Bridge_Inspection_Report_5140-132P.pdf
PDF 4 MB Posted
- Attached to
- Blue Ridge Parkway Federal contract opportunity
- Solicitation number
- DTFH71-17-B-00020
About this file
Bridge Inspection Report_5140-132P
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ROBO_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-077P.pdf | ||
| IFB_Solicitation_-_FTNP-BLRI_2A15.pdf | ||
| Bridge_Inspection_Report_5140-076P.pdf | ||
| Bridge_Inspection_Report_5140-088P.pdf | ||
| Bridge_Inspection_Report_5140-084P.pdf | ||
| Bridge_Inspection_Report_5140-082P.pdf | ||
| Bridge_Inspection_Report_5140-083P.pdf | ||
| Bridge_Inspection_Report_5140-074P.pdf | ||
| Bridge_Inspection_Report_5140-081P.pdf | ||
| FP14_Eng.pdf | ||
| Report_NEPA.pdf | ||
| Bridge_Inspection_Report_5140-078P.pdf | ||
| Bridge_Inspection_Report_5140-075P.pdf | ||
| Plans_-_FTNP-BLRI_2A15.pdf | ||
| VETS-4212_Form.pdf | ||
| Bridge_Inspection_Report_5140-080P.pdf | ||
| Bridge_Inspection_Report_5140-079P.pdf | ||
| Report_Pavement.pdf | ||
| ADV_Subcontracting_plan.doc | DOC document | |
| ADV_Bidder's_Qualifications_Form.doc | DOC document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
SHAWTOWN ROAD (OVERPASS) BRIDGE
SHAWTOWN ROAD (NC ROUTE 1464) OVER BLUE RIDGE PARKWAY
BLUE RIDGE PARKWAY
LE
STRUCTURE NO. 5140-132P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/10/15
Report prepared by: NU
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 5140-132P
SHAWTOWN ROAD (OVERPASS) BRIDGE INSPECTION DATE: 6/10/15
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... P/S CONCRETE CONTINUOUS NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... STRINGER/MULTI-BEAM or GIRDER NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 4 STRUCT. TOTAL LENGTH: .. 219.0 FT (66.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 73.0 FT (22.3 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 30.2 FT (9.2 M) ABUT. FOUNDATIONS: ........ SPREAD FOOTING ON PILES CURB TO CURB WIDTH: ..... 28.2 FT (8.6 M)
PIER FOUNDATION(S): ........ SPREAD FOOTING ON PILES / SPREAD YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 2A10 / NONE SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO STRUCTURE HISTORY: ...... 1985-JOINT REPAIR. 2006-RIPRAP PLACED AT WEST ABUTMENT. 2008-NEW WEARING
SURFACE INSTALLED. 2012-APPROACHES PATCHED.
LOCATION
BLUE RIDGE PARKWAY MILE POINT:
STATE: ................................. NORTH CAROLINA LOCATION: 1.9 MILES FROM U.S. ROUTE 21
FACILITY CARRIED: ............ SHAWTOWN ROAD (NC ROUTE 1464)
FEATURE INTERSECTED: .. BLUE RIDGE PARKWAY
STRUCTURE EVALUATION SUMMARY
This prestressed concrete girder bridge is in good condition overall with only minor problems. These problems include fallen trees with flood debris in the channel, heavy debris accumulation on the west abutment bearing seat, displaced capstones with moderate deterioration of the mortar joints at the parapet ends, moderate vine growth on the north column of the west pier, and ponding on deck due to deteriorated and missing overlay along gutter lines and scuppers.
Additionally, there is severe cracking and deterioration of the wearing surface over the west open deck joint (due to missing steel sliding plate) allowing debris and water to drop down onto the west abutments bearing seat, water is also getting between the southwest masonry facade and concrete wingwall because of the open joint at the gutter line.
Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: M. REGER, H. SALAD
CONDITION ASSESSMENT:
MICHAEL REGER, P.E., FIELD TEAM LEADER 703-948-1424
REPORT REVIEW:
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 12/31/15
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-132P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
58.2 REPAIR/REPLACE DECK JOINT AT WEST ABUTMENT. 32 LF
61.4 REMOVE FALLEN TREES FROM UPSTREAM CHANNEL. 1 LS
60.3 CLEAN DEBRIS FROM BEARING SEAT AREAS. 1 LS
222.3 RESET LOOSE STONES AND REPOINT MORTAR JOINTS AT WEST PARAPET ENDS. 10 LF
60.13 REMOVE VINE GROWTH FROM NORTH COLUMN OF WEST PIER. 1 LS
60.9 PLACE RIPRAP AT SCUPPER SPLASH ZONES ON EMBANKMENT UNDER SPAN #2. 2 EA
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL: ...
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5140-132P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
(STRIPING)
G G N N N G N N G
N G
G N F G G F G N G G G N
G N G N G G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
58.1 MINOR CRACKING ON DECK UNDERSIDE WITH EFFLORESCENCE AT
CONSTRUCTION JOINTS. MINOR CRACKING WITH EFFLORESCENCE
ON DECK OVERHANGS.
58.2,3 MINOR TO SEVERE CRACKING ALONG CURBLINES FOR FULL
LENGTH OF BRIDGE. MINOR TO MODERATE DEBRIS
ACCUMULATION IN JOINTS AT SHOULDERS. MISSING OVERLAY IN
SHOULDERS AND AT SCUPPER FRAMES IS CAUSING PONDING ON
DECK
WATER LEAKING THROUGH EXPANSION JOINTS ONTO BEARING
SEAT AREAS AT ABUTMENTS.
58.2, 222.4 SINCE PREVIOUS INSPECTION, APPROACH ROADWAY HAS BEEN
REPAVED. MINOR TO SEVERE DETERIORATION OF WEST
APPROACH AT DECK JOINT.
58.6 MINOR VERTICAL CRACKING OF PARAPETS; AREAS OF MINOR
SCALING. DISPLACED PARAPET STONES AT WEST EXPANSION
JOINT WITH CRACKED MORTAR JOINTS.
58.7 WATER IS LEAKING THROUGH SEVERAL EXPANSION JOINTS ONTO
BEARING SEAT AREAS AT ABUTMENTS. DRAINS ARE PARTIALLY
CLOGGED; DRAINS ARE RAISED UP TO 1" ABOVE DECK LIMITING
EFFECTIVENESS. DOWNSPOUTS DIRECT RUNOFF ONTO EXTERIOR
BEAMS; SEE 59.2.
EXPOSED SEALANT STRIPS WITH SECTIONS MISSING ALONG
PARAPET / DECK JOINT, CAUSING VOIDS ALONG BASE OF
PARAPETS.
MINOR DEBRIS ACCUMULATION WITH VEGETATION GROWTH ALONG
CURBLINES.
58.8 UTILITY LINE THROUGH DECK (UNABLE TO VERIFY DURING THIS
INSPECTION).
59.2 MODERATE STAINING OF EXTERIOR GIRDERS UNDER DRAINS.
EXPOSED REBAR CHAIRS IN SEVERAL GIRDERS.
F G N G G G
F
F
G
G
FIELD INSPECTION REPORT STRUCTURE NO. 5140-132P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
G F N F N
MED
SUFF
30 FT.
ROCK, SILT
222. APPROACHES 7
OTHER 9.
ALIGNMENT8.
SIGNS 7.
SETTLEMENT6.
EROSION5.
SURFACING 4.
APPROACH GUARDRAIL 3.
RELIEF JOINTS2.
1. APPROACH SLABS N
N F G G G N G N
223. RETAINING WALL N
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDS D.
APPROACH GUARDRAILS C.
TRANSITIONS B.
BRIDGE RAILINGSA. 1
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
59.6 MODERATE CRACKING DEVELOPING INTO SPALL ON SOUTH SIDE
OF EAST PIER DIAPHRAGM; MINOR CRACKING ON NORTH SIDE.
AREAS OF MINOR DELAMINATION ON NORTH SIDE OF EAST PIER
DIAGRAM IN BAY #2 AND WEST ABUTMENT DIAPHRAGM IN BAY #2.
60.1 MINOR CRACKING, SCALING, AND STAINING ON ABUTMENT
BREASTWALLS.
60.3 WATER LEAKAGE AND DEBRIS ACCUMULATION ON BEARING SEATS.
HEAVY ACCUMULATION OF ASPHALT ON WEST ABUTMENT BEARING
SEAT.
60.5,11 FOOTING EXPOSED (9' L X UP TO 3.5' H) AT NORTH END OF WEST
ABUTMENT. RUBBLE RIPRAP IN PLACE ALONG WEST SLOPE
BEGINNING AT FOOTING, EXTENDING TO CHANNEL BANK.
60.6 MINOR TO MODERATE DETERIORATION OF WINGWALL MORTAR
JOINTS WITH MINOR EFFLORESCENCE AND VEGETATION GROWTH;
SEVERAL LOOSE STONES. GEOLOGICAL SURVEY MARKER AT
SOUTHWEST WINGWALL.
60.9 WATER SEEPAGE AND MINOR EROSION AT EAST ABUTMENT SLOPE.
60.11 MODERATE VEGETATION GROWTH ON MASONRY SLOPE PAVEMENT
AT EAST ABUTMENT. EAST ABUTMENT SLOPE PAVEMENT HAS
SETTLED IN TWO LOCATIONS AND HAS TWO FRACTURED STONES.
60.13 MODERATE VINE GROWTH ON NORTH COLUMN OF WEST PIER.
60.17 MINOR TO MODERATE EROSION OF SLOPES AT PIERS DUE TO
DRAINAGE FROM SCUPPERS.
61.2 MINOR TO MODERATE SLOUGHING ALONG CHANNEL BANKS.
EROSION ALONG EAST UPSTREAM BANK DUE TO FALLEN TREE
REDIRECTING STREAM FLOW.
61.4 LARGE FALLEN TREES AND FLOOD DEBRIS IN UPSTREAM AND
DOWNSTREAM CHANNEL.
222.3 MINOR COLLISION DAMAGE TO EAST END OF SOUTH GUARDRAIL.
STRUCTURE LOAD RATING STRUCTURE NO. 5140-132P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 20 18 33 30
TYPE 3 18 17 31 28
TYPE 3S2 24 22 40 36
TYPE 3-3 29 26 48 43
DESIGN LOADING: H15 (M13.5)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-132P
STRUCTURE IDENTIFICATION
(201) PARK: BLUE RIDGE PARKWAY
(202) STRUCTURE NAME: .......... SHAWTOWN ROAD (OVERPASS) BRIDG
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 5140-132P
(205) NPS REGION: .................... 4 - SOUTHEAST
(206) ROUTE CODE NUMBER: ... 1
(207) ROAD SECTION NO: .......... 132P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: ....... YES
(210) OPERATING UNIT: ............. PARK
(211) PROJECT NO(S): ................ 2A10
(212) DRAWING NUMBERS: ....... NONE
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
374 - NORTH CAROLINA (NC)
005 - ALLEGHANY
161000010
BLUE RIDGE PARKWAY
SHAWTOWN ROAD (NC ROU
5140132P0000000
1.9 MILES FROM U.S. ROUTE
16.00 FT (4.88 M)
N/A
3 - FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
6 - P/S CONCRETE CONTINUOUS
02 - STRINGER/MULTI-BEAM or GIRDER
73.0 FT (22.3 M)
219.0 FT (66.8 M)
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
3 - SPREAD FOOTING ON PILES
2 - SPREAD FTG ON BEARING MAT'L
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 2 - H15 (M13.5) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 19.5 TONS (17.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 32.6 TONS (29.5 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/15 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-132P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(51) CURB TO CURB WIDTH: ........... 28.2 FT (8.6 M) (16) LATITUDE: ............................. 36°27'43.30"
(17) LONGITUDE: ......................... 81°00'08.50"
(19) DETOUR LENGTH: ............... 25 MI (40 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 6 - HIGHWAY-WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 4.0 FT (1.2 M)
(56) LEFT: ......................... 99.9 FT (99.9 M)
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
30.2 FT (9.2 M)
28.0 FT (8.5 M)
22.0 FT (6.7 M)
3.0 FT (0.9 M)
3.0 FT (0.9 M)
0 - NO MEDIAN
0 °
NO
28.2 FT (8.6 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
2 - MOUNTED ON PARAPET
2 - CONCRETE/ALUMINUM
1 - CONTINUOUS RAIL
2.33 FT (0.71 M)
99.99 FT (99.99 M)
16.08 FT (4.90 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
4 - Stable; action required to pro
1 - MAINTENANCE
D - MINOR
$0
$0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1985-JOINT REPAIR. 2006-RIPRAP PLACED AT WEST ABUTMENT. 2008-NEW WEARING SURFACE INSTALLED. 2012-APPROACHES
PATCHED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
APPENDIX STRUCTURE NO. 5140-132P
APPENDIX STRUCTURE NO. 5140-132P
PHOTOGRAPHS STRUCTURE NO. 5140-132P
PHOTO #1 - LOOKING WEST TOWARD SPARTA
FLOW
PHOTO #2 - SOUTH (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING WEST
PHOTO #4 - GENERAL VIEW OF EAST DECK JOINT; NOTE CRACKING OF
WEARING SURFACE PLACED ON TOP OF EXPANSION JOINT
PHOTO #5 - VIEW OF VEGETATION GROWTH IN DECK JOINT AT
NORTHEAST CORNER
PHOTO #6 - DETERIORATION OF MORTAR JOINT AT SOUTHEAST
CAPSTONE
PHOTO #7 - WEARING SURFACE FALLING
THROUGH GAP OF MISSING EXPANSION
JOINTS SLIDING STEEL COVER PLATE, WEST
BOUND LANE AT WEST DECK JOINT
PHOTO #8 - TYPICAL VOID ALONG BOTTOM OF
PARAPET, NORTH PARAPET OVER EAST PIER
SHOWN
PHOTO #9 - DETERIORATION OF JOINT
MATERIAL ALONG BASE OF PARAPETS, SOUTH
PARAPET OVER CENTER SPAN
PHOTO #10 - CRACKING OF WEARING
SURFACE ALONG CURBLINE, SOUTH
CURBLINE NEAR WEST END OF STRUCTURE
OVER WEST SPAN SHOWN
PHOTO #11 - WATER PONDING ON
STRUCTURE DUE TO DEBRIS ACCUMULATION
AROUND SCUPPER; NOTE ELEVATED
SCUPPER ABOVE BRIDGE DECK
PHOTO #12 - DETERIORATION AND LOSS OF
WEARING SURFACE ALONG CURBLINES
CREATING PONDING ON BRIDGE DECK, WEST
SPAN SHOWN
PHOTO #13 - TYPICAL DEBRIS ACCUMULATION IN DECK DRAINS; NOTE
DRAIN FRAME EDGE IS ABOVE DECK, NORTH DRAIN IN CENTER SPAN
SHOWN
PHOTO #14 - DISPLACED CAPSTONE AT SOUTHWEST END OF
PARAPET; NOTE DETERIORATION OF EXPANSION JOINT MATERIAL AND
MISSING SLIDING PLATE
PHOTO #15 - STEEL EXPANSION PLATE HAS
BEEN REMOVED AT WEST EXPANSION JOINT,
SOUTHWEST CORNER SHOWN
PHOTO #16 - SHOULDER DROPOFF BEFORE
WEST ABUTMENT
PHOTO #17 - DISPLACED CAPSTONES AND CRACK THROUGH MORTAR
JOINT ON NORTHWEST CORNER
PHOTO #18 - RESURFACED ASPHALT PAVEMENT ON APPROACHES,
WEST APPROACH SHOWN
PHOTO #19 - GENERAL UNDERSIDE VIEW LOOKING WEST, EAST SPAN
PHOTO #20 - TYPICAL EFFLORESCENCE ALONG CONSTRUCTION
JOINTS ON DECK UNDERSIDE, BAY #1 AND #2 IN EAST SPAN SHOWN
PHOTO #21 - TYPICAL EXPOSED OF REBAR CHAIRS ON GIRDER
UNDERSIDE, GIRDER #3 IN EAST SPAN SHOWN
PHOTO #22 - CRACKING OF EAST PIER DIAPHRAGM, NORTH SIDE;
NOTE EXPOSED REBAR
PHOTO #23 - DELAMINATION AND CRACKING OF EAST PIER
DIAPHRAGM, SOUTH SIDE SHOWN
PHOTO #24 - DELAMINATION OF DIAPHRAGM ON BAY #2 AT WEST
ABUTMENT
PHOTO #25 - TYPICAL CONDITION OF BEARING PADS, BEARING PAD #1
AT EAST ABUTMENT SHOWN; NOTE DEBRIS ACCUMULATION (PHOTO
FROM 6/18/2013 INSPECTION)
PHOTO #26 - TYPICAL CONDITION OF BEARING PADS, PAD #3 AT EAST
PIER SHOWN
PHOTO #27 - TYPICAL CONDITION OF BEARING PADS, BEARING PAD #1
AT WEST ABUTMENT SHOWN (PHOTO FROM 6/18/2013 INSPECTION)
PHOTO #28 - ASPHALT ACCUMULATION ON WEST ABUTMENT BEARING
SEAT, BAY #1 SHOWN (PHOTO FROM 6/18/2013 INSPECTION)
PHOTO #29 - GENERAL VIEW OF EAST
ABUTMENT
PHOTO #30 - SEPARATION OF EAST SLOPE
PAVEMENT FROM BREASTWALL; NOTE DEBRIS
ACCUMULATION
PHOTO #31 - TYPICAL EROSION OF SLOPES, EAST SLOPE OF PIER #1
SHOWN
PHOTO #32 - GENERAL VIEW OF WEST PIER, WEST FACE; ALSO NOTE
VINE GROWTH ON NORTH COLUMN
PHOTO #33 - GENERAL VIEW OF WEST ABUTMENT
PHOTO #34 - TYPICAL VERTICAL CRACKING OF ABUTMENT
BREASTWALLS, WEST ABUTMENT SHOWN
PHOTO #35 - EXPOSED FOOTING AT WEST
ABUTMENT; NOTE SCALING BELOW WEEP
HOLES
PHOTO #36 - SEPARATION BETWEEN WEST
ABUTMENT AND SOUTHWEST WINGWALL;
NOTE WATER DRAINING THROUGH FROM
OPEN JOINT ON BRIDGE DECK
PHOTO #37 - EFFLORESCENCE AND WATER
STAINING COMING THROUGH SOUTHWEST
WINGWALL RIGHT BEHIND ABUTMENT AND
UNDERNEATH OPEN BRIDGE JOINT
PHOTO #38 - GENERAL VIEW OF NORTHWEST
WINGWALL
PHOTO #39 - SCUPPER OUT FLOW ON EAST BANK UPSTREAM SIDE,
SPAN #2 SHOWN
PHOTO #40 - EROSION HOLE FROM SOUTH SCUPPER IN SPAN #2
ALONG EAST CHANNEL BANK
PHOTO #41 - FALLEN TREE ACROSS UPSTREAM CHANNEL AND DRIFT
DEBRIS ACCUMULATION DIVERTING CHANNEL FLOW TO EAST; ALSO
NOTE EROSION ON UPSTREAM EAST CHANNEL BANK
PHOTO #42 - COLLISION DAMAGE TO SOUTHEAST APPROACH RAIL
PHOTO #43 - UPSTREAM CHANNEL
PHOTO #44 - DOWNSTREAM CHANNEL
File details come from the government source that posted it. Updated .