34.8 FT (10.6 M)
(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 30.0 FT (9.1 M)
(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 20.0 FT (6.1 M)
(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 5.0 FT (1.5 M)
(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 5.0 FT (1.5 M)
(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN
(29) AVG. DAILY TRAFFIC: .......... 1347 (34) SKEW ANGLE: ............................ 0 °
(30) YEAR OF ADT: ...................... 2013 (35) DECK FLARE?: ........................... NO
(114) FUTURE ADT: ..................... 1482 (47) TOTAL HORIZ. CLEARANCE: .... 32.3 FT (9.8 M)
(115) YEAR OF FUTURE ADT: ..... 2033 (50) SIDEWALKS:
(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)
(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 7 - TIMBER
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 1.50 FT (0.46 M)
(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 000N
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
4 - Stable; action required to pro
2 - REHAB/RECONSTRUCTION
B - MAJOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1983-JOINT REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-080P
PHOTOGRAPHS STRUCTURE NO. 5140-080P
PHOTO #1 - LOOKING SOUTHBOUND TOWARD BLOWING ROCK
FLOW
PHOTO #2 - EAST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO #4 - DETERIORATION OF NORTH APPROACH PAVEMENT; NOTE
POTHOLES
PHOTO #5 - TYPICAL TRANSVERSE CRACKING OF ASPHALT OVER
ABUTMENTS, NORTH APPROACH SHOWN
PHOTO #6 - LONGITUDINAL CRACKING OF WEARING SURFACE OVER
STRUCTURE
PHOTO #7 - SETTLEMENT OF SOUTH APPROACH PAVEMENT; ALSO
NOTE CRACKING OF APPROACH PAVEMENT
PHOTO #8 - DEBRIS ACCUMULATION, VEGETATION AND MOSS
GROWTH AT EAST CURB; ALSO NOTE SPALLING OF CONCRETE EDGE
OF DECK
PHOTO #9 - TYPICAL APPROACH GUARDRAIL END, NORTHEAST
APPROACH RAIL SHOWN
PHOTO #10 - SINKHOLE BEHIND NORTH ABUTMENT, WEST END
PHOTO #11 - SINKHOLE AT EAST CORNER OF
SOUTH ABUTMENT, SIMILAR AT WEST
CORNER
PHOTO #12 - TYPICAL DETERIORATION OF
DECK SIDES, EAST DECK SIDE AT SOUTH
SPAN SHOWN; NOTE VEGETATION AND MOSS
GROWTH
PHOTO #13 - GENERAL VIEW OF SPALLING WITH EXPOSED STEEL
REINFORCEMENT ON EAST DECK SIDE IN SOUTH SLAB, NEAR PIER
PHOTO #14 - DETERIORATION OF DECK SIDES, EAST DECK SIDE IN
NORTH SPAN SHOWN; ALSO NOTE SPALLING ON RAIL POST
PHOTO #15 - DETERIORATION ALONG EAST EDGE OF DECK WITHIN
NORTH SPAN
PHOTO #16 - SPALLING WITH EXPOSED STEEL REINFORCEMENT ON
EAST DECK SIDE IN NORTH SPAN; NOTE SECTION LOSS OF EXPOSED
STEEL REINFORCEMENT, TWO STIRRUPS MISSING HOOK LEG
PHOTO #17 - SPALLING ON RAILPOST AT EAST
SIDE NEAR NORTH END OF STRUCTURE
PHOTO #18 - TYPICAL DETERIORATION OF
DECK SIDES, WEST DECK SIDE AT PIER
SHOWN
PHOTO #19 - GENERAL UNDERSIDE VIEW OF
NORTH SPAN LOOKING WEST
PHOTO #20 - TYPICAL CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF EAST
DECK OVERHANG IN NORTH SPAN, WEST SIDE
SIMILAR
PHOTO #21 - LONGITUDINAL CRACKING WITH EFFLORESCENCE ON
UNDERSIDE OF WEST EDGE OF DECK IN NORTH SPAN
PHOTO #22 - EFFLORESCENCE ALONG CONSTRUCTION JOINT IN
SOUTH SPAN
PHOTO #23 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #24 - GENERAL VIEW OF PIER, SOUTH FACE SHOWN
PHOTO #25 - DETERIORATION OF MASONRY MORTAR JOINTS WITH
EFFLORESCENCE ON EAST END OF PIER, WEST END SIMILAR; ALSO
NOTE VEGETATION GROWTH
PHOTO #26 - SCOUR AND EROSION AT SOUTHEAST CORNER OF PIER
HAS EXPOSED FOOTING
PHOTO #27 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #28 - SPALL OF CAP SEAT AT SOUTH ABUTMENT
PHOTO #29 - CRACKING WITH EFFLORESCENCE ON MORTAR JOINTS
AT SOUTH ABUTMENT
PHOTO #30 - SCOUR AT UPSTREAM SIDE OF SOUTH ABUTMENT; NOTE
VEGETATION GROWTH IN MORTAR JOINTS
PHOTO #31 - EROSION ALONG SOUTHWEST
WINGWALL
PHOTO #32 - UPSTREAM CHANNEL, LOOKING
THROUGH SOUTH SPAN
PHOTO #33 - DOWNSTREAM CHANNEL, LOOKING THROUGH SOUTH
SPAN
File details come from the government source that posted it. Updated .